- Draft Request for Solutions (RFS) Advanced Electrochromic Manufacturing Prototype Project
- Solicitation number
- W900KK-24-R-9001
About this file
This document is a sample statement of work (SOW) for an advanced electrochromic manufacturing prototype project. The SOW outlines requirements for developing and delivering electrochromic prototypes to meet specified performance thresholds. Key deliverables include project execution plans, design documentation, test article submissions, and final prototype sets. Monthly progress reports and quarterly project management reviews are also required. Test articles will be submitted at six-month intervals to validate prototype progression. The final deliverable is to include 20 toroidal visors, 35 spherical goggles, and 200 spectacle lenses to demonstrate manufacturing capabilities. All technical data and software developed under the associated other transaction agreement are to be provided to the government with government purpose rights for a minimum of five years.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS A SAMPLE STATEMENT OF WORK (SOW) AND IS PROVIDED SOLELY FOR THE PURPOSE OF ASSISTING INTERESTED VENDORS IN DEVELOPING A DRAFT SOW FOR IMPLEMENTING ITS PROPOSED SOLUTION TO MEET GOVERNMENT PROGRAM OBJECTIVES. VENDORS MAY ALTER, REVISE, CHANGE, ADD, OR DELETE THIS DRAFT SOW TO ACCURATELY REFLECT ITS TECHNICAL APPROACH TO ACHIEVE ITS SOLUTION.
ABC Company Draft Statement of Work (SOW)
For
Advanced Electrochromic Manufacturing Prototype Project
DATE
1. Requirements:
1.1 General Requirements:
| 1.1.1 | The Contractor shall consult with the Government for any change to the Integrated Master Schedule (IMS) critical paths, milestones, and deliverables based on project progress. |
| 1.1.2 | The Government will review the IMS changes and accept or deny them within the scope of this effort. |
| 1.1.3 | The Contractor shall provide any necessary onsite engineering and technical support in the Government’s assessment efforts to demonstrate, evaluate, and test the prototypes. |
| 1.1.4 | The Contractor shall oversee teammates and other sub-contractors in the development of the entirety of this effort. |
| 1.1.5 | The Contractor shall designate one Program Manager (PM) as the primary contractor point of contact for this effort. |
| 1.1.6 | The Government will provide a DoD Technical Point of Contact (TPOC) for the entirety of this effort. |
| 1.1.7 | The Government will provide a Project Lead Point of Contact (PLPOC) for the entirety of this effort. |
| 1.1.8 | The Government will provide an Agreement officer Representative (AOR) for the entirety of this effort. |
1.2 Specific Requirements:
The following table compares the proposed solution with the Government’s minimum final prototype threshold and overall program objectives: The following table provides the minimum threshold requirements for the final prototype and the Government’s overall EPEDP program objectives.
| Description |
| Threshold |
| Solution |
| Objective |
| Transmission modulation range (Tmax – Tmin) |
| 77% |
99%
| Tmax Clearest State |
| 85% |
100%
| Tmin Darkest State |
| 8% |
1%
| Maximum Switching speed in either direction |
| 2s |
200µs
| Maximum Power Density (W/cm2) |
| 6000 µW/cm2 |
10 µW/cm2
| Maximum Haze |
| 3% |
1%
| Transmission uniformity |
| 10% |
5%
| Minimum Lifetime |
| 12 mos |
36 mos
| Color neutrality |
| Slight color tinting (specify CIE(u’v’ coordinates) |
No noticeable color tinting (specify CIE (u’v’) coordinates)
| Number of transmission states |
| 2 = on/off |
Continuously variable
| Minimum Life Power) (without battery change) |
| 8 hrs |
72 hrs
| Material/Supply Chain |
| Maximum US based |
100% US based
| TRL |
| 4 |
| MRL |
| 4 |
Production Rate:
· Toroidal visor (200 cm2 active area)
· Spherical goggle (40cm2 active area)
· Spectacle lens pair (27 cm2 active area)
· Toroidal visors: 20 /week
· Toroidal visors: 40 /week
· Spherical goggles:100/week
· Spectacle lens: 500/week
| Fail Clear (to Tmax) when power supply is disconnected |
| Mandatory |
Mandatory
| Weight |
| · Same as the currently fielded EDEPD |
| · |
| · Less than the currently fielded EDEPD |
1.2.1 – Steps to accomplish the solution
1.2.2 –
1.2.3 –
2. Deliverables
2.1 Project Technical Milestones/Decision Points (DP)
The program awardee will provide the following deliverables After Receipt of Agreement (ARA) as indicated. This portion should be included in the draft SOW with further detail provided to match proposed solution. For example, if the proposed solution includes quarterly submission of advancing test samples, then the draft SOW should have a corresponding section/paragraph that correlates with each submission.
2.1.1 Project Kick-off
The Contractor shall support a project Kick-off Meeting within thirty (30) calendar days After Receipt of Award (ARA) and provide presentation charts two (2) workdays prior. The agenda shall address project scope, performance, schedule, progress, funding, metrics, risks and their mitigation, and new product opportunity analyses.
2.1.2 Project Execution Plan (2 months ARA)
The Contractor shall host the Project Execution Plan (PEP) meeting, within sixty (60) days ARA. The PEP shall include the following:
| a. | Facility tour including laboratory and manufacturing areas. |
| b. | Presentations with agenda including: |
i. Introduction of Personnel (Management, Technical);
ii. Company Business Plan and synergies with this (OASD(IBP) project;
iii. Current and Planned Product Roadmap;
iv. Plan of Action and Milestones (POAM),
v. Performance metric-based approach for expanding domestic manufacturing capabilities and improving technical performance,
vi. Supply chain for current products;
vii. Plans to on-shore any items not currently available from a US based source.
2.1.3 Design and Manufacturing Plan (3 months ARA)
The Contractor shall provide Design and Manufacturing Plan of their approach toward the agreed upon deliverables to the Government within three (3) months ARA. The focus of the design and manufacturing plan shall include but not limited to:
a. Design to include the solution of the prototype:
i. Solution of the prototype/product with all the requirements in 3.2
ii. Improvement (if any) to meet the objectives
iii. U.S.-Based Supply chain and Materials
iv. Non-U.S.-based Supply Chain and Materials
v. Software & Hardware
vi. Technical Risks, Supply Chain risks and Mitigation plans
b. Manufacturing plan, processes, and target of production rate:
i. Facility
ii. Equipment
iii. Supply chain capability and resilience
iv. Target production capability
v. Manufacturing technology Risks, Supply Chain risks and Mitigation plans
2.1.4 Monthly Progress Reports and Quarterly Project Management Reviews (PMR)
The Contactor shall provide a written Monthly Progress Report limited to 20 pages of text/figures/tables describing: (a) technical and manufacturing achievements since the prior month, (b) plans for next month, and (c) a discussion of any issues. A written Monthly Progress Report is not required in months in which a Quarterly PMR is conducted.
Starting in the third month ARA the Contractor shall support either virtually or in person Quarterly PMR meetings throughout the life of the agreement. The Quarterly PMR read-ahead materials will be submitted to the government 7 business days before the meetings. The PMR shall cover the state of the project execution plan (milestones completed), progress on deliverables, the quality of monthly status reports, funding status, schedule (Gantt chart), comparison of current performance metrics vs. prototype thresholds/program objectives, and other pertinent information.
2.1.5 Test Article Sets
Solutions shall identify multiple sets of Test Articles for submission to the government for testing to validate the progression of the prototype throughout development. This shall identify the Test Article type, quantity and timeline for each submission. The Government preference is for increasing quantities (minimum quantity of four (4)) of test articles at six (6) month intervals until delivery of the final prototype quantities. The first set test article submitted will establish the baseline EDEPD performance for the manufacturer. The manufacturer shall provide test reports of these articles which include all the requirements listed in the SOW. The report shall include the baseline TRL of this set.
2.1.6 Final Set of Test Articles
Depending on the offered solution, the final set of test articles shall include 20 Toroidal visors and/or 35 Spherical goggles and/or 200 Spectacle lens to demonstrate the manufacturing capabilities and prove the processes using US-based qualified sources of supplies. The report shall include the manufacturer’s test reports that meet or exceed all the requirements listed in the SOW. The report shall include the Government expected TRL and MRL for this set.
(24 months ARA) Final Reports
a. Technical report of the prototypes/products to include:
i. Certification of MRL/TRL with Government
ii. Test Reports
iii. US-based suppliers with production capabilities, and
iv. Equipment used
b. Manufacturing capabilities and processes reports
2.1.7 Other Deliverables
3. Government Rights in Technical Data and Computer Software
The Government requires Government Purpose Rights (GPR) in all technical data (including computer software documentation) and computer software developed under any OT associated with this effort, for, at most, a five-year period. The five-year period, or such other period as may be negotiated, will commence upon execution of the OT that required development of the technical data (including computer software documentation) and computer software. Upon expiration of the five-year (or other negotiated period), the Government desires unlimited rights in the technical data (including computer software documentation) and computer software. Printed deliverable (e.g., printed hardcopies, .doc, web-based html, etc.) will be labeled accordingly and contain all appropriate markings associated with the distribution classification.
All technical data, intellectual property and non-commercial off the shelf (non-COTS) software will be provided with a minimum of GPR.
Any commercial or COTS shall be provided with a transferable license that allows distribution of the software and transfer of the license to any Government agency or DoD vendor for any prototype project related purpose. All software licensing shall include a minimum term of five years of use. All software shall be provided with any available major upgrades, minor updates, security patches and technical support for the entire PoP. When the addition of new software or hardware is proposed for the system or developed under this solicitation with Government funding or partial Government funding, the vendor shall ensure that sufficient rights in technical data to include (software and hardware) are procured to enable the Government to maintain and modify the system using Government personnel and/or third-party vendors. Government approval is required for exceptions to GPR.
In its solution, the vendor for any OT awarded in accordance with this RFS shall analyze feasible non-proprietary solutions and incorporate such solutions into its proposed solution when practicable. This preference for non-proprietary solutions applies to any technical data (including computer software documentation) and computer software developed or delivered under the OTA. The vendor shall clearly state all assumptions made during development of its proposal.
The vendor shall provide a data rights assertion table, Attachment 2, for all technical data (including computer software documentation) and computer software to be developed or delivered under the OTA. The data rights assertion table shall identify at the lowest segregable level the technical data (including computer software documentation) and computer software to be developed or delivered under the OTA, the vendor’s assertion as to the Government’s rights in each item of technical data (including computer software documentation) and computer software, the basis for such assertion, and the name of the person asserting any restrictions.
For any technical data (including computer software documentation) or computer software in which the vendor asserts the Government will have less than Government purpose rights, the vendor shall provide the open source, commercial, or other license it asserts is applicable. The vendor’s assertions, including any assertions of its sub-vendors or suppliers must be submitted as an attachment to its Solution Paper. The tables must be completed in the format set forth in the attachment, dated and signed by an official authorized to contractually obligate the vendor. If additional space is necessary, additional pages may be included. There is no page limit for the Data Rights Assertions Tables, and they do not count against the proposed technical solution page limitation.