Att 1 SON - Pool Pump.docx
DOCX document 26 KB Posted
- Attached to
- Pool Pump Replacement Federal contract opportunity
- Solicitation number
- FA3022-25-Q-0304
About this file
This Statement of Need (SON) details a pool pump replacement project for Columbus Air Force Base. The government seeks a Speck BADU Block Multi series Vertical Pump (model 100/250) or an approved equivalent, with specific technical requirements including a 562 g.p.m. nominal flow rate, 800 g.p.m. maximum flow rate, 70 ft. head, and 460V, 3-phase electrical configuration. The contractor is responsible for providing all materials, equipment, transportation, and delivery of one pump with a WISCO Tin Bronze Alloy impeller and housing, along with a 12.6kW E-motor, and must provide the manufacturer's warranty to the government. The solicitation (FA3022-25-Q-0304) is issued by the Department of the Air Force Air Education and Training Command, with questions about the opportunity due by March 17, 2025 at 12:00 pm CST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis-Solicitation Pool Pump.pdf | ||
| Att 2- Clauses and Provisions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED
Replace Pool Pump, Bldg. 947
1. SCOPE. Provide all material, equipment and transportation required for the purchase and delivery of one vertical pool pump located at Columbus AFB, MS. Unit is required to be a Speck, BADU Block Multi series Vertical Pump [model 100/250, a nominal flow rate of 562g.p.m., max flow rate of 800g.p.m., a nominal head of 70 ft., rated at 460V, 3 phase] or approved government equal. Current pump is 15 HP, 1740 RPM, 230/460 V, 3 phase with a design flow of 562 GPM and 70’ head. All suction and discharge piping is sch. 80 PVC. Approved equal must meet all specifications listed above.
2. REQUIREMENTS. The contractor shall furnish all materials, equipment, supplies, and supervision needed to accomplish the tasks described in this statement of need. Under the provisions of the statement of need, the contractor shall accomplish the tasks described below.
3. DELIVERABLES & RESPONSIBILITIES. The contractor is responsible for the following:
· BADU BLOCK 100/250 VERTICAL POOL PUMP
FS160 Duty Point 70' - 800gpm, 460V, 3-Phase, 100mm (4"), PN16 Discharge WISCO Tin Bronze Alloy (ASTM B505 C90700/C92700) Impeller and Housing for Improved NaCl Solution Medium Corrosion Resistance or approved government equal. (Qty. 1)
· BBEL SPEC BADU BLOCK 100/250 E-MOTOR
12.6kW, 60 Hz, 690/400V-B5-RAL5002 (Qty. 1)
· The contractor shall provide any manufacturer’s warranty to the Government.
The Government is responsible for the following:
· Coordinating base access privileges with the appropriate base-level authorities.
4. SCHEDULE. The contractor shall delivery as soon as possible to Columbus Air Force Base
END OF SECTION
File details come from the government source that posted it. Updated .