Att. 2 Drawings.pdf

PDF 5 MB Posted

Attached to
Medford Office HVAC Replacement on the Chequamegon-Nicolet National Forest
Solicitation number
12445521Q0081
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED

UNEXCAVATED

L-WOMEN

L-MEN

L-STORAGE

L-OPEN OFFICE

L-BREAKROOM

L-HALL

L-UTILITY

L-MECH

L-SUPPLY

L-EXERCISE

L-OFFICE 1

L-ELEC.

L-OFFICE 2

L-OFFICE 3

L-OFFICE 4

L-OFFICE 5

ROOM

STAIR B

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

Chequamegon-Nicolet National Forest

Ranger District

EASTERN DISTRICT

DATENO. REVISION / ISSUE

17 Applegate Court, Suite 200

Madison, WI 53713

Phone: (608) 288-9260 email: hein@heinengrp.com

1/4" = 1'-0"1 BASEMENT PLAN DEMOLITION - MECHANICAL

HALL

OFFICE AOFFICE B

LOBBY

COMP RM COMP

OFFICE

GENERAL OFFICE

WOMEN

MEN

OFFICE 1OFFICE 2

OFFICE 3

VEST

OFFICE 4

STAIR B

STAIR A

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

Madison, WI 53713

1/4" = 1'-0"1 FIRST FLOOR PLAN DEMOLITION - MECHANICAL

L-MEN

L-STORAGE

L-OPEN OFFICE

L-BREAKROOM

L-HALL

L-UTILITY

L-MECH

L-SUPPLY

L-EXERCISE

L-OFFICE 1

L-ELEC.

L-OFFICE 2

L-OFFICE 3

L-OFFICE 4

L-OFFICE 5

ROOM

STAIR B

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

Madison, WI 53713

1/4" = 1'-0"1 BASEMENT PLAN - MECHANICAL

LOBBY

COMP RM COMP

OFFICE

GENERAL OFFICE

WOMEN

MEN

OFFICE 1OFFICE 2

OFFICE 3

VEST

OFFICE 4

STAIR B

STAIR A

1/2" PLYWOOD-PAINTED WHITE

5 LAYERS OF 2" RIGID INSULATION

(R 50 MIN REQUIRED)

1X4 TRIM TO SUPPORT ACCESS HATCH

PAINTED WHITE

1/2" PLYWOOD

ADDED BLOWN-IN

INSULATION

EXISTING BATT

INSULATION

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

Madison, WI 53713

1/4" = 1'-0"1 FIRST FLOOR PLAN - MECHANICAL

N.T.S.2 ATTIC HATCH DETAIL

WASTEFIXTUREP# DESCRIPTIONCW.VENT HW.

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

Madison, WI 53713

L-MEN

L-STORAGE

L-OPEN OFFICE

L-BREAKROOM

L-HALL

L-UTILITY

L-MECH

L-SUPPLY

L-EXERCISE

L-OFFICE 1

L-ELEC.

L-OFFICE 2

L-OFFICE 3

L-OFFICE 4

L-OFFICE 5

ROOM

STAIR B

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

Madison, WI 53713

1/4" = 1'-0"1 BASEMENT PLAN - ELECTRICAL

LOBBY

COMP RM COMP

OFFICE

GENERAL OFFICE

WOMEN

MEN

OFFICE 1OFFICE 2

OFFICE 3

VEST

OFFICE 4

STAIR B

STAIR A

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

OFSHEET

Madison, WI 53713

1/4" = 1'-0"1 FIRST FLOOR PLAN - ELECTRICAL

M1.0 - Basement Plan Demolition - Mechanical
M1.1 - First Floor Plan Demolition - Mechanical
M1.2 - Basement Plan - Mechanical
M1.3 - First Floor Plan - Mechanical
M2.0 - Mechanical Schedules & Details
E1.0 - Basement Plan - Electrical
E1.1 - First Floor Plan - Electrical
2021-04-28T12:39:40-0500
JUSTIN BLAKE
2021-04-28T15:13:09-0500
ANN DASSOW

File details come from the government source that posted it. Updated .