This document is a Request for Proposal (RFP) for a Cybersecurity Plan (CSP) from the NAVAIR Patuxent River Naval Air Station, Department of the Navy, dated 26 July 2023. The RFP requires the contractor to generate and deliver a Cyber Security Implementation Plan (CSIP) to address requirements within the PMA-273 CSP and CSIP Contract Data Requirements List (CDRL), following specific Data Item Description (DID) guidelines. If any Government Off-the-Shelf (GOTS) software is to be delivered, the contractor must adhere to additional requirements contained in the final PMA-273 CSP and System-Software CDRL. The document notes that post-award, sections in the DID will be tailored out based on the specific system being delivered, with classified sections removed if the system is unclassified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att (1A) T-6 ACI PWS (Mar2025).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information (CUI)
Controlled Unclassified Information (CUI) 1
NAVAIR Patuxent River Naval Air Station Department of the Navy
Request for Proposal (RFP)
Cybersecurity Plan (CSP)
Dated: 26 July 2023
Version 5.0 Rev. 2
Approved by: _____________________________ Joe Sheelar Program Information System Security Manager
AD53200
DISTRIBUTION STATEMENT A: Approved for public release: distribution unlimited.
Controlled Unclassified Information (CUI)
Controlled Unclassified Information (CUI) 2
The contractor shall generate and deliver a Cyber Security Implementation Plan (CSIP) to address the requirements that will be within the PMA-273 CSP and CSIP Contract Data Requirements List (CDRL) by the authority of Data Item Description (DID) - DI-MGMT-82002B that will be provided. This DID contains the format, content, and intended use information for the data product resulting from the work task described by the contract. As such contractors shall consider reviewing to ensure all possible sections within the DID can be addressed. Post award, sections in the DID will be tailored out based on what is being delivered. For example, if the system being delivered is unclassified, then the classified sections in the DID will be tailored out post award before the contractor starts answering the CSP.
If any Government Off-the-Shelf (GOTS) software is to be delivered to the Government, the contractor shall adhere to the following requirements contained within the final PMA-273 CSP and System-Software CDRL by the authority of DID - DI-MISC-80508B. This DID contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
NOTE: This document will be replaced with the final CSP for the contractor to answer following the CDRL guidelines post award.