This is a Bid Cost Form (Attachment B) for Invitation to Bid (ITB) #26-97 issued by Clayton County, Georgia for the construction of Riverdale Library Renovations. The project encompasses comprehensive renovation work organized across 16 construction divisions, including Contract Requirements/General Requirements, Existing Conditions, Concrete, Metals, Wood and Plastics, Thermal and Moisture Protection, Openings, Finishes, Specialties, Furnishings, Fire Suppression, Plumbing, HVAC, Electrical, and Earthwork. Bidders are required to submit a total base bid price covering all site and utility work, with all pricing to be completed by qualified general contractors. The bid form requires bidders to certify that they have examined the project site and reviewed all contract documents prepared by Gardner Spencer Smith Tench & Jarbeau.
The pricing structure includes a base bid for all construction divisions and an Owner Controlled Allowance Contingency calculated at 5% of the base bid in accordance with County Contract section 4.2.a. Additionally, the bid cost form requires unit prices for seven items related to earthwork (Division 31), including unsuitable soil excavation and haul-off, suitable soil haul-in, compacting fill, geotechnical fabric placement, #3 stone placement, and cut grading with haul-off, with costs to be provided per cubic yard, square yard, or ton as applicable. All unit prices must include full compensation for labor, materials, tools, equipment, transportation, installation, overhead, and profit. Bidders must provide the total base bid amount in both figures and words, along with authorized signatures from company representatives and submission date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXH A Project Plans.pdf | ||
| ATT A Bid Specifications.pdf | ||
| EXH B General Requirements.pdf | ||
| ITB _26_97 Riverdale Library Renovataions for.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Cost Form
| Attachment B - Bid Cost Form | ||
| ITB #26-97 Riverdale Library Renovations for Clayton County, GA | ||
| A. Division Name (Base Bid) | ||
| INCLUDES ALL SITE AND UTILITIES WORK | Price ($) | |
| Division 0 – 1 Contract Requirements/General Requirements | ||
| Division 2 -- Existing Conditions | ||
| Division 3 -- Concrete | ||
| Division 5 -- Metals | ||
| Division 6 -- Wood and Plastics | ||
| Division 7 -- Thermal and Moisture Protection | ||
| Division 8 -- Openings | ||
| Divison 9 -- Finishes | ||
| Division 10 -- Specialties | ||
| Division 12 -- Furnishings | ||
| Division 21 -- Fire Suppression | ||
| Division 22 -- Plumbing | ||
| Division 23 -- Heating, Ventalating and Air-Conditioning (HVAC) | ||
| Division 26 -- Electrical | ||
| Division 31 -- Earthwork | ||
| TOTAL BASE BID FOR RIVERDALE LIBRARY RENOVATIONS | ||
| (Divisions 0-31) | $ - 0 | |
| Owner Controlled Allowance Contingency (5% of Base Bid). In accordance with 4.2.a. of the County Contract | $ - 0 |
| B. UNIT PRICES | ||||
| Unit price is an amount proposed by Bidders, stated on the Bid Form, as a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if the estimated quantities of Work required by the Contract Documents are increased or decreased. See Division 01 Section 01 2200 Unit Prices. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit. | Unit Cost - Add | Unit Cost - Delete | ||
| Description | UOM | |||
| 1. Unsuitable Soil Excavation; Division 31 and as shown on drawing(s) - | ||||
| Provide cost per cubic yard for excavation of unsuitable soil | Per Cubic Yard | |||
| 2. Unsuitable Soil Haul-Off from Site; Division 31 and as shown on drawing(s) - | ||||
| Provide cost per cubic yard for haul-off of unsuitable soil from the site | Per Cubic Yard | |||
| 3. Suitable Soil Haul-In to Site; Division 31 and as shown on drawing(s) - | ||||
| Provide cost per cubic yard for haul-in of suitable soil to the site. | Per Cubic Yard | |||
| 4. Compacting Fill; Division 31 and as shown on drawing(s) - |
Provide cost per cubic yard for compacting suitable soil that replaced
| unsuitable soil. | Per Cubic Yard |
| 5. Placement of Geotechnical Fabric; Division 31 - | |
| Provide cost per square yard for placement of geotechnical fabric. | Per Square Yard |
| 6. Placement of #3 Stone; Division 31 - | |
| Provide cost per ton for placement of #3 stone. | Per Ton |
| 7. Cut Grading and Haul-Off from Site; Division 31 and as shown on drawing(s) - | |
| Provide cost per cubic yard for providing cut grading and haul-off from site. | Per Cubic Yard |
OFFER or BIDDER Having examined the placed of the work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by Gardner Spencer Smith Tench & Jarbeau, for the above-mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the Sum of:
Construction of Riverdale Library Renovation for Clayton County, Georgia Base Bid
| $ - 0 | (In Figures) |
| TOTAL BASE BID (ITEM CONSTRUCTION OF RIVERDALE LIBRARY RENOVATION INCLUDES ALL SITES AND UTILITIES WORK) |
| (In Words) | |
| TOTAL BASE BID |
Printed Name
Signature Title
| Date | |
| COMPANY NAME |
File details come from the government source that posted it. Updated .