Atch1_HVAC Specs_v4_08Sep21.pdf

PDF 119 KB Posted

Attached to
RHS PEB HVAC Federal contract opportunity
Solicitation number
FA462621Q0031
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to RHS PEB HVAC, newest first.
File Type Posted
Atch2_Bid Schedule.pdf PDF
COMBO_HVAC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4626-21-Q-0031

819 RHS PEB HVAC System

SPECIFICATIONS

08 September 2021

1. This 819th RED HORSE (RHS) requirement is for the purchase of a HVAC system to be used in a new Pre-Engineered Building (PEB), located on Malmstrom AFB, MT.

2. The HVAC system is specified as Daikin VRV IV S series ductless heat pump system, brand name or equal. The system includes one (1) large outdoor coil, eight (8) indoor coils, controllers, piping and hardware for installation. The HVAC system features heating capacity down to -22 degrees Fahrenheit with a capacity up to 100% of nominal at 0 degrees Fahrenheit. In addition, two (2) 25 Ton gas packs are required for an open area. This requirement does NOT include installation. The installation will be provided by 819th RHS HVAC shop. The HVAC system consists of the following items, including delivery.

3. Critical performance requirements which the system must meet to maintain acceptable capabilities required for Malmstrom AFB, Montana (northern tier base) environment extremes:

- Daikin VRV Aurora is the Industry’s first air-cooled system that delivers heating capacities down to -22°F (-30°C) as standard

- Daikin’s inverter based vapor injection compressor is designed to deliver heating capacity of up to 100% of nominal at 0°F (-18°C), up to 85% of nominal at -13°F (-25°C) and up to 60% of nominal at -22°F (-30°C)

- Year round comfort and energy savings with Variable Refrigerant Temperature technology

(VRT)

- Refrigerant-cooled efficient and stable inverter board operation, independent of ambient conditions

- Hot gas base pan circuit allows installation without an additional drain pan heater

- Year round comfort and energy efficiency delivered by combining VRV and VRT technologies

- Corrosion resistant, 1000 hours salt spray tested Daikin PE blue fin heat exchanger

- Ships factory standard with coil guards

- Digital display on the unit for improved and faster configuration, commissioning, and troubleshooting

- Standard Limited Warranty: 10-year limited parts warranty.

4. Daikin (brand name or equal) HVAC System parts and quantities:

QUANTITY MODEL & DESCRIPTION

2 EA DBG3003VH00010C: 25 TON 230-3 WITH FACTORY INSTALLED NON-

FUSED DISCONNECT & POWERED GFCI WITH CONVENIENCE

OUTLET

2 EA SHZECNJ180300B: 15-25 TON END DISHARGE ONLY ECON

2 EA D4120: 4-WIRE DUCT SMOKE DETECTOR

2 EA DST3: 3 FT DUCT SAMPLING TUBE W/ HOLES

2 EA HZCURB180300NSS: NON SVC SIDE OPENING SLAB MOUNT CURB

1 EA RXLQ96TATJA: AURORA 8 TON 230/3 HEAT PUMP

3 EA FXAQ07PVJU: WALL MOUNT FXAQ 208/230V 1PH

1 EA FXAQ18PVJU: WALL MOUNT FXAQ 208/230V 1PH

1 EA FXAQ24PVJU: WALL MOUNT FXAQ 208/230V 1PH

2 EA FXZQ09TAVJU: VRV 2X2 CASSETTE 9500 BTU

1 EA FXZQ15TAVJU: VRV 2X2 CASSETTE 15000 BTU

4 EA KHRP26A22TA: VRF-S HEAT PUMP REFNET JOINT,

FROM KHRP26A22T9

3 EA KHRP26A33T9: REFNET BRANCH PIPING KIT, TO KHRP26A33TA

8 EA BRC1E73: REMOTE NAVIGATION CONTROLLER, FROM BRC1E72

3 EA BYFQ60C3W1W: FXZQ WHITE DECORATION PANEL

5 EA ASPMW-UNI: MINI WHITE PUMP KIT 100-250V

3 EA ASPMO-UNIVERSAL: MINI ORANGE UNIV PUMP 100-250V,

FROM ASPMO - 115V OR 230V, 30,000 BTU

1 EA PDM2.058.04: 3/8X164 FT PRE-INSULATED LINE

1 EA PDM2.058.05: 1/2X164 FT PRE-INSULATED LINE

1 EA PDM2.058.06: 5/8X164 FT PRE-INSULATED LINE

1 EA PDM2.058.02: 1/4X164 FT PRE-INSULATED LINE

1 EA PDM2.059.07: 3/4X82 FT PRE-INSULATED LINE

1 EA PDM2.059.09: 7/8X82 FT PRE INSULATED LINE

1 RL W181P-2051BLRB: 18/2 STR, NON-SHIELDED, 1000FT, BLUE

1 EA QSSB48-24: QUICKSLING 24" TALL MOUNTING BRACKET

File details come from the government source that posted it. Updated .