Att. 2 Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 12445521Q0081
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Solicitation 12445521Q0081.docx | DOCX document | |
| Att. 1 Statemend of Work-Specifications.pdf | ||
| Att. 3 Davis Bacon Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED
UNEXCAVATED
L-WOMEN
L-MEN
L-STORAGE
L-OPEN OFFICE
L-BREAKROOM
L-HALL
L-UTILITY
L-MECH
L-SUPPLY
L-EXERCISE
L-OFFICE 1
L-ELEC.
L-OFFICE 2
L-OFFICE 3
L-OFFICE 4
L-OFFICE 5
ROOM
STAIR B
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
Chequamegon-Nicolet National Forest
Ranger District
EASTERN DISTRICT
DATENO. REVISION / ISSUE
17 Applegate Court, Suite 200
Madison, WI 53713
Phone: (608) 288-9260 email: hein@heinengrp.com
1/4" = 1'-0"1 BASEMENT PLAN DEMOLITION - MECHANICAL
HALL
OFFICE AOFFICE B
LOBBY
COMP RM COMP
OFFICE
GENERAL OFFICE
WOMEN
MEN
OFFICE 1OFFICE 2
OFFICE 3
VEST
OFFICE 4
STAIR B
STAIR A
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
Madison, WI 53713
1/4" = 1'-0"1 FIRST FLOOR PLAN DEMOLITION - MECHANICAL
L-MEN
L-STORAGE
L-OPEN OFFICE
L-BREAKROOM
L-HALL
L-UTILITY
L-MECH
L-SUPPLY
L-EXERCISE
L-OFFICE 1
L-ELEC.
L-OFFICE 2
L-OFFICE 3
L-OFFICE 4
L-OFFICE 5
ROOM
STAIR B
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
Madison, WI 53713
1/4" = 1'-0"1 BASEMENT PLAN - MECHANICAL
LOBBY
COMP RM COMP
OFFICE
GENERAL OFFICE
WOMEN
MEN
OFFICE 1OFFICE 2
OFFICE 3
VEST
OFFICE 4
STAIR B
STAIR A
1/2" PLYWOOD-PAINTED WHITE
5 LAYERS OF 2" RIGID INSULATION
(R 50 MIN REQUIRED)
1X4 TRIM TO SUPPORT ACCESS HATCH
PAINTED WHITE
1/2" PLYWOOD
ADDED BLOWN-IN
INSULATION
EXISTING BATT
INSULATION
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
Madison, WI 53713
1/4" = 1'-0"1 FIRST FLOOR PLAN - MECHANICAL
N.T.S.2 ATTIC HATCH DETAIL
WASTEFIXTUREP# DESCRIPTIONCW.VENT HW.
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
Madison, WI 53713
L-MEN
L-STORAGE
L-OPEN OFFICE
L-BREAKROOM
L-HALL
L-UTILITY
L-MECH
L-SUPPLY
L-EXERCISE
L-OFFICE 1
L-ELEC.
L-OFFICE 2
L-OFFICE 3
L-OFFICE 4
L-OFFICE 5
ROOM
STAIR B
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
Madison, WI 53713
1/4" = 1'-0"1 BASEMENT PLAN - ELECTRICAL
LOBBY
COMP RM COMP
OFFICE
GENERAL OFFICE
WOMEN
MEN
OFFICE 1OFFICE 2
OFFICE 3
VEST
OFFICE 4
STAIR B
STAIR A
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
Madison, WI 53713
1/4" = 1'-0"1 FIRST FLOOR PLAN - ELECTRICAL
| M1.0 - Basement Plan Demolition - Mechanical |
| M1.1 - First Floor Plan Demolition - Mechanical |
| M1.2 - Basement Plan - Mechanical |
| M1.3 - First Floor Plan - Mechanical |
| M2.0 - Mechanical Schedules & Details |
| E1.0 - Basement Plan - Electrical |
| E1.1 - First Floor Plan - Electrical |
| 2021-04-28T12:39:40-0500 | |
| JUSTIN BLAKE |
| 2021-04-28T15:13:09-0500 | |
| ANN DASSOW |
File details come from the government source that posted it. Updated .