Expression of Interest and Specification: ATR Loop Pressurizer Fabrication
This is an Expression of Interest (EOI) and accompanying specification (SPC-71416) issued by Battelle Energy Alliance, LLC (BEA), the Management & Operating Contractor of Idaho National Laboratory (INL), a U.S. Department of Energy facility. BEA seeks qualified vendors to fabricate one ASME Section VIII, Division 2 stainless steel pressure vessel for use as the ATR Loop Pressurizer in the 1A-NE experiment loop. The vessel will maintain system pressure, provide degassing capability, and compensate for pressure surges in the Advanced Test Reactor. Expression of Interest responses must be submitted by November 6, 2026, to Chase.egbert@inl.gov. Selected vendors will be invited to participate in a subsequent Request for Proposal (RFP) process for award consideration.
The scope includes fabrication, inspection, and hydrostatic testing (minimum 3415 psig at room temperature with +100/-0 psig tolerance) of a vertically oriented, leg-mounted vessel with radial side arms. The vessel shall be constructed of Type 347 stainless steel with mounting legs of Type 316 stainless steel, designed to ASME Section VIII, Division 2 (2025), AISC 370 (2021), ANSI/AISC N690-18, ASCE 4-16, ASCE 43-19, and ASME NQA-1 (2022 edition). Design specifications include 2500 psig internal design pressure, 668°F design temperature, normal operating pressure of 300–2208 psig at 422–650°F, and a 60-year service life with 1,080 total pressure cycles. All materials must meet Commercial Use (QL3) quality level per NQA-1. The subcontractor must provide shop drawings, Certified Material Test Reports, welding procedure specifications, NDE procedures and inspection reports, lifting lug load test documentation, cleanliness reports, surface finish reports, hydrostatic test reports, and ASME U-1A Data Reports. The vessel must be cleaned to Class B cleanliness, have no paint on internal or external surfaces, achieve 250 microinch Ra or better internal finish (125 microinch Ra for heater legs), and be shipped in horizontal orientation to WestOne Logistics, Idaho Falls, Idaho. Vendors should demonstrate nuclear-grade pressure vessel fabrication experience, ASME/AISC/seismic design capability, and ability to meet all vendor data submittal requirements including shop drawings (in Autocad 2010 or newer format) and qualification records for welders, inspectors, and NDE technicians.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATR Loop Pressurizer Fabrication Expression of Interest (EOI)
INTRODUCTION
Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S.
Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors capable of fabricating an ASME Section VIII, Division 2 pressure vessel for use as the ATR Loop Pressurizer (1A-NE Loop). The fabricated vessel will play a critical role in maintaining system pressure, degassing, and surge compensation for an Advanced Test Reactor (ATR) experiment loop.
BACKGROUND
INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The ATR experiment loops rely on a dynamic pressurizer system to maintain primary coolant pump pressure, provide a means of degassing the primary coolant, and compensate for pressure surges. BEA is requesting vendor capability statements for the fabrication of a vertically oriented, leg-mounted pressure vessel with radial side arms, built to strict nuclear, metallurgical, and structural performance standards. Project-specific INL drawings, design calculations, and procedural references will be furnished to selected vendors.
The scope of work includes the following:
• Fabrication, inspection, and physical testing of one (1) ASME Section VIII, Division 2 stainless steel pressure vessel with associated appurtenances (vessel, mounting leg stand, spray nozzles, lifting lugs), per INL Drawings 1050604, 1050605, and 1050606
• Supply of all materials associated with the vessel and appurtenances
• Hydrostatic testing at room temperature in accordance with ASME code (minimum test pressure 3415 psig, +100/-0 psig tolerance)
• Load testing and documentation of lifting lugs
• Shop drawing development and submission through INL's vendor data system
• Shipping/handling pallet and container for horizontal-orientation transport, forklift-compatible
• Delivery to WestOne Logistics, Idaho Falls, ID
The scope of work does not include the following:
• Installation at the Contractor's facility
• Procurement and installation of clamp-on heaters
• Vessel insulation
• Design, seismic analysis, thermal analysis, stress analysis, or fatigue analysis
• Overpressure protection (provided by a separate direct spring relief valve)
• Floor mounting plate
APPLICABLE CODES AND REFERENCES
The fabrication and associated documentation must comply with the following (as applicable to component type):
• ASME Section VIII, Division 2 (2025)
• AISC 370 (2021)
• ANSI/AISC N690-18 (Nuclear Facility Steel Structures)
• ASCE 4-16 and ASCE 43-19 (Seismic Design)
• ASME NQA-1 (2022 edition)
DESIGN REQUIREMENTS
Vendors should have demonstrated experience with nuclear-grade pressure vessel fabrication and must meet or exceed the following design conditions:
• Materials & Components:
• Vessel and lifting lugs: Type 347 stainless steel
• Mounting legs: Type 316 stainless steel
• Vertically oriented, leg-mounted vessel with elliptical heads and four (4) radially arranged side arms
• Pressure & Temperature Ratings:
• Vessel Internal Design Pressure: 2500 psig
• Vessel Design Temperature: 668°F
• Normal Operating Pressure: 300–2208 psig; Normal Operating Temperature: 422–650°F
• Heater Leg Design Pressure: 2500 psig; Heater Leg Design Temperature: 800°F
• Vessel designed to Section VIII with seismic input per ASCE 4 and ASCE 43 (stand per
AISC 370/N690)
• Fluid Service:
• High-purity, radioactive, demineralized water; pH range 5.0–11.0
• Dissolved solids ≤10 ppm, suspended matter ≤3 ppm, chlorides ≤0.5 ppm, dissolved gas
≤150 cc/kg
• Cyclic Service:
• Pressurizer cycled between ambient and normal operating pressure 18 times/year over a 60-year design life (1,080 total cycles)
• Inspections & Engineering Approval:
• All pressure boundary welds (butt welds, with limited exceptions) inspected per ASME
VIII/NDE requirements, including full volumetric inspection of all four side-arm weld joints
• Fabrication drawings and calculations submitted for formal BEA review/approval through the vendor data system
PROCESS
This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration.
SUBMITTAL REQUIREMENTS
Interested vendors should submit an Expression of Interest that includes the following:
• Company name and point of contact
• Relevant fabrication experience, particularly nuclear or DOE-grade ASME Section VIII pressure vessel work
• Applicable NAICS codes and business size classification
• Any existing DOE or federal contracting experience (if applicable)
• Demonstrated capability to meet ASME, AISC, and seismic-informed design requirements
• Acknowledgment of the ability to meet the following vendor data submittals:
• Shop drawings and bill of materials
• Certified Material Test Reports (CMTRs) for weld filler material, spray nozzles, steel shapes/plates/piping
• Welding procedure specifications (WPS) and welder qualification/continuity logs
• NDE procedures, personnel qualifications, and inspection reports
• Lifting lug load test report
• Cleaning procedure and cleanliness report
• Internal/external surface finish reports
• Hydrostatic test procedure and report
• ASME U-1A Data Report
• As-built drawings
• Completed Vendor Data Schedule and transmittal forms (Form 431.13/431.14)
QUALITY ASSURANCE REQUIREMENTS
The subcontractor's quality program must be equivalent to ASME NQA-1 (2022 edition).
Requirements include:
• Qualification records for welders, inspectors, and NDE technicians (including eye exams)
• Third-party inspection where required
• M&TE calibration records
• Certificates of Conformance (CoC) and ASME Pressure Vessel certification
• Submittal of all quality-related inspection and test documents
FABRICATION & TESTING
• Materials must meet applicable ASME and ASTM specifications; Commercial Use (QL3) quality level per NQA-1
• All pressure boundary joints are butt welds (limited fillet/stake weld exceptions for heater supports, trunnion plate, and spray nozzle attachment)
• Welds ground and polished flush prior to NDE
• Internal surfaces: 250 microinch Ra or better (except nozzles); heater leg exterior: 125 microinch Ra or better
• Cleaning to Class B cleanliness per ASME Code, both prior to final assembly and via final flush
• No paint on internal or external surfaces
• Hydrostatic testing per ASME Section VIII, Division 2 requirements
• BEA inspectors may witness fabrication and testing activities, withhold points specified at least 2 weeks in advance
• ASME "U" stamp certification of the vessel
DELIVERY & PROTECTION
Final vessel must be delivered to WestOne Logistics, 1765 North Yellowstone Highway, Idaho Falls, ID 83401, with:
• Vessel fully flushed, drained, and dried with no residual moisture prior to packaging
• Packed and shipped in horizontal orientation with suitable protective fixtures/fittings
• Clear labeling of purchase order number, gross weight, and lifting points
• Unit prepared for forklift handling; lifting diagram provided prior to shipment
• All shipping documents included in a waterproof envelope
• INL personnel retain rights for inspections, audits, and hold-point reviews throughout fabrication. Final acceptance occurs at the Subcontractor's facility prior to shipment and again upon arrival at WestOne Logistics.
Deadline for submission: November 6, 2026 Submit to: Chase.egbert@inl.gov Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation.
PROPRIETARY INFORMATION
Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.
Idaho National Laboratory
The INL is a U.S. Department of Energy National Laboratory operated by Battelle Energy Alliance.
Document ID: Error! Reference source not found.71416 Revision ID: 0
Effective Date: Error! Reference source not found.
Specification
ATR Loop Pressurizer For 1A-NE Loop
N
O
T
I
N
O
F
T
R
A
N
M
P
O
R
T
L
O
C
V
O
E
D
S
F
T
L
O
R
A
Y
U
C
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
Form 412.09 (Rev. 10)
Idaho National Laboratory
SPC-71416
0ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 2 of 14
CONTENTS
PART 1 GENERAL
1.01 GENERAL
1.02 WORK INCLUDED
1.03 WORK NOT INCLUDED
1.04 CONTRACTOR-PROVIDED MATERIALS, EQUIPMENT, AND
SERVICES
1.05 APPLICABLE CODES, PROCEDURES, AND REFERENCES
1.06 DESIGN REQUIREMENTS
1.07 QUALITY ASSURANCE
1.08 DELIVERY, STORAGE, AND PROTECTION
PART 2 PRODUCTS
2.01 MANUFACTURERS
2.02 MATERIALS
2.03 FABRICATION
2.04 SHOP FINISHING
2.05 EQUIPMENT TAGGING OR IDENTIFICATION
PART 3 EXECUTION
3.01 COMMISSIONING AND ACCEPTANCE
3.02 SUBMITTALS
N
O
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 3 of 14
1 PART 1 GENERAL
3 1.01 GENERAL
4 A. The Advanced Test Reactor (ATR) experiment loops use a dynamic pressurizer system to 5 provide sufficient pressure for the primary coolant pumps, provide a means of degassing 6 the primary coolant, and to compensate for pressure surges. The pressurizer is a vertically 7 installed cylindrical vessel with elliptical heads and four (4) radially arranged side arms 8 attached to the vessel exterior below the minimum water level. The side arms 9 accommodate clamp-on type heaters that provide the necessary heat input to create a
10 steam space in the vessel.
11 B. Throughout this document it shall be understood that the ‘Contractor’ is Battelle Energy 12 Alliance (BEA) and the ‘Subcontractor’ is the vendor who will fabricate and ship this 13 vessel.
14 C. Throughout this document it shall be understood that any reference to ASME code 15 includes the section, division, and edition, as noted in Section 1.05, “Applicable Codes, 16 Procedures, and References.”
17 D. For the purpose of this specification, any reference to “side arm” shall refer to the four 18 radial appurtenances and shall include the nozzles, elbows, and all sections of pipe that 19 make up each assembly as shown on INL Drawing 1050606.
20 E. For the purpose of this specification, any reference to “heater leg” shall mean the vertical 21 portion of the vessel side arms between the lower and upper elbows, including the welds, 22 as defined on INL Drawing 1050606.
23 1.02 WORK INCLUDED
24 A. The Subcontractor shall be responsible for the fabrication, inspection, and physical 25 testing of one (1) ASME Section VIII stainless steel pressure vessel with associated 26 appurtenances as shown on INL Drawings 1050604, 1050605, and 1050606.
27 B. The Subcontractor shall perform and document a hydrostatic test at room temperature in 28 accordance with the ASME code. The minimum hydrostatic pressure has been calculated 29 by the Contractor per ASME Section VIII, Division 2, Section 8.2.1, equation 8.1 to be 30 3415 psig with a tolerance of +100 psig, -0 psig.
31 C. The Subcontractor shall supply all materials associated with this vessel and all 32 appurtenances, including the spray nozzles, as indicated on INL Drawings 1050604, 33 1050605, and 1050606.
34 D. The Subcontractor shall provide a shipping and handling pallet, including a container that 35 will completely enclose the vessel in a horizontal orientation and allow for forklift 36 handling at Contractor’s facility.
37 E. The Subcontractor shall ship the vessel to the Contractor’s receiving location.
N
O
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 4 of 14
1 1.03 WORK NOT INCLUDED
2 A. Installation of this vessel at the Contractor’s facility is not included in the Subcontractor’s 3 scope.
4 B. Procurement and installation of the clamp-on heaters is not included in the 5 Subcontractor’s scope.
6 C. Vessel insulation is not included in the Subcontractor’s scope.
7 D. Design is not included in the Subcontractor’s scope.
8 E. Seismic analysis is not included in the Subcontractor’s scope.
9 F. Thermal analysis is not included in the Subcontractor’s scope.
10 G. Stress analysis is not included in the Subcontractor’s scope.
11 H. Fatigue analysis is not included in the Subcontractor’s scope.
12 I. Overpressure protection is provided by a direct spring relief valve in the systems in which 13 this vessel may be installed. Therefore, overpressure protection is not included in the 14 Subcontractor’s scope.
15 J. Floor mounting plate is not included in the Subcontractor’s scope.
16 1.04 CONTRACTOR-PROVIDED MATERIALS, EQUIPMENT, AND SERVICES
17 A. None.
18 1.05 APPLICABLE CODES, PROCEDURES, AND REFERENCES
19 A. American Society of Mechanical Engineers (ASME) Section VIII, Division 2, 2025.
20 B. American Institute of Steel Construction (AISC) 370, 2021.
21 C. American Institute of Steel Construction (AISC) N690, 2018.
22 D. American Society of Civil Engineers (ASCE) 4, 2016.
23 E. American Society of Civil Engineers (ASCE) 43, 2019.
24 F. ASME, NQA-1, 2022 edition.
25 G. INL Drawing No. 1050604, “ATR 1A NE Pressurizer Leg and Brace Assemblies and 26 Details”
27 H. INL Drawing No. 1050605, “ATR 1A NE Pressurizer Level Indication Pipe and 28 Nameplate Assemblies and Details”
29 I. INL Drawing No. 1050606, “ATR 1A NE Pressurizer Assembly and Details”
N
O
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
I
O
Form 412.09 (Rev. 10)
Idaho National Laboratory
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 5 of 14
1 1.06 DESIGN REQUIREMENTS
2 A. General: The Subcontractor shall supply one (1), vertically oriented, leg mounted vessel 3 with all features as indicated on drawing 1050606. The new vessel shall be made of type 4 347 stainless steel.
5 B. All joints of the pressure boundary are to be butt welds with the following exceptions:
6 1. Stake welds to secure the threaded spray nozzles to the spray nozzle assemblies 7 (See INL Drawing 1050606 Page 5 View G Items 34 and 35).
8 2. Fillet welds on heater supports (See INL Drawing 1050606, Page 5, Section H-H, 9 Item 8).
10 3. Fillet welds on trunnion plate (See INL Drawing 1050606, Page 5, Zone 5 B/C, 11 Item 9).
12 C. Performance:
13 1. Vessel Internal Design Pressure is 2500 psig.
14 2. Vessel External Design and Operating pressure is ambient (12.5 psia).
15 3. Vessel Design Temperature is 668°F.
16 4. Normal Internal Operating Pressure is 300 to 2208 psig.
17 5. Normal Operating Temperature is 422 to 650°F.
18 6. Heater Leg Design Pressure is 2500 psig.
19 7. Heater Leg Design Temperature is 800°F.
20 8. The vessel (See INL Drawing 1050606 Item 2) has been designed by the 21 Contractor to Section VIII with seismic input defined by ASCE 4 and 43. The 22 vessel shall be fabricated by the Subcontractor in accordance with Section VIII.
23 9. The stand, consisting of the (4) radially arranged mounting legs (See INL 24 Drawing 1050604), has been designed by the Contractor in accordance with 25 AISC 370 (for load capacity) and AISC N690 (for load combinations) with 26 seismic input defined by ASCE 4 and ASCE 43. The stand shall be fabricated by 27 the Subcontractor in accordance with these standards.
28 10. Material to be sourced per Bill of Materials found on INL Drawings 1050604, 29 1050605, and 1050606.
30 11. Two lifting lugs (Items 9 and 10 on INL Drawing 1050606) shall be provided, 31 each one of which shall be capable of independently supporting the empty vessel.
32 12. Clamp-on heater halves are installed in pairs (four halves per heater leg) on the 33 four (4) radial heater legs (vertical portion of 3 in. pipe) located near the bottom 34 of the vessel. Each heater half weighs 32 lb. The total energy input is 48 kW 35 (thermal) distributed evenly between the four legs. Heaters are to be Chromalox 36 044-147549-003, or an engineering approved equivalent.
37 13. For Contractor performed structural and thermal analysis, each operating cycle 38 will begin with the vessel filled with water at 70°F to a predetermined level at 39 250psig. Heaters will then be energized and water heated to the operating 40 temperature and pressure.
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
I
O
Form 412.09 (Rev. 10)
Idaho National Laboratory
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 6 of 14
1 14. No paint is allowed on any internal or external surfaces of vessel.
2 D. Site and Operating Environment:
3 1. The vessel will be located inside a concrete shielded cubicle within the ATR 4 building at an elevation of approximately 4,930 feet above sea level with an 5 ambient temperature range of 50 to 150°F.
6 2. The vessel will be insulated by the Contractor with 3 inches of insulation 7 conforming to the following maximum thermal conductivities per ECAR-9140:
8 a. 0.23-0.25 Btu-in/ft2-hr-°F at 100°F
9 b. 0.35-0.40 Btu-in/ft2-hr-°F at 400°F
10 c. 0.55-0.65 Btu-in/ft2 -hr-°F at 800°F
11 3. Insulation density will not exceed 14lb/ft3.
12 4. The pH of the liquid contained in the vessel may vary from 5.0 to 11.0.
13 5. The liquid contained in the vessel will be high purity, radioactive, demineralized 14 water.
15 6. Dissolved solids in the liquid will be held to 10 ppm maximum.
16 7. Suspended matter in the liquid will be held to 3 ppm maximum.
17 8. Chlorides in the liquid will be held to 0.5 ppm maximum.
18 9. Dissolved gas in the liquid will be held to 150 cc/kg maximum.
19 10. Particle size in the liquid will be held at 1 micron to agglomerates of 50 microns.
20 11. Minimum water level in pressurizer during normal operation will be 19% (See 21 INL Drawing 1050606 Page 2).
22 12. Maximum water level in pressurizer during normal operation will be 87.5% (See 23 INL Drawing 1050606 Page 2).
24 13. The pressurizer will be cycled between ambient pressure and normal operating 25 pressure at a frequency of 18 times per year over a 60 year design life (total of 26 1080 cycles).
27 14. All external pipe connections shall be prepared for connection to process piping 28 of the sizes indicated on INL Drawing 1050606.
29 15. Nozzle Loads: The existing pressurizers have been successfully used for 30 approximately 60 years. There was no nozzle load analysis performed for the 31 existing design. The external loads from the system to the pressurizer are 32 insignificant and need not be analyzed. No nozzle load analysis needs to be 33 performed.
34 16. Start Up Sequence: Pressurizer is designed to withstand a thermal transient 35 maximum rate of 4°C (7°F) per minute. Note: Rate is calculated at absolute 36 temperature of 573 K.
37 17. Shut Down Sequence: Pressurizer is designed to withstand a maximum thermal 38 transient of 10°F/minute for the first 30°F or 7°F/minute thereafter (target
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 7 of 14
1 cooldown: 5°F/minute). Note: Rate is calculated at absolute temperature of 573 2 K.
3 E. Restrictions: Any materials other than type 347 stainless steel to come into contact with 4 the vessel, except for materials specifically called out in this specification or the provided 5 INL Drawings, shall be removed either by cleaning or other means not to the detriment of 6 the vessel integrity unless approved by the Contractor.
7 1.07 QUALITY ASSURANCE
8 A. Quality Assurance Program: Equivalent to ASME Nuclear Quality Assurance, NQA-1 9 2022 edition for specified quality level and as applicable to the scope of this
10 specification. Equivalency/adequacy is determined by a Contractor executed audit of the 11 Subcontractor’s quality program.
12 B. Minimum Qualifications of Manufacturer, Supplier, or Personnel: In accordance with the 13 ASME code for the design and manufacture of the specified vessel.
14 C. In addition to the non-destructive examinations (NDE) required by the ASME code, the 15 Subcontractor shall also provide documentation of full volumetric inspections of all weld 16 joints on the four (4) side arms.
17 1.08 DELIVERY, STORAGE, AND PROTECTION
18 A. Delivery: Deliver vessel to WestOne Logistics, 1765 North Yellowstone Highway, Idaho 19 Falls, ID 83401.
20 B. Shipping Documents: All appropriate shipping documents shall accompany the vessel in 21 a waterproof envelope.
22 C. Packaging and Shipping: After all operations are complete, the vessel shall be prepared 23 for shipment. The vessel shall have final flushing/cleaning completed, be drained of all 24 fluids, and allowed to dry so that there is no residual moisture inside the vessel prior to 25 packaging. The vessel shall be packed and shipped in a horizontal orientation. Suitable 26 fixtures, fittings, and packaging material and techniques shall be employed to facilitate 27 careful handling and to prevent damage or contamination during shipment. If the vessel 28 arrives at the designated delivery site showing evidence of damage or contamination, this 29 will be cause for rejecting the vessel and returning it for repair. The packaging of the 30 final product shall allow for handling with a forklift. A lifting diagram, prepared by the 31 Subcontractor, shall be provided to the Contractor prior to shipment.
32 D. Marking: All boxes and crates that accompany the vessel shall be clearly labeled with the 33 purchase order number and any other pertinent information that may be required by the 34 purchase order.
35 E. Gross weight of the empty vessel and lifting points shall be clearly identified on the 36 vessel and boxes or crates.
37 PART 2 PRODUCTS
N
O
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
I
O
Form 412.09 (Rev. 10)
Idaho National Laboratory
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 8 of 14
1 2.01 MANUFACTURERS
2 A. All Subtiers used shall be on the Subcontractor’s approved suppliers list for ASME code 3 work.
4 2.02 MATERIALS
5 A. The vessel, including lifting lugs, shall be made of type 347 stainless steel.
6 B. The mounting legs (see INL Drawing 1050604) shall be made of type 316 stainless steel.
7 C. All materials shall be approved materials per the ASME code and identified in the 8 Section II tables as permitted for Section VIII, Division 2 service at the design 9 temperature.
10 D. The quality level for material acquisitions is “Commercial Use” as determined by the 11 Contractor’s Nuclear Quality Assurance (NQA-1) program. NOTE: The definition of a 12 “Commercial Use (QL3)” items/service, does not meet the definition of “Nuclear Use” 13 but must still meet codes and standards or other specified requirements to provide 14 functions that are defense in depth, important to safety, worker safety, or used for 15 research, mission, and program outcomes.
16 E. Traceability of material documentation shall be provided to the Contractor through the 17 Contractor’s vendor data system.
18 F. No erosion or corrosion allowance is required.
19 G. The spray nozzle assemblies shall be of the same alloy as the vessel and shall be of butt 20 welded construction.
21 H. The depressurizing spray nozzle shall be Spraying Systems Co. part number 3/4HH- 22 347SS7, or Contractor approved equal.
23 I. The degassing spray nozzle shall be Spraying Systems Co. part number 3/8HH-347SS22, 24 or Contractor approved equal.
25 2.03 FABRICATION
26 A. Fabrication shall be in accordance with Subcontractor approved shop drawings based on 27 ASME code, using INL Drawings 1050604, 1050605, and 1050606 as the enveloping 28 drawings and submitted through the Contractor’s vendor data system.
29 B. All welds shall have external surfaces ground and polished flush with the base material 30 prior to performing non-destructive examination (NDE).
31 C. Lifting lugs shall be load tested and documented to show that each one is capable of 32 independently supporting 110% of the weight of the empty vessel with its mounting legs 33 attached.
34 D. No thread sealant is to be used on the spray nozzles or protective cap threads.
35 2.04 SHOP FINISHING
36 A. Cleaning: After fabrication of individual components and prior to welding any of the 37 individual components together, they must be cleaned to cleanness Class B per the 38 ASME Code, or an alternate approved by the Contractor. After final assembly and all
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
I
O
Form 412.09 (Rev. 10)
Idaho National Laboratory
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 9 of 14
1 testing and inspections, a final cleaning must be performed by flushing the entire vessel 2 with High-Quality Water to cleanness Class B as defined in the ASME Code. The 3 minimum amount of flush water to be passed through the vessel shall be equal to the total 4 internal volume of the vessel, applied in such a way that all interior surfaces are 5 sufficiently cleaned. An alternate final flushing method may be used if approved by the 6 Contractor.
7 B. Internal Finish: All internal surfaces shall have a Roughness Height Rating of 8 250 microinches or better with the exception of the nozzles as noted on INL Drawing 9 1050606.
10 C. External Finish: All exterior surfaces (to include grind areas and mill finish surfaces) 11 shall have a uniform and blended finish. The exterior of the pressurizer heater legs 12 between the heater support ring and the upper elbow shall have a Roughness Height 13 Rating of 125 microinches or better.
14 2.05 EQUIPMENT TAGGING OR IDENTIFICATION
15 A. Vessel shall be labeled in accordance with the ASME code.
16 B. In addition to the code-required information, the empty weight of the completed vessel 17 shall be included on the nameplate (See INL Drawing 1050605).
18 C. In addition to the code-required information and item B above, the name plate shall show 19 “1A-M-10” as the vessel designation.
20 D. The nameplate shall be attached to the vessel in the approximate location shown on INL 21 Drawing 1050606.
22 PART 3 EXECUTION
24 3.01 COMMISSIONING AND ACCEPTANCE
25 A. Inspections, Tests, and Hold Points: Contractor Quality Assurance and/or Project 26 personnel reserve the right to specify hold points as deemed necessary and added to the 27 Subcontractor’s production schedule. Contractor personnel shall be notified at least 2 28 weeks in advance of any specified hold points.
29 B. Contractor Surveillance and Audit: Contractor personnel reserve the right to access the 30 Subcontractor’s facility during the manufacturing process with advance notice by the 31 Contractor.
32 C. Final Acceptance Method: Acceptance of completed vessel will be performed by the 33 Contractor prior to shipment at the Subcontractor’s facility and once again upon arrival at 34 WestOne Logistics in Idaho Falls, Idaho.
35 3.02 SUBMITTALS
37 A. General: This section specifies the administrative, technical, and quality requirements for 38 submittals. Submittal requirements are tabularized on a Vendor Data Schedule (Form 39 431.14). The work shall be accomplished in accordance with approved submittals except 40 that the Subcontractor shall not be relieved of responsibility for deviations from 41 requirements in the Contract Documents by Contractor review of shop drawings, product
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
I
O
Form 412.09 (Rev. 10)
Idaho National Laboratory
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 10 of 14
1 data, samples or similar submittals unless the Subcontractor has specifically informed the 2 Contractor in writing of such deviation at the time of submittal and the Contractor has 3 given written approval for the specific deviation as a minor change in the work. The 4 Subcontractor shall not be relieved of responsibility for errors or omissions in the shop 5 drawings, product data, samples or other submittals by the Contractors authorization to 6 proceed with the work.
8 Review by the Contractor is subject to the limitations stated in the following:
10 1. Review of submittals is not conducted for the purpose of determining the 11 accuracy and completeness of other details such as dimensions and quantities, or 12 for substantiating instructions for installation or performance of equipment or 13 systems, all of which remain the responsibility of the Subcontractor as required 14 by the Contract Documents.
16 2. The Subcontractor shall review data, drawings, and other submittals for 17 compliance with the Contract Documents, mark them “approved” and submit 18 them. Submittals that are not marked as reviewed for compliance with the 19 Contract Documents and approved by the Subcontractor may be returned by the 20 Contractor without action. If the Contractor determines the Subcontractor’s 21 submittal to be incomplete or unacceptable, the Subcontractor shall make a 22 complete and acceptable submittal to the Contractor by the second submission of 23 a submittal item.
25 3. The Subcontractor shall be responsible for providing submittals in accordance 26 with the Vendor Data Schedule and these specifications, providing submittals 27 with adequate time for review and re-submittal, and advising the Contractor of 28 any submittal that may be delayed and which might, if further delayed, extend 29 completion of the project.
31 B. Procedures:
32 1. General Procedures: Vendor data, whether prepared by the Subcontractor or 33 Subcontractor’s subtier or supplier, shall be submitted as instruments of the 34 Subcontractor. Therefore, prior to submittal, the Subcontractor shall ascertain 35 that material and equipment covered by the submittal and the contents of the 36 submittal itself, meet all the requirements of the Contract specifications, 37 drawings, or other contract documents. The submittal shall be stamped approved 38 prior to submittal as stated in the summary paragraph above.
40 a. Each submittal shall contain identification for each separable and separate 41 piece of material or equipment, and literature with respect to the information 42 provided in the specification and on the Vendor Data Schedule. Submittals 43 shall be numbered consecutively for each different submittal.
44 2. Vendor Data Schedule: Vendor data required by the specification sections or the 45 drawings to support design, construction, and operation of the project is 46 identified on a Vendor Data Schedule. The Vendor Data Schedule provides a 47 tabular listing by item number, drawing or specification reference, and 48 description of the item or service. The type of submittal is identified by a
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 11 of 14
1 “Vendor Data Code,” and the time required to submit the item is identified by a 2 “When to Submit” code. An “Approval” code specifies whether the submittal is 3 for Mandatory Approval or for Information Only. One copy of routine paper or 4 electronic file submittals is required; additional copies may be required by the 5 Vendor Data Schedule. Electronic file submittals are preferred. Submittals that 6 cannot be scanned or provided electronically, such as large shop drawings, will 7 require 6 copies for Mandatory Approval and 4 copies for Information Only.
8 Material or color samples will require 2 sets for Mandatory Approval and 1 set 9 for Information Only.
11 3. Vendor Data Transmittal and Disposition Form 431.13: All vendor data shall be 12 submitted to the Contractor using the Vendor Data Transmittal and Disposition 13 Form. The form provides the Subcontractor a method to submit vendor data and 14 provides the Contractor a means of dispositioning the submittal. The 15 Subcontractor shall list the Vendor Data Schedule item number, a Vendor Data 16 Transmittal tracking number (if applicable), the drawing or specification number 17 reference, a Tag Number (if applicable), the submittal status (e.g., Mandatory 18 Approval, Information Only, Re-submittal, or Or-equal), the Revision Level, and 19 the item description. The description shall include the heat or lot number for 20 items requiring Certified Mill Test Reports. The description should be complete 21 enough that a person unfamiliar with the project can determine what the 22 submittal includes.
24 4. Disposition by the Contractor: The Contractor’s comments and required action 25 by the Subcontractor will be indicated by a disposition code on the submittal. The 26 disposition codes will be classed as follows:
28 a. “A” “Work May Proceed.” Submittals so noted will generally be classed as 29 data that appears to be satisfactory without corrections subject to the 30 limitations described in the summary section above.
31 b. “B” “Work May Proceed with Comments Incorporated. Revise Affected 32 Sections and Resubmit Entire Submittal.” This category will cover data that, 33 with the correction of comments noted or marked on the submittal, appear to 34 be satisfactory and require no further review by the Contractor prior to 35 construction, subject to the limitations described in the summary section 36 above.
37 c. “C” “Work May NOT Proceed. Revise and Resubmit.” Submittals so 38 dispositioned will require a corrected resubmittal for one of the following 39 reasons:
40 1). Submittal requires corrections, per comments, prior to final review.
41 2). Submittal data incomplete and requires more detailed information prior 42 to final review.
43 3). Submittal data does not meet Contract document requirements.
44 d. “D” “Accepted for Use. Information Only Submittal.” Submittals so 45 dispositioned will generally be classified as Information Only for 46 as-specified material and equipment.
N
O
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
I
O
Form 412.09 (Rev. 10)
Idaho National Laboratory
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 12 of 14
1 5. All submittals will be returned to the Subcontractor. Acknowledgment of receipt 2 of dispositioned vendor data by the Subcontractor will not be required.
4 6. The Contractor will return dispositioned submittals with reasonable promptness.
5 The Subcontractor shall note that a prompt review is dependent on timely and 6 complete submittals in strict accordance with these instructions.
8 C. Equipment or Product Data: Equipment data shall include the manufacturer's name and 9 address, the model number, and specific information on performance, operating curves
10 and data, ratings, capacities, characteristic efficiencies, catalog data, equipment 11 dimensions, evidence of compliance with safety and performance standards, and other 12 data required to fully describe the equipment. Data shall be submitted in sets covering 13 complete systems or functioning units. The data shall also be identified with the tag 14 number of the equipment or device for which the data applies.
16 D. Qualifications: Qualification records shall be provided as indicated on the vendor data 17 schedule.
19 E. Drawings: Each shop drawing submittal shall be complete and shall be accompanied by 20 technical and performance data as necessary to fully illustrate the information in the 21 drawings, or cross referenced to such data contained in previous submittals. The drawings 22 shall be fully dimensioned showing detailed construction of the vessel. Unless otherwise 23 specified, submittals shall consist of black-line printed copies. Hard copies and an 24 electronic copy shall be submitted where required. Electronic copies of all drawings shall 25 be transferred to the Contractor as Autocad version 2010 or newer .DWG or .DXF file.
26 Format Microstation V8.DGN format and Sepia type prints are not acceptable. 3D 27 models shall be submitted in both native file and .stp or .ifc file types. One set of copies 28 will be returned to the Subcontractor marked to show the required corrections or 29 approval.
31 1. Title Block and Identification: On each shop drawing, a 1-1/2 2-1/2 in. space 32 shall be provided for the Contractor's review status stamp. Each shop drawing 33 shall include a title block showing:
34 a. Project name and location 35 b. Name and address of Subcontractor or manufacturer as applicable 36 c. Date, scale of drawings, unique drawing identification number, and 37 referenced design drawing number 38 d. Subcontractor’s review and approval stamp or signatures 39 e. Revision record including signatures and dates.
41 2. Preparation and Size: Details and information shall be clearly drawn, 42 dimensioned (including tolerances), noted, cross referenced and shall be of such 43 quality as to ensure legible B (11 17 in.) size photocopy reproductions.
44 Drafting and drawing standards shall be consistent with the practices established 45 by ANSI Y14.1 or other acceptable standards and as specified herein.
46 a. Where applicable, views shall be oriented so that plant north faces up or to 47 the left.
SPC-71416
0 ATR LOOP PRESSURIZER FOR 1A-NE
LOOP
Identifier:
Revision:
Effective Date: TBD Page: 13 of 14
1 b. Use of abbreviations shall be avoided where space permits spelling in full; if 2 used, abbreviations shall be described in a legend on the drawing.
3 c. Text shall be no less than 1/16” (0.0625”) when drawings are printed on an 4 11” 17” sheet.
5 3. Dimensions and Tolerances:
6 a. Architectural engineering drawings shall express dimensions in United States 7 (U.S.) customary units of feet, inches, and fractions of inches.
8 b. Civil engineering drawings shall express dimensions in U.S. customary units 9 of feet and tenths of feet.
10 F. Test Procedures: Inspection and test procedures shall include, as applicable: description 11 of item or items involved, inspection or testing to be performed, a listing of testing 12 agency and technical personnel to be used, description of equipment and facilities to be 13 used, test prerequisites, test methods, test evaluation and acceptance criteria, safety 14 precautions, sign-off requirements, methods for control and calibration of measuring and 15 test equipment, proposed test record form, references to applicable portions of the 16 Contract documents, and detailed procedures, methods, and criteria for evaluation and 17 acceptance.
19 Test Reports: Where specifically required by other sections, inspection and test reports shall be provided 20 within 10 working days of such inspection or test. Inspection and test reports shall include, as applicable:
21 identification of material or item inspected, inspection data, functional test data, date(s) and place(s) of 22 inspection/tests, names of agencies and technicians involved, references to procedures and methods used, 23 references to applicable portions of the Contract documents, names of persons evaluating test results, 24 identification of work failing to meet inspection/test acceptance criteria, and detailed description of 25 corrective action taken.
N
O
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
431.14 05/12/2026 Rev. 13
Project Title / Number:
Specffication Number:
VENDOR DATA SCHEDULE
ATR 1A NE Pressurizer
SPC-71416
Procurement Technical Authority: Chance Schultz
Vendor Data Coordinator: Judy Thomson
Email Address: Judy.ThomsonAinl.goy
Rev.: 0
Date: 7/01/2026
Phone #: 208-526-7606
INSTRUCTIONS
1. Refer to the Form 431.13 for instructions on submittals.
2. Submittal of paper documents require permission and specific instructions from the VDC.
3. The INL will place all submitted vendor data into an electronic system that is accessible to all INL employees unless the supplier/subcontractor idenfifies submitted information as proprietary. Proprietary submittals will be placed in restricted folders with access controls to only those with the "need to know" at the discretion of the PM
4. This form should be transmitted to the VDC for input to the vendor data system. Upon final approval by the Technical Authority the Vendor Data Schedule from EDMS shall be sent to the vendor to use for all vendor data submittals.
5. For INL construction: Include both the specificafion section name and the submittal description. Example: Piping Insulation - Product Data
WHEN TO SUBMIT:
AC — As Completed AFI — At Final Inspection ARO - After Receipt of Order AT — After Test
BFA — Before Final Acceptance BFS — Before Fabrication Start PDS — Prior to Delivery on Site PS — Prior to Shipment
PT — Prior to Test PTW — Prior to Welding PTC — Prior to Construction Start
PTI — Prior to Installation RO8 — Prior to Removal Off-Site PTP — Prior to Purchase TS — Time of Shipment item No. Clause / Article / Drawing / Specification
Reference
Description When To
Submit
1. SPC-71416 1.07 ASME Pressure Vessels certification ARO
2. SPC-71416 2.02 CMTR - Chemical and physical analysis of the weld filler material PS
3. SPC-71416 2.02 CMTR - Spray Nozzles PS
4. SPC-71416 2.02 CMTR - Steel Shapes, Plates, Piping, Piping components. etc PS
5. SPC-71416 2.03 Shop Drawings BFS
6. SPC-71416 2.03 Lifting lug load test report PS
7. SPC-71416 2.04 Cleaning procedure PT
8. SPC-71416 2.04 Cleanliness report AT
9. SPC-71416 2.04 Internal surface finish report PS
10. SPC-71416 2.04 External surface finish report Ps
11. SPC-71416 3.02 Hydrostatic test procedure PT
12. SPC-71416 3.02 Hydrostatic test report AT
13. SPC-71416 3.02 U1-A Data report PS
14. SPC-71416 3.02 Welding procedure specification PTW
15. SPC-71416 3.02 Welder qualification and continuity log PTW
16. SPC-71416 3.02 Weld inspection procedure PTW
17. SPC-71416 3.02 Welding inspector qualification PTW
18. SPC-71416 3.02 Weld maps PTW
19. SPC-71416 3.02 Weld inspection report AT
20. SPC-71416 3.02 NDE procedure PT
N
O
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
431.14 05/12/2026 Rev. 13
VENDOR DATA SCHEDULE
21. SPC-71416 3.02 NDE personnel qualification PT
22. SPC-71416 3.02 NDE personnel eye exams PT
23. SPC-71416 3.02 NDE reports AT
24. SPC-71416 3.02 M&TE calibration records AT
25. SPC-71416 3.02 As-built drawings PS
N
O
T
F
N
O
R
T
O
C
V
O
F
T
L
O
R
A
Y
S
I
O
N
E
D
R
E
F
A
B
R
I
C
A
T
SECTION A-A
SCALE: 1/4
SECTION B-B
SCALE: 1/2
A A
B
B
A A
B B
C C
D D
01MF3
DWG NO. REV
SHEET OF
REQUESTER:
DESIGN:
DRAWN:
PROJECT NO.
SPCL CODE
EFFECTIVE DATE:
FOR REVIEW/APPROVAL SIGNATURES
SEE DCR NO.
RESP ENGR:
INDEX CODE NUMBER
AREA TYPE CL ORIG
SCALE:
SIZE CAGE CODE
1 3
000.B
D 533 0670 99 081 1050604
D. MANNING
C. SCHULTZ
C. SCHULTZ
N. OLDHAM
NOTED
745915
ATR
1A NE PRESSURIZER
LEG AND BRACE
ASSEMBLIES AND DETAILS
NST0856
INL.idw Rev 18
DO NOT SCALE DRAWING
TOLERANCES: .X = ` .1
DECIMALS: .XX = ` .03
FRACTIONS
ANGULAR ` 2~
DIMENSIONING AND SYMBOLOGY PER
ASME Y14.5 AND STD-10011
UNLESS OTHERWISE SPECIFIED
SURFACE ROUGHNESS
DIMENSIONS AND TOLERANCES
ARE IN INCHES
` 1/8
.XXX = ` .010
D a t e
A
M
F i l e
R
B
P a t h
C i v a u l t l o c a l P r o j e c t s N
S
T F a c i l i t i e s A
T R
A d v a n c e d
T e s t
R e a c t o r I L o o p
A
N
E
F l u x
T r a p
P r e s s u r i z e r i d w
REVISIONS
REV
DESCRIPTION EFFECTIVE DATE:
1-1 LEG ASSEMBLY
3 ITS
*SAFETY CLASSIFICATION TABLE
SS STD-3009 SAFETY SIGNIFICANT
SR REG. GUIDE 1.70 SAFETY RELATED
SC STD-3009 SAFETY CLASS
NS
NO REQUIREMENTS
FOR SAFETY OR QUALITY
ITS IMPORTANT TO SAFETY
CG
NON-NUCLEAR CODES
OR STANDARDS APPLY
NONSAFETY-RELATED WITH
AUGMENTED REQUIREMENTS
NSR-
AR
MISSION CRITICALMC
DASH
NO.
NEXT ASSY
APPLICATION
-1 1050606
-2 1050606
NOTES:
UNLESS OTHERWISE NOTED, REMOVE ALL BURRS AND SHARP EDGES.
CLEANLINESS PER MCP-6043 LEVEL C.
PRESERVE AND PROTECT PER STD-7020 A, CLASS I.
UNLESS OTHERWISE NOTED, ALL INSIDE RADII SHALL BE .010 MAX.
WELDING OPERATORS, WPS AND WELD PROCEDURE QUALIFICATION REPORTS SHALL
COMPLY WITH THE REQUIREMENTS OF ASME BPVC, SECTION IX.
WELD AND INSPECT PER AWS D1.6 USING ITEM 21 (WELD FILLER METAL). VISUAL AND PT
IS REQUIRED.
WELD PRE-HEAT TEMPERATURE ≥ 50°F UNLESS SPECIFIED HIGHER IN WPS.
ALL RECTANGULAR TUBING SHALL BE INSPECTED FOR LONGITUDINAL CRACKING ON
INBOARD AND OUTBOARD EDGES OF EACH CORNER AFTER BEING CUT TO LENGTH. DYE
PENETRATION SHOULD BE APPLIED INBOARD OF EACH CUT END BY AT LEAST 1/2" TO
CONFIRM ZERO CRACKING IS PRESENT, FOLLOWING METHOD AND ACCEPTANCE
CRITERIA PER AWS D1.6.
ITEM 21 MUST BE A DUAL CERTIFIED ER316/ER316L WELD FILLER METAL.
QTY REQD
PART OR
IDENTIFYING NO.
NOMENCLATURE
OR DESCRIPTION
MATERIAL/SPECIFICATION
OR VENDOR NAME
ITEM
NO.
-1
PARTS LIST
QL
(1, 3, OR 4)
SAFETY
CLASSIFICATION*
-2
1.
2.
3.
4.
5.
6.
7.
8.
9.
2X
2-2 BRACE ASSEMBLY
5-5
SUPPORT LEG, VERTICAL
TUBING, 4 X 2 X .25,
316/316L SST
ASTM A554
3 ITS1
6-6 FOOT
PLATE, .75 THK
ASTM A240
7-7
SUPPORT LEG, HORIZONTAL
TUBING, 4 X 2 X .25,
8-8 BOTTOM LEG GUSSET
PLATE, .25 THK
3 ITS2
9-9 SHOULDERED COLLAR
PLATE OR BAR,
OR A276
3 ITS4
10-10 CLAMP BRACKET MOUNT
PLATE OR BAR,
OR A276
3 ITS1
11-11
SUPPORT LEG, BRACE
CHANNEL, C4 X 7.25
ASTM A276
3 ITS 1
12-12
SUPPORT GUSSET, LEFT
PLATE, .50 THK
13-13
SUPPORT GUSSET, RIGHT
PLATE, .50 THK
21 WELD FILLER METAL
ER316/316L
AWS A5.9
3 ITSARAR
5 SEE DETAIL
6 REF
7 SEE DETAIL
SEE DETAIL, 2X
10 SEE DETAIL
4X, SEE DETAIL
11 SEE DETAIL
13 SEE DETAIL
12SEE DETAIL
6 SEE DETAIL
5 REF
10 REF
8 REF
1/4
3 SIDES
ASSEMBLY-1
ASSEMBLY-2
ISOMETRIC-1
REFERENCE ONLY
SCALE: NONE
ISOMETRIC-2
REFERENCE ONLY
SCALE: NONE
(31.132)
(8.00)
(1.72)
(47.16)
(14.400)
3 SIDES
2X
C
C
A
A
D
B
A
A
16 4X
17 4X
18 4X
BOLT, HEX HD, 1/2-20 UNC-2A X 3 1/2 LG,
GRADE B8M
316 SST
ASME B18.2.1
AND ASTM A193
3 ITS4
WASHER, PLAIN,
1/2, TP316, REGULAR, TYPE B
ASME B18.21.1
AND ASTM A240
3 ITS4
NUT, HEX,
1/2-20 UNC-2B, GRADE B8M
ASME B18.2.2
AND ASTM A194
7 REF
9 REF
16 REF
17 REF
18 REF
(1.01)
I
N
F
O
R
M
A
T
I
Y
P
R
O
V
F
B
R
I
C
A
T
I
N
S
T
R
U
C
T
I
O
N
N
L
E
A
S
A A
B B
C C
D D
01MF3
DWG NO. REV
SHEET
INDEX CODE NUMBER
AREA TYPE CL ORIG
SCALE:
SIZE CAGE CODE
000.B D
533 0670 99
NOTED
1050604081
NST0856
OF
D a t e
A
M
F i l e
R
B
P a t h
C i v a u l t l o c a l P r o j e c t s N
S
T F a c i l i t i e s A
T R
A d v a n c e d
T e s t
R e a c t o r I L o o p
A
N
E
F l u x
T r a p
P r e s s u r i z e r i d w
4.75
1.25
2.00
4.00 n1.10 THRU
(.75)
.5
12.15
.5
12.15
1 X 45°
(.25)
44.75
(4.00)
(2.00)
(14.216)
10.00R
.00
.05+
(4.00)
(2.00)
DETAIL
SCALE:1/2
DETAIL
SCALE: 1/2
ISOMETRIC-5
SCALE: NONE
ISOMETRIC-6
REFERENCE ONLY
SCALE: NONE
ISOMETRIC-7
REFERENCE ONLY
SCALE: NONE
ISOMETRIC-8
REFERENCE ONLY
SCALE: NONE
45°
14.014
14.114 3.250
.925
1.850
45°
4X n1.153
.002
.010+
THRU ONE WALL, NS
4X n.570 THRU ONE WALL, FS
(n1.153)
(n.570)
(4.316)
(.25)
(.25)
F
O
R
M
A
T
I
P
R
O
V
B
R
I
C
A
T
I
N
S
T
R
U
C
T
I
O
N
N
L
E
A
S
SECTION C-C
SCALE: 2/1
C C
A A
B B
C C
D D
01MF3
DWG NO. REV
SHEET
INDEX CODE NUMBER
AREA TYPE CL ORIG
SCALE:
SIZE CAGE CODE
000.B D
533 0670 99
NOTED
1050604081
NST0856
OF
D a t e
A
M
F i l e
R
B
P a t h
C i v a u l t l o c a l P r o j e c t s N
S
T F a c i l i t i e s A
T R
A d v a n c e d
T e s t
R e a c t o r I L o o p
A
N
E
F l u x
T r a p
P r e s s u r i z e r i d w
.5
4.00
.5
4.00
.50 X 45°
.50 X 45°
(.50)
.5
4.00
.5
4.00
.50 X 45°
.50 X 45°
(.50)
31.132
(1.72)
DETAIL
ISOMETRIC-11
SCALE: NONE
ISOMETRIC-12
REFERENCE ONLY
SCALE: NONE
ISOMETRIC-13
REFERENCE ONLY
SCALE: NONE
45°2X
R10.000
R11.500
1.850
3.250
1.00
(3.405)
R.252X
1.00
R FULL
.50
4.10.702X
1.75
.925
1.750
.010
.000+
(5.50)
4X n.570 THRU
(9.114)
(11.060)
1.005
.000
.005+
7.000
(9.5)
.65 n.570
1.150n
.010
.000+
(n1.150)
(n.570)
DETAIL
ISOMETRIC-9
SCALE: NONE
ISOMETRIC-10
REFERENCE ONLY
SCALE: NONE
DETAIL
(.321)
(.296)
(4.00)
ISOMETRIC-10
REFERENCE ONLY
SCALE: NONE
ALIGNMENT
KEY
ALIGNMENT
KEY
ALIGNMENT
KEY
1.750
8.054
19.114
I
N
F
O
R
M
A
T
I
P
R
O
V
B
R
I
C
A
T
I
N
S
T
R
U
C
T
I
O
N
N
L
E
A
S
A A
B B
C C
D D
01MF3
DWG NO. REV
SHEET OF
REQUESTER:
DESIGN:
DRAWN:
PROJECT NO.
SPCL CODE
EFFECTIVE DATE:
FOR REVIEW/APPROVAL SIGNATURES
SEE DCR NO.
RESP ENGR:
INDEX CODE NUMBER
AREA TYPE CL ORIG
SCALE:
SIZE CAGE CODE
1 3
000.B
D 533 0670 99 081 1050605
D. MANNING
C. SCHULTZ
C. SCHULTZ
LEVEL INDICATION PIPE AND NAMEPLATE
ASSEMBLIES AND DETAILS
NST0856
INL.idw Rev 18
DO NOT SCALE DRAWING
UNLESS OTHERWISE SPECIFIED
SURFACE ROUGHNESS
DIMENSIONS AND TOLERANCES
ARE IN INCHES
` 1/8
.XXX = ` .010
D a t e
A
M
F i l e
R
B
P a t h
C i v a u l t l o c a l P r o j e c t s N
S
T F a c i l i t i e s A
T R
A d v a n c e d
T e s t
R e a c t o r I L o o p
A
N
E
F l u x
T r a p
P r e s s u r i z e r i d w
REVISIONS
REV
1-1 LEVEL INDICATION PIPE ASSEMBLY
SS STD-3009 SAFETY SIGNIFICANT
SR REG. GUIDE 1.70 SAFETY RELATED
SC STD-3009 SAFETY CLASS
NS
NO REQUIREMENTS
FOR SAFETY OR QUALITY
ITS IMPORTANT TO SAFETY
CG
NON-NUCLEAR CODES
OR STANDARDS APPLY
NONSAFETY-RELATED WITH
AUGMENTED REQUIREMENTS
NSR-
AR
MISSION CRITICALMC
DASH
NO.
NEXT ASSY
APPLICATION
-1 1050606
-2 1050606
UNLESS OTHERWISE NOTED, REMOVE ALL BURRS AND SHARP EDGES.
CLEANLINESS PER MCP-6043 LEVEL C.
PRESERVE AND PROTECT PER STD-7020 A, CLASS I.
WELD AND INSPECT PER ASME BPVC, SECTION VIII, DIVISION 2, 2025 EDITION, SECTION
6.2, "WELDING AND FABRICATION REQUIREMENTS."
WELDING OPERATORS, WPS AND WELD PROCEDURE QUALIFICATION REPORTS SHALL
COMPLY WITH THE REQUIREMENTS OF ASME BPVC, SECTION IX.
UNLESS OTHERWISE NOTED, ALL WELDS SHALL BE TYPE 1 BUTT WELD JOINTS PER
ASME BPVC SECTION VIII, DIVISION 2.
WELD PRE-HEAT TEMPERATURE ≥ 50°F UNLESS SPECIFIED HIGHER IN WPS.
ALL BUTT WELDS SHALL HAVE EXTERNAL SURFACE GROUND FLUSH WITH THE BASE
MATERIAL PRIOR TO PERFORMING DYE PENETRANT TESTING NDE.
TIGHTEN ITEM 15 (PLUG) PER MANUFACTURER'S INSTRUCTION.
UNLESS OTHERWISE STATED, USE ITEM 18 (WELD FILLER METAL: ER347) FOR ALL
WELDS.
WELD ITEMS 9 AND 10 (NAMEPLATES) TO ITEM 8 (NAMEPLATE MOUNTING BRACKET), AS
WELL AS ITEMS 7 (NAMEPLATE STANDOFF) TO ITEM 8 (NAMEPLATE MOUNTING BRACKET),
UTILIZING ITEM 19 (WELD FILLER METAL: ER316/316L).
ITEM 19 MUST BE A DUAL CERTIFIED ER316/316L WELD FILLER METAL.
MARK PER THE FOLLOWING:
- METHOD: STD-13122-3E (LASER MARKING).
- CHARACTER HEIGHT: .10 FILLED.
- LOCATION: APPROXIMATELY AS SHOWN.
- NOMENCLATURE: AS SHOWN.
CMTR DOCUMENTATION REQUIRED TO BE PROVIDED.
PART OR
IDENTIFYING NO.
NOMENCLATURE
OR DESCRIPTION
MATERIAL/SPECIFICATION
OR VENDOR NAME
ITEM
NO.
-1
PARTS LIST
QL
(1, 3, OR 4)
SAFETY
CLASSIFICATION*
-2
10.
11.
12.
13.
14.
ISOMETRIC-2
REFERENCE ONLY
SCALE: NONE
ISOMETRIC-1
REFERENCE ONLY
SCALE: NONE
2-2 NAMEPLATE ASSEMBLY
1.0
1.0
.752X
(9.0)
(6.5)
(3.06)
3.16
1/8
G
G
1/8 MIN
1/8
1/8
1/32
(8.03)
(n1.90)
(9.50)
10 SEE DETAIL
9 SEE DETAIL
8 SEE DETAIL
132X
142X
6SEE DETAIL
ASSEMBLY-2
ASSEMBLY-1
5-5 NOZZLE PIPE
PIPE, 1 1/2 SCHED 80
SEAMLESS, TP347 SST
ASME SA-312
7-7 NAMEPLATE STANDOFF
PLATE, 3/16 THK
347 SST
3 MC 1
8-8 NAMEPLATE MOUNTING BRACKET
PLATE, 3/16 THK
9-9 CUSTOMER NAMEPLATE
SHEET, 16 GA (.063 THK)
10-10 MBI NAMEPLATE
SHEET, 16 GA (.063 THK)
6-6
CAP, BUTT WELD, 1 1/2 NPS
ROUND BAR,
ASME SA-182 OR SA-403
AND ASME B16.9
PIPE, 3/8 SCHED 80
SEAMLESS, TP347 SST
3 ITSAR
14SS-600-1-6W
CONNECTOR, 3/8 TUBE X 3/8 MALE PIPE WELD,
SWAGELOK
18 WELD FILLER METAL
ER347
152X
15SS-600-P
PLUG, 3/8 TUBE,
SWAGELOK
A
C
A
A
19 WELD FILLER METAL
4.22X
(4.06)
4.00
B
F
O
R
M
A
T
I
P
R
O
V
B
R
I
C
A
T
I
N
S
T
R
U
C
T
I
O
N
N
L
E
A
S
A A
B B
C C
D D
01MF3
DWG NO. REV
SHEET
INDEX CODE NUMBER
AREA TYPE CL ORIG
SCALE:
SIZE CAGE CODE
000.B D
533 0670 99
NOTED
1050605081
NST0856
OF
D a t e
A
M
F i l e
R
B
P a t h
C i v a u l t l o c a l P r o j e c t s N
S
T F a c i l i t i e s A
T R
A d v a n c e d
T e s t
R e a c t o r I L o o p
A
N
E
F l u…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .