This document is a Rangeland Livestock Watering Facilities Specifications file for the Payette National Forest, Council-01 District, located in the Indian Mountain C&H Allotment. The document provides detailed technical specifications and site recommendations for constructing and maintaining metal livestock watering troughs and associated water collection/retention systems.

The specifications include precise engineering details for water facility construction, such as using 1.5" and 2" metal pipes, ball valves, quick couplers, and support posts made from green wooden posts or railroad ties. Site maintenance recommendations focus on water management techniques, including using bentonite to seal pond bases, managing sediment removal, preventing water leakage, and strategies for maintaining spillways. The document includes multiple annotated diagrams and photographs illustrating installation methods, structural components, and recommended site improvements for rangeland water infrastructure, with a specific focus on enhancing water retention and preventing erosion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Forest: Payette District: Council-01 Date: 5-28-2025 Observer: H. Boll

Allotment: Indian Mountain C&H Site: Rangeland Livestock Watering Facilities Specifications

Legal Description: ¼, ¼, Sec. , T , R UTM: Zone 11 N: E N

Description:

Insert bentonite core into the inner face of the dam.

Dig down in the thalweg and replace original material with compacted bentonite.

Clean and bentonite the pond.

Water usually escapes from the original thalweg of the drainage under the pond.

The thalweg should be cleaned out and taken down to hard pack.

Bentonite could then be packed in its place.

Sediment removed from the storage area of the pond should be pushed out over the dam and used to bolster/raise the height of the dam.

If the spillway shows signs of head cutting or incision, rock fill should be placed in the spillway to dissipate energy during high flow events.

Rocks could be collected from the surrounding area.

Here is a situation were the dam and spillway could be raised in order to increase holding capacity.

Lava Fire Rangeland Livestock Watering Facilities Rebuild(photoform).pdf
Lava Fire Rangeland Livestock Watering Facilities Rebuild (specifications).pdf

File details come from the government source that posted it. Updated .