This solicitation package seeks bids for the repair of a black start generator at Eielson Air Force Base in Alaska. Key requirements include replacing the 2.5 MW diesel generator, radiator, muffler, stack, controls, day tank and ancillary components. The work also involves installing new catwalks, concrete floor and foundations for the radiator and muffler, replacing the generator room HVAC system, and demolishing and reconstructing the roof and walls of the generator room. Bidders must provide a temporary blackstart-capable generator during construction. The solicitation will be awarded as a firm fixed-price contract under sealed bidding procedures. The acquisition is reserved as a total small business set-aside. The NAICS code is 236210 and small business size standard is $36.5 million. Questions are due by April 22 and bids are due based on the solicitation package available only on beta.SAM.gov. The Department of the Air Force Pacific Air Forces is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Bidder Questions and Answer Responses.pdf | ||
| Bidder Questions and Answer Responses.pdf | ||
| Amendment 1.pdf | ||
| Atch 3 - Blackstart Spec Complete 11 Dec 19.pdf | ||
| Atch 6 - Blackstart Hazmat Survey Report.pdf | ||
| Atch 2 - Blackstart submittal_register.pdf | ||
| VOID - Old Wage Determination.pdf | ||
| Atch 1- Blackstart bid sched.pdf | ||
| Solicitation - FA500420B0006.pdf | ||
| Atch 4 - Blackstart Drawing set ifc 11-04-2019(reduced).pdf | ||
| Atch 7 - Wage Determination.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEEDER BUS A
TO C/A TIE
FEEDER SWITCHGEAR BUILDING
400:5
SR
102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134
VCB
SP1
1200A N.O.
SPARE
50:5
FDR11
1200A
FEEDER 11
50:5
FDR10
1200A
50:5
FDR9
1200A
50:5
FDR8
1200A
50:5
FDR7
1200A
50:5
SP2
1200A N.O.
SPARE
50:5
2000:5
SR
DT1
2000A
300:5
2000:5
SR
A/B TIE
2000A N.O.
50:5
PT & CPT
2000:5
SR
FEEDER BUS B
PT
VCB VCB VCB VCB VCB VCB
VCB
VCB
2000:5
SR
DT2
2000A
300:5
2000:5
SR
VCB
PT & CPT PT & CPT
SP3
1200A N.O.
SPARE
50:5
VCB
SP4
1200A N.O.
SPARE
50:5
VCB
50:5
VCB
50:5
VCB
50:5
VCB
50:5
VCB
50:5
VCB
FDR2
1200A
FDR6
1200A
FDR5
1200A
FDR4
1200A
FDR3
1200A
2000:5
SR
B/C TIE
2000A N.O.
50:5
VCB
FEEDER BUS C
PT
SP5
1200A N.O.
SPARE
50:5
VCB
SP6
1200A N.O.
SPARE
50:5
VCB
SP7
1200A N.O.
SPARE
50:5
VCB
50:5
VCB
FDR14
1200A
50:5
VCB
FDR12
1200A
50:5
VCB
50:5
VCB
FDR1
1200A
SP8
1200A N.O.
SPARE
2000:5
SR
DT3
2000A
300:5
2000:5
SR
VCB
2000:5
SR
C/A TIE
2000A N.O.
50:5
VCB
TO BUS A
MAIN DISTRIBUTION
TRANSFORMERS
FEEDER 10 FEEDER 9 FEEDER 8 FEEDER 7 FEEDER 2 FEEDER 6 FEEDER 5 FEEDER 4 FEEDER 3 FEEDER 14 FEEDER 12 FEEDER 1
PNLPANEL FS
PNLPANEL FS-2
GENERATOR SWITCHGEAR BUILDING
PNL
PANEL
GS
PNL
PANEL
GS-2
GENERATOR BUS A
300:5
SR
102 103 104 105 106 107 108 109 110 111
VCB
SP1-A
1200A N.O.
4000:5
SR
VCB
TIE-A
2000A N.O.
112 113 114 115 116 117 118 119 120 121 122
VCB
SP2-A
1200A N.O.
VCB
SS1D-A
1200A
2000:5
SR
DT1-A
2000A
2000:5
VCB
TO DT1
1200:5
SR
VCB
GVEA-A
2000A
2000:5
SR
DT2-A
2000A
VCB
VCB
EBH-A
1200A
2000:5
TO DT2
VCB
WBH-A
1200A
600:5
SR
VCB
BSG-A
2000A N.O.
2000:5
SR
DT3-A
2000A
VCB
2000:5
TO DT3
1200:5
SR
VCB
ONAN-A
2000A N.O.
VCB
SS1A-A
1200A
1200:5
SR
VCB
G1-A 2000A
1200:5
SR
VCB
G2-A 2000A
1200:5
SR
VCB
G3-A 2000A
1200:5
SR
VCB
G4-A 2000A
1200:5
SR
VCB
G5-A 2000A
VCB
SS1B-A
1200A
VCB
SS1C-A
1200A
VCB
MCCH-A
1200A
VCB
MCCT5-A
1200A
GENERATOR BUS B
222 221 220 219 218 217 216 215 214 213 212 211 210 209 208 207 206 205 204 203 202 201
300:5
SR
VCB
SP1-B
1200A N.O.
S P A R E
VCB
SP2-B
1200A N.O.
S P A R E
VCB
SS1D-B
1200A N.O.
DT1-B
2000A N.O.
VCB
2000:5
SR
2000:5
TO DT1
VCB
GVEA-B
2000A N.O.
1200:5
SR
DT2-B
2000A N.O.
VCB
2000:5
SR
2000:5
TO DT2
VCB
EB-B
1200A N.O.
VCB
WB-B
1200A N.O.
VCB
BSG-B
2000A N.O.
600:5
SR
DT3-B
2000A N.O.
VCB
2000:5
SR
2000:5
TO DT3
VCB
1200:5
SR
ONAN-B
2000A N.O.
VCB
SS1A-B
1200A N.O.
VCB
G1-B 2000A N.O.
1200:5
SR
VCB
SS1B-B
1200A N.O.
VCB
G2-B 2000A N.O.
1200:5
SR
VCB
SS1C-B
1200A N.O.
VCB
G3-B 2000A N.O.
1200:5
SR
VCB
MCCH-B
1200A N.O.
VCB
G4-B 2000A N.O.
1200:5
SR
VCB
MCCT5-B
1200A N.O.
VCB
G5-B 2000A N.O.
1200:5
SR
T-SS1D
225KVA
7200V-208/120V 5.18%
SS1D
DISC.
T-WBH
500KVA
7200V-480/277V 4.32%
415A
1200:5
TO
G5-A/B
600:5
TO
G5-A/B
415A
1200:5
TO
G4-A/B
600:5
TO
G4-A/B
415A
1200:5
TO
G3-A/B
600:5
TO
G3-A/B
415A
1200:5
TO
G2-A/B
600:5
TO
G2-A/B
415A
1200:5
TO
G1-A/B
600:5
TO
G1-A/B
POWER PLANT BUILDING 6203
T-MCCCH
750/1000KVA
7200V-480/277V 8.81%
T-EBH
500KVA
7200V-480/277V 4.32%
1C1A3
T-SS1C
1500KVA
7200-480/277V 5.97%
STATION SERVICE BUS 1B
N.O. N.O. N.O. N.O.
PNL
LTG PANEL 1B
MCC
MCC I
MCC
MCC J
MCC
MCC F
MCC
MCC H
MCC
MCC D/G
SP EXCITER
3000:5
T-SS1B
1500/1725KVA
7200V-480/277V 5.75%
BFP-1
300HP
M
STATION SERVICE BUS 1A
MCC
MCC A
MCC
MCC B
MCC
MCC C
MCC
MCC E
PNL
LTG PANEL 1A
N.O.
3000:5
T-SS1A
1500/1725KVA
7200V-480/277V 5.75%
VFD VFD VFD VFD
ID FAN 4
400HP
M
MCC
ID FAN 3
400HP
M
ID FAN 5
400HP
M
ID FAN 6
400HP
M
460A
1200:5
TO
BSG-A/B
600:5
TO
BSG-A/B
COAL HANDLING MCC
N.O.MAIN MAIN
3 ELS355
ELS1B1
1200A
3 ELS353
ELS451ELS452
69KV TO DAWSON RD.
SUBSTATION
69KVTO JOHNSON RD.
SUBSTATION
12.47KV MAIN BUS
ELS359 ELS3513ELS356 ELS3510
R1
ELS1R1
(FUTURE)
R2 ELS1R2 R3 ELS1R3 R4 ELS1R4
ELS357
(FUTURE)
ELS358
800A
ELS3512
800A
ELS3511
800A
ELS3515 ELS3516 ELS3518ELS3517
12.47KV TRANSFER BUS
3 ELS1519 3 ELS1520
(3 )7
KC
MI
L
ELST1
OA/FA/FA
12/16/20MVA
69KV-12.47KV
7.15%
CSM
ELST3
OA/FA
5/6.25MVA
12.47KV-7.2KV
7.85%
ELST5
OA/FA
5/6.25MVA
12.47KV-7.2KV
7.73%
DT1
ONAN/ONAF/ONAF
15/20/25/28MVA
7.2KV-7.2KV
6.792%
DT2
ONAN/ONAF/ONAF
15/20/25/28MVA
7.2KV-7.2KV
6.802%
DT3
ONAN/ONAF/ONAF
15/20/25/28MVA
7.2KV-7.2KV
6.767%
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
(1 )3
KC
MI
L
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
400:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
300:5
SR
KEY INTERLOCKED
NOT
CONNECTED
GVEA SUBSTATION
MCC
WEST BAGHOUSE EAST BAGHOUSE
11111
(1
#2
AW
G
MCC
T-MCCT5
1500/1725KVA
7200V-480/277V 5.73%
T5 MCC
N.O.
KEY INTERLOCKED
MCC
BLACK START
3.125MVA
7.2KVDG
pf=0.8
GEN 1
3.125MVA
7.2KVTG
pf=0.8
GEN 2
3.125MVA
7.2KVTG
pf=0.8
GEN 3
6.25MVA
7.2KVTG
pf=0.8
GEN 4
6.25MVA
7.2KVTG
pf=0.8
GEN 5
12.5MVA
7.2KVTG
pf=0.8
BEI
VCB
ONAN-MAIN
1200A
VCB
ONAN-1
1200A N.O.
BEI
VCB
ONAN-2
1200A N.O.
BEI
VCB
ONAN-3
1200A N.O.
BEI
VCB
ONAN-4
1200A N.O.
BEI
ONAN
SWITCHGEAR
T-ONAN2
2000KVA
480V-7200V
ONAN-2
1.875MVA
480/277VDG
pf=0.8
T-ONAN1
2000KVA
480V-7200V
ONAN-1
1.875MVA
480/277VDG
pf=0.8
T-ONAN3
2000KVA
480V-7200V
ONAN-3
1.875MVA
480/277VDG
pf=0.8
T-ONAN4
2000KVA
480V-7200V
ONAN-4
1.875MVA
480/277VDG
pf=0.8
(4 )7
KC
MI
L
(4 )7
KC
MI
L
(4 )7
KC
MI
L
(4)750KCMIL (4)750KCMIL (4)750KCMIL
(3 )7
KC
MI
L
(3 )7
KC
MI
L
(1
#2
AW
G
(1
#2
AW
G
(1 )5
KC
MI
L
(3 )5
KC
MI
L
(1 )5
KC
MI
L
(1 )5
KC
MI
L
(2 )5
KC
MI
L
(2 )5
KC
MI
L
(1
4/ 0A
WG
(1
4/ 0A
WG
(1
4/ 0A
WG
(1
4/ 0A
WG
(1
4/ 0A
WG
1C1C1
VSD
ID FAN 1
400HP
M
1C1C2
VSD
ID FAN 2
400HP
M PNL
ONAN PANELS
1C1C3
MCC
MCC 1A1
(3 )5
KC
MI
L
ONAN GENERATORS
1C2A3
STATION
SERVICE BUS 1C
STATION
SERVICE 1D
1C2C4
4 4
4 4
GENERAL NOTES
LEGEND
FUSE CUTOUT
MOTOR
FUSE
SWITCH (N.O.)
GANG OPERATED AIR BREAK (GOAB) N.O.
FUSED DISCONNECT (N.O.)
SPST (BLADES) N.O.
UNDERGROUND LINE
OVERHEAD LINE
CIRCUIT SWITCHER - MOTOR OPERATED
A. GENERATOR SWITCHGEAR CIRCUIT BREAKERS ARE SHOWN IN THEIR NORMAL CONFIGURATION WITH BUS A IN SERVICE AND BUS B IS STANDBY.
B. CIRCUIT BREAKERS AND SWITCHES ARE NORMALLY CLOSED UNLESS NOTED OTHERWISE.
SWITCH (N.C.)
FUSED DISCONNECT (N.C.)
GANG OPERATED AIR BREAK (GOAB) N.C.
SPST (BLADES) N.C.
SUBSTATION TRANSFORMER
GE MULTILIN SR750
FEEDER PROTECTION RELAY
KEYED NOTES
VCB VACUUM CIRCUIT BREAKER
BREAKER POSITION DEPENDENT ON GENERATOR
LINE UP.
THE BLACK START GENERATOR CAPACITY IS LIMITED
TO 1800KW BASED ON RADIATOR RESTRICTIONS.
THE ONAN GENERATORS ARE LIMITED TO 1.25KW
BASED ON EPA SOURCE TESTING.
B
D r a w i n g
N u m b e r
C h k b y
P l o t
S c a l e
P l o t
D a t e
D w n b y
D e s c r i p t i o n
F i l e
N a m e
D a t e
R e v
D a t e
A p p r o v e d
D e s i g n e d b y
Reference Number:
of
Sheet
Sheet
A C D E F HG
I J K
1 1
O P
E R
A
TI
O N
A L
O N
E -L
IN
E
D
IA
G R
A M
P R
IM
A
R Y
E
LE
C
TR
IC
A
L D
IS
TR
IB
U
TI
O
N S
Y S
TE
M
C E
N
TR
A L
H E
A
TI
N G
P
O W
E R
P
LA
N T
C O
N
TR
A C
T:
F
4-
-D -8
D E
P A
R
TM
E N
T O
F
TH
E A
IR
F
O R
C E
P A
C
IF
IC
A
IR
F
O R
C E
S
E
IE
LS
O
N A
IR
F
O R
C E
B A
S E
FA
IR
B A
N K
S , A
LA
S
K A
D A H
R L
D L F
E A F B
N T S
E A F B
I N I T I A L
I S S U E
D A H
DG
M
DIESEL GENERATOR
MCC
PNL
VFD
PANEL
VARIABLE FREQUENCY DRIVE
MOTOR CONTROL CENTER
CSM
SR
GE MULTILIN SR489 GENERATOR
MANAGEMENT RELAY
SR
GE MULTILIN SR745 TRANSFORMER
PROTECTION RELAY
SR
CURRENT TRANSFORMER
ZERO SEQUENCE
CURRENT TRANSFORMER
TG TURBINE GENERATOR
BASLER BE1-51
OVERCURRENT RELAY
BEI
4 TRANSFORMER SECONDARY IS WYE-GROUND CONNECTED;
HOWEVER, THE NEUTRAL CONNECTION IS NOT CARRIED
INTO MAIN BUS/PANEL.