ATT C - Fillable Bidding Worksheet.pdf

PDF 204 KB Posted

Attached to
WILLAMETTE RIVER BOAT SALVAGE/DISPOSAL PROJECT
Solicitation number
S-25000-00005474
Issued by
Multnomah County, Oregon

About this file

This document is an Attachment C: Fillable Bidding Worksheet for the Willamette River Boat Salvage/Disposal Project in Lane County, Oregon. The project requires the removal, storage, and disposal of 15 vessels from the Willamette River. The worksheet asks the offeror to provide details on the salvage method, storage location, and disposal plan for each vessel, as well as a timeline for the major project milestones and the total costs for removal, storage, and disposal. The offeror must also acknowledge acceptance of the contract terms and conditions specified in the Request for Proposals (RFP).

The worksheet includes a breakdown of costs for each vessel, including removal, 31-day storage if applicable, and disposal. Offerors must provide the names and locations of any waste facilities used, as well as any subcontractors that may perform work. The total project cost must be provided at the end of the worksheet, which the offeror must sign electronically.

View the file

Other files

File Type Posted
Attachment A Sample contract.doc DOC document
RFP ARPA Phase 3.doc DOC document
ATT B - Vessel Descriptions.pdf PDF
Sole Source Determination doc Institute for Applied Ecology.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C: FILLABLE BIDDING WORKSHEET

2.2 Offer Content Requirements

For convenience, the following fillable worksheet has been provided.

Name of company

Name of authorized representative

Authorized representative email address

Authorized representative phone number

2.2.1 Project Plan

1. Thoroughly address how each vessel (identified by the reference number assigned in Attachment B:

Vessel Descriptions) will be removed from the water, including method of salvage and flotation, tow route, haul-out method, haul-out location, and major equipment

2. For any vessels requiring storage upon removal, describe where storage will take place

3. Describe where vessel dismantling will occur and how fuel, oil, and any other hazardous wastes will be handled

4. List the names and locations of waste facilities to be used for the disposal of all waste products (including oils, fuels, hazardous waste)

5. List the names of any companies which may perform work on behalf of the Offeror and an overview of the types of work that may be performed

6. Describe the proposed timeline for major portions of the project, including dates of commencement and completion

2.2.2 Costs

Vessel Reference #

Removal 31 day storage if applicable

Disposal Total

Project Total

2.2.3 Compliance with Specifications, Requirements, and Terms and Conditions

Offeror shall provide a statement accepting all Contract terms and Conditions that are specified in the RFP, including Attachments and Exhibits, as amended by any Addenda.

_______________________________ (offeror) accepts all Contract terms and Conditions that are specific in the RFP, including Attachments and Exhibits, as amended by any Addenda.

(Electronic Signature) (Date)

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Name of company:
Name of authorized representative:
Authorized representative email address:
Authorized representative phone number:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
15:
16:
2 For any vessels requiring storage upon removal describe where storage will take placeRow1:
3 Describe where vessel dismantling will occur and how fuel oil and any other hazardous wastes will be handledRow1:
4 List the names and locations of waste facilities to be used for the disposal of all waste products including oils fuels hazardous wasteRow1:
5 List the names of any companies which may perform work on behalf of the Offeror and an overview of the types of work that may be performedRow1:
6 Describe the proposed timeline for major portions of the project including dates of commencement and completionRow1:
Vessel Reference Row1:
RemovalRow1:
31 day storage if applicableRow1:
DisposalRow1:
TotalRow1:
Vessel Reference Row2:
RemovalRow2:
31 day storage if applicableRow2:
DisposalRow2:
TotalRow2:
Vessel Reference Row3:
RemovalRow3:
31 day storage if applicableRow3:
DisposalRow3:
TotalRow3:
Vessel Reference Row4:
RemovalRow4:
31 day storage if applicableRow4:
DisposalRow4:
TotalRow4:
Vessel Reference Row5:
RemovalRow5:
31 day storage if applicableRow5:
DisposalRow5:
TotalRow5:
Vessel Reference Row6:
RemovalRow6:
31 day storage if applicableRow6:
DisposalRow6:
TotalRow6:
Vessel Reference Row7:
RemovalRow7:
31 day storage if applicableRow7:
DisposalRow7:
TotalRow7:
Vessel Reference Row8:
RemovalRow8:
31 day storage if applicableRow8:
DisposalRow8:
TotalRow8:
Vessel Reference Row9:
RemovalRow9:
31 day storage if applicableRow9:
DisposalRow9:
TotalRow9:
Vessel Reference Row10:
RemovalRow10:
31 day storage if applicableRow10:
DisposalRow10:
TotalRow10:
Vessel Reference Row11:
RemovalRow11:
31 day storage if applicableRow11:
DisposalRow11:
TotalRow11:
Vessel Reference Row12:
RemovalRow12:
31 day storage if applicableRow12:
DisposalRow12:
TotalRow12:
Vessel Reference Row13:
RemovalRow13:
31 day storage if applicableRow13:
DisposalRow13:
TotalRow13:
Vessel Reference Row14:
RemovalRow14:
31 day storage if applicableRow14:
DisposalRow14:
TotalRow14:
Vessel Reference Row15:
RemovalRow15:
31 day storage if applicableRow15:
DisposalRow15:
TotalRow15:
Vessel Reference Row16:
RemovalRow16:
31 day storage if applicableRow16:
DisposalRow16:
TotalRow16:
Vessel Reference Row17:
RemovalRow17:
31 day storage if applicableRow17:
DisposalRow17:
TotalRow17:
TotalProject Total:
Electronic Signature:
Date:
Offeror:

File details come from the government source that posted it. Updated .