Att 16 - S02_Drawings_6A.pdf

PDF 15 MB Posted

Attached to
595-601 Construct New CLC Construction DBB Lebanon, PA VISN 4
Solicitation number
36C77624R0026_1
Issued by

About this file

This document appears to be Attachment 16 - S02_Drawings_6A.pdf, which is related to Solicitation Number 36C77624R0026_1 for the "595-601 Construct New CLC Construction DBB Lebanon, PA VISN 4" project.

The solicitation is for a new construction project to build a Community Living Center (CLC) at the Lebanon, PA VA Medical Center. The initial phase includes one new resident hospice building with a garage, a portion of the main loop road, associated parking, and a new Mechanical Room/Link Building connected by an enclosed corridor. The total approximate square footage of the new buildings is 18,500 sf. The project will include general construction, alterations, roads, walks, grading, drainage, mechanical, electrical, plumbing, fire protection, utility systems, and removal of existing structures as required by the drawings and specifications. The Department of Veterans Affairs Technology Acquisition Center Austin is the procuring agency.

View the file

Other files

File Type Posted
Amend 0010 - 36C77624R0026 0010.pdf PDF
Amend 0009 - AE601.pdf PDF
Amend 0009 - 36C77624R0026 0009.pdf PDF
Amend 0009 - AE VA Responses 8.20.24.xlsx XLSX spreadsheet
Amend 0008 - AE VA Responses 8.15.24_R1.xlsx XLSX spreadsheet
Amend 0008 - Wage Determination 8.15.24.pdf PDF
Amend 0008 - 36C77624R0026 0008.pdf PDF
Amend 0008 - Contents of Zip File.docx DOCX document
Amend 0008 - Response Attachements.zip ZIP file
Amend 0007 - Zip File Contents.docx DOCX document
Amend 0007 - Combined JA 8.8.24.pdf PDF
Amend 0007 - AE Responses.zip ZIP file
Amend 0007 - 36C77624R0026 0007.pdf PDF
Amend 0007 - AE VA Responses 8.9.24.xlsx XLSX spreadsheet
Amend 0006 - 36C77624R0026 0006.pdf PDF
Amend 0005 - 36C77624R0026 0005.pdf PDF
Amend 0005 - AE VA Responses 7.22.24.xlsx XLSX spreadsheet
Amendment 0004 - 36C77624R0026 0004.pdf PDF
Amendment 0004 - JA Redacted - HVAC Controls - Distech.pdf PDF
Amendment 0004 - AE VA Responses 7.19.24.xlsx XLSX spreadsheet
Amendment 0003 - 36C77624R0026 0003.pdf PDF
Site Visit Sign-in Sheet 6.24.24 - Comment added 7.3.24.pdf PDF
Site Visit Sign-in Sheet 6.24.24.pdf PDF
Amendment 0002 - 36C77624R0026 0002.docx DOCX document
Amend 0001 - Att 1 - S02_595-601 Lebannon CLC_Updated GI001.pdf PDF
Amend 0001 - Att 4 - S02_595-601 Lebanon CLC_Updated Bid Docs Specs Vol III.pdf PDF
Amend 0001 - Att 5 - S02_595_601 Lebanon CLC_Updated Drawings.zip ZIP file
Amend 0001 - Att 8 - JAs Combined Redacted.pdf PDF
Amend 0001 - Att 2 - S02_595-601 Lebanon CLC_Updated Bid Docs Specs Vol I.pdf PDF
Amend 0001 - Att 3 - S02_595-601 Lebanon CLC_Updated Bid Docs Specs Vol II.pdf PDF
Amend 0001 - Att 6 - Limitations on Subcontracting.docx DOCX document
Amend 0001 - 36C77624R0026 0001.docx DOCX document
Amend 0001 - Att 7 - Wage Determination 4.24.24.pdf PDF
Att 3 - S02_595-601 Lebanon CLC_Updated Bid Docs Specs Vol II.pdf PDF
Att 10 - S02_Drawings_3A.pdf PDF
Att 9 - S02_Drawings_3.pdf PDF
Att 15 - S02_Drawings_6.pdf PDF
Att 6 - S02_Drawings_1A.pdf PDF
Att 4 - S02_595-601 Lebanon CLC_Updated Bid Docs Specs Vol III.pdf PDF
Att 14 - S02_Drawings_5A.pdf PDF
Att 1 - S02_595-601 Lebannon CLC_Updated GI001.pdf PDF
Att 13 - S02_Drawings_5.pdf PDF
Att 7 - S02_Drawings_2.pdf PDF
Att 20 - Wage Determination 4.24.24.pdf PDF
Att 19 - Limitations on Subcontracting.docx DOCX document
Att 12 - S02_Drawings_4A.pdf PDF
Att 17 - S02_Drawings_7.pdf PDF
Att 18 - S02_Drawings_7A.pdf PDF
Att 8 - S02_Drawings_2A.pdf PDF
Att 11 - S02_Drawings_4.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

MECHANICAL

SCHEDULES

M-702

MKPK

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MECHANICAL

SCHEDULES

M-703

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MECHANICAL

CONTROLS DIAGRAMS

M-801

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MECHANICAL

CONTROLS DIAGRAMS

M-802

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MECHANICAL

CONTROLS DIAGRAMS

M-803

TT

FT

T

TT

FT

T

CO2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MECHANICAL

CONTROLS DIAGRAMS

M-804

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MECHANICAL

CONTROLS DIAGRAMS

M-805

JJPPB

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MECHANICAL

CONTROLS DIAGRAMS

M-806

ELECTRICAL

ABBREVIATIONS & SYMBOLS

E-001

MJRPK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

NOTES

E-002

MJRPK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

CP112

545.305

XMARK

BUILDING

BUILDING

W

AY

ONE

WAY

ONE

W

AY O

NE

BUILDING

X

X

X

X

X

X

X

ELECTRICAL

SITE PLAN

ES101

MJRMJR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 Revisions: Date:

MR PROJECT NO: 0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

ACTUAL

NORTH

F

G

H

I

J

6 74.8 5.1 9.16.8

E.1

S1

S1

S2

S2

S2

S2S2

W

F2

S1S1

B1B1B1

B1

B1

B1 B1

B1 B1 B1

B1B1

B1B1

B1 B1B1

B1

B1

B1

B1

B1

B1 B1

B1B1

D1

D1

C1

C1

X

B1

X

D1

D1

B1

S1S1

B1

S1S1

S1S1

S1S1

D1

SOILED/

RECYCLE/ WASTE

PICKUP

PANTRY

STAFF LOUNGE

TOUCHDOWN

CORRIDOR

STAFF TLT

TOILET

132ASTORAGE

138A

RESIDENT

LAUNDRY

GARAGE

SOILED HOLD

CLEAN SUPPLY

CORRIDOR

LOW VOLT

IT

EMERGENCY

ELECTRICAL

MECHANICAL &

PLUMBING

EVS

ELECTRICAL

OS

OS

OS

OS

OS

LSL-1

OS

B1

X

S1

1 1

MATCHLINE

FOR CONTINUATION

SEE DWG. EL112

NL2-74

LSL-2

LSL-2

LSL-2LSL-2

LSL-2

LSL-2

LSL-2

LSL-2

LSL-2

LSL-2

LSL-2

LSL-2LSL-2

LSL-2

NL2-75NL2-75

NL2-75

NL2-75NL2-75

NL2-75

NL2-75

NL2-75

NL2-75

NL2-75

NL2-75

NL2-75

NL2-75

NL2-75NL2-75

NL2-75

LSL-2

NL2-75

LSL-2

NL2-75

NL2-75

NL2-75NL2-75

NL2-75

NL2-75

NL2-75

NL2-75

NL2-75 NL2-75

NL2-75

NL2-75

NL2-75

NL2-75NL2-75

NL2-75

NL2-75

NL2-75

NL2-75

NL2-75NL2-75

NL2-75NL2-75

NL2-75

NL2-75

NL2-75

NL2-75

NL2-75 NL2-75

NL2-75

NL2-75

NL2-75NL2-75

NL2-75

NL2-75

NL2-75NL2-75

NL2-75

LSL-1

6.5

7.4 7.9

LIGHTING CONTROL

PANEL LC1

r8

PC

LSL-1

LSL-2

r8

F2

LSL-1

r8

LSL-1

LSL-1

F2

F2

F2 r8 r8

LSL-1

F2 r8 r8

ADD ALTERNATE NOTE 1.

X

NL2-75

S1S1

NL2-75

S2

LSL-2

NL2-75

S2

1 TO MEZZANINE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:1

P M

EL111

ELECTRICAL

LIGHTING PLAN

1ST FLOOR, AREA A

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

LIGHTING PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. EXIT SIGNS ON THIS SHEET SHALL BE CONNECTED TO CIRCUIT LSL-2. EXIT

SIGNS SHALL BE WIRED AHEAD OF ANY SWITCHING.

3. REFER TO LIGHTING FIXTURE SCHEDULE ON E-702 FOR MORE INFORMATION ON

LIGHT FIXTURES.

4. SEE LIGHTING CONTROL RISER DIAGRAM AND SCHEDULES ON E-502 FOR FURTHER

INFORMATION ON LIGHTING CONTROL SYSTEM.

5. PORCH LIGHTS SHALL BE CONTROLLED BY RELAY r8 IN LIGHTING CONTROL PANEL

LC1, LOCATED IN LOW-VOLTAGE ROOM 166 VIA PHOTOCELL SHOWN ON EL112.

SHEET KEYNOTES:

1 SEE DETAIL 12/E-501 AND DETAIL 10/E-501 FOR FURTHER INFORMATION ON SWITCHING

OF EMERGENCY LIGHTING FIXTURES.

ADD ALTERNATE NOTES:

1. ADD ALTERNATE NO 6: FIT OUT PATIENT'S LAUNDRY ROOM. SCOPE INDICATED

REPRESENTS ADD ALTERNATE NO 6.

BASE BID SCOPE SHALL BE THE SHELLING OF RESIDENT LAUNDRY 136. REPLACE

(2) TYPE B1 LIGHTING FIXTURES WITH (1) TYPE S1 LIGHTING FIXTURE.

Revisions: Date:

A

B

C

K

L

M

D

E

6 7

4.8

5.1

9.1

O

6.8

C.1

C.2

E.1

D1 D1

P2

P2

P2

D2

B1 B1

B1

B1

D2

D2

D2

D2

D2

D2

D2 D2

D2

D2

D2

D2

D2

D2

D2 D2

D2

D2 D2

D2

P3 P3 P3

P3 P3

P3P3P3

P3 P3 P3

P3 P3 P3

P3P3

P3P3P3

P3 P3 P3

P3

D2 D2

D2D2

D2 D2

D2D2

D2 D2

D2D2

F1

F1

P1

P1

P1

C1

F1

F1

X

X

X

D1

F2

F2

D1 D1

D2

D2

K1 K1

K1

K1 K1

F2

F2

LIVING ROOM

KEEPING ROOM

CORRIDOR

STORAGE

117A

CORRIDOR

MEDS

122A

CONSULT

W.C. STORAGE

CORRIDOR

TOILET

SPA

MULTI PURPOSE

CORRIDOR

KITCHEN

CONCIERGE

DINING

CORRIDOR

TEAM STATION

X

X

X X

U1

U1

U1

OS

OS

OS

OS D

B

C.5

MATCHLINE

FOR CONTINUATION

SEE DWG. EL111

M A

TC

H

LIN

E

FO

R

C O N

TIN

U A

TIO

N

S E E

D W G

E L1

M A

TC

H

LI

N E

FO

R

C O N

TI

N U A

TI

O N

S E E

D W G E L1

D1

D1 D1

D1 D1

D1

D2 D2

D

F2

K1

LSL-1

LSL-1

LSL-1

LSL-1LSL-1

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-8

LSL-3

LSL-3

LSL-3

LSL-8

LSL-8

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-78

NL2-78

NL2-78

NL2-78

NL2-78

NL2-78

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76NL2-76

NL2-76NL2-76

NL2-76 NL2-76

NL2-76

NL2-76 NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-76

NL2-79

NL2-79

NL2-79NL2-79

NL2-79

NL2-79

NL2-79

NL2-79

NL2-76 NL2-76

NL2-76

NL2-76

NL2-76

NL2-76 NL2-76

NL2-76

NL2-76

NL2-78NL2-78

NL2-78 NL2-78

NL2-78

NL2-78

NL2-78 NL2-78

NL2-78

NL2-78NL2-78

NL2-78

NL2-78

NL2-78

NL2-78

NL2-78 NL2-78

NL2-78NL2-78NL2-78

NL2-77NL2-77

NL2-77 NL2-77

NL2-77

NL2-77 NL2-77

NL2-77 NL2-77

C.9

K.5

L.3

8.2

6.5

7.4 7.9 r8

NL2-78

PICTURE LIGHT

LV1

LV2

r1 r1 r1 r2 r2 r2 r2 r2 r2 r2 r2 r2 r2r2 r2 r2 r2 r2 r2 r2 r2 r2 r2 r2 r2 r2

NL2-76

NL2-76

a a a aa r6 r6 r6 r7r7 r3 r3 r3 r3 r3 r3 r5 r5 r5 r4 r4 r4 r4r4 r4 r4 r4r4 r4 r4 r4 r4r4r4 r4 r4 r4

PC

r4 r4 r4 a a r8 r8

LSL-8

r8 r8 r8 r2 r2

LSL-1

P3

NL2-78

P3P3

2 2 2

LSL-1

F2 r8

B1B1

NL2-76

MOUNT TO

VERTICAL FACE

OF OVERHANG.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:4

P M

EL112

ELECTRICAL

LIGHTING PLAN

1ST FLOOR, AREA B

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

LIGHTING PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. EXIT SIGNS ON THIS SHEET SHALL BE CONNECTED TO CIRCUIT LSL-8. EXIT

SIGNS SHALL BE WIRED AHEAD OF ANY SWITCHING.

3. REFER TO LIGHTING FIXTURE SCHEDULE ON E-702 FOR MORE INFORMATION ON

LIGHT FIXTURES.

4. SEE LIGHTING CONTROL RISER DIAGRAM AND SCHEDULES ON E-502 FOR FURTHER

INFORMATION ON LIGHTING CONTROL SYSTEM.

5. PORCH LIGHTS SHALL BE CONTROLLED BY RELAY r8 IN LIGHTING CONTROL PANEL

LC1, LOCATED IN LOW-VOLTAGE ROOM 166 VIA PHOTOCELL SHOWN ON EL112.

SHEET KEYNOTES:

1 SEE DETAIL 12/E-501 AND DETAIL 10/E-501 FOR FURTHER INFORMATION ON SWITCHING

OF EMERGENCY LIGHTING FIXTURES.

2 PROVIDE 1 1/4" EXTENSION ON JUNCTION BOX. REMOVE GYPSUM AS REQUIRED TO RUN

1/2" CONDUIT TO LIGHT FIXTURE JUNCTION BOX. ROUTE CONDUIT ABOVE THE TONGUE

AND GROOVE AND BELOW THE ICE PROTECTION UNDERLAYMENT.

C

D

A.1 1.1

4.8 5.1

D1

D1

C1

X

X

RESIDENT TLT

106A

RESIDENT TLT

104A

RESIDENT TLT

103A

STORAGE

RESIDENT TLT

101A

RESIDENT TLT

102A

RESIDENT RM

WEST MECH

ACCESS

GUEST /

BARIATRIC

RESIDENT RM

RESIDENT TLT

105A

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESIDENT RM

J1, (EM)

J1, (EM)

F2

X

D1

D1

D1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

S1

OS

OS

M A

TC

H

LI

N E

FO

R

C O N

TI

N U A

TI

O N

S E E

D W G E L1

L1

L1

L1

F1 b

D4

D3

D3

F4

D,a b a dc d c c

D4 a

F1 b

F4 c

D4 a

D4 a

D4 a

D4 a

F1 b

D1 cd cd cd c d c c d d

D,a b

D,a b

D,ab

D,ab

D,a b

D,a b

F4 c c

F4

F4 c c

F4

F4 c c

F4

F4 c c F4

F4 c

F4 c

F4 c

F4 c

F1 b

F1 b

F1 b F1 b

F1 b

F1 b

F1 b

F1 b

F1 b

F1 b

F1 b

F1 b

D3 c

D3 c

D3 c

D3 c

D3 c

D3 c

D3 d

D3 d

D3 d

D3 d

D3 d

B1

B1

F1 b

F1 b

F1 b

F1 b

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

D4 a

LSL-3

NL2-79

NL2-79

LSL-3

B1

NL2-79

NL2-79

LSL-3

NL2-79

LSL-3

NL2-81

LSL-3

NL2-81

LSL-3

NL2-81

LSL-3

NL2-80

LSL-3

NL2-80

LSL-3

NL2-80

LSL-3

NL2-80

LSL-3

NL2-79

LSL-3

NL2-79

LSL-3

NL2-81

LSL-3

D3 d

NL2-79

NL2-79

NL2-79

NL2-79

NL2-79

NL2-79

NL2-79

NL2-79

NL2-79

NL2-81

NL2-80

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-79

NL2-79

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81 NL2-79

NL2-79

NL2-79

NL2-79

NL2-79

NL2-79

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-81

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-79

NL2-79

NL2-80

NL2-80NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

NL2-80

C.9

A.8

B.2

NL2-79

LV3

rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb3 rb2 rb1

CORRIDOR

MICROPANEL LCb

LOCATED ABOVE

ACCESSIBLE CEILING TILE

N1

N1

N1

N1

2 2

N12

N1 2 N1

N1

N1

N1

N1

N1

2 2

N1

N1

2 2 r8

OS

SOILED UTILITY

LSL-1

F2 r8

SEE ADD ALTERNATE NOTE 1.

SEE ADD ALTERNATE NOTE 1.

GUEST/

BARIATRIC

RESIDENT TLT

100A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:3

P M

EL113

ELECTRICAL

LIGHTING PLAN

1ST FLOOR, AREA C

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 LIGHTING PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. EXIT SIGNS ON THIS SHEET SHALL BE CONNECTED TO CIRCUIT LSL-3. EXIT

SIGNS SHALL BE WIRED AHEAD OF ANY SWITCHING.

3. REFER TO LIGHTING FIXTURE SCHEDULE ON E-702 FOR MORE INFORMATION ON

LIGHT FIXTURES.

4. SEE LIGHTING CONTROL RISER DIAGRAM AND SCHEDULES ON E-502 FOR FURTHER

INFORMATION ON LIGHTING CONTROL SYSTEM.

5. PORCH LIGHTS SHALL BE CONTROLLED BY RELAY r8 IN LIGHTING CONTROL PANEL

LC1, LOCATED IN LOW-VOLTAGE ROOM 166 VIA PHOTOCELL SHOWN ON EL112.

SHEET KEYNOTES:

1 SEE DETAIL 12/E-501 AND DETAIL 10/E-501 FOR FURTHER INFORMATION ON SWITCHING

OF EMERGENCY LIGHTING FIXTURES.

2 NITE LIGHT. NITE LIGHT ON THIS SHEET CONNECTED TO CIRCUIT LSL-3. NITE LIGHT

SHALL ALWAYS BE ON.

ADD ALTERNATE NOTES:

1. ADD ALTERNATE NO 8: FIT OUT WESTERN WING. SCOPE INDICATED REPRESENTS

ADD ALTERNATE NO 8.

BASE BID SCOPE SHALL BE THE SHELLING OF THE (7) RESIDENT ROOMS AND

BATHROOMS IN THIS AREA. ELECTRICAL CONTRACTOR SHALL PROVIDE AND

INSTALL (4) TYPE S1 LIGHTING FIXTURES, A LIGHT SWITCH, AND AN EXIT SIGN IN

THE SHELL SPACE ON THE NORTH SIDE OF THE CORRIDOR AND (4) TYPE S1

LIGHTING FIXTURES, A LIGHT SWITCH, AND AN EXIT SIGN IN THE SHELL SPACE ON

THE SOUTH SIDE OF THE CORRIDOR. S1 FIXTURES SHALL BE CIRCUITED TO

NL2-79. EXIT SIGNS SHALL BE CIRCUITED TO LSL-3.

FOR ALL CONDUIT RUNS REQUIRED FOR THE BASE BID DEVICES THAT WILL BE

INSTALLED IN THE FUTURE FIT OUT OF THE SHELLED SPACE, ELECTRICAL

CONTRACTOR SHALL PROVIDE REQUIRED CONDUITS WITH PULLSTRINGS FROM THE

SOURCE PANEL TO THE BOUNDARY OF THE SHELL SPACE ALONG COLUMN LINE 5.

ALL CONDUITS SHALL TERMINATE IN PULLBOXES ABOVE AN ACCESSIBLE CEILING

FOR FUTURE EXTENSION.

K

L

M

P

Q

9.1

O

N

11.5

B1

B1

B1

B1

B1

F1

F1

D4

D4

D4

D4

D4

D3

D3

D3

D3

D4

D4

D4

D4

D4

D4

F1

F1

F1

X

X

X

RESIDENT TLT

109A

MED GAS

CORRIDOR

RESIDENT TLT

108A

RESIDENT TLT

107A

RESIDENT TLT

110A

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESIDENT TLT

111A

RESIDENT RM

RESIDENT RM

RESIDENT RM

109 RESPIRATORY

STORAGE

BARIATRIC

RESIDENT TLT

RM

113A

EAST MECH

ACCESS

BARIATRIC

RESIDENT RM

CORRIDOR

D1

D1

D1

D1

F4

F4

F4

F4

J1, (EM)

J1, (EM)

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

D,a b

D,a b a a a a a a a a a a a b b b b b d c dc d d c c c c c c

F2

S1

M A

TC

H

LIN

E

FO

R

C O N

TIN

U A

TIO

N

S E E

D W G E L1

F2

F2 X

F2

B1

B1

B1

F1 b

F1

F1 b b

D,a b

F1b

D3 d

D3 d

D3 d

D3 d

D3 d

D3 c

D3 c

D3 c

D3 c

D3 c

F1 b

F1 b

F1 b

F1 b

F4

F4 c c

F4

F4 c c

F4

F4 c c

F4

F4 c c

F4

F4 c c d c dc d c dc dc

D4 a

D,a b

F1 b

F1 b

D4

D4

D4

D4

D4

D4 a a a a a a

D4

D4

D4

D4

D4

D4 a a a a a a

D4

D4

D4

D4

D4

D4 a a a a a a

D4

D4

D4

D4

D4

D4 a a a a a a

D4

D4

D4

D4

D4

D4 a a a a a a

D,a b

D,a b

D,ab

LSL-1

LSL-1

LSL-1

LSL-1

NL2-82

NL2-82

LSL-4

NL2-82

LSL-4

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

LSL-4

NL2-82

LSL-4

NL2-82

LSL-4

NL2-82

LSL-4

NL2-82

LSL-4

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

NL2-82

LSL-4

LSL-4

LSL-4

LSL-4

LSL-4

LSL-4

LSL-4

LSL-4

NL2-84

NL2-83

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-82

LSL-4

NL2-82

LSL-4

NL2-82

NL2-82

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-84

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

NL2-83

F1

F1 b b

NL2-83

NL2-83

F1

F1 b b

NL2-83

NL2-83

F1b

F1 b NL2-83

NL2-83

C.9

K.5

L.3

12.2

8.2

7.4 7.9

MICROPANEL LCa

LOCATED ABOVE

ACCESSIBLE CEILING TILE

ra2 ra2 ra2 ra2 ra2 ra2 ra1 ra3

LV4

L1 ra2 ra2 ra2 ra2 ra2 ra2 ra2

N1

N1

N12

N1

N1

N1

N1

N1

N1

N1

N1

N1

N1

N12

CORRIDOR

OS

r8 r8 r8 r8

NL2-82

RESIDENT TLT

112A

X

X

S1

S1

S1

S1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:4

P M

EL114

ELECTRICAL

LIGHTING PLAN

1ST FLOOR, AREA D

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1 LIGHTING PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. EXIT SIGNS ON THIS SHEET SHALL BE CONNECTED TO CIRCUIT LSL-4. EXIT

SIGNS SHALL BE WIRED AHEAD OF ANY SWITCHING.

3. REFER TO LIGHTING FIXTURE SCHEDULE ON E-702 FOR MORE INFORMATION ON

LIGHT FIXTURES.

4. SEE LIGHTING CONTROL RISER DIAGRAM AND SCHEDULES ON E-502 FOR FURTHER

INFORMATION ON LIGHTING CONTROL SYSTEM.

5. PORCH LIGHTS SHALL BE CONTROLLED BY RELAY r8 IN LIGHTING CONTROL PANEL

LC1, LOCATED IN LOW-VOLTAGE ROOM 166 VIA PHOTOCELL SHOWN ON EL112.

SHEET KEYNOTES:

1 SEE DETAIL 12/E-501 AND DETAIL 10/E-501 FOR FURTHER INFORMATION ON SWITCHING

OF EMERGENCY LIGHTING FIXTURES.

2 NITE LIGHT. NITE LIGHT ON THIS SHEET CONNECTED TO CIRCUIT LSL-4. NITE LIGHT

SHALL ALWAYS BE ON.

WP

WP

WP

F

G

H

I

J

6 74.8 5.1 9.16.8

E.1

SOILED/

RECYCLE/ WASTE

PICKUP

PANTRY

STAFF LOUNGE

TOUCHDOWN

CORRIDOR

STAFF TLT

TOILET

132A

STORAGE

138ARESIDENT

LAUNDRY

GARAGE

SOILED HOLD

CLEAN SUPPLY

CORRIDOR

LOW VOLT

IT

EMERGENCY

ELECTRICAL

MECHANICAL &

PLUMBING

EVS

ELECTRICAL

PNL NDP

ATS-N

PNL NH

XFMR T-N

PNL NL1

DD

BB

PNL EDP

ATS-EQ ATS-CR ATS-LS

XFMR T-CR

PNL CRL

XFMR T-LS

PNL LSL

PNL EQL

XFMR T-EQ

REMOTE

GENERATOR

CONTROL

PANEL

PNL EQH

MATCHLINE

FOR CONTINUATION

SEE DWG. EP112

MOTORIZED

GARARGE

DOOR

PNL NL2

NL2-53

NL2-53

NL2-53

N H ,3 ,5

N L-

,9 ,1

NL2-54

NL2-54

NL2-54

NL2-54

NL2-54

NL2-54

C R L

C R L

C R L

CRL-17

LSL-5

C R L

C R L-

,2

C R L-

,2

CRL-14 CRL-14

C R L

C R L-

,2

C R L-

,3

NL2-64

NL2-64

NL2-64

NL2-64

NL2-63

NL2-63

NL2-63

NL2-63

NL2-65

NL2-56 NL2-56

NL2-56

NL2-56

NL2-56

NL2-56

CRL-12

CRL-12

CRL-12

NL2-58

N L

N L

N L

NL2-58

NL2-58

NL2-58

NL2-58 NL2-58

NL2-58

NL1-19 NL1-19

NL1-19

ECB-CR

ECB-LS

F3 3

6.5

7.4 7.9

LIGHTING CONTROL

PANEL LC1

1-P-1C

PNL NL3

1-P-1B

1-P-1A

1-B-2

1-B-3

1-B-1

1-DWH-2

1-DWH-1

1-DCP-1&2

1-DHP-1&2

1-UH-1

1-KEF-1

IN ATTIC

NL2-64

WP

NL2-64

LSL-8

VOICE EVACUATION

SYSTEM PANEL

NEMA 3R

NAC PANELS

SEE ADD ALTERNATE NOTE 1.

BAS PANELEQL-29

1-AC-146

EQL-18

1-CP-146

1-BCF-1

CONCRETE PAD

C R L

CRL-17

NL2-56

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:5

P M

EP111

ELECTRICAL

POWER PLAN

1ST FLOOR, AREA A

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

POWER PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. REFER TO ELECTRICAL CONNECTION SCHEDULE ON DRAWING E-702 FOR FURTHER

INFORMATION ON ELECTRICAL CONNECTIONS TO MECHANICAL AND PLUMBING

EQUIPMENT.

3. SEE DRAWING E-701 FOR PANEL SCHEDULES.

4. PROVIDE HOUSEKEEPING PADS UNDER ALL TRANSFORMERS AND ATS'S. SEE

STRUCTURAL DRAWINGS FOR DETAIL.

SHEET KEYNOTES:

1 THESE TRANSFORMERS ARE STACKED ABOVE EACH OTHER.

2 EPO BUTTONS FOR THE BOILERS CIRCUITED TO EQL-20.

3 COORDINATE ELECTRICAL CONNECTION AND PLUG TYPE WITH DRYER / WASHER

MANUFACTURER PRIOR TO ROUGH-IN. PROVIDE DISCONNECT IF REQUIRED.

4 GROUND BAR, REFER TO DETAIL 11/E-501 FOR FURTHER INFORMATION.

5 JUNCTION BOXES FOR GAS SHUT OFF VALVE AND SWITCH (SWITCH PROVIDED BY PLUMBING

CONTRACTOR). CIRCUIT TO LSL-7.

6 PROVIDE POWER AND CONDUITS PER MANUFACTURERS RECOMMENDATIONS.

7 JUNCTION BOX FOR BAS CONTROL PANEL. COORDINATE FINAL LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO ROUGH-IN.

ADD ALTERNATE NOTES:

1. ADD ALTERNATE NO 6: FIT OUT PATIENT'S LAUDRY ROOM. SCOPE INDICATED

REPRESENTS ADD ALTERNATE NO. 6.

BASE BID SCOPE SHALL BE THE SHELLING OF RESIDENT LAUNDRY 136.

ELECTRICAL INFRASTRUCTURE FOR THE WASHER AND DRYER SHALL NOT BE

INSTALLED. CIRCUIT BREAKERS FOR WASHER AND DRYER SHALL BE LABELED AS

SHOWN ON PANEL SCHEDULES FOR "FUTURE USE".

TP

TP

WP

TP

TP

B

+B

HOOD

CONTROL

EXHAUST HOOD

NL1-20

A

B

C

K

L

M

D

E

5 6 7 8

4.8

5.1

9.1

O

6.8

C.1

C.2

E.1

LIVING ROOM

KEEPING ROOM

CORRIDOR

STORAGE

117A

CORRIDOR

MEDS

122A

CONSULT

W.C. STORAGE

CORRIDOR

TOILET

SPA

MULTI PURPOSE

CORRIDOR

KITCHEN

CONCIERGE

131DINING

CORRIDOR

TEAM STATION

122+

MICROWAVE OVEN

DOUBLE DECK

WALL OVEN

RANGE

NL1-20

REFRIGERATOR

COFFEE

MAKER

NL1-31

MICROWAVE OVEN

NL1-25,27

TOASTER

NL1-29

COUNTERTOP ICE MACHINE

NL1-23

REFRIGERATOR W/ FREEZER BASE

NL1-21

TP

TP

TP

TP

J

DISHWASHER

TP

TP

TP

FIREPLACE, POWER

TV

C.5

M A

TC

H

LIN

E

FO

R

C O N

TIN

U A

TIO

N

S E E

D W G E P

MATCHLINE

FOR CONTINUATION

SEE DWG. EP111

M A

TC

H

LI

N E

FO

R

C O N

TI

N U A

TI

O N

S E E

D W G E P

NL1-26NL1-28

N L ,3

N L ,3

NL1-28

NL1-28

NL1-19

NL1-19

NL1-19

NL1-19NL1-40

NL1-40NL1-40

NL1-40

NL1-40

NL1-40

N L ,2

N L

N L

N L

N L

N L

N L ,1 ,1

NL1-10

NL1-10

NL1-10

NL1-10

NL1-12

NL1-12

NL1-12

NL1-12NL1-12

NL1-33

NL1-14

NL1-14

NL1-14

NL1-14

NL1-12

NL1-17

NL1-17

NL1-17

CRL-1

CRL-1

C R L-

C R L-

NL1-18

NL1-16

N L

NL1-16

NL1-16

NL1-16 NL1-16

+ TV

NL1-17

NL1-14 NL1-14

SHADE CONTROL

3 3

NL1-19

SECURITY GATE

CONTROL PANEL.

SEE ES101 FOR

MORE INFORMATION

C.9

K.5

L.3

8.2

6.5

7.4 7.9

DOOR

CONTROL

LSL-6

4 5

DOOR

CONTROL

LSL-6

DOOR

CONTROL

LSL-6

MED GAS ALARM

LSL-9

DOOR

CONTROL

LSL-6

NL1-19

ACCESS

CONTROL

PANEL AND

MONITOR

G F C I

LSL-10

LSL-10

SMOKE DAMPERS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:5

P M

EP112

ELECTRICAL

POWER PLAN

1ST FLOOR, AREA B

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

POWER PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. REFER TO ELECTRICAL CONNECTION SCHEDULE ON DRAWING E-702 FOR FURTHER

INFORMATION ON ELECTRICAL CONNECTIONS TO MECHANICAL AND PLUMBING

EQUIPMENT.

3. SEE DRAWING E-701 FOR PANEL SCHEDULES.

SHEET KEYNOTES:

1 ROUTE THE CONDUIT FROM THE NEAREST FULL HEIGHT WALL TO THE DESK IN FLOOR SLAB.

PROVIDE (1) 3/4" CONDUIT FOR POWER AND (1) 1" CONDUIT FOR TELECOMMUNICATION

WITH PULLSTRING. FOR EACH CONDUIT RUN, PROVIDE 6" CONDUIT STUB UP AT THE DESK

AREA.

2 COORDINATE RECEPTACLE CONFIGURATION WITH SPA CORD AND PLUG TYPE. PROVIDE

3-#12, 1-#12G IN 3/4"C.

3 JUNCTION BOX FOR ELECTRICAL CONNECTION TO MECHOSHADE. COORDINATE ALL POWER

AND CONDUIT REQUIREMENTS WITH SHADE MANUFACTURER.

4 ELECTRICAL CONTRACTOR SHALL COORDINATE ALL RANGE AND HOOD REQUIREMENTS WITH

EQUIPMENT MANUFACTURER. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

JUNCTION BOXES, 120 VOLT CIRCUITS, FIRE ALARM TIE-INS, AND WIRED CONNECTIONS TO

CLOCK BOX, ELECTRICAL SHUT-OFF VALVE, AND ADA SWITCH.

5 PROVIDE JUNCTION BOX IN WALL BEHIND RANGE ELECTRICAL BOX (RANGE ELECTRICAL BOX

BY OTHERS).

WP

WP

A

B

C

A.1 1.1

4.8 5.1

RESIDENT TLT

106A

RESIDENT TLT

104A

RESIDENT TLT

103A

STORAGE

RESIDENT TLT

101A

RESIDENT TLT

102A

RESIDENT RM

WEST MECH

ACCESS

GUEST /

BARIATRIC

RESIDENT RM

RESIDENT TLT

105A

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESIDENT RM

M A

TC

H

LI

N E

FO

R

C O N

TI

N U A

TI

O N

S E E

D W G E P

PATIENT LIFT

PATIENT LIFT

PATIENT LIFT

TV

PATIENT LIFT

PATIENT LIFT

PATIENT LIFT

PATIENT LIFT

NL1-8

NL1-8

NL1-8

NL1-9

NL1-9

N L

N L

N L

N L

C R L-

C R L-

NL1-10

NL1-10

NL1-10

NL1-5

NL3-93

NL3-93

NL3-93 NL3-93

NL3-93

NL1-5

NL1-5

CRL-8

CRL-8

NL3-97

NL3-97

CRL-10

CRL-10

NL3-91

NL3-91

CRL-6

CRL-6

NL3-87

NL3-87

CRL-4

CRL-4

NL3-85

NL3-85

CRL-4

CRL-4

NL3-89

NL3-89

CRL-6

CRL-6

NL3-95

NL3-95

CRL-8

CRL-8

NL1-6

NL1-6

NL3-95

NL3-95

NL3-95

NL1-6

NL1-7

NL3-97

NL3-97

NL3-97

NL1-7

NL1-7

NL1-1

NL1-1

NL3-85

NL3-85

NL3-85

NL1-2

NL1-2

NL1-2

NL3-87

NL3-87

NL3-87

NL1-3

NL1-3

NL1-3

NL3-89

NL3-89

NL3-89

NL1-4

NL1-4

NL1-4

NL3-91

NL3-91

NL3-91

C.9

A.8

B.2

DOOR

CONTROL

LSL-6

NL1-1

NL3-85

CRL-4

TV

NL1-2

NL3-87

CRL-4

CRL-6

NL3-89

NL3-91

CRL-6

+ TV

NL1-4

TV

NL1-3

TV

NL1-5

NL3-93

CRL-8

CRL-8

NL3-95

TV

NL1-6

CRL-10

NL3-97

TV

NL1-7

1-EF-AB1

IN ATTIC

SOILED UTILITY

NL1-1

CORRIDOR

SEE ADD ALTERNATE NOTE 1.

SEE ADD ALTERNATE NOTE 1.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:4

P M

EP113

ELECTRICAL

POWER PLAN

1ST FLOOR, AREA C

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

POWER PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. REFER TO ELECTRICAL CONNECTION SCHEDULE ON DRAWING E-702 FOR FURTHER

INFORMATION ON ELECTRICAL CONNECTIONS TO MECHANICAL AND PLUMBING

EQUIPMENT.

3. SEE DRAWING E-701 FOR PANEL SCHEDULES.

ADD ALTERNATE NOTES:

1. ADD ALTERNATE NO 8: FIT OUT WESTERN WING. SCOPE INDICATED REPRESENTS

ADD ALTERNATE NO. 8.

BASE BID SCOPE SHALL BE THE SHELLING OF THE (7) RESIDENT ROOMS AND

BATHROOMS IN THIS AREA. ELECTRICAL CONTRACTOR SHALL PROVIDE AND

INSTALL (2) DUPLEX RECEPTACLES IN THE SHELL SPACE ON THE NORTH SIDE OF

THE CORRIDDOR AND (2) DUPLEX RECEPTACLES IN THE SHELL SPACE ON THE

SOUTH SIDE OF THE CORRIDOR. ELECTRIACL CONTRACTOR SHALL PROVIDE POWER

TO (2) HOT WATER HEATERS IN SHELL SPACE. CIRCUIT RECEPTACLES AND HOT

WATER HEATERS TO NL1-1.

FOR ALL CONDUIT RUNS REQUIRED FOR THE BASE BID DEVICES THAT WILL BE

INSTALLED IN THE FUTURE FIT OUT OF THE SHELLED SPACE, ELECTRICAL

CONTRACTOR SHALL PROVIDE REQUIRED CONDUITS WITH PULLSTRINGS FROM THE

SOURCE PANEL TO THE BOUNDARY OF THE SHELL SPACE ALONG COLUMN LINE 5.

ALL CONDUITS SHALL TERMINATE IN PULLBOXES ABOVE AN ACCESSIBLE CEILING

WP

WP

PATIENT LIFT

WP

WP

WP

K

L

M

P

Q

N

11.5

RESIDENT TLT

109A

MED GAS

CORRIDOR

RESIDENT TLT

108A

RESIDENT TLT

107A

RESIDENT TLT

110A

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESIDENT TLT

111A

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESPIRATORY

STORAGE

BARIATRIC

RESIDENT TLT

RM

113A

EAST MECH

ACCESS

BARIATRIC

RESIDENT RM

CORRIDOR

PATIENT LIFT

M A

TC

H

LIN

E

FO

R

C O N

TIN

U A

TIO

N

S E E

D W G E P

1-MAC-1

1-MVP-1

PATIENT LIFT

PATIENT LIFT

PATIENT LIFT

PATIENT LIFT

PATIENT LIFT

NL2-50

NL2-50

NL2-50

NL2-50

NL2-50

NL2-52

NL2-52

NL2-52

NL2-51

NL2-51

N L2

N L

NL2-51

N L

N L

C R L-

C R L-

NL2-49

NL2-49

NL2-49

NL3-98

NL3-98

NL3-98

NL3-98

NL3-98

CRL-15

CRL-15

CRL-15

CRL-15

NL3-96

NL3-96

NL3-96

NL3-96

NL3-96

NL2-48

NL2-48

NL2-48

NL2-47

NL3-94

NL3-94

CRL-13

CRL-13

NL3-94

NL3-94

NL3-94

NL2-47

NL2-47

CRL-13

CRL-13

NL3-92

NL3-92

NL3-92

NL2-46

NL2-46

NL2-46

NL3-92

NL3-92

CRL-9

CRL-9

NL3-86

NL3-86

NL3-86

NL3-86

NL3-86

NL2-43

NL2-43

NL2-43

NL3-88

NL3-88

CRL-9

CRL-9

NL2-44

NL2-44

NL3-88

NL3-88

NL3-88

NL2-44

CRL-11

CRL-11

NL3-90

NL3-90

NL2-45

NL2-45

NL3-90

NL3-90

NL3-90

NL2-45

C.9

K.5

L.3

12.2

8.2

7.4 7.9

DOOR

CONTROL

LSL-6

NL2-52

TV

NL2-43

NL3-86

CRL-9

CRL-9

NL3-88

TV

NL2-44

TV

NL2-45 NL3-90

CRL-11

TV

NL2-46

NL3-92

CRL-13

+TV

NL2-47

NL3-94

CRL-13

TV

NL2-48

NL3-96

CRL-15

CRL-15

NL3-98

TV

NL2-49

1-P-2A

1-P-2B

1-P-2C

1-UH-2

RESIDENT TLT

112A

1-GLY-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:5

P M

EP114

ELECTRICAL

POWER PLAN

1ST FLOOR, AREA D

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

POWER PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. REFER TO ELECTRICAL CONNECTION SCHEDULE ON DRAWING E-702 FOR FURTHER

INFORMATION ON ELECTRICAL CONNECTIONS TO MECHANICAL AND PLUMBING

EQUIPMENT.

3. SEE DRAWING E-701 FOR PANEL SCHEDULES.

C

K

L

M

D

E

F

G

H

I

J

5 6 7

A.1 1.1

4.8

5.1

P

Q

9.1

O

6.8

N

C.1

11.5

C.2

E.1

C.5

C.9

K.5

L.3

12.2

8.2

6.5 7.4 7.9

A.8

B.2

DOWN

CONDUCTOR

DOWN

CONDUCTOR

DOWN

CONDUCTOR

DOWN

CONDUCTOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:0

P M

EP121

ELECTRICAL

LIGHTINING PROTECTION PLAN

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"1

LIGHTNING PROTECTION PLAN - ROOF

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. SEE DRAWING E-501 FOR LIGHTNING PROTECTION DETAILS.

LIGHTNING PROTECTION NOTES:

1. THE COMPLETED INSTALLATION SHALL MEET THE "INSTALLATION REQUIRMENTS FOR

LIGHTNING PROTECTION SYSTEMS, UL96A" OF UNDERWRITERS LABORATORIES -

CURRENT EDITION AND NFPA 780 2020 EDITION. A CERTIFICATE OF COMPLETION

FROM AN AUTHORITY HAVING JURISDICTION SHALL BE FURNISHED TO THE OWNER

UPON COMPLETION.

2. ALUMINUM LIGHTNING PROTECTION SYSTEM COMPONENTS SHALL NOT BE MOUNTED

TO COPPER SURFACES. COPPER COMPONENTS SHALL BE USED TO AVOID

ELECTROLYTIC CORROSION.

3. METAL BODIES WITHIN 6'-0" OF THE LIGHTNING PROTECTION SYSTEM SHALL BE

BONDED TO THE SYSTEM IN ACCORDANCE WITH UL96A.

4. UNDERGROUND METALLIC PIPING ENTERING THE BUILDING SHALL BE BONDED TO

THE NEAREST DOWN CONDUCTOR OR GROUND ELECTRODE.

5. ROOF TOP EQUIPMENT NOT SHOWN ON THIS DRAWING SHALL BE PROTECTED AS

REQUIRED TO MEET THE CODE REQUIREMENTS LISTED ABOVE INCLUDING THE

INSTALLATION OF AIR TERMINALS AND OR BONDING. IF THE METAL THICKNESS OF

AN OBJECT IS 3/16" OR GREATER, AIR TERMINALS MAY BE ELIMINATED IF THE

OBJECT IS PROPERLY CONNECTED TO THE SYSTEM.

6. AIR TERMINALS ARE TO BE LOCATED AS SHOWN. THEY ARE TO BE A MAXIMUM OF

24" FROM THE ROOF EDGE AND PROJECT A MINIMUM OF 10" ABOVE THE

PROTECTED EDGE. THE SPACING BETWEEN AIR TERMINALS ARE NOT TO EXCEED 20

FEET. AIR TERMINALS THAT EXTEND 24" ABOVE THE PROTECTED EDGE ARE NOT

TO EXCEED A SPACING GREATER THAN 25', EXCEPT FOR MID-ROOF AIR TERMINALS

(50' MAX SPACING).

7. ALL LIGHTNING CONDUCTORS ARE TO MAINTAIN A HORIZONTAL OR DOWNWARD

PATH. ALL BENDS IN THE CONDUCTOR SHALL HAVE A RADIUS BEND OF 8 INCHES

OR GREATER, AND SHALL HAVE AN ANGLE BEND OF 90 DEGREES OR GREATER.

8. EACH INDIVIDUAL ITEM OF THE LIGHTNING PROTECTION SYSTEM IS NOT LABELED

FOR THE SAKE OF CLARITY, BUT A COMPLETE SYSTEM SHALL BE PROVIDED TO

MEET CODE REQUIREMENTS.

9. ROOF PADS, PAVERS, FLASHING OR ANY OTHER SPECIAL ROOFING MATERIALS

REQUIRED FOR THE INSTALLATION OF THE LIGHTNING PROTECTION SYSTEM SHALL

BE FURNISHED AND INSTALLED BY THE ROOFING CONTRACTOR.

H

I

J

6 74.8 5.1 9.16.8

E.1

SOILED/

RECYCLE/ WASTE

PICKUP

PANTRY

STAFF LOUNGE

TOUCHDOWN

CORRIDOR

STAFF TLT

TOILET

132A

STORAGE

138ARESIDENT

LAUNDRY

GARAGE

SOILED HOLD

CLEAN SUPPLY

CORRIDOR

160LOW VOLT

IT

EMERGENCY

ELECTRICAL

MECHANICAL &

PLUMBING

EVS

ELECTRICAL

D D

S

D

E

W

W

W

FW

P

FW

P

W

MATCHLINE

FOR CONTINUATION

SEE DWG. ET112

6.5

7.4 7.9

S

P

CABLE TRAY

(TYP)

S

S

P

P

W

R

FW

P

SEE ADD ALTERNATE NOTE 1

SEE ADD ALTERNATE NOTE 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:1

P M

ET111

ELECTRICAL

TELECOM PLAN

1ST FLOOR, AREA A

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

TELECOM PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. CABLE TRAY SHALL BE 12" WIDE X 4" HIGH OPEN LADDER TYPE, MOUNTED

ABOVE ACCESSIBLE CEILING, UNLESS NOTED OTHERWISE.

3. VA IS RESPONSIBLE FOR FINAL LOCATION OF ALL NEW WIRELESS ACCESS POINTS.

CONTRACTOR SHALL COORDINATE WITH VA OIT DEPARTMENT PRIOR TO

INSTALLATION OF WAP BACKBOXES. AT EACH WAP, CONTRACTOR IS RESPONSIBLE

FOR A 4-GANG BACKBOX WITH 2-JACK DEVICE AND CAT6A WIRES BACK TO IT

146.

4. SEE DRAWING E-603 FOR MORE INFORMATION ON TELE/DATA SYSTEM.

5. REFER TO DETAILS ON E-503 FOR FURTHER INFORMATION ON DOOR ACCESS

CONTROL (WANDERGUARD) SYSTEM.

SHEET KEYNOTES:

1 PROVIDE 4' X 8' X 3/4" FIRE RETARDANT PAINTED PLYWOOD BACKBOARD (TYP OF 3

WALLS).

2 (2) TWO - 4" CONDUITS.

3 (3) THREE IT RACKS.

4 CONTROLLED ACCESS POINT. DOOR SHALL BE LOCKED FROM THE OUTSIDE AND ONLY

ACCESSIBLE TO STAFF VIA A PIV CARD READER. DOOR SHALL ALSO BE EQUIPPED WITH A

COMBINATION CAMERA/2-WAY INTERCOM ENCLOSURE. CAMERA WILL SHOW VIDEO AND

INTERCOM WILL PROVIDE AUDIO AT TWO DESK LOCATIONS IN THE BUILDING: CONCIERGE

131 AND TEAM STATION 122. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

PROVIDING MONITORS AT DESKS AND ALL CONDUIT AND WIRING REQUIRED BETWEEN THE

DOOR AND THE CONTROL DESK LOCATIONS. DOOR WILL ALSO INTEGRATE WITH THE VA

PROVIDED WANDERGUARD SYSTEM TO RELEASE THE ELECTRIC LOCKS UPON "DOOR OPEN"

REQUEST FROM THE DESKS. DOORS WILL FAIL OPEN UPON A FIRE ALARM TROUBLE

SIGNAL. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS OF CONTROLLED

ACCESS DOOR WITH ARCHITECTURAL DRAWINGS AND VA. BASIS OF DESIGN SHALL BE

AIPHONE: IXG COMMERCIAL SERIES.

ADD ALTERNATE NOTES:

1. ADD ALTERNATE NO 1: INTERIOR AND EXTERIOR CAMERAS PROVIDED BY THE

CONTRACTOR. SCOPE INDICATED REPRESENTS ADD ALTERNATE NO. 8.

BASE BID SCOPE SHALL BE THAT ALL SECURITY CAMERAS ARE TO BE PROVIDED

BY THE VA. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUIT,

BACKBOX, AND WIRING TO EACH CAMERA LOCATION.

C

K

L

M

D

E

5 6 7

4.8

5.1

9.1

O

6.8

C.1

C.2

E.1

LIVING ROOM

KEEPING ROOM

CORRIDOR

STORAGE

117A

CORRIDOR

MEDS

122A

CONSULT

W.C. STORAGE

CORRIDOR

TOILET

SPA

MULTI PURPOSE

CORRIDOR

KITCHEN

CONCIERGE

131DINING

CORRIDOR

TEAM STATION

D

E

D

FW

P

C.5

MATCHLINE

FOR CONTINUATION

SEE DWG. ET111

M A

TC

H

LIN

E

FO

R

C O N

TIN

U A

TIO

N

S E E

D W G

E T1

M A

TC

H

LI

N E

FO

R

C O N

TI

N U A

TI

O N

S E E

D W G E T1

SECURITY GATE

CONTROL

PANEL

C.9

K.5

L.3

8.2

6.5

7.4 7.9

CABLE TRAY

(TYP)

P

S

P

S P

S

D

E

P

S

ACCESS

CONTROL

PANEL AND

MONITOR

FW

P

ACCESS

CONTROL

PANEL AND

MONITOR

FW

P

SEE ADD

ALTERNATE NOTE 1

SEE ADD

ALTERNATE NOTE 1

SEE ADD

ALTERNATE NOTE 1

SEE ADD

ALTERNATE NOTE 1

SEE ADD

ALTERNATE NOTE 1

SEE ADD

ALTERNATE NOTE 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:0

P M

ET112

ELECTRICAL

TELECOM PLAN

1ST FLOOR, AREA B

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

TELECOM PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. CABLE TRAY SHALL BE 12" WIDE X 4" HIGH OPEN LADDER TYPE, MOUNTED

ABOVE ACCESSIBLE CEILING, UNLESS NOTED OTHERWISE.

3. VA IS RESPONSIBLE FOR FINAL LOCATION OF ALL NEW WIRELESS ACCESS POINTS.

CONTRACTOR SHALL COORDINATE WITH VA OIT DEPARTMENT PRIOR TO

INSTALLATION OF WAP BACKBOXES. AT EACH WAP, CONTRACTOR IS RESPONSIBLE

FOR A 4-GANG BACKBOX WITH 2-JACK DEVICE AND CAT6A WIRES BACK TO IT

146.

4. SEE DRAWING E-603 FOR MORE INFORMATION ON TELE/DATA SYSTEM.

5. REFER TO DETAILS ON E-503 FOR FURTHER INFORMATION ON DOOR ACCESS

CONTROL (WANDERGUARD) SYSTEM.

SHEET KEYNOTES:

1 GATE SYSTEM MAIN PANEL WITH GATE RELEASE AND 2-WAY COMMUNICATION CAPABILITY.

BASIS OF DESIGN IS DELTA SCIENTIFIC. PROVIDE A COMPLETE SYSTEM INCLUDING

MANUFACTURER RECOMMENDED WIRING AND CONDUIT. SEE DRAWING ES101 FOR ADDITIONAL

MORE INFORMATION.

2 (2) TWO - 4" CONDUITS.

3 ROUTE THE CONDUIT FROM THE NEAREST FULL HEIGHT WALL TO THE DESK IN FLOOR SLAB.

PROVIDE (1) 3/4" CONDUIT FOR POWER AND (1) 1" CONDUIT FOR TELECOMMUNICATION

WITH PULLSTRING. FOR EACH CONDUIT RUN, PROVIDE 6" CONDUIT STUB UP AT THE DESK

AREA.

4 GATE VIDEO MONITOR. CONNECT TO GATE CAMERA AND COORDINATE WIRING WITH

MANUFACTURER RECOMMENDATIONS.

5 CONTROLLED ACCESS DOOR MASTER PANEL WITH INTEGRAL MONITOR AND 2-WAY INTERCOM

FUNCTIONALITY. MASTER STATION SHALL BE CAPABLE OF RECEIVING VIDEO AND

COMMUNICATING WITH GUEST AT DOOR VIA INTERCOM. MASTER STATION SHALL BE ABLE TO

INTERFACE WITH VA-PROVIDED WANDERGUARD SYSTEM TO UNLOCK THE DESIRED DOOR.

ALARM WILL SOUND AT MASTER STATION SHOULD A DOOR BE PROPPED OPEN. BASIS OF

DESIGN SHALL BE AIPHONE: IXG COMMERCIAL SERIES.

6 CONTROLLED ACCESS POINT. DOOR SHALL BE LOCKED FROM THE OUTSIDE AND ONLY

ACCESSIBLE TO STAFF VIA A PIV CARD READER. DOOR SHALL ALSO BE EQUIPPED WITH A

COMBINATION CAMERA/2-WAY INTERCOM ENCLOSURE. CAMERA WILL SHOW VIDEO AND

INTERCOM WILL PROVIDE AUDIO AT TWO DESK LOCATIONS IN THE BUILDING: CONCIERGE

131 AND TEAM STATION 122. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

PROVIDING MONITORS AT DESKS AND ALL CONDUIT AND WIRING REQUIRED BETWEEN THE

DOOR AND THE CONTROL DESK LOCATIONS. DOOR WILL ALSO INTEGRATE WITH THE VA

PROVIDED WANDERGUARD SYSTEM TO RELEASE THE ELECTRIC LOCKS UPON "DOOR OPEN"

REQUEST FROM THE DESKS. DOORS WILL FAIL OPEN UPON A FIRE ALARM TROUBLE

SIGNAL. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS OF CONTROLLED

ACCESS DOOR WITH ARCHITECTURAL DRAWINGS AND VA. BASIS OF DESIGN SHALL BE

AIPHONE: IXG COMMERCIAL SERIES.

ADD ALTERNATE NOTES:

1. ADD ALTERNATE NO 1: INTERIOR AND EXTERIOR CAMERAS PROVIDED BY THE

CONTRACTOR. SCOPE INDICATED REPRESENTS ADD ALTERNATE NO. 8.

BASE BID SCOPE SHALL BE THAT ALL SECURITY CAMERAS ARE TO BE PROVIDED

BY THE VA. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUIT,

C

D

A.1 1.1

4.8 5.1

RESIDENT TLT

106A

RESIDENT TLT

104A

RESIDENT TLT

103A

STORAGE

RESIDENT TLT

101A

RESIDENT TLT

102A

RESIDENT RM

WEST MECH

ACCESS

GUEST /

BARIATRIC

RESIDENT RM

RESIDENT TLT

105A

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESIDENT RM

RESIDENT RM

E

E

D D

S

D

M A

TC

H

LI

N E

FO

R

C O N

TI

N U A

TI

O N

S E E

D W G E T1

E

E

E

E

E

E

E

E

E

E

E

E

E

E

C.9

A.8

B.2

D

D

D

D

D

D

D

P

S

P

S

CABLE TRAY

(TYP)

2J

2J

2J

2J

2J

2J

2J

SOILED UTILITY

SEE ADD ALTERNATE

NOTE 1

FW

P

SEE ADD ALTERNATE NOTE 2.

SEE ADD ALTERNATE NOTE 2.

GUEST/

BARIATRIC

RESIDENT TLT

100A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

AREA A

AREA B

AREA C AREA

D

/8

/2

:5

:5

P M

ET113

ELECTRICAL

TELECOM PLAN

1ST FLOOR, AREA C

CONSTRUCT NEW COMMUNITY

LIVING CENTER (CLC)

LEBANON, PENNSYLVANIA

595-601

CLC-1

2023-02-09 MR PDK0499-0124

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"1

TELECOM PLAN - 1ST FLOOR

GENERAL SHEET NOTES:

1. SEE DRAWING E-001 AND E-002 FOR ABBREVIATIONS, SYMBOL LIST AND NOTES.

2. CABLE TRAY SHALL BE 12" WIDE X 4" HIGH OPEN LADDER TYPE, MOUNTED

ABOVE ACCESSIBLE CEILING, UNLESS NOTED OTHERWISE.

3. VA IS RESPONSIBLE FOR FINAL LOCATION OF ALL NEW WIRELESS ACCESS POINTS.

CONTRACTOR SHALL COORDINATE WITH VA OIT DEPARTMENT PRIOR TO

INSTALLATION OF WAP BACKBOXES. AT EACH WAP, CONTRACTOR IS RESPONSIBLE

FOR A 4-GANG BACKBOX WITH 2-JACK DEVICE AND CAT6A WIRES BACK TO IT

146.

4. SEE DRAWING E-603 FOR MORE INFORMATION ON TELE/DATA SYSTEM.

5. REFER TO DETAILS ON E-503 FOR FURTHER INFORMATION ON DOOR ACCESS

CONTROL (WANDERGUARD) SYSTEM.

1 (2) TWO - 4" CONDUITS.

2 CONTROLLED ACCESS POINT. DOOR SHALL BE LOCKED FROM THE OUTSIDE AND ONLY

ACCESSIBLE TO STAFF VIA A PIV CARD READER. DOOR SHALL ALSO BE EQUIPPED WITH A

COMBINATION CAMERA/2-WAY INTERCOM ENCLOSURE. CAMERA WILL SHOW VIDEO AND

INTERCOM WILL PROVIDE AUDIO AT TWO DESK LOCATIONS IN THE BUILDING: CONCIERGE

131 AND TEAM STATION 122. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

PROVIDING MONITORS AT DESKS AND ALL CONDUIT AND WIRING REQUIRED BETWEEN THE

DOOR AND THE CONTROL DESK LOCATIONS. DOOR WILL ALSO INTEGRATE WITH THE VA

PROVIDED WANDERGUARD SYSTEM TO RELEASE THE ELECTRIC LOCKS UPON "DOOR OPEN"

REQUEST FROM THE DESKS. DOORS WILL FAIL OPEN UPON A FIRE ALARM TROUBLE

SIGNAL. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS OF CONTROLLED

ACCESS DOOR WITH ARCHITECTURAL DRAWINGS AND VA. BASIS OF DESIGN SHALL BE

AIPHONE: IXG COMMERCIAL SERIES.

SHEET KEYNOTES:

ADD ALTERNATE NOTES:

1. ADD ALTERNATE NO 1: INTERIOR AND EXTERIOR CAMERAS PROVIDED BY THE

CONTRACTOR. SCOPE INDICATED REPRESENTS ADD ALTERNATE NO. 8.

BASE BID SCOPE SHALL BE THAT ALL SECURITY CAMERAS ARE TO BE PROVIDED

BY THE VA. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUIT,

BACKBOX, AND WIRING TO EACH CAMERA LOCATION.

2. ADD ALTERNATE NO 8: FIT OUT WESTERN WING. SCOPE INDICATED REPRESENTS

ADD ALTERNATE NO. 8.

BASE BID SCOPE SHALL BE THE (7) RESIDENT ROOMS AND BATHROOMS IN THIS

AREA SHALL BE SHELLED.

FOR ALL CONDUIT RUNS REQUIRED FOR THE BASE BID DEVICES THAT WILL BE

INSTALLED IN THE FUTURE FIT OUT OF THE SHELLED SPACE, ELECTRICAL

CONTRACTOR SHALL PROVIDE REQUIRED CONDUITS WITH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .