ATCH 9 Structural Drawings.pdf
PDF 723 KB Posted
- Attached to
- Install Site Prep for Cart Washer at Lake Nona, 675-22-811 located at the Orlando VA Medical Center
- Solicitation number
- 36C24823R0097_RFP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATCH 8 SPS HVAC Schedules.pdf | ||
| ATCH 2 - PRICE MATRIX.xlsx | XLSX spreadsheet | |
| S02 - 36C24823R0097 DB Cart Washer.pdf | ||
| ATCH 6 Hospital Final TnB Report.pdf | ||
| ATCH 5 - Specialized Experience Form (3 Pages) - EXAMPLE.pdf | ||
| ATCH 1 - DOL Wage Determination.pdf | ||
| ATCH 4 - EMR (1 PAGE).docx | DOCX document | |
| ATCH 3 - Past Performance Questionnaire.pdf | ||
| ATCH 7 675-22-811 HVAC Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E E
F F
G G
F.4 F.4
E.4 E.4
H-SF5.150
TYP
427.5
27.5
E.5
2" TOPPING
40'-10"
6" TOPPING
H-SF5.154
C8x11.5
L6x3 1/2x5/16
(LLV), TYP
M
IN4"
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950Professional Seals:
EB / RLF of 432204 JUNE, 2010
BUILDING IS FULLY SPRINKLERED
01 AND 02
HC
HOSPITAL / CLINIC
H-SF1.3FD6
LEVEL 3, AREA D, ZONE 6
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
D2
D5 D6
E1 E3
D1
AREA D, ZONE 6
D7
CLINIC
HOSPITAL
P-W P-E
A4
E4
W
LEVEL 3 FLOOR FRAMING PLAN NOTES:
1. TYPICAL TOP OF SLAB ELEVATION AT LEVEL 3 = +41'-4". ALL
OTHER ELEVATIONS ON THIS PLAN ARE REFERENCED AS + OR -
FROM THIS TYPICAL TOP OF SLAB ELEVATION.
2. ALL TOPPING SLABS SHALL BE LIGHT WEIGHT CONCRETE.
3. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND DEPTHS
OF FLOOR SLAB DEPRESSIONS.
4. FOR ALL OTHER INFORMATION SHOWN ON PLAN REFER TO
PACKAGE 1C.
5. REFER TO MEP DRAWINGS TO DETERMINE NUMBER AND
LOCATION OF REQUIRED PIPE SLEEVES.
No. Description Date
1 CPR 191 12/08/11
File details come from the government source that posted it. Updated .