Att_6_Finale_Price_Breakout.pdf

PDF 97 KB Posted

Attached to
GAOA FINALE DAM RECONSTRUCTION
Solicitation number
140L0625R0015
Issued by

About this file

This document is a Schedule of Items for the GAOA Finale Dam Reconstruction project, detailing two bid sections: a Base Bid and an Additive 1 Bid. The Base Bid encompasses 17 line items for dam reconstruction, including mobilization, site clearing, excavation, embankment work, outlet works construction, and slope protection, with quantities ranging from 1 lump sum to 13,000 cubic yards. The quantities are noted as not guaranteed, with measurement and payment defined in a separate section.

The Additive 1 Bid includes eight supplementary items focused on fencing and infrastructure, such as installing 430 rods of 4-wire barbed wire fence, 5 end panels, 5 stress panels, 4 corner panels, 3 barbed wire gates, 5 rods of drainage crossing, 420 rods of fence removal, and 2 cattleguard removals and installations. The bid structure allows for flexible pricing and scope, with separate totals for the Base Bid and Additive 1 Bid, enabling potential modular project implementation.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAOA FINALE DAM RECONSTRUCTION

SCHEDULE OF ITEMS

BASE BID

Item

No.

Description

Quantity*

Unit Price Total Cost

1 Mobilization & Preparatory Work 1 LS

2 Site Clearing & Restoration 1 LS

3 Existing Outlet Works Demolition 1 LS

4 Common Excavation 13,000 CY

5 Muck Excavation 650 CY

6 Compacted Embankment 10,000 CY

7 Lime Amended Embankment 1,600 CY

8 Filter Sand 560 CY

9 Drain Gravel 210 CY

10 Road Gravel 410 Ton

11 Outlet Works Tower and Inlet Structure 1 LS

12 Outlet Works Conduit 1 LS

13 Stilling Basin 1 LS

14 New Riprap Slope Protection 320 Ton

15 Water Control/Dewatering 1 LS

16 Stabilization Fabric 500 SY

17 General Construction Operations 1 LS

TOTAL BASE BID

*Quantities are not guaranteed. Measurement and payment for each Bid Item is defined in Section 01150, Measurement and Payment.

ADDITIVE 1 BID

BID

ITEM

NO.

PAY ITEM

NO.

Description

Quantity

Unit Price

Total Cost

A1.1 MT02834(1) Barbed Wire Fence 4-Wire 430 Rod

A1.2 MT02834(5) Barbed Wire End Panel, Type II 5 EA

A1.3 MT02834(6) Barbed Wire Stress Panel 5 EA

A1.4 MT02834(9) Five-Post Barbed Wire Corner Panel Type II 4 EA

A1.5 MT02834(23a) Barbed Wire Gate, 4-Wire 3 EA

A1.6 MT02834(52) Drainage Crossing Type A 5 Rod

A1.7 MT02837(10) Fence Removal 420 Rod

A1.8 MT02881(13) CattleGuard Removal and Installation 2 EA

TOTAL ADDITIVE 1 BID

BASE BID

ADDITIVE 1 BID

TOTAL BASE + ADDITIVE 1 BID

File details come from the government source that posted it. Updated .