About this file

This performance work statement outlines requirements for inspection and maintenance services at two U.S. government-owned sidetracks in Tsurumi, Japan. The contractor shall inspect the roadbeds and electrical systems at Sidetracks No. 342 and 343 annually from April 2024 through March 2025, maintaining them according to Japan Freight Railway Company rules. Services include inspecting track components, signals, switches, crossings, and other electrical assets. The contractor must schedule work to avoid interfering with government operations and respond to any safety-related emergencies. The contractor will be subject to quality assurance reviews and must remove unacceptable staff. Subcontractors must meet contract standards. The contractor must comply with all Japanese environmental regulations and properly handle hazardous and non-hazardous waste. Appendices provide inspection details, equipment lists, and schedules.

View the file

Other files

File Type Posted
Single Source Justification.pdf PDF
FA520924Q0014.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

FY24 SIDETRACK INSPECTION AND

ELECTRICAL SYSTEM MAINTENANCE

AT

U.S. GOVERNMENT SIDETRACKS

NO. 342 AND 343, TSURUMI

FLCY-Tsurumi

15 Feb 2024

The attached PWS is being provided in accordance with (IAW) Section 801, 10 USC 2330. Any contract or task order resulting from this request is to be acquired using performance-based principles.

Attachment 1 to Solicitation No. FA520924Q0014

PERFORMANCE WORK STATEMENT

FOR

FY21 INSPECTION OF SIDETRACKS AND MAINTENANCE OF ELECTRICAL SYSTEMS AT

U.S. GOVERNMENT SIDETRACK NO. 342 AND 343, TSURUMI

1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform inspection and maintenance of electrical systems at U.S. Government Sidetrack No. 342 and 343, Tsurumi, in a manner that will ensure continuous and reliable railroad operational condition. The performance period shall be from 01 April

2024 through 31 March 2025.

1.1. MAINTENANCE AND REPAIR SERVICES. The maintenance and repair services shall be in accordance with (IAW) the Japan Freight Railway Company’s (JFRC) rules and regulations as specified in the

Agreement Between the United States of America and JFRC for Handling Military Sidetracks, dated 01 Apr

1987, Articles 2, 4, 6 and its first supplemental agreement dated 13 July 1987, paragraph 5 entitled

“Maintenance”; the second supplement dated 16 March 1988, subparagraphs 5.e. and 5.f.; and the 6th supplement dated 31 July 2007, subparagraph 5.e.(1). All construction debris or waste generated from this contract shall be removed IAW all Japanese laws and regulations, Japan Environmental Governing Standards

(JEGS, See Appendix A), commercial practices, and local standards.

1.2. The Contractor shall perform the services IAW the estimated workload, site plans, and work schedules for

FY24 in Appendices B through D as identified as the results of pre-joint and joint surveys conducted in June and

July 2021 IAW the said agreement above. The services shall include but is not limited to:

(a) Item 0001: Inspection of Sidetrack OU-1 (No. 343) IAW Appendices B and D.

(b) Item 0002: Inspection of Sidetrack OU-2 (No. 342) IAW Appendices B and D.

(c) Item 0003: Inspection of Electrical System of Sidetrack OU-1 and OU-2 IAW Appendices B, C, and D.

(d) Item 0004: Emergency Repair IAW Paragraph 1.3.

1.2.1. INSPECTION OF ROADBED. The Contractor shall perform inspection services to ensure roadbeds are properly maintained in good condition. The items to be inspected and the schedule are identified in

Appendices B and D. The required services include but not limited to safety patrolling, inspection of track irregularity, switching device, regular tie, ballast, rail, and other materials.

1.2.1.1. PRE-JOINT SURVEY AND JOINT SURVEY.

1.2.1.1.1. PRE-JOINT SURVEY. Pre-Joint Survey that is conducted by the Contractor is required to complete the draft instructions for both the Sidetrack Roadbed Maintenance and the Sidetrack Inspection contracts for next fiscal year. The result of pre-Joint Survey shall be incorporated in the draft instructions in a timely manner for the next fiscal year contract and be submitted to the Contracting Officer (KO), Contract

Administrator (CA), and the Government Representative (GR) for Joint-Survey by the Contractor.

1.2.1.1.2. DRAFT INSTRUCTIONS. Draft instructions shall be submitted to the KO and GR by the

Contractor after the pre-joint survey and prior to the Joint Survey in a timely manner in order for the requiring activity to be able to confirm the project scope. The Contractor shall provide instructions concerning the maintenance to be performed for the following year along with English translation.

1.2.1.1.3. JOINT SURVEY. Joint Survey will be conducted with the representatives of the Contractor and the

Government in order to determine what work needs to be performed for the next fiscal year, based on the draft instructions that are prepared by the Contractor after pre-Joint Survey.

1.2.1.2. MARKING REQUIREMENT. Any deficiencies that are identified as a result of inspection and pre-

Joint Survey and that are required to be repaired shall be marked with paint at OU1, OU2, and JR-Anzen Station by the Contractor prior to Joint Survey. Enclose that the marked characters with circles or squares or change the paint color and clarify the difference from the marked characters of current contract.

1.2.1.3. RESULT OF INSPECTION. The result of inspection shall be immediately incorporated into the draft instructions in a timely manner for the next fiscal year or the fiscal year after next.

1.2.2. MAINTENANCE OF ELECTRICAL SYSTEMS. The Contractor shall perform electrical maintenance work to ensure electrical devices are maintained in good condition. The items to be inspected and maintained, the schedule for inspection, and site plans are identified in Appendices B through D. The required services include but not limited to inspection and maintenance of signal equipment, switching device, iron conduit system, railroad crossing safety equipment, interlocking device, signal line, power source, circuit track, electric power device, and telecommunication devices.

1.3. EMERGENCY REPAIR. In the event that action is required to correct a safety issue or protect lives and/or properties, the KO may verbally instruct the Contractor to proceed with the emergency repairs by issuance of a supplemental agreement pursuant to FAR 52.212-4, Contract Terms and Conditions

- Commercial Items in this contract. All repair work shall be IAW the JFRC’s rules and regulations.

1.4. JFRC’S INITIAL INSPECTION. After completion of the Contractor’s scheduled work cited in the contract, initial inspection shall be performed by JFRC prior to inspection by the Government. Inspection of services will be accomplished by the designated GR based on the JFRC’s certification of inspection.

1.4.1. CERTIFICATES. Certificates that are submitted by the Contractor and the subcontractors after roadbed and electrical system inspection shall be submitted both in English and Japanese to the KO and CA through the

GR.

1.4.2. INSPECTION PICTURES. The Contractor shall submit digital pictures to the GR after each inspection for contract records. The pictures to be taken shall be corresponding with each inspection item.

1.5. NAVFAC-FE, ENVIRONMENTAL OFFICE (PRY4 PWD ENVIRONMENTAL). The Contractor shall be familiar with Environmental Management System (EMS) at Commander, Fleet Activities, Yokosuka

(COMFLEACT Yokosuka) which applies to all COMFLEACT Yokosuka departments, tenant organizations, and their contractors and its subcontractors within COMFLEACT Yokosuka’s fence line; and knowledge of environmental that are applicable to operations similar to those of this contract. EMS is available at ECATTS website (See Appendix A).

1.5.1. The Contractor and the subcontractor shall perform work under the contract consistent with

COMFLEACT Yokosuka’s EMS goals and policy.

1.5.2. The Contractor and the subcontractor shall maintain monitoring and measurement information to address the EMS goals and policy.

1.5.3. The Contractor and the subcontractor shall complete the latest EMS Awareness Training prior to performance of the scheduled work at COMFLEACT Yokosuka by ECATTS training modules on ECATTS website https://environmentaltraining.ecatts.com/ and/or by equivalent training method. The Contractor and its subcontractor shall submit certifications to the KO prior to performance of the scheduled work; and shall retain training records and make them available upon request.

1.6. HAZARDOUS WASTE (HW).

1.6.1. No hazardous waste (HW) shall be brought onto the government property from off-base nor shall no HW be abandoned on government property.

Attachment 1 to Solicitation No. FA520924Q0014 https://environmentaltraining.ecatts.com/

1.6.2. The Contractor shall identify construction activities that will generate HW and identify, segregate, containerize, label, handle, accumulate/store, and dispose of it IAW the current JEGS (See Appendix A), installation regulations and requirements such as HW Management Plan (HWMP), and all the applicable

Japanese national and local regulations and requirements. If the work requires the temporary storage/collection of HWs on site overnight, the Contractor shall request the establishment of a Contractor Hazardous Waste

Accumulation Point (HWAP) at the point of generation and operate the Contractor HWAP to comply with the applicable regulations and requirements. When HW will be removed from the job site properly daily, the

Contractor HWAP is not required. For further guidance, contact the CFAY PWD Environmental (Extension: 243-

3186/4886 or Commercial: 046-816-3186/4886).

1.6.3. Any HW generated from this work will be properly disposed of through on-base Hazardous Waste Storage

Area (HWSA), located in Bldg. 1822 in COMFLEACT Yokosuka, or at an approved off-base disposal facility

IAW the current JEGS (See Appendix A), installation regulations and requirements, and all the applicable

Japanese national and local regulations and requirements. In general, the Contractor shall dispose of HWs, excluding asbestos containing material (ACM) waste and contaminated soil or unless specified in this contract, at the HWSA while it shall dispose of HWs, such as ACM waste and contaminated soil in addition to specified waste in this contract, at off-base disposal facility with the Government’s approval. HWs that are turned into the

HWSA shall be accompanied by a completely filled Hazardous Waste Disposal Request Form with a properly established disposal Job Order Number (JON) from the KO. Contact the HWSA (Extension: 243-5777 or

Commercial: 046-816-5777) for coordination or to schedule HW turn-in. Turn-in arrangement with the HWSA shall be made at least three (3) working days in advance. Off-base disposal coordination shall be performed by the Contractor properly. Legible copies of Waste Disposal Manifest (at least a copy of receipt “A” at the time of shipping and a copy of receipt “E” upon completion of disposal) shall be submitted to the CFAY PWD

Environmental via the KO in a timely manner. To obtain further disposal instructions and guidance, the

Contractor shall coordinate with the CFAY PWD Environmental via the KO.

1.7. REQUIREMENT FOR HANDLING SOIL, SOLID WASTES, AND RECYCLABLE

MATERIALS. (If applicable)

1.7.1. The soil in entire OU1 and OU2 are “contaminated”. Soil in OU1 and OU2 were determined to be contaminated with following these chemicals or heavy metals everywhere. “Lead”, “Arsenic”, “Diesel/Waste

Oil”, “Fluorine”, and “Mercury” were exceeded the contaminated soil disposal criteria of JEGS 2020 and

Japan Soil Contamination Countermeasure Law. Soil testing in Tsurumi OU1 and OU2 were conducted in

July 2000, Aug 2005, May 2009, May 2011, and Jul 2013.

1.7.2. Per CNFJ “Contaminated Soil Excavation and Management Policy”, soil generated from the excavation may be backfill into the same spots where the soil comes from. Soil testing is not required when the excavated soil is backfill in the original location. Excavated soil shall not be moved other locations without testing.

Excavated soil shall not be mixed and shall be segregated from other material. Rocks, concrete waste, and other material shall not be separated from contaminated soil in the process of loading or transporting. Excess contaminated/suspected/unknown soil disposed through off-base will be tested by a certified laboratory and properly disposed of off-base IAW JEGS and Japan Soil Contamination Countermeasure Law. A legible copy of soil testing results can be submitted CFAY Soil Manager through the GR.

1.7.3. During the temporary storing of excavated soil until off-base disposal or backfill, the excavated soil shall be covered with vinyl sheets to prevent the soil from run-off by rain, and the label that indicates “Project

Name”, “Contract Number”, “Contractor’s Name”, and “POC phone number” shall be posted on the vinyl sheet. For further soil disposal guidance, contact CFAY PWD Environmental at 243-5180/6720 (Extension) or

046-816-5180/6720 (Commercial).

1.7.4. Soil sampling plan shall include sampling methods, sampling equipment and container, number of samples to be tested, sample volumes (minimum quantity required per container), preservation techniques, holding times and chain of custody (COC); and be submitted to CFAY PWD Environmental Soil Program

Manager at 243-5180 (Extension) or 046-816-5180 (Commercial) prior to sampling even if excess soil will be disposed of off base or placed at a different location.

1.7.5. Any non-hazardous solid/industrial/construction/waste/debris other than recyclable scrap metals generated from this operation will be properly segregated and transported/disposed of permitted off-base solid industrial waste disposal/landfill facility by government-approved solid/industrial waste transportation/disposal contractor IAW local and prefectural solid industrial waste transportation and disposal laws and regulations. A legible copy of Waste Disposal Manifest (a copy of receipt “E”) with the completion date of landfill and CFAY

Solid Waste Tonnage Report shall be submitted to Solid Waste Manager, CFAY PWD Environmental through the GR. The CFAY Solid Waste Tonnage Report shall include the totals of (1) the accurate weight unit (Kg) and (2) monetary unit** (Both Dollar and Yen with the timely exchange rate). **If the material disposed or recycled off-base was sold for profit, you must indicate the amount the material was sold for, using < > symbols around the amount (i.e., <$150> or<¥15,000>).

1.7.6. Non-hazardous solid/industrial waste storage containers provided at the operation site should be leak-proof, water-proof, and vermin-proof including sides, seams, and bottoms; and be durable enough to withstand anticipated usage and environmental conditions without rusting, cracking, or deforming in a manner that would impair serviceability. Storage containers should have functional lids or equal to cover. Containers should be stored in the avoidable area from physical damage and on a firm, level, well-drained surface that is large enough to accommodate all of the containers and that is maintained in a clean, spillage- free condition.

1.7.7. All recyclable scrap metals must remain the property of the Government unless indicated, and must be delivered to and recycled through Bldg. 4856 CFAY Qualified Recycling Program (QRP). Before delivering the scrap metal, submit the attached form “CONTRACTOR TURN-IN OF RIPPED OUT MATERIAL” filled out blanks and contact PRY35 CFAY Solid Waste/QRP department. Size a piece of the scrap metal not larger than 2.5 meter wide, 6.0 meter length, and 2.5 meter height; and not exceed 4,000 kg. Scrap metals include steel, cast iron, copper, electrical wires, PCB-free cables and transformers, housing units, shelving, pipes, metal supports, valves, radiators, ducts, conduits, metal siding, metal roofing, handrails, wiring, etc.

Any metal with firmly adhered lead-based paint may be recycled through the QRP. Do not include any thermal insulation or PCB containing items in scrap metals. Off-base recycling of scrap metals requires inspection and approval by the QRP before recycling off-base.

1.7.8. The scrap rails shall not exceed the maximum allowable size of 8 meters (26 feet) when the

Contractor turns in the scrap to CFAY QRP.

1.8. INTERFERENCE WITH GOVERNMENT OPERATIONS. The Contractor shall make every effort to schedule its inspection and maintenance activities so as not to interfere with U.S. Government operations. In the event such interference is necessary, the Contractor shall provide the GR with a minimum of five (5) working days advance notification of the proposed work by written copies.

1.9. WORK SCHEDULE. The annual work schedules are specified in the Appendix C.

1.10. HUMANITARIAN ASSISTANCE AND DISASTER RELIEF (HADR). The scope of this contract includes services to respond to requirements in a contingency environment including humanitarian assistance and disaster relief.

1.11. GENERAL INFORMATION.

1.11.1. QUALITY CONTROL. The Contractor shall develop and maintain a quality control program to ensure the services are performed IAW the PWS, the standards of the contract, and the JFRC’s regulations. A

QCI (Quality Control Inspector) shall be responsible for inspecting, identifying, and preventing defects in the quality of service performed.

1.11.2. QUALITY ASSURANCE. The Government will evaluate all of the Contractor’s performance

IAW the Quality Assurance Surveillance Plan (QASP) by appointing GR to monitor performance to ensure services are received.

1.11.3. GOVERNMENT REMEDIES. The KO shall follow FAR 52.212-4, Contract Terms and

Conditions - Commercial Items for the Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

1.11.4. CONTRACTOR PERSONNEL.

(a) CONTRACT MANAGER (CM). The Contractor shall provide a CM who shall be responsible for the performance of the work. The name of this person and an alternate or alternates, who shall act for the

Contractor when the manager is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract and shall be individuals who are capable of conversing in and comprehending English.

(b) CONTRACTOR EMPLOYEES. The Contractor personnel shall be easily recognizable as the

Contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the Contractor’s company name and the employee’s name.

(c) REMOVAL OF CONTRACTOR’S EMPLOYEES. The Contractor shall utilize only experienced, responsible, and capable employees in the performance of this contract. The KO may require that the

Contractor remove from the Government job any of his/her employees who endanger persons or properties, or whose continued employment under this contract is inconsistent with the interests of military security.

(d) THIRD COUNTRY NATIONALS (TCN). The Security Forces on each base control entry to the base. Under certain circumstances, the TCN might be denied entry. It is the Contractor’s responsibility to coordinate with the Security Forces at each base when there is a question about particular circumstances.

(e) The Contractor shall not employ any persons who are employees of the U.S. Government and/or

Master Labor Contract employees if employing that person would create a conflict of interest or become in violation of the Procurement Integrity Act (See Federal Acquisition Regulation Section 3.104).

Additionally, the Contractor shall not employ any persons who are employees of the Department of the Air

Force, either military or civilian, unless such person seeks and receives approval according to DOD 5500.7- R, the Joint Ethics Regulation (JER).

1.11.5. SUBCONTRACTING. The Contractor shall submit a list of its subcontractors to the KO. The subcontractors shall meet the standards required by this contract to perform the service. The prime Contractor is responsible for the performance of the subcontractors.

1.11.6. INSTALLATION BASE PASSES. For access to U.S. Installations, the U.S. Government will issue all required Gate Passes/Vehicle Passes to the Contractor personnel at no cost to the Contractor. To obtain passes, the Contractor is required to submit documents IAW each installation instruction. The prime Contractor shall be responsible for all passes issued to his/her own or his/her subcontractor’s employees under this contract. The

Contractor shall return all applicable passes upon termination of employment or completion of this contract to the Installation Pass Office.

(a) GATE PASSES. In order to obtain Gate Passes, the Contractor may be required to (i) submit certificates of residence, abstracts of family registers, and an ID photo, in addition to application forms which could vary depending on each installation, and (ii) make appointments at the Installation Pass Offices to take ID photos and pick up issued passes. The Contractor is responsible for the expenses and costs that they would incur in order to obtain Gate Passes.

(b) VEHICLE PASSES. In order to obtain Vehicle Passes, the Contractor shall submit the proof of valid liability insurance that must cover the automobile liability insurance in the types and minimum amounts of (i) Bodily Injury - ¥30,000,000 per person per occurrence, in addition to the Japanese Compulsory

Insurance (JCI), and (ii) Property Damage - ¥3,000,000 per occurrence.

1.11.7. HOURS OF OPERATION.

(a) WORK HOURS. The Contractor work hours are from 0800 to 1630 Monday through Friday including

Japanese holidays, but excluding U.S. legal holidays. The Contractor shall finish their work before sunset for safety reasons.

(b) U.S. LEGAL HOLIDAYS. Recognized U.S. legal holidays are listed below. Holidays falling on a

Saturday may be observed on the preceding Friday. Holidays falling on a Sunday may be observed on the following

Monday.

DATE HOLIDAY

1st January New Year’s Day

3rd Monday in January Martin Luther King’s Birthday

3rd Monday in February President’s Day

Last Monday in May Memorial Day

19th June Juneteenth Day

4th July Independence Day

1st Monday in September Labor Day

2nd Monday in October Columbus Day

11th November Veteran’s Day

4th Thursday in November Thanksgiving Day

25th December Christmas Day

1.11.8. REPORTS OF DAMAGES, DESTRUCTION, INJURY, OR DEATH.

(a) The Contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract. For the purposes of this clause, the term “property” includes equipment or property of any type, whether Government owned or not. The term “Contractor” includes the Contractor, its agents, servants, or employees.

(b) The Contractor shall submit these reports to the KO through the GR as follows:

(1) A preliminary report shall be made as soon as practicable after the time the incident occurs. Report may be either verbal, email or facsimile.

(2) A complete written report shall be submitted within 96 hours after occurrence of the incident. A copy of this report shall be furnished to the KO.

2. SERVICES SUMMARY (SS).

The following Services Summary (SS) identifies the performance objectives and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective PWS Para Performance Threshold Method of Assessment

SS 1: Inspection of Roadbed

Ensure reliable and continuous condition IAW the JFRC’s rules and regulations.

1.2.1. Zero (0) defect. 100% Inspection

SS 2: Maintenance of Electrical Systems

Ensure reliable and continuous condition IAW the JFRC’s rules and regulations.

1.2.2. Zero (0) defect. 100% Inspection

SS 3: Emergency Repair

Ensure reliable and continuous condition IAW the JFRC’s rules and regulations.

1.3. Zero (0) defect. 100% Inspection

SS 4: Required Submittals

Use AF From 3000 (Appendix E) to the maximum extent practicable for the required submittals

1.2.1.1.2., 1.4.1., 1.4.2., 1.9., 1.11.4

Zero (0) defect. 100% Inspection

3. GOVERNMENT-FURNISHED PROPERTIES AND SERVICES.

3.1. UTILITIES. Water, electricity, and sewage, where available from existing work sites, will be provided to the Contractor without cost. Wastewater contained chemical and paint shall not be discharged into the sewage and storm line.

3.2. SECURITY FORCES AND FIRE PROTECTION. Upon request for assistance, the following units will provide services on base as necessary:

(a) Base Security Forces Telephone 110 or 911 (046-816-0911)

(b) Base Fire Department Telephone 117 or 911 (046-816-0911)

4. APPENDICES.

A. References

B. Electrical Portion Inspection Patrol Service (List of Track Patrol Quantity)

C. Work Schedule for Electrical Portion (Track Patrol and Appearance Inspection)

D. Inspection Patrolling Equipment at Anzen, No. 1 & 2 (OU1 / OU2), Tsurumi (Drawing)

E. Material Approval Submittal (AF IMT 3000)

APPENDIX A

REFERENCES

1. JEGS

Original version issued by Headquarters, U.S. Forces Japan:

https://www.usfj.mil/Portals/80/2018%20JEGS.PDF?ver=2018-04-26-195301-487 (The URL is subject to change)

2. EMS

https://environmentaltraining.ecatts.com/

(The URL is subject to change)

Attachment 1 to Solicitation No. FA520924Q0014 https://www.usfj.mil/Portals/80/2018%20JEGS.PDF?ver=2018-04-26-195301-487

APPENDIX B

№342 & №343 鶴見基地 U.S.MILITARY SIDING №342 & №343 TSURUMI Terminal

系統 番号 system № 単位

Unit

数量

Q.tity

検査項目

Inspection item

検査周期

Inspection cycle

入換標識 基

Shunting Indicator Job

車止標識 組

Car Stop Marker Set

標識付転換機 組

Switch Stand with Marker Set

転てつ標識 組

Switch Indicator Set

転てつ転換鎖錠装置 組

Switch and Lock Movement Set

鉄管装置 m

Signal Conduit m

入換標識 基

Shunting Indicator Job

転てつ転換鎖錠装置 組

Switch and Lock Movement Set

鉄管装置 m

Signal Conduit m

踏切警報機 組 日石踏切に設備

Level Crossing Signal Set set up Nisseki R.C.

接地装置 箇所 OU2 燃料基地 静電気アース用

Grounding Device Place

信号スイッチ箱 個

Signal Switch Box Job

レールボンド 箇所

Rail Bond Place

レール絶縁 組 信号電流 区分用

Rail Insulater Set signal current divison

信号ケーブル m

Signal Cable m

接続箱 個

Joint Box Job

トラフ m 100

Trough m

リレー 組

Signal Relay Set

整流器 個

Rectifier Job

蓄電池 組 停電時 バックアップ用

Battery Set back up in cace of power failure

踏切制御子 個 踏切制御用

Electronic Train Detector Job crossing control

踏切しゃ断機 組 日石踏切に設備

Crossing Barrier Set set up Nisseki R.C.

踏切警報機 組 日石踏切に設備

Level Crossing Signal Set set up Nisseki R.C.

整流器 個 踏切電源用

Rectifier Job power source of crossing

踏切制御子 個 踏切制御用

Electronic Train Detector Job crossing control

踏切しゃ断機 組 日石踏切に設備

Crossing Barrier Set set up Nisseki R.C.

通信ケーブル架空 m

Communication Cable(Aerial) m

通信ケーブル地上 m

Communication Cable(Ground-Based) m

沿線電話機 個

Trackside Telephone Job

支持柱 本

Support Pillar(Concrete Pole) Job

支線 箇所

Branch Line Place

スイッチ箱 個

Switch Box Job

低圧電線 m

Low Pressure Electric Wire m

自動点滅器用 箇所

Flasher Place

踏切投光器用 箇所

Crossing Floodlight Place

絶縁変圧器 個

Insulating Transformer Job

照明設備・踏切用 個

Light Equipment,Crossing Job

自動点滅器 個

Flasher Job

分電盤 個

Cabinet Panel Job

保守指示書 式

Maintenance instruction sheet making Job

電力設備 electric power equipment

支持物 Pillar

接地装置 grounding device power source of crossing

6ヶ月に一回検査

Inspection once every six months

双動機 21. 22

1年に一回 検査

Annual inspection

双動機 21. 22 ground of static electricity on fuel transport base

機能検査 function inspection

軌道回路 track circuit

電線路 electric Line

踏切電源用

諸設備 other equipment signal current transmision(stafic elestricity measures)

踏切保安設備 level crossing protection device

測定検査 measurement inspection

6ヶ月に一回検査

Inspection once every six months

機能検査 function inspection

機能検査 function inspection cable accomodation

双動機 21イロ 22イロ

測定検査 measurement inspection

(1) 巡回検査数量表 List of Track Patrol Quantity

レール継目部 145ヶ所 接地線端 46ヶ所(OU1)

踏切保安設備 level crossing protection device

巡回検査指示事項

Details of Track Patrol

記 事

Remarks

LED形 1組 反射材 10組

1年に一回 検査

Annual inspection

検査対象設備

Inspection Target Facilities

機能検査 function inspection

双動機 21イロ 22イロ

信号装置 signal device

100.5 electric bulb 2set

ケーブル収容用

1年に一回 検査

Annual inspection

1年に一回 検査

Annual inspection

1年に一回 検査

Annual inspection

ケーブル配線用箱

軌道回路 track circuit

100.5

踏切動作用154m 標識電球用 74m cable wiring box

転てつ装置 power switch movement

信号装置 signal device

双動機 21イロ 22イロ

8 2

通信設備 communication equipment

信号設備 signal equipment

通信設備 communication equipment

電線路 electric Line

電灯電力設備 light electricity facilities

電線路 electric Line

電源装置 power supply system

電灯電力設備 electric and light power system

機能検査 function inspection

23 2

26 2

25 1

諸設備 other equipment

転てつ装置 power switch movement

測定検査 measurement inspection

6ヶ月に一回検査

Inspection once every six months

APPENDIX C

(1) 巡回検査 及び 目視検査 Track Patrol and Appearance Inspection

4月 5月 6月 7月 8月 9月 10月 11月 12月 1月 2月 3月

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

入換標識 Shunting Indicator

車止標識 Car Stop Marker

標識付転換機 Switch Stand With Marker

転てつ標識 Switch Target

転てつ転換鎖錠装置 Switch and Lock Movement

鉄管装置 Signal Pipe Line

入換標識 Shunting Indicator

転てつ転換鎖錠装置 Switch and Lock Movement

鉄管装置 Signal Pipe Line

踏切警報機 Level Crossing Signal

接地装置 Grounding Device

信号スイッチ箱 Signal Switch Box

レールボンド Rail Bond

レール絶縁 Rail Insulater

信号ケーブル Signal Cable

接続箱 Joint Box

トラフ Trough

リレー Signal Relay

整流器 Rectifier

蓄電池 Battery

踏切制御子 Electronic Train Detector

踏切しゃ断機 Crossing Barrier

踏切警報機 Level Crossing Signal

整流器 Rectifier

踏切制御子 Electronic Train Detector

踏切しゃ断機 Crossing Barrier

通信ケーブル(架空) Communication Cable(Aerial)

通信ケーブル(地上) Communication Cable(Ground-Based)

沿線電話機 Trackside Telephone

支持柱(コンクリート柱) Support Pillar(Concrete Pole)

支線(支持物) Branch Line

スイッチ箱 Switch Box

低圧電線 Low Pressure Electric Wire

接地装置(自動点滅器用) Grounding Device( Flasher)

接地装置(踏切投光器用) Grounding Device(Crossing Floodlight)

絶縁変圧器 Insulating Transformer

照明設備(踏切用) Light Equipment(Crossing)

自動点滅器 Flasher

分電盤 Cabinet Panel

保守指示書 Maintenance instruction sheet making

(2) 取替工事☆ Replacement

4月 5月 6月 7月 8月 9月 10月 11月 12月 1月 2月 3月

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

☆★ 巡回検査(検査会社による) track patrol(company of inspection) ◎ 目視検査 (JR社員による) 各年間スケジュール visual inspection(JR staff) each year-round schedule

記 事 Remarks№ Electrical Services

2024 2025

ATTACHMENT1

№ Electrical Services 記 事 Remarks

№342 & №342 鶴見基地

U.S.MILITARY SIDING №342 & №343 TSURUMI Terminal

測定検査 measurement inspection

◎-目視検査

(JR社員による)

visual inspection(JR staff)

機能検査 function inspection

機能検査 function inspection

機能検査 function inspection

機能検査 function inspection

機能検査 function inspection

WORK SCHEDULE FOR ELECTRIC PORTION

測定検査 measurement inspection

2024 2025

測定検査 measurement inspection

★-機能検査 (検査会社による1年 に一回) function inspection(company of inspection,Annual inspection)

☆-測定検査 (検査会社による 6ヶ月に一回) measurement inspection(company of inspection,Inspection once every six months)

APPENDIX D

OU2 NISSEKI R.C. Box

11 15 Signal Cable 154m

13 17 Trough 19m

13 19&24 Rectifier 1SET

14 20 Battery 1SET

17 21&25 Control Relay 1SET

2 HAMA ANZEN J.R. Station

NISSEKI R.C.

10&23 Warning Signal 2SET

22&26 Crossing Barribr 2SET

Indicator (Marker) Cable OU1

15 Signal Cable 74m 13 Rail Bond 12JOB

17 Trough 36m 14 Rail Insurator 2SET

ANZEN Station № Form

13 Rail Bond 6JOB 2

14 Rail Insurator 2SET 4 №21 and 22 Point

5 №21 and 22 Point

6 №21 and 22 Point

8 №21 and 22 Point

9 №21 and 22 Point

10 NISSEKI R.C. X1 and X2

11 OU2

13 OU1.OU2 and JR ANZEN

14 OU1.OU2 and JR ANZEN

16 NISSEKI R.C. Box

19 NISSEKI R.C. Box

20 NISSEKI R.C. Box

21 NISSEKI R.C.

22 NISSEKI R.C. WB1 and WB2

23 NISSEKI R.C. X1 and X2

24 NISSEKI R.C. Box

25 NISSEKI R.C.

26 NISSEKI R.C. WB1 and WB2 ★(1年に一回 検査)

☆(6ヶ月に一回 検査)

☆(6ヶ月に一回 検査)

★(1年に一回 検査)

★(1年に一回 検査)

★(1年に一回 検査)

★(1年に一回 検査)

☆(6ヶ月に一回 検査)

☆(6ヶ月に一回 検査)

INSPECTION PATROLLING EQUIPMENT AT SIDING № 342 & 343 TSURUMI (ELECTRICAL SYSTEMS)

Ground Equipment 1 SET

Rail Bond (Joint) 127 JOB

Rail Bond (Ground Equipment) 46 JOB

Rail Insurator 8 SET

Trough 45m

★(1年に一回 検査)

★(1年に一回 検査)

★(1年に一回 検査)

★(1年に一回 検査)

☆(6ヶ月に一回 検査)

☆(6ヶ月に一回 検査)

★(1年に一回 検査)

★(1年に一回 検査)

★(1年に一回 検査)

Car Stop Indicator

(1) Inspection Item Remark

車止標識 Car Stop Marker

転てつ標識 Switch Target

転てつ転換鎖錠装置 Switch and Lock Movement

★(1年に一回 検査)

★(1年に一回 検査)

★(1年に一回 検査)

踏切しゃ断機 Crossing Barrier

踏切警報機 Level Crossing Signal

整流器 Rectifier

踏切制御子 Electonic Train Detector

踏切しゃ断機 Crossing Barrier

レール絶縁 Rail Insulator

信号ケーブル Signal Cable

接続箱 Joint Box

トラフ Trough

整流器 Rectifier

踏切制御子 Electonic Train Detector

蓄電池 Battery

鉄管装置 Signal Pipe Line

転てつ転換鎖錠装置 Switch and Lock Movement

鉄管装置 Signal Pipe Line

踏切警報機 Level Crossing Signal

接地装置 Grounding Equipment

レールボンド Rail Bond

#1

21イ

ANZEN J.R. Station

OU2

NISSEKI R.C.

5&8 No.22

22イ 22ロ

21ロ

114ロ

#2

#3

#4

#5

ANZEN #9

#3

#4OU1

Base is Inner Line

Inspection Patrolling Equipment is Line

J.R. Line

CWB1

WB2

X1

X2

ANZEN #8

カ2

カ3

カ1

Gate

E

5&8 No.21

6&9

6&9

21&25

E

C

10&23

10&23

22&26

22&26

AF3000_Print.pdf
2_PWS APPENDIX_D thru J.pdf
鶴見OU1
鶴見OU2
まくらぎ交換内表
2023 指示書施工略図
石油積込締結装置交換
レール交換

まくらぎ交換写真

File details come from the government source that posted it. Updated .