Atch1StatementOfWork.pdf
PDF 158 KB Posted
- Attached to
- Heat Plant Circulation Pump Repair
- Solicitation number
- FA4626-24-Q-0039
About this file
This document is a Statement of Work (SOW) detailing the requirements for repairing and reconditioning a high temperature hot water circulation pump at Malmstrom Air Force Base. The key tasks include inspecting the pump components, repairing or replacing the case, cover, adapter, wear rings, shaft, impeller, and bearing housing as needed, and upgrading the mechanical seal, wear rings, and throat bushing. The work must be performed by a company specializing in fluid handling and industrial API 610 pumping equipment. The contractor is required to provide documentation including a final work scope report, mechanical seal drawing, spare parts list, running clearances, air test results, and dynamic balance report. The SOW also lists the specific OEM replacement parts required. The related federal contract opportunity is a solicitation issued by the Department of the Air Force Global Strike Command for the heat plant circulation pump repair, with a detailed description matching the SOW requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch4HeatPlantPhoto.jpg | JPG image | |
| Atch3HeatPlantPhoto.jpg | JPG image | |
| Atch2InstallationPerimeterAccessControl.pdf | ||
| COMBO_HPCPRepair.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
REPAIR AND RECONDITION HIGH TEMPERATURE HOT WATER
CIRCULATION PUMP
1. Summary of Work:
1.1. The contractor shall provide all labor, equipment, materials to repair and recondition of the Dean Brothers R-484 6x8-15 ½ end-suction centrifugal type pump used on the distribution system of the high temperature hot water heating plant.
1.2. The Contractor shall recondition the pump with OEM parts and upgrade of the mechanical seal, wear rings and throat bushing to meet manufacturer specifications. Shipping costs back to Malmstrom AFB will be included in the price quote.
2. Pump Information:
2.1. Manufacturer: Dean Brothers
2.2. Model: R-484
2.3. Size: 6x8-15 ½
3. WORK SCOPE:
3.1. Qualification:
3.1.1. All work is to be performed by a company specializing in fluid handling & industrial API 610 pumping equipment.
3.2. Inspection:
3.2.1. Visual inspection of all components
3.2.2. Disassemble pump
3.2.3. Record run-outs
3.2.4. Record clearances
3.2.5. Disassemble rotor
3.2.6. Record clearances
3.2.7. Check case/cover split line
3.2.8. Sandblast all components if needed
3.2.9. Clean components
3.3. Case:
3.3.1. Inspect machined fits for proper dimensions and for any defects
3.3.2. Weld Repair/Build-up of fits (weld pads, etc.) or casing flaws if required
3.3.3. Machine fits if required to achieve minimum manufacturer recommended clearances
3.3.4. Skim-cut flange gasket surfaces
3.3.5. Spiral-cut flange gasket surfaces
3.3.6. Clean and de-burr all sharp edges
3.3.7. Prep for final assembly
3.4. Cover:
3.4.1. Inspect machined fits for proper dimensions and for any defects
3.4.2. Minor Weld Repair/Build-up of fits (weld pads, etc.) or casing flaws if required
3.4.3. Machine fits if required to achieve minimum manufacturer recommended clearances
3.4.4. Modify stuffing box to accept new John Crane 8B1T mechanical seal with Plan 23 flush
3.4.5. Clean and de-burr all sharp edges
3.4.6. Prep for final assembly
3.5. Adapter – Cover to Bearing Frame:
3.5.1. Inspect machined fits for proper dimensions and for any defects
3.5.2. Minor Weld Repair/Build-up of fits (weld pads, etc.) or casing flaws if required
3.5.3. Machine fits if required to achieve minimum manufacturer recommended clearances
3.5.4. Clean and de-burr all sharp edges
3.5.5. Prep for final assembly
3.6. Case & Cover Wear Rings and Throat Bushing:
3.6.1. Manufacture new CR-6100 case wear ring.
3.6.2. Manufacture new CR-6100 cover wear ring.
3.6.3. Manufacture new CR-6100 throat bushing.
3.6.4. Inspection of finished parts and work preformed
3.7. Shaft:
3.7.1. Inspect for TIR
3.7.2. Polish impeller fits
3.7.3. Clean threads
3.7.4. Prep for final assembly
3.8. Impeller:
3.8.1. Inspect impeller prior to any work for damage, etc.
3.8.2. Weld impeller bore and finish machine to proper size if required
3.8.3. Tack weld or set screw all impeller wear rings in three places if needed
3.8.4. Final Inspect of impeller and work preformed
3.8.5. Prep for final assembly
3.9. Rotating Assembly:
3.9.1. Machine impeller and shaft as one rotating assembly
3.9.2. Skim cut impeller wear rings
3.9.3. Final finish OD’s to proper surface finish
3.9.4. Ensure proper TIR of impeller wear ring OD’s and sleeve OD/s to +/- 0.001”
3.9.5. Balance assembly to 4 W/N criteria
3.10. Bearing Housing:
3.10.1. Clean bearing housing
3.10.2. Inspect machined fits for proper dimensions and for any defects
3.10.3. Minor Weld Repair/Build-up of fits (weld pads, etc.) or casing flaws if required
3.10.4. Machine fits if required to achieve minimum manufacturer recommended clearances
3.10.5. Clean and de-burr all sharp edges
3.10.6. Epoxy Coat inside of bearing housing if needed
3.10.7. Inspect
3.10.8. Prep for final assembly
3.11. Pump Seal
3.11.1. Install John Crane Type 8B1T cartridge mechanical seal with pumping ring
3.12. Seal Flush:
3.12.1. Conversion to Plan 23 Seal Flush will be required for adequate cooling of the mechanical seal.
3.12.2. Plan 23 Seal Flush piping, heat exchanger and auxiliary components will be the customer’s responsibility and are not included in this scope of supply.
3.13. Closed System Lubrication:
3.13.1. Install ISOMAG magnetic bearing isolators
3.13.1.1. Requires modification of existing bearing covers
3.13.2. Install Oil-Rite milled aluminum level gauge with dial thermometer and Viton seals
3.13.2.1. Requires modification of existing bearing frame
3.14. Final Assembly:
3.14.1. Install new parts listed in below table
3.14.2. Install case wear ring into pump case
3.14.3. Install cover wear ring into pump cover
3.14.4. Install stuffing box bushing into pump cover
3.14.5. Apply Sealant to gland studs to prevent leakage of cooling water from cover cooling chamber
3.14.6. Orientate stuffing box chamber vent in Top Vertical (12:00) position
3.14.7. Record final clearances
3.14.8. Record final run-outs
3.14.9. Install mechanical seal
3.14.10 Install coupling hub if provided
3.14.11 Apply proper torque to all fasteners
3.14.12 Final Inspect of all installations and work preformed
3.14.13 Air test complete unit for 30 minutes, record results
3.14.14 Mask any needed areas and prep for paint
3.14.15 Paint with high temperature silver paint
3.15. Prep for Shipment:
3.15.1. Prior to shipping remove gauge, external tubing, etc.
3.15.2. Package loose parts to be shipped with pump
3.15.3. Plug any openings
3.15.4. Verify mechanical seal spacers are in place
3.15.5. Palletize pump in vertical position to minimize tipping during transit
3.15.6. Plastic wrap palletized pump
3.15.7. Tag shipment with Contract Number and correct shipping address
3.15.8. Firm Freight, FOB Destination to be included in the quoted price
3.16. Documentation to be provided:
3.16.1. Detailed final work scope report listing all tasks performed on the pump
3.16.2. Mechanical Seal drawing
3.16.3. Spare parts list for all new parts
3.16.4. As built running clearances
3.16.5. Air test results on assembled pump
3.16.6. Dynamic balance report on impeller
4. Parts Required:
4.1. All parts are OEM (Original Equipment Manufacturer) unless manufacturer is stated otherwise
4.2. Common fasteners, bearings, plugs, etc. may be procured locally and not be limited to the OEM
5. Parts Table:
Item # Description Qty.
*4 Impeller Key 1 5A Casing Drain Plug 1 5C Casing Stud Nut As Needed *6 Casing Back Cover Wear Ring - Greene Tweed WR650 1 6A Casing Wear Ring - Greene Tweed WR650 1 7A Bull’s Eye Oil Level Indicator 1 *10 Shaft Sleeve – Custom manufactured for John Crane seal 1
*10K Shaft Sleeve Key 1 *12 Impeller Nut 1
*12A Impeller Washer 1 *12B Impeller Lock Washer 1 *12C Impeller Washer Dowel Pin 1
13/95A/95B John Crane 8B1T, P/N M196682, Cartridge Mechanical Seal 1 14 Gland Stud As Needed 15 Gland Nut As Needed *25 Radial Bearing 1
*25A Thrust Bearing 2 *31 Thrust Bearing Lock Nut 1
*31A Thrust Bearing Lock Washer 1 *54 Throat Bushing - Greene Tweed WR650 1 *76 Bearing Isolator – Inboard - ISOMAG 1
*76A Bearing Isolator – Outboard - ISOMAG 1 77 Casing Gasket 1
*77B End Cover Gasket 1
N/A Milled aluminum level gauge with dial thermometer and Viton seals –
Oil-Rite P/N B3540-20300VN2W 1