This sources sought announcement from the Department of the Navy seeks information from potential offerors for a future procurement to provide paint, coatings, preservation products, and engineering/technical services for the hull preservation of the USS SAN DIEGO (LPD-22). Interested companies are requested to submit a notice of interest including company information and responses to specific questions by 2PM local time on June 1, 2021. The anticipated request for quote is scheduled for release on or around June 15, 2021, and will be for a firm fixed price contract under NAICS code 325510 for shipyard work to be performed at the contractor's facility. Offerors are asked to demonstrate capability and past performance in providing both paint and coating products as well as the required manufacturing guarantee.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NAVY Performance Work Statement (XX0921) San Diego.docx | DOCX document | |
| Att 3 Navy Paint Warranty SDG.docx | DOCX document | |
| Exhibit A .xlsx | XLSX spreadsheet | |
| CDRL B002 - USS San Diego - Draft.pdf | ||
| CDRL B001 - USS San Diego - Draft.pdf | ||
| Att 2 Navy DBIDS Force Protection List SDG.pdf | ||
| CDRL B005 - USS San Diego - Draft.pdf | ||
| CDRL B004 - USS San Diego - Draft.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1:
NAVY PRODUCT SUPPORT REQUIREMENT
ATTACHMENT 1: NAVY PRODUCT SUPPORT REQUIREMENT
The purpose of this contract is to provide paint coatings and related products to the US Navy fleet in a timely manner, which may require fully employing all of the Contractor’s facilities. The Contractor is responsible for delivering the full range and depth of all products to TO BE DETERMINED (TBD).
The Contractor will be required to make deliveries to TBD.
· The Contractor is responsible for delivering products to TBD (reference Table 4 for availability orders).
Main Ports
TABLE 1:
MAIN PORTS
TBD
Availability Delivery Timeframes Availability orders are for shipyard/industrial work. All availability orders shall be provided per the following delivery timeframes:
TABLE 2:
AVAILABILITY ORDER
DELIVERY TIMEFRAMES
| TBD |
| 8 days |
| Paint Arrival at Shipyard |
| A-30 |
| Paint Representative at Shipyard |
| D-2 |
Please note during an availability, any additional paint orders shall be delivered per the timeframes outlined in Table 1.
Availabilities in (TBD)
As quoted in Exhibit A, Field Service Technical Representative travel costs will be paid at the fixed price listed for (TBD).