Atch1-SOW.pdf
PDF 135 KB Posted
- Attached to
- Ground Squirrel Control Federal contract opportunity
- Solicitation number
- FA4626-20-Q-0048
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch3-PricingWkst_Updated.xlsx | XLSX spreadsheet | |
| Atch2-Installation Perimeter Access Control.pdf | ||
| Atch3-PricingWkst.xlsx | XLSX spreadsheet | |
| COMBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
STATEMENT OF WORK (SOW)
for
Richardson’s Ground Squirrel Control
Malmstrom Air Force Base
MONTANA
11 Jun 2020
SECTION 1
DESCRIPTION OF SERVICE
1. GENERAL REQUIREMENTS
1.1. The certified applicator (a.k.a the contractor) shall provide all labor, rodenticide, chemicals, fumigants, equipment, and incidentals necessary to perform rodenticide treatments, extermination and carcass removal of Richardson’s Ground Squirrels for approximately 672 acres of main base area and 328 acres of housing area. The certified applicator shall apply control measures to include EPA and DoD approved fumigants, rodenticides, smoke applications, and traps, in accordance with the Safety Data Sheet (SDS) and product label. All fumigants, smoke applications, rodenticides and chemicals must be approved by the Malmstrom AFB Pest Management Consultant before use. FUMIGANTS AND SMOKE APPLICATIONS
MUST NOT BE APPLIED INTO A BURROW SYSTEM THAT IS WITHIN 100 FEET OF A
BUILDING THAT IS, OR MAY BE, OCCUPIED BY HUMANS, AND/OR DOMESTIC
ANIMALS. Placement of placards must be visible to the public when fumigants/chemicals/rodenticides are in use or present in the area.
1.2. SUMMARY OF WORK
1.3. Work will be conducted in accordance with the following regulatory requirements, DoD Directive 4715.1E, “Environmental Safety and Occupational Health”, Department of Defense Instruction (DODI) 4150.07, DoD Pest Management Program, 29 May 2008; Armed Forces Pest Management Board (AFPMB) Technical Guide (TG) No. 11, Hydrogen Phosphide Fumigation with Aluminum Phosphide, March 2013; AFPMB TG No. 15, Pesticide Spill Prevention and Management, August 2009; AFPMB TG 21: Pesticide Disposal Guide for Pest Control Shops, July 2002; Administrative Rules of Montana (ARM) 4.10: Agricultural Sciences Division (including Pesticide- related rules); MCA 80-8-2: Pesticide Registration & Licensing.
1.4. The certified applicator is responsible for a written Fumigation Management Plan (FMP).
The FMP will follow state, county, and local authorities’ specific requirements. The FMP must be written PRIOR TO ENTRY treatment, including fumigation for burrowing pests. In addition to the plan, the applicator must read the complete label which includes the container label and Applicator’s Manual. Follow the directions and abide by all restrictions.
2. PERIOD OF PERFORMANCE
2.1. Ordering period will begin August 1, 2020 through July 31, 2021.
3. CONTRACTOR EMPLOYEES
3.1. Employee Certifications. Applicator shall have valid applicator’s license with the State of Montana. A certified applicator must be physically present, responsible for, and maintain visual and/or voice contact with all fumigation workers during the application of the fumigant.
4. ENVIRONMENTAL, SAFETY, AND HEALTH
4.1. Environmental Hazards. Comply with the highest degree of environmental protection or safety practices where any disagreements between requirements exist. Use of fumigants in a manner that may kill or otherwise harm an endangered or threatened species or adversely modify their habitat is a violation of Federal laws. Before using any fumigant, rodenticide, or pesticide, you must obtain the PESTICIDE USE BULLETIN FOR PROTECTION OF ENDANGERED SPECIES for the county in which the product is used.
4.2. Specific Safety Requirements.
4.2.1. When fumigants are used in athletic fields or parks, the applicator shall post a sign at entrances to the treated site containing the words: DO NOT ENTER/NO ENTRY, FIELD NOT FOR USE, the name and EPA registration number of the fumigant, and a 24-hour emergency response number. Placards may be removed 2 days after the final treatment.
4.2.2. When fumigants are used on a site other than an athletic field or park, the applicator shall post a sign at the application site containing the signal word DANGER/PELIGRO, skull and crossbones, the name and EPA registration number of the fumigant, and a 24-hour emergency response number. Signs may be removed 2 days after the final treatment.
4.3. Contractor Liability. The applicator shall be liable and responsible for all costs resulting from non-compliance, whether accidental or intended, resulting from:
4.3.1. Hazardous Chemical Discharge. Any discharge or spills resulting from contractor negligence.
4.3.2. Non-Compliance with Environmental Regulations. Failure to follow any Federal, State, local laws or regulations.
4.3.3. Fines and Corrective Actions. Any fines or corrective actions assessed by any regulatory or governing agency due to the actions or omissions of the contractor in carrying out his/her duties.
5. MISHAP NOTIFICATION AND REPORTING. The contractor/applicator shall immediately report any and all injuries and damage involving contractor, Air Force (AF) civilian or military personnel to the QAE and the Wing Safety Office.
5.1. Cooperate fully and assist government personnel in any government investigation of the mishap, until released by the mishap investigative authority through the Contracting Officer (CO). Safety personnel shall have the right, at any time, to investigate and report all mishaps involving Air Force personnel and property. The CO and Contractor Safety Representative may accompany Air Force mishap investigation personnel but may not release information regarding the mishap without written approval of the AF Safety investigating official or senior installation commander.
5.2. Maintain records of contractor employee’s occupational injuries, illnesses, and other related activities as required.
6. FIRE PREVENTION. Establish and implement procedures to ensure careful handling and storage of flammable and combustible products in accordance with (IAW) National Fire Protection Association (NFPA) Standard 30 and National Fire Codes.
7. SECURITY REQUIREMENTS. Applicators will be required to comply with all security measures while on Malmstrom AFB. This includes, but is not limited to, giving way to all emergency vehicles that are in response. The contractor’s on-site personnel are required to abide by all real world Force Protection Condition (FPCON) measures, Random Anti-terrorism Measures (RAMs), shelter-in-place, evacuations, lock-down notices as directed (i.e.
mandatory badge / ID check, hand carried items will be searched, etc.).
8. HOUSEKEEPING AND CUSTODIAL SERVICES. The contractor must maintain the contractor assigned areas in a clean, safe, and sanitary condition. Remove trash from all the work areas, store all flammables in an approved flammable storage container, and ensure the area is left in an orderly manner at the end of the duty day.
8.1. Sanitary Facilities. The contractor’s employees may use the nearest sanitary facilities. The contractor shall not use facilities in controlled or restricted areas IAW security requirements.
8.2. Refuse Collection. Waste generated by the contractor in performance of the services specified with this SOW shall be disposed of by contractor off base in compliance with State and Local ordinances, including hazardous materials in which proper disposal instructions shall be complied with. All trash, debris, and refuse caused by the job shall be removed and disposed and shall be deposited in an approved receptacle or container furnished by the contractor. The job site shall be cleaned at the end of each workday.
9. ADMINISTRATIVE RECORDS. All records, documents, and associated papers provided by the government and generated during the period of this contract become government property and will remain in place upon contract termination or completion. During the period of the contract, records, documents, and associated papers shall be available for review.
10. INSPECTION.
10.1. Quality Assurance Evaluator. The 341st Civil Engineering Squadron will provide a Quality Assurance Evaluator (QAE) to verify accomplishment of work. The QAE will be the spokesman for compliance with base standards. Conflicts between the QAE and the contractor will be resolved by the Contracting Officer. If, for some reason, a change in the QAE personnel is required, the contractor will be notified in writing by the Contracting Officer. The contractor shall coordinate contractor activities with the 341st Civil Engineering Squadron.
10.2. Final Inspection. The contractor will notify the QAE of their estimated work completion date at least 3 days in advance, to verify accomplishment of work and receive contractor work report. Any deficiencies found shall be rectified by the contractor and the contractor shall inform the QAE upon completion.
7. SECURITY REQUIREMENTS. Applicators will be required to comply with all security measures while on Malmstrom AFB. This includes, but is not limited to, giving way to all emergency vehicles that are in response. The contractor’s on-site personnel a...
File details come from the government source that posted it. Updated .