ATT 10 - PWS (25 Sep 24).docx
DOCX document 142 KB Posted
- Solicitation number
- FA8540-25-R-0001
About this file
This document is a Performance Work Statement (PWS) for the production and sustainment support of Sniper ATP, LANTIRN, and IRST/Legion Foreign Military Sales (FMS) and USAF requirements. The PWS describes the services required to provide and sustain these targeting and navigation systems, including depot-level repair and return, data, program support, depot lay-in, program reviews, and on-call technical support.
The PWS establishes Lockheed Martin Missiles and Fire Control as the Source of Repair for over 20 international air forces. The contract has a 7-year duration with a 3-year base period and one 4-year option. It includes both production and sustainment requirements, with sustainment commencing in April 2027. The PWS details the technical requirements for manufacturing, testing, and delivering the various pods, containers, spares, software, integration support, and other related items. It also covers the sustainment activities such as repair and return, depot lay-in, and program management. Performance thresholds and metrics are specified for both production and sustainment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT 14-AFMCFORM-807 IRST.pdf | ||
| ATT 8 -DDFORM 1653.pdf | ||
| ATT 6 - CDRL (25 Sep 24).docx | DOCX document | |
| ATT 7 DD Form 254.pdf | ||
| ATT 2-SUSTAINMENT CLINS (002).docx | DOCX document | |
| ATT 9-AFMC FORM 158.pdf | ||
| ATT 16-AFMCFORM-807 SNIPER.pdf | ||
| ATT 15-AFMCFORM-807 LANTIRN.pdf | ||
| ATT 1-RESERVED-TBD CLINS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement For Production and Sustainment Support For Sniper ATP, LANTIRN and IRST/Legion Foreign Military Sales (FMS) / USAF
Including but not limited to: USAF Production; FMS Production & Sustainment for Bahrain, Belgium, Bulgaria, Colombia, Egypt, Greece, Indonesia, Iraq, Jordan, Korea, Kuwait, Morocco, Oman, Pakistan, Poland, Qatar, Romania, Saudi, Slovakia, Taiwan, Thailand, Türkiye and other countries as requirements generate.
FA8540-24-R-0004
PR # FD2060-23-33137
25 September 2024
DISTRIBUTION STATEMENT E
Distribution authorized to DoD Components only; Direct Military Support; 12 September 2024. Other requests for this document shall be referred to AFLCMC/WNX, 236 Milledgeville St, Ste F30 Robins AFB, GA 31098-1813
1.0 Description of Services
Objective(s): This Performance Work Statement (PWS) describes the services required to provide and sustain the Low Altitude Navigation and Targeting Infrared for Night (LANTIRN), the Sniper Advanced Targeting Pod (ATP) system and the Legion/Infrared Search and Track (IRST) system. The PWS also establishes Lockheed Martin Missiles and Fire Control, hereafter referred to as Contractor, as the Source of Repair for the following countries, but is not all inclusive: Bahrain, Belgium, Bulgaria, Colombia, Egypt, Indonesia, Iraq, Jordan, Korea, Kuwait, Morocco, Oman, Pakistan, Poland, Qatar, Romania, Saudi, Slovakia, Taiwan, Thailand, and Turkiye. The sustaining activities shall include but are not limited to accomplishing Line Replaceable Units (LRU) Depot-level Repair and Return, Data, Program Support, Depot Lay-In, Program Reviews, and On-Call Technical Support. “The duration of this ID/IQ contract is seven (7) years with a base three-year period and one option period with four one-year ordering periods. The weapon systems this contract will support are F-16, F-15, F-18 and FA50. This contract encompasses both production and sustainment requirements; however, sustainment will not commence until 1 Apr 2027, as pricing is already available in FA8540-22-D-0001.
1.1. The Contractor shall provide the necessary resources required for the management, fabrication, upgrade/retrofit, integration support, testing and shipping of its Non-Developmental Item (NDI) ATP System, LANTIRN Navigation Pod and IRST as it relates to the requirements document associated with each specific delivery order (DO) placed under this IDIQ contract.
1.2. Benefit to the United States: This acquisition will benefit FMS/USAF customers by providing a 7-year contract solution for the Production and Sustainment of Sniper ATP, LANTIRN and Legion/IRST Pods. The FMS program is part of security assistance authorized by the Arms Export Control Act (AECA). It is a fundamental United States (U.S.) foreign policy tool. Under Section 3, of the AECA, the U.S. may sell defense articles and services to foreign countries and international organizations when it is determined to strengthen the security of the U.S. and promote world peace.
1.3. Background
1.3.1. Sniper/LANTRIN/IRST are the most widely deployed targeting/navigation systems for fixed-wing aircraft in use by the United States Air Force (USAF) and are also the targeting system of choice for more than 20 international air forces. In addition to fulfilling precision strike mission requirements, these systems are changing the way armed forces operate in theater with new capabilities to meet the challenges of non-traditional intelligence, surveillance, and reconnaissance.
1.3.2. Sniper/LANTIRN/IRST provides mission-critical targeting capabilities for aircrew survivability and mission success. Sniper/LANTRIN/IRST specialize in long-range target detection/identification, continuous surveillance, and navigation for all missions, including close air support of ground forces. Imagery, video datalink, and J-series weapons-quality coordinates and enhances the warfighter’s ability to rapidly detect, analyze, and target air and ground targets while keeping aircrews out of the range of threats. LANTRIN provides low altitude navigation capabilities using terrain following radar.
2.0 Services Summary –
2.1. Production
| Performance Objective |
| PWS Reference |
| Performance Threshold |
| In-Country Maintenance Familiarization |
| 4.3.8 |
| Successful completion of in-country Sniper ATP, LANTIRN Navigation Pod, and IRST familiarization, as tailored to each customer, and notification to the U.S. Government within 30 calendar days of completion. Training will be verified by the Government via customer satisfaction report post training. |
| Quality of CDRL data/document |
| 4.2.1 |
| There shall be no more than one (1) rejection of any single data/document deliverable. There shall be no more than a total of two (2) rejection(s) of data/document deliverables per contract year. The rejected deliverable shall be corrected and resubmitted within seven (7) calendar days of notification of Government rejection. |
| Receipt of CDRL data/document |
| 4.2.4 |
| There shall be no more than three (3) late receipt(s) of data/document(s) per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date accepted by the Government. |
Sniper ATP, IRST, LANTIRN Navigation Pod, LANTIRN FINS upgrades, and all Production Deliverables
| 4.3.1 |
| Contractor shall have no more than two Supply Discrepancy Reports (SDRs) or Product Quality Deficiency Reports (PQDR) per country, per year during this reporting period. All. Sniper, IRST, LANTIRN Nav Pods and all Production Deliverable shall be delivered IAW the contract with zero defects |
2.2. Sustainment
| Performance Objective |
| PWS Reference |
| Performance Threshold |
Maintenance and Repair of Items. Meet Turnaround Time (TAT)
| 4.4.1 |
| Perform all actions necessary to return a repairable item to a serviceable condition IAW PWS Appendix 8, with an aggregate performance of at least 10% less than the times shown calculated annually at the end of each contract year, and with no single item exceeding 150% of the time shown or time shown plus 60 days whichever is less. For Sniper and LANTIRN, the days will be measured from the date Contractor receives funding under the applicable repair CLIN on the delivery order and the item is received by the Contractor at its Warner Robins, GA repair location until Depot Repair Form (DRF) closure. For IRST, the calendar days will be measured from the date the item is received by the Contractor at its Orlando, FL repair location until Depot Repair Form (DRF) closure. In the event an item is awaiting funding, the TAT will be measured upon the induction date. Early delivery is authorized. Partial Shipments are authorized. |
Performance bands have been established to assess the Contractor’s TATs:
≥ 90% = Satisfactory 75% < TAT < 90% = Very Good TAT ≤ 75% = Excellent TAT requirements are identified in PWS Appendix 8. The TAT will be calculated annually at the end of each contract year for all countries and all repairs inducted in that year.
| Ensure Investigation of all Supply Discrepancy Reports (SDR) and Product Quality Deficiency Reports (PQDR) |
| 4.4.3 |
| All investigation results to include corrective action plan shall be accomplished within forty-five (45) calendar days upon receipt of SDR or PQDR. No more than two (2) SDRs per contract year. |
| Quality of CDRL data/document |
| 4.2.1 |
| There shall be no more than one rejection of any single data/document deliverable. There shall be no more than a total of two (2) total rejection(s) of data/document deliverables per contract year. The rejected deliverable shall be corrected and resubmitted within seven (7) calendar days of notification of Government rejection. |
| Receipt of CDRL data/document |
| 4.2.4 |
| There shall be no more than three (3) late receipt(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date accepted by the Government. |
3.0 Government Property
3.1. Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) 52.245-1, all other applicable Government regulations, and as specified in the contract. The Contractor shall provide all the required property to perform the requirements of this contract.
3.2. Government Property to be Provided: Government property will be provided in accordance with the Scheduled Government Furnished Property (SGFP) contract attachment.
(CDRL A/B/C/D/E/F/G00J, DI-PSSS-80727A, Government Furnished Material (GFM) by National Stock Number (NSN))
3.3. Reporting of Government Property: The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) Government property in its possession in accordance with FAR 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil, as stipulated by DFARS 252.245-7005. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/.
3.4. Loss of Government Property
3.4.1. Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.
3.4.2. Reporting Loss of Government Property: The Contractor shall report loss of Government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.
(CDRL A/B/C/D/E/F/G00K, DI-MGMT-80441D, Government Property (GP) Inventory Report)
3.5. Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.
4.0 Technical Requirements
4.1. Period and Place of Performance
4.1.1. Contract/Order Period of Performance - Production: The duration of this I/D contract is seven (7) years with a base three (3) year period and one option period with four (4) one-year ordering periods. This contract includes both production and sustainment; however, sustainment will not begin until Ordering Period 1. The period of performance for sustainment will be eight (8) month basic, plus five (5) twelve (12) month ordering periods.
LRUs shall be returned to the Contractor’s facility in Warner Robins, GA. Some repair activities will require performance at applicable suppliers’ facilities.
4.1.2. Place of Performance: The primary place of performance for this contract shall be at the Contractor’s facility. Some integration efforts will require performance at aircraft manufacturer facilities and/or test bases (CONUS/OCONUS). Familiarization training shall be provided in-country as required. (CLIN X032, X045) Lockheed Martin Corporation Bldg 640 Door X-19 Page Road, Robins AFB Warner Robins, GA 31098 Lockheed Martin Missiles and Fire Control. 5600 Sand Lake Road Orlando, FL 32819-8907
4.2. Contract Data Requirements List(s) (CDRL)
| OP 1 |
| OP 2 |
| OP 3 |
| OP 4 |
| OP 5 |
| OP 6 |
| OP 7 |
| Title |
| DID |
| PWS Ref. |
| A001 |
| B001 |
| C001 |
| D001 |
| E001 |
| F001 |
| G001 |
| Status Report |
| DI-MGMT-80368A |
| 4.3.15, 4.4, 4.4.6, 4.14.4 |
| A002 |
| B002 |
| C002 |
| D002 |
| E002 |
| F002 |
| G002 |
| Contract Change Proposals (CCP) |
| DI-ADMIN-81401C |
| 4.3.6, 4.6.5 |
| A003 |
| B003 |
| C003 |
| D003 |
| E003 |
| F003 |
| G003 |
| Engineering Change Proposals (ECP) |
| DI-SESS-80639E |
| 4.5.2.2, 4.6.8 |
| A004 |
| B004 |
| C004 |
| D004 |
| E004 |
| F004 |
| G004 |
| Technical Report - Study/Services |
| DI-MISC-80508B |
| 4.4.3, 4.4.6, 4.4.7, 4.5.2.2, 4.6.1 |
| A005 |
| B005 |
| C005 |
| D005 |
| E005 |
| F005 |
| G005 |
| Program Protection Implementation Plan (PPIP) |
| DI-ADMN-81306/ |
| 4.6 |
| A006 |
| B006 |
| C006 |
| D006 |
| E006 |
| F006 |
| G006 |
| Training Materials |
| DI-ILSS-80872/T |
| 4.3.8 |
| A007 |
| B007 |
| C007 |
| D007 |
| E007 |
| F007 |
| G007 |
| Computer Program Identification Number (CPIN) Catalog Information |
| DI-MISC-81454D |
| 4.3.4, 4.3.5 |
| A008 |
| B008 |
| C008 |
| D008 |
| E008 |
| F008 |
| G008 |
| Performance Specification Documents |
| DI-SDMP-81465A |
| 4.3.1 |
| A009 |
| B009 |
| C009 |
| D009 |
| E009 |
| F009 |
| G009 |
| Software Version Description (SVD) |
| DI-IPSC-81442A |
| 4.3.4, 4.3.5 |
| A00A |
| B00A |
| C00A |
| D00A |
| E00A |
| F00A |
| G00A |
| Software Product Specification (SPS) |
| DI-IPSC-81441A |
| 4.3.4, 4.3.5 |
| A00B |
| B00B |
| C00B |
| D00B |
| E00B |
| F00B |
| G00B |
| Software Test Report (STR) |
| DI-IPSC-81440A |
| 4.3.6 |
| A00C |
| B00C |
| C00C |
| D00C |
| E00C |
| F00C |
| G00C |
| Status Report for Contractor Receipt/Shipment of Foreign Military Sales (FMS) Repair/Return Assets |
| DI-MISC-80915 |
| 4.4.5, 4.4.6, 4.4.9 |
| A00D |
| B00D |
| C00D |
| D00D |
| E00D |
| F00D |
| G00D |
| Specification Change Notice (SCN) |
| DI- SESS -80643E |
| 4.6.9 |
| A00E |
| B00E |
| C00E |
| D00E |
| E00E |
| F00E |
| G00E |
| Test Procedures |
| DI-NDTI-80603A |
| 4.3.1 |
| A00F |
| B00F |
| C00F |
| D00F |
| E00F |
| F00F |
| G00F |
| Acceptance Test Procedures |
| DI-NDTI-80603A |
| 4.3.1, 4.6 |
| A00G |
| B00G |
| C00G |
| D00G |
| E00G |
| F00G |
| G00G |
| Program-Unique Specification Documents |
| DI-SDMP-81493A |
| 4.6 |
| A00H |
| B00H |
| C00H |
| D00H |
| E00H |
| F00H |
| G00H |
| Air Force Technical Manual Contracts Requirement (TMCR) |
| TMCR 86-01 |
| 4.3.1, 4.3.6, 4.3.9, 4.4.13 |
| A00J |
| B00J |
| C00J |
| D00J |
| E00J |
| F00J |
| G00J |
| Government Furnished Material (GFM) by National Stock Number (NSN) |
| DI-PSSS-80727A |
| 3.2 |
| A00K |
| B00K |
| C00K |
| D00K |
| E00K |
| F00K |
| G00K |
| Government Property (GP) Inventory Report |
| DI-MGMT-80441D |
| 3.4.2 |
| A00L |
| B00L |
| C00L |
| D00L |
| E00L |
| F00L |
| G00L |
| Software Requirements Specification (SRS) |
| DI-IPSC-81433A |
| 4.3.4, 4.3.5 |
| A00M |
| B00M |
| C00M |
| D00M |
| E00M |
| F00M |
| G00M |
| System/Subsystem Specification (SSS) |
| DI-IPSC-81431A |
| 4.3.4, 4.3.5 |
| A00N |
| B00N |
| C00N |
| D00N |
| E00N |
| F00N |
| G00N |
| Contractor’s Corrective Action Plan |
| DI-MGMT-80501 |
| 4.4.3 |
| A00P |
| B00P |
| C00P |
| D00P |
| E00P |
| F00P |
| G00P |
| Software Vulnerability Assessment Report (SVAR) |
| DI-IPSC-82252A |
| 4.6.1 |
| A00Q |
| B00Q |
| C00Q |
| D00Q |
| E00Q |
| F00Q |
| G00Q |
| Programmatic Environmental Safety and Health Evaluation (PESHE) Plan) |
| DI-ENVR-81840 |
| 5.5.6 |
| A00R |
| B00R |
| C00R |
| D00R |
| E00R |
| F00R |
| G00R |
| Supplier's Configuration Management Plan |
| DI-SESS-80858D |
| 4.6.6 |
| A00S |
| B00S |
| C00S |
| D00S |
| E00S |
| F00S |
| G00S |
| Hazardous Material Management Program (HMMP) Plan |
| DI-MGMT-81398D |
| 5.5.7 |
| A00T |
| B00T |
| C00T |
| D00T |
| E00T |
| F00T |
| G00T |
| Data Accession List (DAL) |
| DI-MGMT-81453C |
| 4.2.5 |
| A00U |
| B00U |
| C00U |
| D00U |
| E00U |
| F00U |
| G00U |
| Contract Funds Status Report (CFSR) |
| DI-MGMT-81468A |
| 4.6.5 |
| A00V |
| B00V |
| C00V |
| D00V |
| E00V |
| F00V |
| G00V |
| Cybersecurity Strategy Implementation Plan |
| DI- SCRE-82143A |
| 4.6.4 |
| A00W |
| B00W |
| C00W |
| D00W |
| E00W |
| F00W |
| G00W |
| Test Plan |
| DI-NDTI-80566A |
| 4.3.1 |
4.2.1. Quality of CDRL Deliverable(s): There shall be no more than one rejection of any single deliverable. There shall be no more than a total of two total rejection(s) of deliverables per contract year. The Government will reject a deliverable if any technical errors or two or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS, or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within seven (7) calendar days of notification of Government rejection
4.2.2. Submission of CDRL Deliverable(s): The Contractor shall electronically deliver all contractual data using the Government controlled method of delivery, Multi-user ECP Automated Review System (MEARS), https://mears1.redstone.army.mil/mears/Default.aspx/.
An alternate method of delivery when MEARS is down for file maintenance will be the DISA application, known as DoD SAFE, https://safe.apps.mil/. It will be available to all DoD Common Access Card (CAC) holders.
Note: Separately priced data must also be submitted/accepted in Wide Area Workflow (WAWF) in order for the Contractor to receive payment.
4.2.3. The Contractor shall be receptive to the training offered by the Government on the MEARS system.
4.2.4. Receipt of CDRL Deliverable(s): There shall be no more than three late receipt(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government. The Contractor shall prepare, maintain and track the contract data status schedule and ensure timely data deliveries.
4.2.5. Data Accession List (DAL)
The Contractor shall maintain a current listing of all non-CDRL data generated in performance of the contract in a Data Accession List (DAL) electronic information system accessible by the Government. All technical documentation and other data generated in performance of this program shall be made available to the Government via the DAL. The Contractor shall provide a central point of contact for Data Management who shall ensure contract data compliance with the contract.
(CDRL A/B/C/D/E/F/G00T, DI-MGMT-81453C, Data Accession List (DAL))
4.3. Production Technical Requirements
4.3.1. The Contractor shall manufacture, test and deliver as identified in the respective DO:
1. Production - Sniper ATP Pods– Full Configuration (CLIN: X001)
2. Production - LANTIRN Navigation Pods – Full Configuration (CLIN: X002)
3. Production - IRST Systems – Full Configuration (CLIN: X003)
4. Production - IRST Systems – Unique (CLIN: X004)
5. Production - Sniper ATP Pods Container (CLIN: X005)
6. Production - LANTIRN Navigation Pods Container (CLIN: X006)
7. Production - IRST Container (CLIN: X007)
8. Production - Sniper LRU Spares - (CLIN: X008)
9. Production - LANTIRN LRU Spares - (CLIN: X009)
10. Production - IRST Spares (CLIN: X010)
11. Production - IRST Spares – Unique (CLIN: X011)
12. Production - Pylons (CLIN: X012)
13. Production - Reserved (CLIN: X013)
14. Production - Reserved (CLIN: X014)
15. Production - Reserved (CLIN: X015)
16. Production - Sniper Standard Software & Integration (CLIN: X016)
17. Production - LANTIRN Standard Software & Integration (CLIN: X017)
18. Production - IRST Standard Software & Integration (CLIN: X018)
19. Production - Sniper Unique Software & Integration (CLIN: X019)
20. Production - LANTIRN Unique Software & Integration (CLIN: X020)
21. Production - IRST Unique Software & Integration (CLIN: X021)
22. Production - Integration Test Event – 1 week w/Travel CONUS (CLIN: X022)
23. Production - Integration Test Event – 1 week w/Travel OCONUS (CLIN: X023)
24. Production - Integration Test Event- Without Travel (CLIN: X024)
25. Production - Reserved (CLIN: X025)
26. Production - Reserved (CLIN: X026)
27. Production - Site Survey (CLIN: X027)
28. Production - ICS- Repair & Return (CLIN: X028)
29. Production - ICS - Repair & Return – Unique (CLIN: X029)
30. Production - ICS – Management (CLIN: X030)
31. Production - Contractor Technical Support (CLIN: X031)
32. Production - User Familiarization/Refresher Events – OCONUS (CLIN: X032)
33. Production - CSTOs - Initial Delivery (CLIN: X033)
34. Production - CSTOs – Update (CLIN: X034)
35. Production - Sniper O-Level Support Equipment (CLIN: X035)
36. Production - LANTIRN O-Level Support Equipment (CLIN: X036)
37. Production - IRST O-Level Support Equipment (CLIN: X037)
38. Production - O-Level Support Equipment – Unique (CLIN: X038)
39. Production - Reserved (CLIN: X039)
40. Production - Sniper Bench Stock (CLIN: X040)
41. Production - LANTIRN Bench Stock (CLIN: X041)
42. Production - IRST Bench Stock (CLIN: X042)
43. Production – Retrofit Labor (CLIN: X043)
44. LANTIRN 3rd Gen FIN Upgrade (CLIN: X044)
45. User Familiarization Training – CONUS (CLIN: X045)
46. Production - Program Support (CLIN: X046)
47. Production – Obsolescence (CLIN: X047)
48. Production – PMR Travel CONUS (CLIN:X048)
49. Production – PMR Travel OCONUS (CLIN: X049)
The Contractor shall perform system-level acceptance testing on each new Sniper ATP, LANTIRN, and/or IRST system ordered IAW the latest approved version. The Contractor shall submit any Acceptance Test Procedures changes prior to the start of acceptance testing on the first deliverable as required. In addition, the Contractor shall perform system-level delta acceptance testing, as required, IAW the latest approved delta acceptance test procedure to verify compliance with the unique acceptance test requirements. The Contractor shall submit new or delta Acceptance Test Procedures prior to the test event IAW CDRL A/B/C/D/E/F/G00F. The Contractor shall submit a System Performance Specification IAW CDRL A/B/C/D/E/F/G008. As required, the Contractor shall submit changes to the Performance Specification Documents previously approved IAW (CDRL A/B/C/D/E/F/G008 and test reports in association with CDRL A/B/C/D/E/F/G00F). (CLIN: X001, X002, X003, X004)
New LANTIRN Navigation Pod and required support equipment will be negotiated at first delivery order. The acquisition process will be performed IAW CDRLs, DD254s and the DD250 process. TMCR will be delivered at time of delivery order. The Contractor shall upgrade, test, and deliver Government Furnished Equipment (GFE) legacy LANTIRN navigation pods and Navigation FINS to the enhanced resolution (ER) configuration; retrofit ECUs to utilize R-124 refrigerant and deliver to the LANTIRN inventory IAW current country system specifications at time of contract award. The Contractor shall modify only serviceable LANTIRN Navigation Pods and LANTIRN FINS unless the unserviceable part is not reused in the upgraded LRU. The Contractor shall be authorized a day for day extension to the delivery schedule for pods that require repair; otherwise, a mutually agreed upon date shall be established between the Contractor and the program manager based on the incurred repair delay. The Contractor shall load the current Navigation ER pod OFP software and verify the serviceability of the upgraded pod IAW CDRL A/B/C/D/E/F/G00F (DI-NDTI-80603A). (CLIN 0044)
(CDRL A/B/C/D/E/F/G008, DI-SDMP-81465A, Performance Specification Documents) (CDRL A/B/C/D/E/F/G00E, DI-NDTI-80603A, Test Procedures) (CDRL A/B/C/D/E/F/G00F, DI-NDTI- 80603A, Acceptance Test Procedure) (CDRL A/B/C/D/E/F/G00W, DI-NDTI-80566A, Test Plan)
System Engineering: As part of the above tasks, the Contractor shall ensure that the design integrity is maintained at the system level. This shall include providing the system, hardware, safety, reliability and software engineering disciplines and resources for design compliance and technical oversight to ensure the system performance parameters are met. The Contractor shall investigate and provide notification of parts obsolescence issues as required. The Contractor shall have no more than two Supply Discrepancy Reports (SDRs) or Product Quality Deficiency Reports (PQDR) per country, per year during this reporting period.
All Sniper ATP, LANTIRN Nav Pods, LANTIRN FINS upgrades, IRST systems, and all Production Deliverables shall be delivered IAW the contract with zero defects.
Applicable documents The following documents of the exact issue shown at the time of initial contract award form a part of this PWS to the extent specified herein. Only documents referenced within the specified requirements are applicable, and only to the extent applied to the requirement. In the event of a conflict between documents referenced and the PWS, the PWS shall take precedence.
Sniper ATP Non-Government Documents – Production
| 77420004 |
| System Specification Sniper ATP (Latest USAF Approved Version DoD Only) |
| 77422001 |
| Acceptance Test Procedure for the Advanced Targeting Pod (Latest USAF Approved Version DoD Only) |
| ISO-9001-2000 |
| Quality Management Systems -Requirements |
| 77432001 |
| Delta Acceptance Test Procedure for the Sniper Advance Targeting Pod (ATP) (Latest USAF Approved Version) |
| 77420004-001 |
| Classified Addendum to the System Specification |
| 77420004-002 |
| Classified Addendum to the System Specification |
| 77430004-001 |
| Rev A Foreign Military Sales (FMS) Addendum to System Specification Sniper ATP. All Sniper ATP and all Production Deliverables shall be delivered IAW the contract. |
LANTIRN Navigation Pod Non-Government Documents
| RWE 83-07 |
| Prime Item Development Spec |
| RWE 83-07 |
| LANTIRN ER Navigation Pod Addendum Spec to RWE 83-07 PIDS |
| 717456899 Rev K |
| Acceptance Test Procedure |
| LI12_PPL70800000-007 |
| Quality Management Systems |
IRST Non-Government Documents
| IRS_SPC70800754-001 |
| IRST F-18 Block II System Product Specification |
| IRS_SPC70800754-002 |
| IRST F-18 Block II System Product Specification - Classified Appendix |
| IRS_SPC70809754-001 |
| IRST Legion Pod Product Specification |
| IRS_SPC70809754-002 |
| IRST Legion Pod Product Specification - Classified Appendix |
| IRS_SPC70802684-001 |
| IRST V2 IRR Product Specification |
| IRS_SPC70802684-002 |
| IRST V3 IRR Product Specification |
| IRS_SPC70810754-001 |
| IRST V2 Processor Product Specification |
| IRS_SPC70810754-001 |
| IRST V2 Processor Product Specification |
| IRS_SPC70810754-002 |
| IRST V3 Processor Product Specification |
| IRS_SPC70810754-003 |
| IRST CSEU Processor Product Specification |
| IRS_SPC70802523-002 |
| IRST IMU Product Specification |
| IRS_SPC70811162-001 |
| IRST Legion Pod ECU Product Specification |
| IRS_SPC70811162-002 |
| IRST Embedded Pod ECU Product Specification |
4.3.2. Pod Containers: As required in the applicable DO, the Contractor shall deliver the quantity of Sniper ATP, LANTIRN Navigation Pod, and IRST containers. The containers shall be manufactured to the same requirements as the USAF approved containers for the USAF Sniper ATP, LANTIRN Navigation Pod, and IRST programs. The containers shall also serve as shipping containers for the Sniper ATP, Navigation Pod and IRST. (CLIN: X005, X006, X007)
4.3.3. Software and Support: The Contractor shall load the current, DoD or country specific, Sniper ATP, LANTIRN Navigation Pod, FINS upgrade, or IRST OFP software. (CLIN: X016, X017, X018, X019, X020, X021)
4.3.4. Sniper ATP, LANTIRN Navigation Pods, LANTIRN FINS upgrades, and IRST Operational Flight Program (OFP) Software: The Contractor shall modify, qualify, and document Sniper ATP, LANTIRN Navigation Pods, IRST, and LANTIRN FINS upgrades OFP software for compatibility with the respective aircraft. The Contractor shall incorporate the aircraft manufacturer/integrator Laser Mask Zone (LMZ) curves in the Sniper ATP OFP. The LMZ curve data will be provided by the Contractor to the aircraft manufacturer/integrator two months after receipt of aircraft manufacturer/integrator curves. The Contractor shall deliver the executable software for the respective country’s Sniper ATP, LANTIRN, IRST or FINS upgrade OFP and the Portable Maintenance Aid (PMA) IAW CDRLs CDRL A/B/C/D/E/F/G007 (DI- MISC-81454D) and CDRL A/B/C/D/E/F/G009 (DI-IPSC-81442A). (CLIN: X016, X017, X018, X019, X020, X021)
The Contractor shall request the assignment of a single Computer Program Identification Number (CPIN) for the Sniper ATP, and/or LANTIRN Navigation Pods and/or IRST FINS upgrades OFP. The Contractor shall include the Government assigned CPIN along with the Contractor assigned OFP part number and load the I.D. number in a “Read Me” text file on the deliverable media containing the OFP executable code. The same technique shall be used to request and identify a single CPIN for Contractor developed PMA/PDT software IAW CDRL A/B/C/D/E/F/G00A (DI-IPSC-81441A).
Customers purchasing downlink and PMA/PDTs with encryption capabilities shall require modified PMAs/PDTs (uniquely identified by part number). The Government will add the customers using encryption to the ACPIN 92Q-AAQ33/MAINTAID/XX-S001-00A&D (XX denotes country code) which is the encryption CD Automated Computer Program Identification Number (ACPIN). PMA/PDT SVD, and Software Product Specification (SPS) IAW CDRL A/B/C/D/E/F/G007 (DI-MISC-81454D), CDRL A/B/C/D/E/F/G009 (DI-IPSC-81442A/T), and CDRL A/B/C/D/E/F/G00A (DI- IPSC-81441A/T).
(CDRL A/B/C/D/E/F/G007, DI-MISC-81454D, Computer Program Identification Number (CPIN) Catalog Information) (CDRL A/B/C/D/E/F/G009, DI-IPSC-81442A, Software Version Description (SVD)) (CDRL A/B/C/D/E/F/G00A, DI-MISC-81441A, Software Production Specification (SPS)) (CDRL A/B/C/D/E/F/G00L, DI-IPSC-81433A, Software Requirements Specification (SRS)) CDRL A/B/C//D/E/F/G00M, DI-IPSC-81431A, System/Subsystem Specification (SSS))
4.3.5. Global Scope Software – Sniper: The Contractor shall provide specific Global Scope and DTED capabilities for Sniper ATP to the Government for both All customers. For FMS customers, the Government will place the respective FMS country on distribution for applicable Global Scope and DTED versions. No CDRLs related to Global Scope or DTED are required unless the customer requests and pays for NRE for new software ACPIN 92Q-AAQ33/SNIPERGS/XX-F001-00A&D (XX denotes country code). (CLIN X016)
The Contractor shall inform the Government which applicable Global Scope Version (generic) software to release. It is the Government’s desire to use no more than three CPINS for all Global Scope software managed in Government data bases. The Software Version Description (SVD) and SPS shall be unique to Global Scopes. Deliveries of SPS and SVD will not be necessary unless Non-Recurring Engineering (NRE) is involved to develop a new version Global Scope software. Should a customer request modification to one of the Global Scope versions, a new SVD, SPS, and ACPIN submission will be required. This new version should be compatible with previous versions. If applicable, IAW CDRLs A/B/C/D/E/F/G007 CDRL A/B/C/D/E/F/G009, CDRL A/B/C/D/E/F/G00A
(CDRL A/B/C/D/E/F/G007, DI-MISC-81454D, Computer Program Identification Number (CPIN) Catalog Information) (CDRL A/B/C/D/E/F/G009, DI-IPSC-81442A, Software Version Description (SVD)) (CDRL A/B/C/D/E/F/G00A, DI-MISC-81441A, Software Production Specification (SPS)) (CDRL A/B/C/D/E/F/G00L, DI-IPSC-81433A, Software Requirements Specification (SRS)) CDRL A/B/C//D/E/F/G00M, DI-IPSC-81431A, System/Subsystem Specification (SSS))
4.3.6. System Integration
The Contractor shall support Sniper ATP, LANTIRN Navigation Pods, LANTIRN FINS upgrade, and/or IRST OFP software integration testing at aircraft manufacturer/integrator Systems Integration Laboratory (SIL) and flight tests. (CLIN: X022, X023, X024)
The Contractor shall provide source data based on the Interface Control Document (ICD) from aircraft manufacturer/integrator for respective country’s aircraft. The ICD source data shall be in Contractor format and shall define the Sniper ATP, LANTIRN Navigation Pod, LANTIRN FINs upgrade, or IRST to Aircraft hardware, electrical and signal interfaces IAW CDRL A/B/C/D/E/F/G00H (TMCR-86-01).
The Contractor shall provide off-site and in-house technical, maintenance, and software support. (CLIN: X022, X023, X024)
The Contractor shall respond to System Performance Anomaly Reports (SPARs) generated during integration testing. The Contractor shall provide off-site and in-house technical and software support for LMZ testing and electromagnetic testing (EMI / EMC) as required. IAW CDRL A/B/C/D/E/F/G002 (DI-ADMIN-81401C (CDRL A/B/C/D/E/F/G002, DI-ADMN- 81401C, Contract Change Proposals (CCPs)) (CDRL A/B/C/D/E/F/G00B, DI-IPSC-81440A, Software Test Report (STR)) (CDRL A/B/C/D/E/F/G00H, TMCR 86-01 Air Force Technical Manual Contract Requirement (TMCR))
4.3.7. Interim Contractor Support (ICS)
The Contractor shall maintain, in serviceable condition, the Sniper, LANTIRN and IRST Systems that are used to support integration, including contactor furnished equipment (CFE) when applicable and approved by the government, beginning upon completion of DD250 through verification of serviceability at the end of integration. The Contractor shall plan, implement, and perform ICS including acquisition management and repair services as required. The Contractor shall perform all actions necessary to return repairable items shown in Appendix 7 of this PWS to a serviceable condition. (CLIN: X028, X029, X030)
Repair of items which are Beyond Economical Repair (BER) is not required. BER is defined as any item which meets the following criteria:
a) The repair is uneconomical or unreasonable (see note below);
NOTE: Uneconomical or unreasonable” means that the cost to repair the LRU would exceed 75% of what it would cost to buy a replacement LRU at the time the LRU was deemed BER.
The repair requires a part, equipment, and/or supplier repair that is obsolete and not available
c) The hardware includes damage due to foreign objects, fire, explosion, flood, crash, combat, or acts of God
d) The repair is for a failure/damage caused by improper maintenance and/or system operation.
The Contractor may be seek an equitable adjustment if/as event (a) through (d) occur. Whenever it is determined that an item meets the above criteria, the contractor shall submit a request to the PCO (Procuring Contracting Officer) for disposition instructions.
In accordance with FAR 52.211-5, Material Requirements, the Contractor is authorized to use reconditioned, used or remanufactured material during contract performance to return the item to a serviceable condition that meets the requirements of Supply Condition Code “A” for ICS repairs under CLIN X028.
4.3.8. In-Country on-the-Job Familiarization Course
The Contractor shall provide course materials reflecting the country specific configuration. When specified, the Contractor shall provide O-level maintenance and pilot familiarization on country specific aircraft Sensor Suite and support equipment at the specified country locations. Course materials consist of PowerPoint presentations and technical publications. The training material shall be suitable for the purpose of indoctrinating and training operator personnel. The material shall contain sufficient written or audio-visual interaction to guide students through all specified didactic and hands-on training. The customer training shall cover how to operate and maintain Sniper ATP, LANTIRN and/or IRST. The Maintenance training shall include hardware description, aircraft interface, support equipment, spares, maintenance concept and safety precautions, and Global Scope. Global Scope training will provide an overview and description of the Global Scope program, including Waypoint Editor, maps, video data and files. Aircrew training will include major assemblies, system power-up, switches, displays, code entry, maintainability/reliability, fault reporting and LRU identification. Each training session will be conducted within a one-week period. Course materials to include visual aids, training schedule, handouts, workbooks and evaluation forms.
The Contractor shall ensure successful completion of in-country Sniper ATP, LANTIRN, or IRST familiarization, as tailored to each customer and required by the applicable DO, and notification to the U.S. Government within 30 calendar days of completion. The Contractor shall interact with students, answering questions and providing supplemental training as necessary. Training will be verified by the Government via customer satisfaction report post training.
(CLIN: X032, X045) (CDRL A/B/C/D/E/F/G006, DI-ILSS-80872/T, Training Materials)
4.3.9. Country Standard Technical Orders (CSTOs) & Source Data As required in the applicable DO, the Contractor shall deliver Sniper ATP, LANTIRN Navigation Pods, LANTIRN FINS upgrades, or IRST Operation & Maintenance and Ground Support Equipment CSTOs along with Aircrew and Fault Isolation Procedures Source Data. See CSTOs listed in Appendix 4, 5, & 6. IAW CDRL A/B/C/D/E/F/G00H. Undefined new LANTIRN Nav Pod CSTOs will be negotiated at delivery order. (CLIN: X033, X034) The applicable DO shall specify whether “initial” (CLIN X033) or “update” (CLIN X034) apply for the particular customer. “Update” CSTOs and Source Data will be provided annually only if there was an approved AFTO 22/Recommended Change for the applicable country CSTOs. Otherwise, CLIN X033 shall be utilized for upgrades/modification with associated CSTCTO, regardless if a country already has CSTOs and Source Data.
All updates shall be delivered in the form of change pages. Change pages are defined as the specific page/pages associated with the Delivery Order effort. They shall be just the affected page/pages so they can be interfiled into the initial copy (Ex. If page 3 is touched page 3 in its entirety will be provided as a change page)
Exception: IAW TOs 00-5-3 any update that changes 70% or more of the technical order should be submitted as a revision.
(CDRL A/B/C/D/E/F/G00H, TMCR 86-01 Air Force Technical Manual Contract Requirement (TMCR))
4.3.10. Support Equipment
The Contractor shall provide and/or deliver the type and quantity of Sniper ATP, LANTIRN Navigation Pods, LANTIRN FINS upgrade, and IRST Systems support equipment, including but not limited to ground handling equipment (Ref Appendix 2 & 3 for typical items but not limited to only this list) as required in the applicable DO. The equipment shall be manufactured to the same requirements as approved for the specific FMS customer for the Sniper ATP, LANTIRN Navigation Pods, LANTIRN FINS upgrade, and IRST Systems programs. The Contractor is authorized to deliver equipment to the latest configuration. Undefined new LANTIRN Nav Pod Support Equipment will be negotiated at delivery order as authorized in each DO. (CLIN: X035, X036, X037, X038)
4.3.11. LRU Spares
As required in the applicable DO, the Contractor shall provide the quantity of Sniper ATP, LANTIRN Navigation Pods, and/or IRST spares identified in the TDD. The spares shall be manufactured to the same requirements as approved for the specific FMS customer for Sniper ATP, LANTIRN Navigation Pods and/or IRST programs. The Contractor is authorized to deliver to the latest configuration, as specified in each DO. Appendix 7 – LRU Spares Table. (CLIN: X008, X009, X010, X011)
4.3.12. Retrofit of Sniper, LANTIRN Navigation Pods and IRST
As required in the applicable DO, the Contractor shall provide modification and retrofit of Sniper ATPs, LANTIRN Navigation Pods, and IRST. This may consist of repair and return of unserviceable Line Replaceable Units, shop replaceable units, technical updates, support equipment maintenance and updates as required, and other resources identified for the management and successful execution of the retrofit program. (CLIN: X043)
4.3.13. Bench Stock
The Contractor shall deliver bench stock items in the quantity of lots reflected in the applicable DO to the respective country and base. (CLIN: X040, X041 and X042)
4.3.14. Pylons
As required in the applicable DO, the Contractor shall provide the quantity of Sniper Pylons. The Pylons shall be purchased concurrently with the Sniper Pod CLIN, unless Pod pylons are purchased as GFE. (CLIN X012)
4.3.15. Program Management
The Contractor shall maintain management and control systems for planning, scheduling, surveillance, and control of Contractor and subcontractor activities necessary to meet the requirements of the contract. The Contractor shall designate a Program Manager charged with responsibility for the orders placed under this contract. The Contractor’s Program Management activities shall include program coordination, data management, risk management, other key functions. The Contractor shall support Government requests for management information and special reports in accordance with specified requirements or other mutually agreeable content. The Contractor shall provide quarterly program status reports IAW CDRL A/B/C/D/E/F/G001 (DI- MGMT-80368A) and shall identify the Contractor’s build schedule. (CLIN: X046)
(CDRL A/B/C/D/E/F/G001, DI- MGMT-80368A, Status Report)
4.3.16. Delivery Schedule
Contract delivery schedules shall be mutually negotiated between the Government and the Contractor for all deliveries under this contract. The schedule should include all hardware and software for each delivery order.
4.4. Sustainment Technical Requirements
The contractor shall conduct a comprehensive repair and return and sustainment program to meet the requirements as identified in this section of the PWS.
1. Sustainment – Repair and Return – Minor Complexity (CLIN X050)
2. Sustainment – Repair and Return – Low Complexity (CLIN X051)
3. Sustainment – Repair and Return – Medium Complexity (CLIN X052)
4. Sustainment – Repair and Return – High Complexity (CLIN X053)
5. Sustainment – Repair and Return – Major Complexity (CLIN X054)
6. Sustainment – Repair and Return – Pod Tester (CLIN X055)
7. Sustainment – Repair and Return – Portable Maintenance Aid (CLIN X056)
8. Sustainment – Repair and Return – Roll Break Return Box (CLIN X057)
9. Sustainment – Repair and Return – Digital Cartridge Interface (CLIN X058)
10. Sustainment – Repair and Return – LANTIRN (CLIN X059)
11. Sustainment – Repair and Return – IRST (CLIN X060)
12. Sustainment – On-Call Tech Support – (CLIN X061)
13. Sustainment – Non-Recurring Engineering (CLIN X062)
14. Sustainment – IRST Test Station (X063)
15. Sustainment – Depot Lay-In F-15/F-16/F-18 Common Depot Lay In (CLIN X064)
16. Sustainment – Depot Lay-In F-15/F-16 Common Adapter Lay-In (CLIN X065)
17. Sustainment – Depot Lay-In F-15/F-16 Adapter Depot Lay-In (CLIN X066)
18. Sustainment – Depot Lay-In Legacy IDCA (FLIR) Deport Lay-In (CLIN X067)
19. Sustainment – Depot Lay-In 1K IDCA (FLIT) Depot Lay-In (CLIN X068)
20. Sustainment – Depot Lay-In TWDL (Data Link) Depot Lay-In (CLIN X069)
21. Sustainment – Depot Lay-In Digital Data Recorder (DDR) Depot Lay-In (CLIN X070)
22. Sustainment – Depot Lay-In 1CLST Depot Lay-In (CLIN X071)
23. Sustainment – Depot Lay-In 2CLST Depot Lay-In (CLIN X072)
24. Sustainment – Depot Lay-In DVI Pod Unique Hardware Depot Lay-IN (CLIN X073)
25. Sustainment – Depot Lay-In F-18 Super Hornet Unique Hardware Depot Lay-In (CLIN X074)
26. Sustainment – Depot Lay-In F-18 Super Hornet Unique TWDL Hardware Depot (CLIN X075)
27. Sustainment – Depot Lay-In LANTIRN (CLIN X076)
28. Sustainment – Depot Lay-In IRST (CLIN X077)
29. Sustainment – Repair and Return – Sniper ATP (CLIN X078)
30. Sustainment - Program Support (CLIN X079)
31. Sustainment – Field Service Representative (FSR) (CLIN X080)
32. Sustainment – Saudi Program Support (CLIN X081)
33. Sustainment – PMR Travel CONUS (CLIN X082)
34. Sustainment – PMR Travel OCNUS (CLIN X083)
35. Production – Standard Data (CLIN X084)
36. Sustainment – Standard Data (CLIN X085)
37. Sustainment - Teardown, Test, and Evaluation (TT&E) (CLIN X086) The Contractor shall conduct a comprehensive repair and return sustainment program to meet the requirements as identified in this section of the PWS. (CLIN: X051, X052, X053)
Provide CDRL submissions for each country separately. Provide Quarterly Status Reports to the program manager IAW CDRL A/B/C/D/E/F/G001, Status Report (DI- MGMT-80368A). (CLIN: X063)
(CDRL A/B/C/D/E/F/G001, DI- MGMT-80368A, Status Report)
APPLICABLE DOCUMENTS
The following documents, of the exact issue shown at the time of initial contract award, form a part of this PWS to the extent specified herein. Only documents referenced within the specified requirements are applicable. In the event of a conflict between documents referenced and the PWS below, the PWS shall take precedence.
Sniper Non-Government Documents
| 77430004-xxx |
| System Specification Sniper (Applicable FMS Approved Version) |
| 77422001 |
| Advanced Targeting Pod (latest USAF approved version) |
| 77432001 |
| Delta Acceptance Test Procedure for the Sniper Advance Targeting Pod (ATP) (Latest USAF Approved Version) |
| 717455601 |
| System Specification – IRST |
| RWE 83-07 PT1 |
| System Specification – LANTIRN |
| RWE 83-07 PT2 |
| Navigation Pod |
| 717456705 |
| System Specification – LANTIRN Navigation ER Pod |
| ISO-9001-2015 |
| Quality Management Systems -Requirements |
| 77420004-001 |
| Classified Addendum to the System Specification |
| 77420004-002 |
| Classified Addendum to the System Specification |
| 77430004-001-Rev A |
| Foreign Military Sales (FMS) Addendum to System Specification Sniper ATP |
IRST Non-Government Documents
| IRS_SPC70800754-001 |
| IRST F-18 Block II System Product Specification |
| IRS_SPC70800754-002 |
| IRST F-18 Block II System Product Specification – Classified Appendix |
| IRS_SPC70809754-001 |
| IRST Legion Pod Product Specification |
| IRS_SPC70809754-002 |
| IRST Legion Pod Product Specification – Classified Appendix |
| IRS_SPC70802684-001 |
| IRST V2 IRR Product Specification |
| IRS_SPC70802684-002 |
| IRST V3 IRR Product Specification |
| IRS_SPC70810754-001 |
| IRST V2 Processor Product Specification |
| IRS_SPC70810754-002 |
| IRST V3 Processor Product Specification |
| IRS_SPC70810754-003 |
| IRST CSEU Processor Product Specification |
| IRS_SPC70802523-002 |
| IRST IMU Product Specification |
| IRS_SPC70811162-001 |
| IRST Legion Pod ECU Product Specification |
| IRS_SPC70811162-002 |
| IRST Embedded Pod ECU Product Specification |
4.4.1. LRU Repair
The Contractor shall perform all actions necessary to return the items shown in Appendix 7 & 8 of this PWS to a serviceable condition that meets the requirements of Supply Condition Code “A” which is defined as issuable without qualification with new, used, repaired, or reconditioned material. The Turn Around Time (TAT) requirements for all assets shall be IAW Appendix7 & 8 for each item identified, with an aggregate performance of at least 10% less than the times shown calculated annually at the end of each contract year, and with no single item exceeding 150% of the time shown or time shown plus 60 days whichever is less. For Sniper and LANTIRN, the calendar days will be measured from the date the item is inducted by the Contractor at its Warner Robins, GA repair location until Depot Repair Form (DRF) closure. For IRST, the calendar days will be measured from the date the item is received by the Contractor at its Orlando, FL repair location until Depot Repair Form (DRF) closure. In the event an item is awaiting funding, the TAT will be measured upon the induction date.
Early delivery is authorized. Partial Shipments are authorized.
Performance bands have been established to assess the Contractor’s TATs:
≥ 90% = Satisfactory 75% < TAT < 90% = Very Good TAT ≤ 75% = Excellent TAT requirements are identified in PWS Appendix 8. The TAT will be calculated annually at the end of each contract year for all countries and all repairs inducted in that year.
For new Depot Lay-In requirements, TAT will not apply for the first nine (9) months for Sniper and first twenty-four (24) months for IRST to allow for procurement of lay-in materials.
Contract Attachment 13, Depot Lay-In Requirements, identifies FMS Customers, configurations and pod quantities applicable to Depot Lay-In, as well as FMS Customers that:
1.) Have not procured adequate Depot Lay-In Material; or 2.) Procured additional pods; or 3.) Are upgrading their pods and need lay-in to cover the new configuration
Early delivery is authorized. Partial Shipments are authorized.
For LRUs/O-Level Support Equipment which cannot be repaired to the original configuration under which it was inducted, the Contractor is authorized to deliver the repaired item to the latest configuration.
Material Requirements: The Government authorizes the use of used, reconditioned, and/or remanufactured material in accordance with FAR 52.211-5, Material Requirements.
(CLINs: X050 – X060)
4.4.2. Depot Lay In
The Sniper, LANTIRN Navigation Pod, and IRST Depot Lay-in pool provides the means to acquire depot parts in advance of depot requirements to ensure the TAT contract requirements are achieved. FMS Customers are required to purchase Sniper and/or IRST Depot Lay-in upon award of Sustainment coverage for the initial/additional pods or pod upgrades. For new Depot Lay-In requirements, TAT will not apply for the first nine (9) months for Sniper and first twenty-four (24) months for LANTIRN Navigation Pod and IRST to allow for procurement of lay-in materials. The TAT for all assets shall be IAW Appendix 8 of this PWS for each item identified after the purchase of Sniper LANTIRN Navigation Pod, and IRST Depot Lay-in pool materials is executed for an FMS countries’ existing inventory of pods. For each FMS Customer the Depot Lay-in configuration previously purchased is identified in Attachment 13 Depot Lay-In Requirements. Replenishment of Sniper, LANTIRN Navigation Pod, and IRST Depot Lay-in pool materials used is included in the LRU repair price. The Contractor retains ownership at all times to Sniper and IRST Depot Lay-in pool. (CLIN: X064-X077)
4.4.3. Supply Deficiency Report (SDR) and Product Quality Deficiency Report (PQDR):
The Contractor shall be required to investigate SDRs and PQDRs. The investigation results, including conclusive definitive cause and corrective action, shall be provided to the Government Program Manager through the applicable Defense Contract Management Agency (DCMA), Administrative Contracting Officer (ACO). All investigation results to include corrective action plan (CAP) shall be accomplished within forty-five (45) calendar days upon receipt of SDR/PQDR exhibit. The report shall address the procedures and actions on SDRs/PQDRs under the CLS program. (CDRL A/B/C/D/E/F/G004) CAPs are defined as tools used to constructively address deficiencies in contract performance requirements. The CAP shall include the following items:
a. Description of the corrective action(s).
b. The impact of the proposed corrective action on the…
This is the start of the file's text. The full file is on GovTribe.