ATT_2_1075_B34_CHILLER_REPL_DWGS.pdf
PDF 8 MB Posted
- Attached to
- Building 34 Chiller Replacement Federal contract opportunity
- Solicitation number
- W9123624B2010
About this file
This pre-solicitation notice provides advance information about an upcoming Invitation for Bid for the Building 34 Chiller Replacement project at Defense Supply Center Richmond in Richmond, Virginia. The U.S. Army Corps of Engineers-Norfolk District will replace the existing chilled water equipment, including an air-cooled chiller, pumps, expansion tanks, piping system, and electrical infrastructure. The existing diesel generator and cooling tower will also be demolished and replaced with a new natural gas generator and automatic transfer switch to support backup operation. Minor site work and building modifications are required. The contract completion date is 180 calendar days after notice to proceed. Bids are due in response to a solicitation on SAM.gov. The requirement will be set aside for small businesses with a NAICS code of 236220 and size standard of $45 million. Prospective offerors should monitor SAM.gov for the solicitation and any amendments. Preliminary plans and specifications are attached for advance review.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att_1_1075_DSCR_B34_CHILLER_REPLACEMENT_SPECS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
BLDG 34
N
SCALE: NTS
LOCATION MAP
N
SCALE: NTS
U.S. ROUTES 1 AND 301
FLAG
POLE
GATE 2
THE FLAG
LOT 1
PARKING
ADMIN. BLDG
MAIN
ENTRANCE
GATE NO. 1
6TH STREET
S-4426
M
GATE 3
'L' ROAD
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
M
AR
K D
ES
C
R
IP
TI
O
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-001
C O
VE
R
S H
EE
T
D
SC
R , R
IC
H
M O
N D
, V
IR
G
IN
IA
N
O R
FO
LK
D
IS
TR
IC
T
FR
O N
T
ST
R
EE
T N
O R
FO
LK
, V A
M . J
O H
N
SO
N
E.
M
O R
TO
N
R . N
AG
EL
Z.
G
R O
SE
JU
N
E
N
AO
F
IL
E N
O
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
NORFOLK DISTRICT
JUNE 2022
DSCR, RICHMOND, VIRGINIA
B34 CHILLER REPLACEMENT
R
TA
S U
BM
IT
TA
L
NAO FILE NO.:
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDICATED ON
INDEX OF DRAWINGS.
CHIEF, ENGINEERING & CONSTRUCTION DIVISION
APPROVED
CHIEF, DESIGN BRANCH
APPROVED
ENGINEERING BRANCH DESIGN LEAD
RECOMMENDED
INDEX OF DRAWINGS
SHEET ID SHEET TITLE
ARCHITECTURAL
A-001 ARCHITECTURAL LEGEND, ABBREVIATIONS, & PROJECT NOTES
AD111 DEMOLITION PLAN
A-101 OVERALL FIRST FLOOR PLAN
A-111 NEW WORK PLANS
A-201 OVERALL ELEVATIONS
A-501 SECTIONS AND DETAILS
A-601 DOOR SCHEDULE AND DETAILS
MECHANICAL
M-001 MECHANICAL LEGEND, ABBREVIATIONS, SCHEDULES AND DETAILS
MH111 PARTIAL FIRST FLOOR PLANS - HVAC
M-501 DETAILS
M-601 CHILLED WATER SCHEMATIC DIAGRAM
MI800 CONTROLS LEGEND AND ABBREVIATIONS
MI801 CHILLED WATER SYSTEM CONTROL SEQUENCE OF OPERATION AND POINTS
MI802 CHILLED WATER SYSTEM CONTROL DIAGRAM
MI803 CONTROLS
MI804 CONTROLS
ELECTRICAL
E-001 ELECTRICAL LEGEND, ABBREVIATIONS, AND NOTES
EP111 PARTIAL FIRST FLOOR PLANS - POWER
EP501 ELECTRICAL DETAILS
EP601 PANELBOARD SCHEDULES
INDEX OF DRAWINGS
SHEET ID SHEET TITLE
GENERAL
G-001 COVER SHEET
SURVEY/MAPPING
V-001 EXISTING CONDITIONS
CIVIL
C-001 ABBREVIATIONS
C-002 HAUL ROUTE
CD101 DEMOLITION SITE PLAN
CS101 SITE PLAN
CS102 STAKEOUT PLAN
CG101 GRADING AND EROSION & SEDIMENT CONTROL PLAN
CU101 UTILITY PLAN
C-501 EROSION AND SEDIMENT CONTROL HANDBOOK
C-502 EROSION AND SEDIMENT CONTROL DETAILS
C-503 DETAILS
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS
SB101 FOUNDATION PLAN
SF101 FRAMING PLAN
SB501 FOUNDATION TYPICAL DETAILS
SF501 FRAMING TYPICAL DETAILS
SF502 CMU TYPICAL DETAILS
SF503 CMU TYPICAL DETAILS
EXIST. SIDEWALK
BRICK WALL
BR
IC
K W
AL
L
C O
N C
R
ET
E
PA
D W
IT
H
C H
IL
LE
R
EXISTING CONC.
BU
IL
D
IN
G
FA
C
E O
F C
H
IL
LE
R
D O
O R
E N
TR
AN
C E
PAD WITH
TRANSFORMER
BU
IL
D
IN
G
EX
IS
T.
C
O N
C P
AD BU
IL
D
IN
G
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
WWWWWWWWWWWWWWW
WWWWWWWWW
EXIST. 12" RCP
W W
W W
W W
EXIST. 6" WATER
EXIST. 6" WATER
(ASPHALT)
PARKING LOT
COMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
TELEPHONE/ COMM LINE
(APPROX. LOCATION)
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
S:
\D
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
V.
D
W G
1:
:0
PM
/2 1/
AE
C
_N C
S_ 4_
M O
N O
.S
TB
E4
TO
N
ZM
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
EX
IS
TI
N G
C O
N D
IT
IO
N S
V-101
GENERAL SHEET NOTES:
1" = 5'-0"
EXISTING CONDITIONSB8
SCALE IN FEET
5 0 105
PLAN
NORTH
LEGEND:
1. NAO SURVEY SECTION COMPLETED TOTAL STATION
SURVEY ON DEC 06 2021 AND PROCESSED ON DEC 07 2021
USING SURVEY DATUM'S NAVD 88, NAD 83 (2011) VIRGINIA
SOUTH.
SD
WW
EE
COMM
STORM
WATER
COMMUNICATION
UNDERGROUND PRIMARY POWER
X 122.8 SPOT ELEVATION
S:
\D
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C .D
W G
1:
:3
PM
/2 1/
AE
C
_B &W
.S
TB
E4
TO
N
ZM
N
ABBREVIATIONS
L ANGLE
A/C AIR CONDITIONING
A/C UNIT AIR CONDITIONING UNIT
AB ANCHOR BOLT
ABV ABOVE
AC ALTERNATING CURRENT
ACC ACCESSIBLE
ACI AMERICAN CONCRETE INSTITUTE
ACR ACRYLIC PLASTIC
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACSR ALUMINUM CABLE STEEL REINFORCED
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
ADDM ADDENDUM
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, ADJUSTABLE
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
AHR ANCHOR
AHU AIR HANDLING UNIT
AI AREA INLET
AIC AMPERE INTERRUPTING CAPACITY
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
A.L. ACTIVE LEAF
ALT ALTERNATE
ALUM ALUMINUM
AMB AMBIENT
AMP AMPERE
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECT
ARI AMERICAN REFRIGERATION INSTITUTE
ASB ASBESTOS
ASC ABOVE SUSPENDED CEILING
ASPH ASPHALT
ATC ACOUSTICAL TILE CEILING
AUTO AUTOMATIC
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
AWT ACOUSTICAL WALL TREATMENT
BB BULLETIN BOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BEJ BRICK EXPANSION JOINT
BEV BEVEL
BITUM BITUMINOUS
BJT BED JOINT
BL BUILDING LINE
BLDG BUILDING
BLW BELOW
BM BENCHMARK
BO BOTTOM OF
BOT BOTTOM
BP BACK PLASTER(ED)
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRG PL BEARING PLATE
BRK BRICK
BRKT BRACKET
BRZ BRONZE
BS BOTH SIDES
BSMT BASEMENT
Btu BRITISH THERMAL UNIT BtuH BTU PER HOUR
BTWN BETWEEN
BUR BUILT-UP ROOFING
BW BOTH WAYS
CAB CABINET
CAP CAPACITY
CB CATCH BASIN
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CE COVER ELEVATION
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CFI CONDUCTIVE FLOORING
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CH BD CHALKBOARD
CHFR CHAMFER
CHIM CHIMNEY
CHK CHECK
CHR PL CHROME PLATED
CI CAST IRON
CI CURB INLET
CIP CAST-IN-PLACE
CIRC CIRCULAR
CJ CONTROL JOINT
CJ CONSTRUCTION JOINT
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLGL CLEAR GLASS
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLOS CLOSURE
CLR CLEAR(ANCE)
CLWG CLEAR WIRED GLASS
cm CENTIMETER(S)
CMP CORRUGATED METAL PIPE
CMPST COMPOSITE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNL CONDUCTIVE NEOPRENE LATEX
CNR CORNER
CNTR COUNTER
CO CLEANOUT
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBUSTION
COMPT COMPARTMENT
CONC CONCRETE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
CORR CORRIDOR
COV COVER
CPRS COMPRESSIBLE
CPT CARPET
CRCMF CIRCUMFERENCE
CRES CORROSIVE RESISTANT STEEL
CRG CROSS GRAIN
CRS COURSE(S)
CS CAST STONE
CSK COUNTERSUNK
CSMT CASEMENT
CT CERAMIC TILE
CT CURRENT TRANSFORMER
C TO C CENTER TO CENTER
CTR CENTER
CU CONDENSING UNIT
Cu COPPER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CU YD CUBIC YARDS
CV CEILING VENT
CVH CONDUCTIVE VINYL HOMOGENEOUS (SHEET
TYPE)
CW COLD WATER
CYL CYLINDER
d PENNY (AS IN NAIL - 10D)
DAT DATUM
DB DRY BULB
DBL DOUBLE
DBL ACT DR DOUBLE ACTING DOOR
DCJ DOWELED CONTROL JOINT
DCJT DUMMY CONTROL JOINT
DEG DEGREE
DEMO DEMOLITION
DEPR DEPRESSION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DH DUCT HEATER
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISC DISCONNECT
DISP DISPENSER
DISTR PNL DISTRIBUTION PANEL
DIV DIVISION
DL DEAD LOAD
DMPF DAMPPROOFING
DMPR DAMPER
DMT DEMOUNTABLE
DN DOWN
DR DOOR
DR DRAIN
DRB DRAINBOARD
DR CL DOOR CLOSER
DS DOUBLE STRENGTH (GLASS)
DS DOWNSPOUT
DT DRAIN TILE
DVTL DOVETAIL
DWG DRAWING
DWLS DOWELS
DWR DRAWER
DWTR DUMBWAITER
DX DIRECT EXPANSION
E EAST
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION - GRADE OR BUILDING
ELEC ELECTRIC
EM EXPANDED METAL
EMD ESTIMATED MAXIMUM DEMAND
EMER EMERGENCY
ENCL ENCLOSE(URE)
ENTR ENTRANCE, ENTERING
EP ELECTRICAL PANELBOARD
EPRF EXPLOSION PROOF
EPY EPOXY COATING
EQ EQUAL
EQUIP EQUIPMENT
ESCAL ESCALATOR
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EXC EXCAVATE
EXH EXHAUST
EXH A EXHAUST AIR
EXST EXISTING
EXP EXPANSION
EXP EXPOSED
EXP BT EXPANSION BOLT
EXT EXTERIOR
F FAHRENHEIT
FA FIRE ALARM
FA FRESH AIR
FAC FIRE APPARATUS CLOSET
FAI FRESH AIR INTAKE
F BRK FIRE BRICK
FC FOOT CANDLE
FC BRK FACE BRICK
FCG FACING
FCJ FLOOR CONSTRUCTION JOINT
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDMPR FIRE DAMPER
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FF FACTORY FINISH
FGL FIBERGLASS
FH FIRE HYDRANT
FH FLAT HEAD
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHR FIRE HOSE RACK
FHS FIRE HOSE STATION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIN FINISH
FIN FLR FINISH FLOOR
FIXT FIXTURE
FJT FLUSH JOINT
FLASH FLASHING
FLR FLOOR
FLEX FLEXIBLE
FLG FLOORING
FLR PL FLOOR PLATE
FLUOR FLUORESCENT
FN FENCE
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIRE PARTITION
FP FIREPROOF
FPM FEET PER MINUTE
FR FIRE RESISTANT
FR FRAME
FRG FORGED
FRMG FRAMING
FRT FIRE-RETARDANT
FS FULL SIZE
FSTNR FASTEN(ER)
FT FEET
FTG FOOTING
FURG FURRING
FUT FUTURE
FW FIRE WATER
FWC FABRIC WALL COVERING
G NATURAL GAS
GA GAGE
GAL GALLON(S)
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL
GF GROUND FACE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFE GOVERNMENT-FURNISHED EQUIPMENT
GFE/CI GOVERNMENT-FURNISHED EQUIPMENT
CONTRACTOR INSTALLED
GI GALVANIZED IRON
GIP GALVANIZED IRON PIPE
GKT GASKET(ED)
GL GLASS
GL BLK GLASS BLOCK
GLF GLASS FIBER
GLZ GLAZING
GLZ CMU GLAZED CONCRETE MASONRY UNITS
G GROUND
GOVT GOVERNMENT
GPM GALLONS PER MINUTE
GPT GYPSUM TILE
GRAN GRANITE
GR LN GRADE LINE
GRTG GRATING
GST GLAZED STRUCTURAL TILE
GSU GLAZED STRUCTURAL UNITS
GT GROUT
GWT GLAZED WALL TILE
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
HB HOSE BIBB
HC HOLLOW CORE
HCD HALON CONTAINMENT DAMPER
HCP HANDICAPPED
HD HEAD
HD HEAVY DUTY
HDBD HARDBOARD
HD JT HEAD JOINT
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HES HIGH EARLY-STRENGTH CEMENT
HEX HEXAGON
HH HANDHOLE
HK HOOK(S)
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HP HIGH PRESSURE
HP HORSEPOWER
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH
HSGYP HIGH-STRENGTH GYPSUM PLASTER
HSKPG HOUSEKEEPING
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HYDR HYDRAULIC
Hz HERTZ
IC INTERCOM
ID INSIDE DIAMETER
IESNA ILLUMINATING ENGINEERING SOCIETY OF NORTH
AMERICA
ILK INTERLOCK
IN INCH
INCIN INCINERATOR
INCL INCLUDED
INSF INSULATING FILL
INSUL INSULATION
INT INTERIOR
INTM INTERMEDIATE
INV INVERT
IP IRON PIPE
IPS IRON PIPE SIZE
I.P.S. INSIDE PIPE SIZE
JAN CLO JANITOR’S CLOSET
J-BOX JUNCTION BOX
JCT JUNCTION
JST JOIST
JT JOINT
KIP KILOPOUND (1000 POUNDS)
KIT KITCHEN
KOP KNOCKOUT PANEL
KPL KICKPLATE
kV KILOVOLTS kVA KILOVOLT AMPERES kVAR KILOVOLT AMPERES REACTIVE kW KILOWATT
KWY KEYWAY
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAT LEAVING AIR TEMPERATURE
LAU LAUNDRY
LAV LAVATORY
LB LAG BOLT
LB POUND
LBL LABEL
LBR LUMBER
LC LIGHT CONTROL
LD LOAD
LDG LOADING
LG LENGTH
LH LEFT HAND(ED)
LIN LINEAR
LKR LOCKER
LL LIVE LOAD
LLD LEAD-LINED DOOR
LM LUMEN
LMST LIMESTONE
LNTL LINTEL
LONG LONGITUDINAL
LP LIGHTPROOF
LPD LIGHTPROOF DOOR
LPL LIGHTPROOF LOUVER
LPT LOW POINT
LR LIVING ROOM
LS LAWN SPRINKLER
LT LIGHT
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWT LEAVING WATER TEMPERATURE
m METER(S)
M&B MATCHED AND BEADED
MACH MACHINE
MAS MASONRY
MATL MATERIAL(S)
MAX MAXIMUM
MB MACHINE BOLTS
MBR MEMBER
MC MEDICINE CABINET
MCJ MASONRY CONTROL JOINT
MCO METAL-CASED OPENING
MDS METAL DIVIDER STRIP
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDIUM
MEMB MEMBRANE
MES METAL EDGE STRIP
MFD METAL FLOOR DECKING
MFG MANUFACTURING
MFR MANUFACTURER
MG MOTOR GENERATOR
MGT MATTE-GLAZED TILE
MH MANHOLE
MI MALLEABLE IRON
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
ML METAL LATH
ML MONOLITHIC
MLDG MOULDING
MLWK MILLWORK
mm MILLIMETER(S)
MNIC MATERIAL NOT IN CONTRACT (INSTALLATION BY
CONTRACTOR)
MO MASONRY OPENING
MOD MODULAR
MOD. MODIFIED
MOT MOTOR
MP MOVABLE PARTITION
MR MOP RECEPTOR
MRB MARBLE BASE
MRD METAL ROOF DECKING
MS MACHINE SCREWS
MT METAL THRESHOLD
MT MOUNT
MTD MOUNTED
MTFR METAL FURRING
MTL METAL
MVBL MOVABLE
MULL MULLION
N NORTH
NAT NATURAL
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
Ni NICKEL
NIC NOT IN CONTRACT
NL NAILABLE
N.L. NEOPRENE LATEX
NM NONMETALLIC
NO NORMALLY OPEN
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
N’’REQD NOT REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OBSC OBSCURE
OBW OBSERVATION WINDOW
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFC OFFICE
OGL OBSCURE GLASS
OH OVERHEAD
OHMS OVALHEAD MACHINE SCREW
OHWS OVALHEAD WOOD SCREW
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OPS OPERATIONS
OS & Y OUTSIDE SCREW AND YOKE
OWGL OBSCURE WIRED GLASS
P POLE
PA PUBLIC ADDRESS
PAR PARALLEL
PB PANIC BAR
PBD PARTICLE BOARD
PBS PUSH BUTTON STATION
PC PIECE
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCP CEMENT PLASTER (PORTLAND)
PD PAVEMENT DRAIN
PED PEDESTAL
PERF PERFORATE(D)
PERIM PERIMETER
PH PHASE
PHAR PHARMACY
PI POINT OF INTERSECTION
PIPU PREFAB ISOLATION POWER UNIT
PIV POST INDICATING VALVE
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLAT PLATFORM
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLG PILING
PL GL PLATE GLASS
PLYWD PLYWOOD
PNL PANEL
PT PAINT(ED)
POL POLISHED
PORC PORCELAIN
PORT PORTABLE
PPGL POLISHED PLATE GLASS
PPM PARTS PER MILLION
PR PAIR
PREFAB PREFABRICATE(D)
PREFIN PREFINISHED
PREFMD PREFORMED
PRKG PARKING
PROJ PROJECT
PRV PRESSURE-REGULATING VALVE
PS PIPE SPACE
P.S. PRESSED STEEL
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PNEUMATIC TUBE
PT. POINT
PT CONC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PV PAVED
PVC POLYVINYL CHLORIDE
PVG PAVING
PW PASS WINDOW
QT QUARRY TILE
QT. QUART
QTR QUARTER
1/4 RND QUARTER ROUND
QTY QUANTITY
R RADIUS
R RANGE
R RISER
RA RETURN AIR
RAB RABBETED
RA GR RETURN AIR GRILLE
RAR RETURN AIR REGISTER
RB RUBBER BASE, RESILIENT BASE
RBL RUBBLE STONE
RBR RUBBER
RC REMOTE CONTROL
RCP REINFORCED CONCRETE PIPE
RCVR RECEIVER
RD ROOF DRAIN
RDG INS RIGID INSULATION
RECPT RECEPTACLE
REC ROOM RECREATION ROOM
RECT RECTIFIER
REF REFERENCE
REFL REFLECT
REFR REFRIGERATION
REG REGISTER
REG REGLET
REINF REINFORCE
REM REMOVE(ABLE)
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RFG ROOFING
RH RELATIVE HUMIDITY
RH RIGHT HAND
RH ROOF HATCH
RK RACK
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RP RETRACTABLE PARTITION
RPM REVOLUTIONS PER MINUTE
RPRT RAISED PATTERN RUBBER TILE
RTF RUBBER TILE FLOOR
RVS REVERSE
RVT RIVET
RWC RAINWATER CONDUCTOR
S SOUTH
SA SUPPLY AIR
SB SPLASH BLOCK
S.B. SECURITY BARS
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SD STORM DRAIN
SDI STEEL DOOR INSTITUTE
SECT SECTION
SEQ SEQUENCE
SFGL SAFETY GLASS
SFTU STRUCTURAL FACING TILE UNIT
SFU STRUCTURAL FACING UNIT
SG SHEET GLASS
SHLDR SHOULDER
SHT SHEET
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SKLT SKYLIGHT
SLNT SEALANT
SLV SLEEVE
SM SHEET METAL
SMS SHEET METAL SCREWS
SOV SHUT OFF VALVE
SPC SPACER
SPCL SPECIAL
SPD SOUNDPROOF DOOR
SPEC SPECIFICATION
SPF SOUNDPROOF
SP FIN SPECIAL FINISH
SPH SPACE HEATER
SPKR SPEAKER
SQ SQUARE
SQHD SQUARE HEAD
S&R SHELF AND ROD
SS SERVICE SINK
SS STANDING SEAM (ROOF)
SST STAINLESS STEEL
STA STATION
STD STANDARD
STG SEATING
STL STEEL
STOR STORAGE
ST PR STATIC PRESSURE
STR STRINGER
STRUCT STRUCTURAL
STWY STAIRWAY
SUB FL SUBFLOOR
SUSP SUSPENDED
SV SHEET VINYL
SW SWITCH
SWBD SWITCHBOARD
SYMM SYMMETRICAL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TAN TANGENT
TB TOWEL BAR
TC TERRA COTTA
TEL TELEPHONE
TEMP TEMPERATURE
TEMP TEMPORARY
TER TERRAZZO
TERM TERMINAL
T&G TONGUE AND GROOVE
TGL TOGGLE
TH TRUSS HEAD
THK THICK(NESS)
THRES THRESHOLD
TK BD TACKBOARD
TKS TACKSTRIP
TO TOP OF
TOL TOLERANCE
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPTN TOILET PARTITION
TRANS TRANSOM
TRANS TRANSVERSE
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
UC UNIT COOLER
UGND UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
UNEX UNEXCAVATED
UNFIN UNFINISHED
UPS UNINTERRUPTABLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV UNIT VENTILATOR
V VOLT
VAR VARNISH
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VCT VITRIFIED CLAY TILE
VD VAULT DOOR
VENT VENTILATOR(TION)
VERT VERTICAL
VEST VESTIBULE
VF VINYL FABRIC
VG VERTICAL GRAIN
VH VINYL HOMOGENEOUS
V.I.F. VERIFY IN FIELD
VJ V-JOINT(ED)
VNR VENEER
VOL VOLUME
VR VAPOR RETARDER
VRM VERMICULITE
VS VENT STACK
V.T. VOLTAGE TRANSFORMER
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
WB WET BULB
WBL WOOD BLOCKING
WC WATER CLOSET
W/C WHEELCHAIR
WCO WOOD-CASED OPENING
WD WOOD
WD WOOD DOOR
WDSP WASTE DISPOSER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WALL HUNG
WH WATER HEATER
WHB WHEEL BUMPER
WHM WATT-HOUR METER
WI WROUGHT IRON
WKSH WORK SHOP
WM WIRE MESH
W/O WITHOUT
WP WATERPROOF(ING)
WP WEATHERPROOF
WP WORKING POINT
WR WASTE RECEPTACLE
WRB WARDROBE
WS WATERSTOP
W.S. WASTE STACK
WSCT WAINSCOT
WT WEIGHT
WTH WIDTH
W/W WALL TO WALL
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
WWR WELDED WIRE REINFORCEMENT
XFMR TRANSFORMER
YD YARD
YD YARD DRAIN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
AB
BR
EV
IA
TI
O N
S
C-001
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C .D
W G
1:
:5
PM
/2 1/
AE
C
_B &W
.S
TB
E4
TO
N
ZM
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
H
AU
L
R O
U
TE
C-002
PLAN
NORTH
A5 SCALE: 1" = 500'-0"
HAUL ROUTE
GENERAL NOTES:
1. CONTRACTOR'S ACCESS TO THE PROJECT SITE WILL BE VIA THE CONTRACTOR GATE AT DSCR. HAUL
ROUTE SHALL BE ON A-ROAD, 2ND STREET, 1ST STREET AND G-ROAD AS SHOWN ON THIS SHEET.
2. THE CONTRACTOR SHALL UTILIZE THE EXISTING ASPHALT PAVEMENT AREA LOCATED WITHIN THE LIMITS OF BUILDING 34 AS A LAYDOWN AREA. THE CONTRACTOR SHALL ENSURE THAT ALL EROSION AND SEDIMENT CONTROLS ARE IN PLACED PRIOR TO ESTABLISHMENT OF THE LAYDOWN AREA. THE CONTRACTOR SHALL STAY WITHIN THE PROJECT'S LIMITS/ LAND DISTURBANCE BOUNDARY AS SHOWN
ON THE PLANS.
3. UPON COMPLETION OF THE PROJECT, THE LAYDOWN AREA WILL BE RESTORED TO CONDITIONS
DIRECTED AND APPROVED BY THE CONTRACTING OFFICER.
4. CONTRACTOR WILL BE REQUIRED TO PROVIDE ANY AND ALL UTILITIES NECESSARY TO COMPLETE
THE WORK.
5. CONTRACTOR TO VERIFY THE EXACT LOCATIONS OF ALL EXISTING SITE FEATURES PRIOR TO
STARTING WORK.
6. ANY DAMAGE BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AND AT THE
CONTRACTOR'S EXPENSES TO ORIGINAL OR BETTER CONDITIONS.
7. PROVIDE SMOOTH TRANSITIONS AT THE TIE-IN TO EXISTING FEATURES. SITE GRADING AND PAVING
WORK SHALL BE DONE IN SUCH A MANNER TO ENSURE POSITIVE DRAINAGE TO THE EXISTING
DRAINAGE FEATURES AND TO PREVENT PONDING ON THE FINISHED GRADES AND CREATION OF LOW POINTS. THE CONTRACTOR SHALL MAKE FIELD ADJUSTMENTS AS NECESSARY TO ACHIEVE POSITIVE
DRAINAGE WHEN AUTHORIZED BY THE COR.
8. EXISTING UTILITIES SHOW ARE BASED ON EXISTING RECORDS AND FIELD SURVEY AND NOT
GUARANTEED TO BE EXACT OR COMPLETE. THE CONTRACTOR IS FULLY RESPONSIBLE FOR
VERIFYING ANY AND ALL ON-SITE EXISTING UTILITIES THAT COULD BE IMPACTED BY THE PROPOSED
WORK SHOWN ON THE PLANS.
9. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER REMOVAL, HANDLING, DISPOSAL OR
RECYCLING OF ALL DEMOLISHED BUILDING CONTENTS. THE CONTRACTOR SHALL REMOVE AND
DISPOSE OF ALL ASBESTOS CONTAINING MATERIALS (ACM) AND/OR OTHER HAZARDOUS MATERIALS (HM) PRESENT IN OR ON THE EXISTING BUILDING 34 AND ITS SURROUNDING AREAS THAT HAVE BEEN IDENTIFIED EITHER IN THE GOVERNMENT PROVIDED SURVEYS AND/OR ENCOUNTERED DURING THE CONSTRUCTION PHASE. ABATEMENT SHALL BE IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
DRAWINGS,SURVEYS AND REPORTS PROVIDED BY THE GOVERNMENT ARE PROVIDED AS
REFERENCES AND TO AID THE ACM AND HM REMOVAL DESIGN FOR THE PROJECT. ALL ACM AND
HM SHALL BE ABATED PER FEDERAL, STATE AND LOCAL GUIDELINES AND REGULATIONS AND
SHALL BE COORDINATED WITH THE DEFENSE LOGISTICS AGENCY. THE GOVERNMENT MAKES NO
WARRANTIES OR GUARANTEES, IMPLIED OR OTHERWISE, REGARDING THE ACCURACY OF
SPECIFIC QUANTITIES OF ACM OR HM PROVIDED, AS THESE ARE ESTIMATES.
10. DURING ALL PHASES OF CONSTRUCTION, THE CONTRACTOR MUST KEEP ALL ROADWAY ACCESS
OPEN FOR EMERGENCY VEHICLES AS TO NOT HINDER THE RESPONSE IN AN EMERGENCY
SITUATION.
11. CONTRACTOR TO ENSURE THAT THE WIDTHS OF ROADWAY ACCESS FOR EMERGENCY VEHICLES
ARE NOT OBSTRUCTED BY ANY AND ALL APPLICABLE FEDERAL AND LOCAL REGULATIONS AND
STANDARDS. FURTHERMORE, CONTRACTOR MUST ENSURE THAT NO VEHICLES ARE ALLOWED TO
BE PARKED WITHIN ANY AND ALL ROADWAY OF THE CONSTRUCTION AREA AS TO NOT OBSTRUCT
THE ABILITY OF EMERGENCY VEHICLE TO ACCESS THE ROADWAY.
12. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL DESIGNATE A PERSON TO ACT ON THE CONTRACTOR'S BEHALF. THIS INDIVIDUAL SHALL BE FULLY RESPONSIBLE FOR THE FIRE PREVENTION PROGRAM PER THE REQUIREMENT OF THE LATEST VERSION OF THE NATIONAL
FIRE PROTECTION ASSOCIATION-NFPA 241. THIS INDIVIDUAL SHALL BE RESPONSIBLE FOR
COMPLYING WITH ANY AND ALL THE REQUIREMENTS OF LATEST VERSION OF THE NFPA 241 AND SHALL CARRIES ALL THE DUTIES TO ENSURE THAT THE SITE CONDITIONS ARE MET THROUGHOUT
THE CONSTRUCTION PHASE.
DSCR CONTRACTOR GATE
(NORTH GATE)
ROAD G
ROAD G
ROAD L
PROJECT SITE - BLDG. 34
ROAD A
EXIST. LOAD CENTER
750 KVA
EXIST. SIDEWALK
LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
WWWWWWWWWWWWWW
WWWWWWWWW
EXIST. 12" RCP
W W
W W
W W
EXIST. 6" WATER
EXIST. 6" WATER
COMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
TELEPHONE/ COMM LINE
(APPROX. LOCATION)
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
S:
\D
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C D
_C S_
C G
.D W
G 2:
:1
PM
/2
2/
AE
C _N
C S_
4_ M
O N
O .S
TB
E4
TO
N
ZM
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
D
EM
O
LI
TI
O N
S
IT
E
PL
AN
CD101
GENERAL SHEET NOTES:
DEMOLITION KEY NOTES:
LEGEND:
1. DEMOLISH ALL SURFACE FEATURES.
2. DEMOLISH CHAIN LINK CANOPY (NOT SHOWN)
1. SEE C-001, V-101 FOR APPLICABLE INFORMATION.
EXISTING CONCRETE SLAB AND SIDEWALK TO
BE REMOVED.
SCALE: 1" = 5'-0"
DEMOLITION SITE PLANB7
SCALE IN FEET
00000000000000005 105
PLAN
NORTH
MECHANICAL ROOM
SD
WW
EE
COMM
STORM DRAIN
WATER
COMMUNICATION
PRIMARY POWER
GAS GAS LINE
LOD LIMITS OF DISTURBANCE
KEY PLAN:
BLDG. 34
PROJECT LOCATION
PARKING LOT
(ASPHALT)
EXIST. LOAD CENTER
750 KVA
EXIST. SIDEWALK
LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
6.43'
4.00'
4.
45°
45°
45°
4.
3.42'
3.
9.
7.72'
6.
3.
1.22'
1.
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
WWWWWWWWWWWWWW
WWWWWWWW
W W
W W
W W
COMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
TELEPHONE/ COMM LINE
(APPROX. LOCATION)
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
3.00'
14.48'
4.96'
.9
2.24
4.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
S:
\D
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C D
_C S_
C G
.D W
G 2:
:1
PM
/2
2/
AE
C _N
C S_
4_ M
O N
O .S
TB
E4
TO
N
ZM
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
SI
TE
P
LA
N
CS101
GENERAL SHEET NOTES:
KEY NOTES:
LEGEND:
1. CONCRETE SIDEWALK DETAILS - SEE DETAIL J9/C503. (ALSO
APPLIES TO ALL STOOPS AND LANDINGS).
2. LIGHT DUTY CONCRETE - SEE DETAILS L2,J9/C503 .
3. EQUIPMENT PADS - SEE STRUCTURAL PLANS.
4. POST FOR ATFP (ANTI TERRORISM FORCE PROTECTION)
CANOPY - SEE STRUCTURAL PLANS.
5. CONCRETE SPLASH BLOCK - SEE DETAILS D2/C503.
6. SEE ARCHITECTURAL PLANS FOR BRICK WALL.
7. SEE ARCHITECTURAL PLANS FOR ORNAMENTAL FENCE AND
GATE.
SCALE: 1" = 5'-0"
SITE PLANB7
SCALE IN FEET
00000000000000005 105
1 2
1. SEE C-001, V-101 FOR APPLICABLE INFORMATION.
PLAN
NORTH
LIGHT DUTY CONCRETE (SIDEWALKS)
NEW EQUIPMENT PADS - SEE STRUCTURAL
SD
WW
EE
COMM
STORM DRAIN
WATER
COMMUNICATION
PRIMARY POWER
GAS GAS LINE
LOD LIMITS OF DISTURBANCE
BRICK WALL - SEE ARCHITECTURAL
KEY PLAN:
(ASPHALT)
EXIST. LOAD CENTER
750 KVA
EXIST. SIDEWALK
LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
N: 3675957.3070 E: 11791515.5405
N: 3675959.1493 E: 11791507.9415
N: 3675984.6489 E: 11791495.6457
N: 3675968.6088 E: 11791503.3802
N: 3675960.3468 E: 11791502.9282
N: 3675949.0215 E: 11791479.5776
N: 3675958.1747 E: 11791475.1428
N: 3675972.3991 E: 11791512.9924
N: 3675957.7640 E: 11791514.2322
N: 3675964.5981 E: 11791519.2416 N: 3675965.6271 E: 11791519.9979
N: 3675962.8587 E: 11791521.1015
N: 3675957.2749 E: 11791520.0602
N: 3675961.3868 E: 11791518.0774
N: 3675972.8627 E: 11791531.1284
N: 3675975.9891 E: 11791534.9854
N: 3675939.8682 E: 11791484.0123
N: 3675970.8038 E: 11791517.5590
N: 3675971.7839 E: 11791531.6486
N: 3675973.8824 E: 11791536.0006
N: 3675977.5019 E: 11791543.5068
N: 3676004.5056 E: 11791530.4857
N: 3675965.9744 E: 11791519.6006
N: 3675966.8756 E: 11791499.7857N: 3675953.8311
E: 11791506.0758
N: 3675977.3265 E: 11791531.0862
N: 3675963.1934 E: 11791508.6834
N: 3675961.4599 E: 11791508.0778
N: 3675960.6077 E: 11791507.8797
N: 3675960.3568 E: 11791507.3593
N: 3675973.7316 E: 11791530.5380
N: 3675972.1510 E: 11791532.3737
N: 3675973.2701 E: 11791531.8546
N: 3675970.1701 E: 11791499.9518
N: 3675986.0825 E: 11791492.2789
N: 3675974.2533 E: 11791515.9742
N: 3675978.3434 E: 11791524.4563 N: 3675990.8037 E: 11791518.4480
N: 3675986.7137 E: 11791509.9659
N: 3675981.6515 E: 11791538.2959
N: 3675999.0660 E: 11791529.8987
N: 3675995.6275 E: 11791522.7678
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
S:
\D
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C D
_C S_
C G
.D W
G 2:
:1
PM
/2
2/
AE
C _N
C S_
4_ M
O N
O .S
TB
E4
TO
N
ZM
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
ST
AK
EO
U T
PL
AN
CS102
GENERAL SHEET NOTES:
KEY NOTES:
LEGEND:
1. SEE C-001, V-101 FOR APPLICABLE INFORMATION.
2. COORDINATES NOT SHOWN FOR EQUIPMENT PADS DUE TO
CONTRACTOR'S SHOP DRAWING SUBMITTALS.
1. SEE STRUCTURAL PLANS FOR ATFP (ANTI TERRORISM
FORCE PROTECTION) CANOPY POST LAYOUT.
2. SEE CS101 & ARCHITECTURAL PLANS FOR WALL DETAILS.
3. STAKEOUT COORDINATES ARE APPROXIMATE.
CONTRACTOR SHALL FLAG AND STRINGLINE LOCATIONS
PRIOR TO SELECTION OF EQUIPMENT. ONCE SELECTION
DATA IS AVAILABLE. CONTRACTOR HALL SET AND/OR
ADJUST FLAGS FOR APPROVAL BY THE COR.
SCALE: 1" = 5'-0"
STAKEOUT PLANB7
SCALE IN FEET
00000000000000005 105
PLAN
NORTH
LIGHT DUTY CONCRETE (SIDEWALKS)
NEW EQUIPMENT PADS - SEE STRUCTURAL
GRAVEL (2" DEEP, #57 STONE)
KEY PLAN:
(ASPHALT)
EXIST. LOAD CENTER
750 KVA
EXIST. SIDEWALK
LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
WWWWWWWWWWWWWW
WWWWWWWWW
W W
W W
W W
COMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
TELEPHONE/ COMM LINE
(APPROX. LOCATION)
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
122.8
122.8122.83
122.8
122.8
122.83
122.85
122.96
123.0 123.0
122.92
122.9
FF=123.0
122.8
123.0
122.8
MATCH GRADE
MATCH GRADE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
S:
\D
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C D
_C S_
C G
.D W
G 2:
:2
PM
/2
2/
AE
C _N
C S_
4_ M
O N
O .S
TB
E4
TO
N
ZM
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
G
R
AD
IN
G
A N
D E
R O
SI
O
N
S
ED
IM
EN
T C
O N
TR
O
L
PL
AN
CG101
GENERAL SHEET NOTES:
LEGEND:
1. SEE C-001, V-101 FOR APPLICABLE INFORMATION.
2. NEW CANOPY POSTS NOT SHOWN FOR CLARITY.
3. ONCE ALL CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED
AND PRIOR TO DEMOBILIZATION, THE CONTRACTOR SHALL
REMOVE THE CONSTRUCTION ENTRANCE AND INSTALL ALL
EROSION AND SEDIMENT CONTROL MEASURES WITHIN THOSE
LIMITS.
SCALE IN FEET
00000000000000005 105
PLAN
NORTH
LIGHT DUTY CONCRETE (SIDEWALKS)
NEW EQUIPMENT PADS - SEE STRUCTURAL
GRAVEL (2" DEEP, #57 STONE)
CONSTRUCTION ENTRANCE
KEY NOTES:
A7 SCALE: 1" = 5'-0"
GRADING AND EROSION &
SEDIMENT CONTROL PLAN
CE
SF
PS MU TS
SF
PS MU TS
PS MU TS
1 CONTRACTOR SHALL INSTALL GEOTEXTILE MEMBRANE
PRIOR TO PLACING GRAVEL SURFACE.
SF SILT FENCE - SEE DETAIL C-502
MU MULCHING - SEE DETAIL C-502
TS TEMPORARY SEEDING - SEE DETAIL C-502
PS PERMANENT SEEDING- SEE DETAIL C-502
CE CONSTRUCTION ENTRANCE- SEE DETAIL C-502
X 122.8 SPOT ELEVATION
SD
WW
EE
COMM
STORM DRAIN
WATER
COMMUNICATION
PRIMARY POWER
GAS GAS LINE
LOD LIMITS OF DISTURBANCE
FINISH FLOOR OF EQUIPMENT PADS SHALL BE A
MINIMUM OF 3 (THREE) INCHES ABOVE THE ADJACENT
NATURAL GRADE. SLOPE PAD TOWARDS GATE AT 0.5%.
KEY PLAN:
EXIST. 12" CONC PIPE (SD)
EXIST. 6" WATER
EXIST. HIGH VOTAGE UGE
EXIST. 6" WATER
EX
IS
T.
H
IG
H V
OTA
GE
UGE
PARKING LOT
(ASPHALT)
EXIST. LOAD CENTER
750 KVA
EXIST. SIDEWALK
LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
COMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
TELEPHONE/ COMM LINE
(APPROX. LOCATION)
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
LIMITS OF DIRECTIONAL DRILLING
(SEE SPECIFICATION 33 05 23.13)
SEE MECHANICAL PLANS
FOR INTERNAL ALIGNMENT
WITHIN BUILDING 34
EXIST NATURAL GAS LINE
GAS GAS GAS GAS
G
AS
G
AS
G
AS
G
AS
GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
EEEE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
S:
\D
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C D
_C S_
C G
.D W
G 2:
:2
PM
/2
2/
AE
C _N
C S_
4_ M
O N
O .S
TB
E4
TO
N
ZM
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
U
TI
LI
TY
P
LA
N
CU101
GENERAL SHEET NOTES:
LEGEND:
KEY NOTES:
1. SEE C-001, V-101 FOR APPLICABLE INFORMATION.
2. SEE MECHANICAL AND ELECTRICAL PLANS FOR MORE SPECIFIC
INFORMATION.
3. NEW NATURAL GAS AND ELECTRIC LINES WITHIN THE
EXPANDED MECHANICAL YARD ARE APPROXIMATE AND SHALL
BE SUSPENDED FROM THE ATFP (ANTI TERRORISM FORCE
PROTECTION) CANOPY FRAMEWORK. EXACT LOCATION TO BE
DETERMINED ONCE EQUIPMENT SELECTION HAS BEEN MADE.
SEE STRUCTURAL AND ELECTRICAL PLANS.
SCALE IN FEET
00000000000000005 105
PLAN
NORTH
B7 SCALE: 1" = 5'-0"
UTILITY PLAN
LIGHT DUTY CONCRETE (SIDEWALKS)
NEW EQUIPMENT PADS - SEE STRUCTURAL
GRAVEL (2" DEEP, #57 STONE)
SD
WW
EE
COMM
STORM DRAIN
WATER
COMMUNICATION
PRIMARY POWER
GAS GAS LINE
LOD LIMITS OF DISTURBANCE
1. PROPOSED GAS LINE
2. PROPOSED ELECTRICAL LINE
KEY PLAN:
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C .D
W G
1:
:0
PM
/2 1/
AE
C
_B &W
.S
TB
E4
TO
N
ZM
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
ER
O
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
H
AN
D
BO
O K
C-501
1. PROJECT DESCRIPTION
THIS PROJECT CONSISTS THE DEMOLITION OF ALL INTERIOR FEATURES INCLUDING THE EXTERIOR
BRICK WALL AND GATE. THE YARD SHALL BE EXPANDED TO ALLOW FOR A NEW CHILLER AND
NATURAL GAS POWERED GENERATOR TO SERVE THE B34 FACILITY. THE NEW ADDITION WILL
INCREASE FROM 807 S.F TO 1212 S.F. THE TOTAL DISTURBED AREA IS 1945 SQ.FT.
2. EXISTING SITE CONDITIONS
THE EXISTING MECHANICAL YARD IS LOCATED NEAR THE EAST END OF BLDG 34 AND MORE
SPECIFICALLY EAST OF THE MAIN ENTRANCE. THE EXISTING ENCLOSURE IS 807 S.F.
THE MECHANICAL YARD IS BOUNDED ON THREE SIDES BY BLDG 34 AND BY A BRICK WALL AND
DOUBLE PANEL ORNAMENTAL GATE. A SIDEWALK CONNECTS THE MECHANICAL ROOM TO THE
FRONT ENTRANCE. INTERIOR FEATURES INCLUDE THE EQUIPMENT PAD FOR THE CHILLER AND
POSTS SUPPORTING THE ANTI-TERRORISM FORCE PROTECTION (ATFP) CHAIN LINK FENCE
CANOPY.
SITE ELEVATION WITHIN THE MECHANICAL YARD IS VERY FLAT. A DOWNSPOUT IS LOCATED
BEHIND THE MECHANICAL ROOM DOOR WHERE DRAINAGE HAS WASHED AWAY SOME OF THE
SOIL AT ITS BASE. SURFACE DRAINAGE FROM THE REAR OF THE BUILDING TO THE FRONT IS
INTENDED TO REMAIN THE SAME AS THE PRE-PROJECT CONDITION.
3. ADJACENT AREAS
THIS SITE IS BOUNDED ON ALL SIDES BY THE DSCR INSTALLATION.
4. SOILS
A SUBSURFACE EXPLORATION WAS NOT CONDUCTED IN PREPARATION FOR THE DESIGN OF THIS
PROJECT, DUE TO THE MINIMAL EXPANSION OF THE MECHANICAL YARD.
5. CRITICAL AREAS
THERE ARE NO CRITICAL AREAS DEFINED FOR THIS PROJECT.
6. EROSION AND SEDIMENT CONTROL MEASURES
UNLESS OTHERWISE INDICATED, ALL VEGETATED AND STRUCTURAL ESC CONTROL PRACTICES
SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE LATEST EDITION OF THE
MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT
CONTROL HANDBOOK (VESCH) APPLICABLE TO THE PIEDMONT REGION OF VIRGINIA. THE
MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO BEFORE, DURING, AND AFTER
CONSTRUCTION, UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE. REFER TO THE
CONSTRUCTION PLANS FOR DETAILS AND LOCATIONS ASSOCIATED WITH THE CONTROL
MEASURES.
6.1. GENERAL
6.1.1. A COPY OF THE APPROVED ESC PLAN AND THE VESCH SHALL BE MAINTAINED ON THE
SITE AT ALL TIMES.
6.1.2. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN
INDICATED ON THE ESC PLANS (INCLUDING, BUT NOT LIMITED TO OFF-SITE BORROW OR
WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY ESC PLAN TO THE
OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
6.1.3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE
OF ANY ADDITIONAL CONTROL MEASURES NECESSARY TO PREVENT EROSION AND
SEDIMENTATION.
6.2. STRUCTURAL PRACTICES
6.2.1. TEMPORARY STONE CONSTRUCTION ENTRANCE (CE) - VESCH STD. 3.02
TEMPORARY STONE CONSTRUCTION ENTRANCE IS PROVIDED TO REDUCE THE
AMOUNT OF MUD TRANSPORTED ONTO SURROUNDING PAVED ROADWAY BY
CONSTRUCTION VEHICLES. TEMPORARY STONE CONSTRUCTION ENTRANCE WILL BE
PROVIDED TO ALLOW ACCESS FROM THE MAIN ROAD TO EACH SITE AND ACT AS AN
ENTRANCE TO SITES WITH NO ESTABLISHED ENTRANCE. THE CONSTRUCTION ENTRANCE
MUST BE AT A MINIMUM 70-FEET IN LENGTH, 6-INCHES DEEP, AND 24-FEET WIDE.
6.2.2. SILT FENCE - WIRE SUPPORTED (SF) - VESCH STD. 3.05
SILT FENCING WILL SERVE AS A PERIMETER CONTROL TO PROTECT DISTURBED AREAS
FROM OFF-SITE RUNOFF AND TO PREVENT SEDIMENTATION DAMAGE TO AREAS OUTSIDE
THE PROJECT SITE.
6.3. VEGETATED PRACTICES
6.3.1. TEMPORARY SEEDING (TS) - VESCH STD. 3.31
TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN
SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE.
TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN (7) DAYS TO
DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR
LONGER THAN FOURTEEN (14) DAYS. TEMPORARY SEEDING SHALL BE APPLIED
IMMEDIATELY AFTER ROUGH GRADING IS COMPLETED ON THE RESPECTIVE AREAS.
REFER TO TABLE 3.31-B FOR TEMPORARY SEEDING GUIDANCE.
6.3.2. PERMANENT SEEDING (PS) - VESCH STD. 3.32
ALL AREAS AT FINAL GRADE MUST BE SEEDED WITHIN SEVEN (7) DAYS AFTER
COMPLETION OF LAND DISTURBANCE ACTIVITY. EXCEPT FOR SMALL LEVEL AREAS,
SEEDED AREAS SHALL BE PROTECTED WITH MULCH. REFER TO TABLE 3.32-E FOR
PERMANENT SEEDING GUIDANCE.
6.3.3. MULCHING (MU) - VESCH STD. 3.35
AREAS WHICH HAVE BEEN TEMPORARILY OR PERMANENTLY SEEDED SHALL BE MULCHED
IMMEDIATELY FOLLOWING SEEDING TO FOSTER THE GROWTH OF VEGETATION.
7. MANAGEMENT STRATEGIES
7.1. STONE CONSTRUCTION ENTRANCES AND SILT FENCE WILL BE INSTALLED AS AN EARLY STEP
DURING LAND DISTURBING ACTIVITIES.
7.2. THE SITE IS TO DRAIN VIA SHEET FLOW ACROSS THE SIDEWALK/ GATE ENTRANCE AND
ORNAMENTAL FENCE AT THE OPPOSITE END OF THE BRICK WALL/ FACE OF BUILDING.
BEYOND THAT POINT, SURFACE DRAINAGE WILL CONTINUE AS SHEET FLOW TOWARDS THE
EXISTING SIDEWALK AND ASPHALT PARKING LOT.
7.3. RESPONSIBILITY FOR PLAN IMPLEMENTATION SHOULD BE GIVEN TO THE CONSTRUCTION
SUPERINTENDENT AND HE/SHE SHALL MAKE ALL CONSTRUCTION WORKERS AWARE OF THE
PROVISIONS OF THE PLAN.
7.4. ALL ESC CONTROL MEASURES SHALL BE CHECKED CONTINUOUSLY AND ESPECIALLY AFTER
EACH SIGNIFICANT STORM TO LOCATE DAMAGES AND CONDUCT MAINTENANCE
OPERATIONS.
7.5. ALL TEMPORARY ESC CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER
FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED,
UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED
SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF
TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER
EROSION AND SEDIMENTATION.
7.6. WHENEVER A SLOPE FACE HAS WATER SEEPING FROM IT, ADEQUATE DRAINAGE OR OTHER
PROTECTION SHALL BE PROVIDED TO ENSURE THE SAFETY AND STABILITY OF THE SLOPE.
7.7. ANY AND ALL MATERIAL TRANSPORTED ONTO A PUBLIC OR PRIVATE ROAD SURFACE WILL BE
REMOVED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM
THE ROAD BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL
DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED
IN THIS MANNER.
7.8. ALL TEMPORARY EQUIPMENT, CONSTRUCTION MATERIAL, AND DEBRIS MUST BE REMOVED
FROM THE SITE IN A LAWFUL MANNER IN ORDER FOR CONSTRUCTION TO BE CONSIDERED
COMPLETE.
7.9. ALL EXCESS EXCAVATED EARTHWORK MATERIAL SHALL BE PROPERLY TRANSPORTED
OFFSITE AND DISPOSED AT AN APPROVED LOCATION PERTAINING TO APPLICABLE LOCAL,
STATE AND FEDERAL REGULATIONS.
8. SEQUENCE OF CONSTRUCTION
8.1. OBTAIN NECESSARY PERMITS.
8.2. MOBILIZATION.
8.3. ERECT CONTRACTOR STAGING AREAS.
8.4. AS A FIRST MEASURE PRIOR TO LAND DISTURBANCE, INSTALL EROSION AND SEDIMENT
CONTROL MEASURES AROUND LAND DISTURBING ACTIVITIES ON PROJECT SITE.
8.5. INSTALL STABILIZED CONSTRUCTION ACCESS.
8.6. PERFORM DEMOLITION OF EXTERIOR WALL, GATE, AND INTERIOR FEATURES OF EXISTING
MECHANICAL WALL.
8.7. PERFORM SITE DEMOLITION OPERATIONS.
8.8. PERFORM ROUGH GRADING OF THE SITE.
8.9. ALL EXCAVATED MATERIAL SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE
LOCAL, STATE, AND FEDERAL REGULATIONS.
8.10. BEGIN CONSTRUCTION OF NEW EXTERIOR WALL AND INTERIOR FEATURES INCLUDING
CONCRETE SIDEWALK, ANTI-TERRORISM FORCE PROTECTION (ATFP) CANOPY, EQUIPMENT
PADS, AND SUBSEQUENTLY THE NEW CHILLER AND NATURAL GAS GENERATOR.
8.11. INSTALL ALL PROPOSED UTILITIES.
8.12. BACKFILL UTILITY TRENCHES IN A TIMELY MANNER TO MINIMIZE EROSION AND SOIL LOSS.
8.13. INSTALL TEMPORARY SEEDING IN ALL DENUDED AREAS.
8.14. INSTALL HARDSCAPE, TO INCLUDE SIDEWALK.
8.15. FINE GRADE REMAINING SITE.
8.16. INSTALL LANDSCAPING.
8.17. REMOVE TEMPORARY EROSION CONTROL STRUCTURES.
9. PERMANENT STABILIZATION
ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING
WITHIN 7 DAYS FOLLOWING FINISH GRADING. SEEDING SHALL BE DONE IN ACCORDANCE WITH
STD. & SPEC. 3.32, PERMANENT SEEDING, OF THE HANDBOOK. STRAW OR FIBER MULCH WILL BE USED. IN ALL SEEDING OPERATIONS, SEED, FERTILIZER AND LIME WILL BE APPLIED PRIOR TO
MULCHING.
10. MAINTENANCE OF EROSION AND SEDIMENT
CONTROL MEASURES
10.1.TEMPORARY STONE CONST. ENTRANCE (CE) - VESCH STD. 3.02
10.1.1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR FLOW OF MUD ONTO DSCR ROADWAYS. THIS MAY REQUIRE PERIODIC TOP
DRESSING WITH ADDITIONAL STONE OR THE WASHING AND REWORKING OF EXISTING
STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY STRUCTURES
USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED
FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED
IMMEDIATELY. THE USE OF WATER TRUCKS TO REMOVE MATERIALS DROPPED, WASHED,
OR TRACKED ONTO ROADWAYS WILL NOT BE PERMITTED UNDER ANY CIRCUMSTANCES.
10.1.2. REMOVAL. REMOVAL OF THE CE SHALL NOT CAUSE THE MIGRATION OF SEDIMENT
OFFSITE. THE CE CAN BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE.
10.2.SILT FENCE (WITH WIRE SUPPORT) (SF) - VESCH STD. 3.05
10.2.1. SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT
LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE
IMMEDIATELY.
10.2.2. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE
RESULTING FROM END RUNS AND UNDERCUTTING.
10.2.3. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR
TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE
FABRIC SHALL BE REPLACED PROMPTLY.
10.2.4. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST
BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE
BARRIER.
10.2.5. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO
LONGER REQUIRED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE,
PREPARED AND SEEDED.
10.2.6. REMOVAL. SILT FENCE SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR
USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY
STABILIZED.
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C .D
W G
1:
:0
PM
/2 1/
AE
C
_B &W
.S
TB
E4
TO
N
ZM
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
ER
O
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
D
ET
AI
LS
C-502
TABLE 3.31-B
ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS
MULCHING
A. SEEDING MADE IN FALL FOR WINTER COVER AND DURING HOT DRY
SUMMER MONTHS SHALL BE MULCHED IN ACCORDANCE WITH MULCHING,
STD. & SPEC. OF THE VIRGINIA EROSION & SEDIMENT CONTROL
HANDBOOK, THIRD EDITION 1992.
MAINTENANCE
A. IRRIGATION - IF SOIL MOISTURE IS DEFICIENT. SUPPLY NEW SEEDINGS AND
PLANTINGS WITH ADEQUATE WATER FOR PLANT GROWTH UNTIL THEY ARE
FIRMLY ESTABLISHED.
B. REPAIR - INSPECT ALL AREAS FOR PLANTING FAILURES AND MAKE
NECESSARY REPAIRS.
SPECIES
50/50 MIX OF ANNUAL
RYEGRASS (LOLIUM
MULTI-FLORUM) & CEREAL
(WINTER) RYE (SECALE
CEREALE)
ANNUAL RYEGRASS
(LOLIUM MULTI-FLORUM)
GERMAN MILLET (SETARIA
ITALICA)
SEEDING RATE (LBS./ACRE)
50 - 100
60 - 100
SEED MIX:.
39.57% DAVINCI TALL FESCUE 90% GERMINATION
29.90% VAN GOGH TALL FESCUE 90% GERMINATION
29.55% MONET TALL FESCUE 90% GERMINATION
PS
TS CE
SF SF
MU
NTS
PERMANENT SEEDINGG2
NTS
TEMPORARY SEEDINGA2
NTS
SILT FENCEH7 NTS
SILT FENCEH12
NTS
MULCHINGA12NTS
CONSTRUCTION ENTRANCEA7
SC
R
\1
5_ (B
C
H
IL
LE
R
R
EP
LA
C
EM
EN
T) \2
_D
ES
IG
N
\C
IV
IL
D \1
5_
B3 4_
C .D
W G
1:
:1
PM
/2 1/
AE
C
_B &W
.S
TB
E4
TO
N
ZM
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
N
AO
F
IL
E N
O
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N O
R
FO
LK
D
IS
TR
IC
T
FR
O
N T
ST
R
EE
T
N O
R
FO
LK
, V
A
JU
N
E
D
SC
R
, R
IC
H M
O N
D , V
IR
G
IN
IA
B3
C H
IL
LE
R R
EP
LA
C
EM
EN
T
P2
R
TA
S U
BM
IT
TA
L
G . P
R
EV
IT
O
R . T
R
AM
M
EL
L
G . P
R
EV
IT
O
B.
H
AR
R
IS
D
ET
AI
LS
C-503
CONCRETE SIDEWALK
JOINT LAYOUT AND FINISH
EXPANSION JOINT
IN SIDEWALK
CONTRACTION
JOINT IN SIDEWALK
BROOMED FINISH
4" WIDE SMOOTH
TROWELED PERIMETER
E EXPANSION
JOINT
C CONTRACTION JOINT
PREMOLDED JOINT
FILLER
1/8" TO 1/4"
1" M
IN
1/2"
WIDTH VARIES
SEE SHEET CS101 AND CS102
3/4" CHAMFER
IN TURF AREAS
1"
FINISH GRADE
TURF AREAS
FLUSH AT ASPHALT
PAVED AREAS
SIDEWALK
(OPTIONAL)
DRAINAGE
NOTES:
1. PROVIDE CONTRACTION (SAWED) JOINTS AT INTERVALS AT 6' O.C.
2. EXPANSION JOINTS SHALL BE PLACED AT 24' INTERVALS OR AS
SHOWN ON PLANS. ALL EXPANSION JOINTS SHALL BE SEALED
WITH A COMMERCIAL SEALANT MATERIAL.
3. SIDEWALK ADJACENT TO BUILDING TO HAVE A MINIMUM
TRANSVERSE SLOPE OF 1% AWAY FROM BUILDING.
4. 1/2" EXPANSION JOINT MATERIAL AT ALL LOCATIONS WHERE NEW
CONCRETE ABUTS EXITING OR NEW STRUCTURES AND AT ALL
CHANGES IN DIRECTION OF SIDEWALK.
5. SIDEWALK CROSS SLOPE NOT TO EXCEED 2.00%.
6. WALKWAYS WIDER THAN 6' SHALL HAVE DOWELED LONGITUDINAL
JOINTS IN ADDITION TO TRANSVERSE JOINTS.
7. FOR LIGHT DUTY CONCRETE PAVEMENT DETAIL, SEE THIS SHEET.
NTS
CONCRETE SIDEWALK DETAILSJ9
NTS
CONCRETE SIDEWALK AT TURFL2
4" 3500 PSI CONCRETE
4" AGGREGATE BASE COURSE
(VDOT NO.21B, TYPE 1 CRUSHED STONE)
COMPACT TO 95% MAX.
DRY DENSITY PER ASTM 1557.
12"
3"
3000 PSI CONCRETE
24"
D2 TYP. CONCRETE SPLASH BLOCK DETAIL
NTS
ABBREVIATIONS
ABBREVIATION
AB
AFF
ANR
APPROX
ARCH
ATFP
BC
BEJ
BM
BOC
BOE
BOS
BOT
BRG
BP
BRP
CFMF
CFS
CJ
CL
CLR
CMU
COL
CONN
CONC
CONT
COORD
DE
DIA
DIAG
DIM
DN
EA
EF
EJ
ELEV, EL
EOS
EQ
ES
EW
EXT
FDN
FFE
FOB
FS
FTG
GA
HORIZ
HS
HSS
JBE
JS
JST
KB
KIPS (k)
LG
LLH
LLV
LSH
LSV
MAX
MCJ
MECH
MFR
MIN
MOW
N/A
NIC
NO
NOM
OC
OPP
PCL
PJF
PL
PLF
PSF
PSI
RB
REINF
REJ
REQD
SC
SCHED
SDS
SF
SHT
SIM
SPA
SQ
STD
T&B
TOC
TOF
TOM
TOS
TOW
TS
TYP
UON
VERT
WF
WP
WWF
WT
DESCRIPTION
ANCHOR BOLT
ABOVE FINISHED FLOOR
ANCHOR
APPROXIMATELY
ARCHITECTURAL
ANTI-TERRORISM AND FORCE
PROTECTION
BOTTOM CHORD
BUILDING EXPANSION JOINT
BEAM
BOTTOM OF CONCRETE
BOTTOM OF EMBEDMENT
BOTTOM OF STEEL
BOTTOM
BEARING
BEARING OR BASE PLATE
BRICK RELIEF PLATE
COLD-FORMED METAL
FRAMING
COLD-FORMED STEEL
CONTROL JOINT
CENTER LINE
CLEAR
CONCRETE MASONRY UNIT
COLUMN
CONNECTION
CONCRETE
CONTINUOUS
COORDINATE
DECK EDGE
DIAMETER
DIAGONAL
DIMENSION
DOWN
EACH
EACH FACE
EXPANSION JOINT
ELEVATION
EDGE OF SLAB
EQUAL
EACH SIDE
EACH WAY
EXTENSION
FOUNDATION
FINISHED FLOOR ELEVATION
FACE OF BRICK
FOOTING STEP
FOOTING
GAGE
HORIZONTAL
HIGH STRENGTH
HOLLOW STRUCTURAL SHAPE
JOIST BEARING ELEVATION
JOIST SUBSTITUTE
JOIST
KNUCKLED BEAM
1000 POUNDS
LONG
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LONG SIDE HORIZONTAL
LONG SIDE VERTICAL
MAXIMUM
MASONRY CONTROL JOINT
MECHANICAL
MANUFACTURER
MINIMUM
MIDDLE OF WALL
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NOMINAL
ON CENTER
OPPOSITE
PRE-CAST COMPOSITE LINTEL
PREMOLDED JOINT FILLER
PLATE
POUNDS PER LINEAR FOOT
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
ROUND BAR
REINFORCEMENT
ROOF EXPANSION JOINT
REQUIRED
STUB COLUMN
SCHEDULE
SELF DRILLING SCREW
SPREAD FOOTING
SHEET
SIMILAR
SPACES/SPACED
SQUARE
STANDARD
TOP AND BOTTOM
TOP OF CONCRETE
TOP OF FOOTING/FOUNDATION
TOP OF MASONRY
TOP OF STEEL
TOP OF WALL
THICKENED SLAB
TYPICAL
UNLESS OTHERWISE NOTED
VERTICAL
WALL FOOTING
WORKING POINT
WELDED WIRE FABRIC
WEIGHT
CONCRETE CONSTRUCTION NOTES
1. ALL CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF
THE AMERICAN CONCRETE INSTITUTE (ACI).
2. CAST-IN-PLACE CONCRETE SHALL ATTAIN THE MINIMUM 28-DAY COMPRESSIVE
STRENGTHS (f'c) OF:
4000 PSI ALL CONCRETE UON
3. CONCRETE DENSITY SHALL BE NORMAL WEIGHT UON ON DRAWINGS.
4. CONCRETE REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM
A615/A615M, GRADE 60.
5. WELDED WIRE REINFORCEMENT SHALL CONFORM TO ASTM A185. PROVIDE SHEET-
TYPE WWR. SHEET LAPS SHALL BE TIED AND LAPPED ONE FULL MESH SPACING.
6. CONCRETE REINFORCING STEEL SHALL BE CONTINUOUS UNLESS OTHERWISE
INDICATED. CONTINUOUS REINFORCING STEEL SHALL BE LAPPED WITH TYPE "B"
SPLICES IN ACCORDANCE WITH THE REQUIREMENTS OF ACI 318.
7. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS INDICATED. IN NO
CASE SHALL REINFORCEMENT COVER BE LESS THAN THE REQUIREMENTS OF ACI 301.
A. CONCRETE DEPOSITED AGAINST THE GROUND: 3"
B. CONCRETE EXPOSED TO EARTH OR WEATHER:
1. #5 BAR OR SMALLER 1-1/2"
2. #6 BAR OR LARGER 2"
C. INTERIOR ELEVATED FLOOR:
1. TOP 3/4"
2. BOT 1-1/2"
D. SLAB ON GRADE REINF. DEPTH 1-1/2" FROM TOP OF SLAB
8. CONCRETE REINFORCING STEEL MARKED STANDARD HOOK SHALL HAVE A 90-DEGREE
HOOK UNLESS OTHERWISE NOTED. STIRRUP, TIE AND 180-DEGREE HOOKS AND 90-
DEGREE HOOKS SHALL CONFORM TO THE REQUIREMENTS OF ACI 318.
9. PROVIDE 1/2" WIDE ISOLATION JOINT WITH PRE-MOLDED JOINT FILLER MATERIAL WHERE
FOUNDATIONS ABUT VERTICAL SURFACES.
10. ALL EMBEDDED ITEMS SHALL BE PROPERLY PLACED, ACCURATELY POSITIONED, AND
MAINTAINED SECURELY IN PLACE PRIOR TO AND DURING CONCRETE PLACEMENT.
ALL PIPING PASSING THROUGH ELEVATED FLOOR SLABS AND WALLS SHALL BE SLEEVED
TO ALLOW FOR MAINTENANCE AND REPLACEMENT.
11. REINFORCING STEEL SHALL BE SPREAD AT SLEEVES, TIEBACKS, RECESSES AND
OTHER EMBEDDED ITEMS UNLESS OTHERWISE INDICATED. REINFORCEMENT SHALL NOT
BE CUT TO FACILIATE PLACEMENT OF EMBEDDED ITEMS.
12. NO CONCRETE SHALL BE PLACED UNTIL THE CONTRACTING OFFICER OR THE
CONTRACTING OFFICER'S DESIGNATED REPRESENTATIVE HAS INSPECTED ALL
EMBEDDED WORK, INCLUDING REINFORCEMENT.
13. ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED 3/4" UON.
14. ALUMINUM SHALL NOT BE PLACED IN DIRECT CONTACT WITH CONCRETE UNLESS
EFFECTIVELY COATED OR COVERED TO PREVENT ALUMINUM-CONCRETE REACTION AND
ELECTROLYTIC ACTION BETWEEN ALUMINUM AND STEEL.
DESIGN CRITERIA
1. STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE FOLLOWING CODES AND
SPECIFICATIONS:
A. 2018 INTERNATIONAL BUILDING CODE
B. ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDING AND OTHER STRUCTURES
C. UFC 1-200-01 CHANGE 1 DoD BUILDING CODE (2020)
D. ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE &
COMMENTARY
E. UFC 4-010-01 CHANGE 1 DoD MINIMUM ANTITERRORISM STANDARDS FOR
BUILDINGS (2020)
F. UFC 3-301-01 CHANGE 1 STRUCTURAL ENGINEERING (2022)
G. TMS 402/602-16, BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES
H. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS
2. DESIGN LOAD CRITERIA:
A. RISK CATEGORY I
B. SNOW LOAD:
GROUND SNOW LOAD, Pg 20 PSF
SNOW LOAD IMPORTANCE FACTOR, I 0.80
SNOW EXPOSURE FACTOR, Ce 0.90 THERMAL FACTOR, Ct 1.00
D. WIND LOADS:
WIND IMPORTANCE FACTOR, I 1.0
BASIC WIND SPEED, V 104 MPH
WIND EXOSURE CATEGORY C
E. SEISMIC LOADS:
SEISMIC IMPORTANCE FACTOR, I 1.0
SPECTRAL RESPONSE ACCELERATION, Ss 0.22g SPECTRAL RESPONSE ACCELERATION, S1 0.054g
SITE CLASS D
DESIGN SPECTRAL ACCELERATION, SDs 0.229g DESIGN SPECTRAL ACCELERATION, SD1 0.086g
SEISMIC DESIGN CATEGORY B
ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE
F. FROST DEPTH 18"
GENERAL NOTES
1. USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH ALL OTHER DRAWINGS. COORDINATE
THE WORK OF OTHER TRADES INCLUDING, BUT NOT LIMITED TO THE REQUIREMENTS FOR
SLEEVES, INSERTS, HOLES, HANGERS AND ANCHORS.
2. ELEVATIONS ON THE STRUCTURAL DRAWINGS ARE DENOTED AS [+/-X'-X"] REFERENCED TO
THE GRADE ELEVATION DATUM SET AT +0'-0".
3. THE CONTRACTOR SHALL REPORT DISCREPANCIES IN DIMENSIONS BETWEEN DIFFERENT
DRAWINGS TO THE CONTRACTING OFFICER PRIOR TO BEGINNING WORK IN AREAS THAT WILL
BE AFFECTED.
4. DETAILS ENTITLED OR NOTED AS "TYPICAL" APPLY NOT ONLY WHERE SPECIFICALLY
INDICATED OR REFERENCED, BUT ALSO IN ALL OTHER CASES WHERE THE NATURE OF THE
CONSTRUCTION REQUIRES THEIR USE.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .