This statement of work and related solicitation document outline requirements for a firm-fixed price contract to install luxury vinyl tile in building 68 room 216 at Eglin Air Force Base in Florida. The contractor will be responsible for removing existing tile and base, disposing of waste, and installing approximately 1575 square feet of 24"x24" luxury vinyl tile and 165 linear feet of 4" rubber base to match. Additional project details include prepping and repairing the substrate, using transition strips as needed, and meeting all applicable NFPA, UFC, and Eglin AFB electrical standards. Offerors must be able to complete the project on the negotiated schedule with minimal disruption. The contracting officer representative will be Curtis Keefer of the 796th Civil Engineer Squadron Contracting Officer Representative.

View the file

Other files

File Type Posted
Q_A 5-6-22.pdf PDF
Q_A 4-27-22.pdf PDF
Att 1 Provisions and Clauses.pdf PDF
FA282322Q4017.pdf PDF
Att 3 WD 15-4531 R19.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract #: TBD

TRIRIGA ID 2261077

Project Title: Replace Old Tile with LVT, Room 216, Bldg 68 Date: 6 April 2021

SUMMARY OF WORK

1. PURPOSE OF SECTION: The purpose of this section is to provide the Contractor with a Statement of Work for the above mentioned project. The Contractor shall follow the guidelines provided in the Statement of Work of said contract. The Contractor shall seek clarification from the Contracting Officer (CO) if there is any question on the applicability of a provision. These provisions are for the purpose of general information only and are not intended to completely describe the regulations and restrictions that apply on Eglin AFB.

2. PROJECT SCOPE: The project is located on Eglin AFB, Florida. The Contractor shall be required to furnish all materials, equipment, plant, labor and personnel necessary to design, manage, and accomplish this work in accordance with the contract requirements. The Contractor is expected to maintain safety requirements and demonstrate standard construction methods, at all times.

A. Provide everything necessary to remove existing tile & vinyl base, then replace with LVT along with new rubber base as indicated on the Purchase Order. Scope is limited to room 216 within building 68 on Eglin AFB.

B. Contractors shall be responsible for the disposal of the old tile, vinyl cove base, transition strips and any waste generated by the installation of flooring products.

C. Salient Characteristics

a) Luxury Vinyl Tile – Shaw 4074V Compound 2.5 mm 24"x24" Commercial Luxury Vinyl Tile (Brand Name or Equal)

b) 20 Mil Thickness at a minimum

c) Individual Sheets 18” x 18” or 24” x 24”

3. PRINCIPAL FEATURES: Principal features of work are as follows:

A. Civil:

a. None.

B. Architectural:

a. Remove existing cove base, scrape and prep to receive new. (~ 165 LF)

b. Remove existing transition strips, as required.

c. Remove existing tile. Do not disturb substrate to ensure a smooth and secure bonding surface. (~ 1575 SQFT)

d. Install new LVT, 18” x 18” or 24” x 24” LVT, 20 Mil thickness, desired color or equivalent (customer approved).

e. Install 4” cove base (color will coordinate with LVT) ( ~ 165 LF)

f. Install matching transition strips where required. ( ~ 9 LF)

g. All work shall be in accordance with the latest NFPA and NEC requirements to ensure maximum protection against loss of life and property by fire.

h. Design and installation must meet all UFC 3-600-01 and applicable NFPA

Standards.

i. All interior finishes, contents and furnishings must meet NFPA 101 Chapter 10.

C. Mechanical (HVAC):

a. None

D. Electrical

a. All electrical work must be completed IAW NFPA 70 and by a certified electrician.

b. Any fire detection or fire alarm devices that are moved or disconnected for any reason will require reacceptance testing IAW NFPA 72.

c. All work must be in compliance with UFC 3-520-01 Interior Electrical Systems, latest edition.

d. Ensure compliance with the Eglin AFB specific electrical requirements.

E. COMMUNICATIONS: (Customer and 96 CS will verify)

a. All work shall be IAW 96 CS Eglin AFB Cable Installation Specifications, 2 March 2012 (96 CS), or latest release. Provides the technical criteria and information for the installation of base cable infrastructure.

F. SPECIAL INSTRUCTIONS:

a. This project must be completed in a timely matter with minimal impact. Notify CO immediately of any impact regarding long lead items, delays or anything that could affect the negotiated schedule and completion date.

b. Customer will provide escorts if needed.

c. The adjacent areas within this facility will be occupied during construction.

d. Ensure adequate ventilation and coordination prior to work generating fumes, dust, debris and vibration, prior to the activity.

e. Provide warranty, certificates of compliance plus maintenance/cleaning instructions, as applicable the COR prior to the invoice being paid.

COR (Contracting Officer Representative) will be: Curtis Keefer/796CES/CEOES Contracting Officer Representative 850-882-5023