Atch_5_Submittal_List.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Theodore Roosevelt National Park-Replace Boundary Federal contract opportunity
- Solicitation number
- 140P6326B0004
About this file
This file is a submittal list and review estimate template used by the National Park Service (NPS) Denver Service Center for managing construction document submissions and architect/engineer (A/E) review processes on federal projects. The template is designed for use during both the design phase (Construction Documents) and construction phase of projects, with separate instructions for responsible parties including the Design A/E, Construction Contracting Officer Representative (COR), Construction Management Representative (CMR), and the A/E during construction services.
The document is populated with specific requirements for the Theodore Roosevelt National Park Boundary Fence Replacement—North Unit Zone 1 project (PMIS 314720, Solicitation 140P6326B0004). The submittal requirements are organized by specification section and include preconstruction items (project superintendent designation, construction schedule, safety plan, equipment proposals, waste management plan) and materials submittals for fence components (round steel posts, U-channel posts, woven wire, tie wire, H-brace wire and clips, livestock panels, cable, concrete mix, and miscellaneous hardware). The template distinguishes between Informational submittals (reviewed by the CMR) and Action submittals (requiring government responsive action and A/E review), with columns for estimating A/E review time by discipline (Architect, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Project Manager, Landscape Architect). The review estimates are used to calculate government costs for submittal reviews using hourly rates from the A/E's Indefinite Delivery/Indefinite Quantity (IDIQ) contract and to negotiate the submittal review portion of the A/E's construction services task order.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amd_001_Attch_1_Questions_and_Answers_0001.pdf | ||
| Sol_140P6326B0004_Amd_0001.pdf | ||
| Amd_001_Atch_2_Addendum_1_Drawings_0001.pdf | ||
| Amd_001_Atch_3_TRNP_Access_Authorization_NU_0001.pdf | ||
| Atch_2_Drawings.pdf | ||
| Atch_4_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Atch_1_SOW.pdf | ||
| Sol_140P6326B0004.pdf | ||
| Atch_3_Bid_Form.xlsx | XLSX spreadsheet | |
| Atch_6_DOL_Wage_Determination_ND20260039_1_16_26.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Submittal List with Review Estimate Instructions | |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 | |
| DESIGN SERVICES (Construction Documents (CD) Phase) | |
| Responsible Party: Design Architect/Engineer (A/E) | |
| 1 | Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title. |
| 2 | Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals. |
| 3 | In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals. |
| 4 | Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page. |
| CONSTRUCTION SERVICES (Construction Phase) | |
| Responsible Party: Construction Contracting Officer Representative (COR) | |
| 1 | Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary. |
| 2 | Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services. |
| 3 | Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline. |
| 4 | Add discipline heading column as required. |
| 5 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews. |
| 6 | Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order. |
| 7 | Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative. |
| Responsible Party: Architect/Engineer (A/E) | |
| 1 | Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section. |
| 2 | All Informational submittals will be reviewed by Construction Management Representative (CMR). |
| 3 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate. |
| 4 | Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order. |
&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N
Template
| Submittal List with Review Estimate Template |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 |
| SUBMITTAL LIST | ACTION SUBMITTAL | |||||||||
| REVIEW ESTIMATE | ||||||||||
| Theodore Roosevelt National Park (THRO) PMIS 314720 | (Complete this portion for Architect / Engineer (A/E) | |||||||||
| Project Title: Bountary Fence Replacement - North Unit Zone 1 | construction service task order negotiation.) | |||||||||
| SUBMITTAL | REQUIREMENTS | ARCHITECT / ENGINEER REVIEW TIME | ||||||||
| (Indicate with X) | (Indicate in whole or partial hours.) | |||||||||
| INFORMATIONAL | ACTION | |||||||||
| SPECIFICATION SECTION | PARAGRAPH NUMBER | DESCRIPTION | CERTIFICATIONS OR LABORATORY TESTS | REPORTS OR CALCULATIONS | ||||||
| OR PLAN | MANUFACTURER DATA | |||||||||
| AND INSTRUCTIONS | OTHER | SAMPLES | SHOP DRAWINGS | MANUFACTURER DATA | ||||||
| AND INSTRUCTIONS | OTHER | ARCHITECT | CIVIL ENGINEER | STRUCTURAL ENGINEER | MECHANICAL ENGINEER | ELECTRICAL ENGINEER | PROJECT MANAGER COORDINATION | LANDSCAPE ARCHITECT |
| 01 10 00 | 9.1.C | GENERAL REQUIRMENTS | ||||
| Preconstruction Conference Submittal: | ||||||
| Letter designating Project Superintendent | X | |||||
| Construction Schedule | X | |||||
| Schedule of Values | X | |||||
| Accident Prevention (Safety) Plan | X | |||||
| list of Subcontractors | X | |||||
| statements from subcontractors...compliance... | X | |||||
| Quality Control Plan | X | |||||
| Waste Management Plan - Metal Recycling | X | |||||
| Hot Work Permit application | X | |||||
| Proposed Vehicles and Equipment Use (USFS and NPS lands) | X | |||||
| Proposed Haul In / Haul Out and Site Access Frequency | X | |||||
| Fire Prevention Plan | X | |||||
| L0.1 | Project Sequencing and Temporary Access Methods | X | ||||
| L0.1 | Recycled Materials Documentation | X | X | |||
| L0.1 | Materials - Round Steel Posts | X | ||||
| L0.1 | Materials - U-Channel Posts | X | ||||
| L0.1 | Materials - Woven Wire | X | ||||
| L0.1 | Materials - Tie Wire | X | ||||
| L0.1 | Materials - H-Brace Wire and Clips | X | ||||
| L0.1 | Materials - Livestock Panels | X | ||||
| L0.1 | Materials - Cable (3" and 5/8") | X | ||||
| L0.1 | Materials - Concrete Mix | X | ||||
| L0.1 | Materials - Miscelaneous hardware for H-Brace Construction | X | ||||
| L0.1 | Maah Daah Hey Trail Passage Self Closing Gate | X | X | |||
| L0.1 | Suspended Creek Crossing | X | X | |||
| L0.1 | NPS Gate Structure | X | X |
Total: 0 0 0 0 0 0 0
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N