ATT 1 - Statement of Need.pdf
PDF 120 KB Posted
- Attached to
- Pavement Sealcoating Machine Federal contract opportunity
- Solicitation number
- FA302225Q0326
About this file
This Statement of Need outlines the requirement for Columbus Air Force Base to purchase a trailer-mounted pavement sealcoating machine. The specified machine must have a 575-gallon storage tank, 13 HP Honda engine, dual diaphragm pump, 75' hose and spray wand, 88" spray bar, and capability to spray pavement sealers with sand loadings at 50 GPM. The contractor is responsible for delivering the machine, providing manufacturer's warranty, and furnishing all necessary labor, materials, and equipment, with the government responsible for coordinating base access privileges. Delivery is requested as soon as possible to Columbus Air Force Base, with one unit required for purchase.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED
Purchase Pavement Sealcoating Machine, Bldg. 385
1. SCOPE. Provide all material, equipment and transportation required for the purchase and delivery of one trailer-mounted SEALCOATING machine to Columbus AFB, MS. Unit is required to have the following features/specifications: a hose, spray wand and spray bar attachments, a minimum 575-gallon capacity storage tank, direct drive full-sweep agitator, compatibility with pavement sealer & sand mixture, 13 HP engine, or approved government equal.
2. REQUIREMENTS. The contractor shall furnish all labor, materials, equipment, supplies, and supervision needed to accomplish the tasks described in this statement of need. Under the provisions of the statement of need, the contractor shall accomplish the tasks described below.
3. DELIVERABLES & RESPONSIBILITIES. The contractor is responsible for the following:
• TOW BEHIND PAVEMENT SEALCOATING MACHINE
575 Gallon Sealant Storage Tank, Air compressor-13 H.P. Honda Engine, Dual Diaphragm pump-inlet/outlet-1.5”, 75’ hose and spray wand, spray bar-88”, spray pavement sealers with sand loadings at 50 GPM, Direct Drive Forward Reverse Full-sweep Agitation with Rubber Wiper Blades, Two axles-6000lbs-electric braking system, or approved government equal. (Qty. 1)
• The contractor shall provide any manufacturer’s warranty to the Government.
The Government is responsible for the following:
• Coordinating base access privileges with the appropriate base-level authorities.
4. SCHEDULE. The contractor shall deliver as soon as possible to Columbus Air Force Base
END OF SECTION