Atch 4 - SCE Customer Project Information Sheet -.pdf
PDF 218 KB Posted
- Solicitation number
- REQ1128527
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Customer/Project Information Sheet from Southern California Edison (SCE) related to a federal contract opportunity for the electrical repair of the Sycamore Flat water system.
The key details are:
- The federal contract opportunity is for the Sycamore Flat Campground - Electrical Repair to Water Pump, solicitation number REQ1128527.
- The scope of work includes replacing a burned power pole with a pedestal that can house SCE's meter and electrical equipment, replacing the motor control and switches, replacing damaged conduit, and potentially replacing the well pump and repairing broken water lines or spigots.
- The period of performance is 120 days to complete the work at the Sycamore Flat Campground.
- The government is using disaster funding to address the damage caused by the 2020 Bobcat Fire and is coordinating with SCE as the local electrical utility.
- The customer/project information sheet collects details on the project such as the customer information, service requested, electrical loads, and EV charging requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04/15/2022 - Version 7.0 P a g e | 1 DS-111
Customer/Project Information Sheet
Date Received by SCE:
Individual or Business Name:
(Customer / Developer – Tract DBA or LLC )
Address: Email Address:
City: State: Zip Code:
Attn: Phone No:
Legal Contact: Phone No:
(Individual responsible for signing contract, paying fees and receiving potential refunds) Address: Email Address:
City: State: Zip Code:
Primary Field / Site Superintendent / Job Contact:
Relationship to Project: Phone No. (Direct Lines ONLY):
E-mail Address:
FAX No:
Fax No:
Project Address:
City: State: Zip Code:
TG Map # or GPS: Major Cross Street:
Detailed Project Information
Residential: Commercial: Industrial: Agricultural:
Indoor Cultivation
Mixed-Light Cultivation
Service Requested: Overhead: Underground:
Tract: Lot(s):
Is this project subject to Buy America Compliance? Yes No Temporary Service Required: Yes No
Approximate start work date for SCE crews: Your Construction Start Date:
Approximate date you would like the job completed and energized:
Scope of Project:
Panel Size (amps): Service Voltage/Phase:
Total Tons of A/C: Total # of A/C Units: Largest A/C Unit (tons):
Total HP of Pumps: Total # of Pump Units: Largest Pump (HP):
Installing Gas or Electric: Heater: Water Heater: Stove:
Clothes Dryer: Gas Meter to be Installed at Property: Oven:
Square Footage of Buildings (if multiple buildings give all footages):
Homes over 5000 sq. ft larger lots require a Load Schedule. Please contact your electrician for assistance.
Solar or Generation Equipment to be installed (If yes, please attach additional descriptions/specifications): Yes No
Is this project being completed on or near a CalTrans Right Of Way (ROW): Yes No
04/15/2022 - Version 7.0 P a g e | 2 DS-111
Electric Vehicle Charging - Mandatory. Please select one option.
I am interested in one of SCE’s Charge Ready EV infrastructure programs.
• Complete Sections A and B below.
• Refer to Additional EV infrastructure program information or Submit a question, I am NOT interested in one of SCE’s Charge Ready EV infrastructure programs, however I am interested in installing my commercial EV project using Tariff Rule 15, 16, or 29.
• Please email tepmcommercialev@sce.com for additional submittal requirements.
Section A
Electric Vehicle Passenger
• Refer to Additional Information or Submit a question Medium/Heavy Duty
• Refer to Additional Information or Submit a question
Charge Station Plug-In Electric Vehicle
(PEV)
Section B
EV Panel Size & Voltage:
Main breaker rating:
Will the new panel serve any load other than the EV load? Number of Ports:
kW of each Port: Will there be load-side management? Future EV expansion or growth at the site?
https://www.sce.com/evbusiness/overview mailto:chargeready@sce.com https://edisonintl.sharepoint.com/teams/Public/TM2/Shared%20Documents/Forms/AllItems.aspx?id=%2Fteams%2FPublic%2FTM2%2FShared%20Documents%2FPublic%2FRegulatory%2FTariff%2DSCE%20Tariff%20Books%2FElectric%2FRules&viewid=c9868ae1%2Df1cd%2D43b6%2Da712%2Dd734ff79e266 mailto:tepmcommercialev@sce.com https://www.sce.com/evbusiness/chargeready mailto:chargeready@sce.com https://crt.sce.com/overview mailto:chargereadytransport@sce.com
| Future EV expansion or growth at the site: |
| Will there be loadside management: |
| kW of each Port: |
| EV Panel Size Voltage: |
| Panel Serve: [ ] |
| Number of Ports: |
| Main breaker rating: |
| MediumHeavy Duty: Off |
| Electric Vehicle: Off |
| Passenger: Off |
| I am NOT interested in one of SCEs Charge Ready EV infrastructure programs2: Off |
| I am interested in one of SCEs Charge Ready EV infrastructure programs: Off |
| ChargeStation: Off |
| PEV: Off |
| Received by SCE: |
| Major Cross Street: |
| Individual or Business Name Customer Developer Tract DBA or LLC: |
| Address Email Address: |
| City State: |
| Zip Code: |
| Attn Phone No: |
| Legal Contact Individual responsible for signing contracts paying fees and receiving potential refunds Phone No: |
| Address Email Address_2: |
| City State_2: |
| Zip Code_2: |
| Primary Field Site Superintendent Job Contact: |
| Relationshipto Project Phone No: |
| Email Address FAX No: |
| Project Address: |
| State: |
| Zip Code_3: |
| TG Map or GPS: |
| Address: |
| City: |
| Attn: |
| Legal Contact: |
| Address_2: |
| City_2: |
| Relationship to Project: |
| Email Address_3: |
| City PA: |
| Residential: Off |
| Commercial: Off |
| Ind: Off |
| Ag1: Off |
| OH: Off |
| Underground: Off |
| Ag2: Off |
| Tract: |
| Lots: |
| Ag3: Off |
| Is this project subject to Buy America Compliance Yes: Off |
| No: Off |
| Temporary Service Required Yes: Off |
| No_2: Off |
| Approximate start work date for SCE crews: |
| Your Construction Start Date: |
| Approximate date you would like the job completed and energized: |
| Scope of Project: |
| Panel Size amps: |
| ServiceVoltagePhase: |
| Total Tons of AC: |
| Total of AC Units: |
| Largest AC Unit tons: |
| Total HP of Pumps: |
| Total of Pump Units: |
| Largest Pump HP: |
| Heater: [ ] |
| Water Heater: [ ] |
| Stove: [ ] |
| Closthes Dryer: [ ] |
| Gas Meter to be Installed at Property: [ ] |
| Oven: [ ] |
| Square Footage of Buildings if multiple buildings give all footages Homes over 5000 sq ft larger lots require a Load Schedule Please contact your electrician for assistance: |
| Solar or Generation Equipment to be installed If yes please attach additional descriptionsspecifications: Off |
| Yes: Off |
| CTNo: Off |
| CTYes: Off |
File details come from the government source that posted it. Updated .