This sources sought announcement from the Department of the Navy seeks information from paint original equipment manufacturers for the hull preservation of the USS MUSTIN (DDG-89). The Navy requires paint, coatings, and preservation products to meet Navy standards as well as personnel qualified to perform and certify the work. The place of performance is San Diego, California. Interested parties are small businesses as defined by the SBA and must be able to provide both products and the associated manufacturing guarantee. Responses are requested by December 30, 2021 to inform a future solicitation for this requirement from the Naval Sea Systems Command Southwest Regional Maintenance Center to begin in May 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit A.xlsx | XLSX spreadsheet | |
| Att 3 Navy Paint Warranty.docx | DOCX document | |
| Exhibit B CDRLS B001-B012.pdf | ||
| Att 2 Navy DBIDS Force Protection List.pdf | ||
| PWS_MUSTIN.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1:
NAVY PRODUCT SUPPORT REQUIREMENT
ATTACHMENT 1: NAVY PRODUCT SUPPORT REQUIREMENT
The purpose of this contract is to provide paint coatings and related products to the US Navy fleet in a timely manner, which may require fully employing all of the Contractor’s facilities. The Contractor is responsible for delivering the full range and depth of all products to San Diego, CA (subject to change).
The Contractor will be required to make deliveries to San Diego, CA (subject to change).
· The Contractor is responsible for delivering products to San Diego, CA (subject to change)(reference Table 4 for availability orders).
Main Ports
TABLE 1:
MAIN PORTS
San Diego, CA (subject to change)
Availability Delivery Timeframes Availability orders are for shipyard/industrial work. All availability orders shall be provided per the following delivery timeframes:
TABLE 2:
AVAILABILITY ORDER
DELIVERY TIMEFRAMES
| San Diego, CA (subject to change) |
| 8 days |
| Paint Arrival at Shipyard |
| A-30 |
| Paint Representative at Shipyard |
| D-2 |
Please note during an availability, any additional paint orders shall be delivered per the timeframes outlined in Table 1.
Availabilities in San Diego, CA (subject to change)
As quoted in Exhibit A, Field Service Technical Representative travel costs will be paid at the fixed price listed for San Diego, CA (subject to change).