This document is a Statement of Need for the replacement of a 2500 MBTU natural gas boiler located at Building 385 on Columbus Air Force Base. The contractor is responsible for supplying and delivering a new 2500 MBTU Modular Hydronic Boiler, which must be a Cleaver-Brooks product or a government-approved substitute, and providing the manufacturer's warranty. The boiler must be 120V, natural gas-fueled, with a boiler supply temperature of 160F and operating pressure of 75 psig. It must have an automatic air vent control safety and 100% main-valve shutoff with UV scanner for flame supervision. The government is responsible for coordinating base access privileges. The contractor must deliver the boiler before or by 12/31/2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF NEED

Replace 2500 MBTU, Natural Gas Boiler, Bldg. 385

1. SCOPE. Provide all material, equipment and transportation required for the purchase and delivery of one 2500 MBTU Modular Hydronic Boiler located at Columbus AFB, MS. Unit is required to be a CleaverBrooks product or a government, technically reviewed substitute rated at 120V, natural gas fueled with a boiler supply temperature of 160⁰F and operating pressure of 75 psig. Unit is required to have an automatic air vent control safety to remove any air from the system and 100% main-valve shutoff with UV scanner for flame supervision.

2. REQUIREMENTS. The contractor shall furnish all labor, materials, equipment, supplies, and supervision needed to accomplish the tasks described in this statement of need. Under the provisions of the statement of work, the contractor shall accomplish the tasks described below.

3. DELIVERABLES & RESPONSIBILITIES. The contractor is responsible for supplying the following:

• CFC-E-700-2500-125HW (115/1/60) – STD/CFG or a Government technically reviewed substitute (Qty. 1) and its delivery to Columbus AFB, MS

• Manufacturer’s warranty to the Government.

• Boiler startup will be included.

The Government is responsible for the following:

• Coordinating base access privileges with the appropriate base-level authorities.

4. SCHEDULE. The contractor shall deliver before or by 12/31/2024.

END OF SECTION