Atch 4 - Livorno- Technical Evaluation Criteria Final.docx
DOCX document 39 KB Posted
- Attached to
- S&RTS Livorno Italy
- Solicitation number
- HTC711-20-R-R014
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source Selection Information – See FAR 2.101 and 3.104
TECHNICAL WORKSHEET
SOLICITATION #: HTC711-20-R-R014
STEVEDORING AND RELATED TERMINAL SERVICES
PORTS: LIVORNO-MONOFALCONE
When completing this technical worksheet based on the posted requirements, the Offeror shall assume the Government has no prior knowledge of the experience past or present the Offeror may have or performed, and will base its evaluation SOLELY on the information presented within this Technical Worksheet questioner.
**Submission Rules**
1. The entire submission of this Technical Worksheet SHALL NOT exceed 28 single sided pages in length.
2. Page size shall be no larger than 8.5x11 inches and single sided.
3. Submitted Technical Worksheets that exceeds 28 pages, will have only the first 28 pages evaluated and all other pages will be removed before the Technical Worksheet is evaluated.
4. All requested attachments, port certifications, licensing, permits, documentary evidence (photos) and Material Handling Equipment (MHE) lists shall not count against the page limits.
NOTE** Failure to complete this document in its entirety or attach requested documents may result in a quote being ineligible for award.
**Technical Evaluation Questions**
1. Labor/Management
1a. Describe/explain your capability to provide personnel within a 24 and 48 hour notice, in order to support multiple work sites, reception of cargo for truck and loading/discharging multiple decks simultaneously on multiple vessels on multiple berthing.
Click here to enter text.
1b. Describe/explain your plan for addressing labor shortages due to competing requirements “example; commercial “vs” military, and moving from normal work schedules to working 24/7 and how you would mitigate those personnel shortfalls.
Click here to enter text.
1c. Describe the type/class of labor that makes up the different work parties/gangs (i.e. truck, and vessel operations), and their supervision structure.
Click here to enter text.
1d. Describe/explain how you will maintain driver pool for the USG specialized military equipment (i.e. M1A2, M2, strikers, MRAPS). Describe any specialized training or experience you have with the operation of unique US Military equipment?
Click here to enter text.
2. Material Handling Equipment (MHE)
2a. Describe and provide a list, of equipment you have in your inventory that is available to use to handle all classes of supply (to include HAZMAT and Explosives). Please include details for LO/LO and RO/RO operation for vessel and truck operations.
Click here to enter text.
2b. Describe how would you supply equipment for working multiple vessels while conducting stevedoring operations working 24/7 operations to support loading/discharging multiple decks simultaneously on multiple vessels on multiple berthing while performing reception and depositing of USG cargo?
2c. Describe and provide photos of what equipment you have in your inventory that would be used to tow/dray dead lined vehicles up to 160,000 lbs. on, and off a vessel with deck heights up to 10’6’’. Describe also your plan to mitigate working multiple decks on a vessel loading/discharging inoperable vehicles to and from staging lots, while keeping up with minimum set productivity levels.
Click here to enter text.
2d. The Government requires that you provide contact maintenance team, equipment and vehicle(s) capable of determining the condition of its cargo rapidly, describe how your company will support this requirement while working in multiple operations (i.e. staging lots, loading trucks, and on multiple vessel decks).
Click here to enter text.
2e. The Government requires that its contractor shall have the capability to make minor equipment repairs on site and during an operation (i.e. changing tire, refueling vehicles, changing batteries), describe how your company will provide this requirement?
Click here to enter text.
3. Reception and Disposition
3a. The Government requires our stevedore contractor to provide receipt and disposition and transfer of cargo Please explain your current or past business practices with reception, transferring, and disposition of cargo at each of the named ports, per the requirements.
Click here to enter text.
3b. The Government maintains positive control of all cargo being imported and exported, please explain or show evidence of how (based on the requirements) you would maintain control of cargo placed in your care, including tallying, checking and inventory of cargo.
Click here to enter text.
3c. The Government may elect to operate on a 24/7 basis, please explain or show evidence of your management services to operate under those conditions, include available labor, skills sets, and include certifications, licensing, training as describe in the requirement.
Click here to enter text.
4. Vessel Operations
4a. The Government requires its contractor to be flexible in providing service. Can you provide flexible start times for receiving cargo at the port, starting vessels at odd hours or transitioning from normal work day schedules? Please explain your ability to provide this flexibility of varied start times and describe any impacts to Government.
Click here to enter text.
4b. Describe/explain your ability to load/discharge cargo to/from a vessel without causing damage and In Accordance With (IAW) the Governments safety requirements.
Click here to enter text.
4c. Explain or describe the loading and discharging of RO/RO & LO/LO cargo to/ from vessels
4d. Do you have experience with lashing/securing U.S. Military Cargo and specific tie down procedures related to vessel operations? Please Explain.
4e. The Governments cargo is unique in that it comes in all weight classes, operable and inoperable (wheel vehicles, track vehicles, containers, breakbulk), where the working multiple decks is advantageous to the Government.
Explain your stevedore’s ability to conduct vessel discharge operations, by describing MHE, labor, lift capability, and staging, where barge operations, and rail operations are being worked simultaneously?
Click here to enter text.
5. Truck operations
5a.Does your company have the ability to provide access for loading and unloading trucks?
Click here to enter text.
5b. Explain your capabilities to successfully and efficiently conducting truck operations without causing damage to any Government cargo. Describe your management plan to safety load or discharge the Governments cargo per its requirements.
Click here to enter text.
5c. Explain your capabilities you have for cargo reception & disposition via trucks? Is the area used for loading/discharging trucks in close proximity of staging areas, and piers?
Click here to enter text.
5d. During truck operations there may be a need for portable end ramps (weight capacity of 140 tons). Please show evidence and describe your access to the named items above, (photos accepted).
Click here to enter text.
5e. Government cargo as stated elsewhere is unique and loading or discharging trucks takes a broad range of MHE and skilled labor, Please describe (photos accepted) your ability to handle loading and unloading RO/RO and describe how you would handle dead lined or inoperable vehicles weighing from 15,000 to 150,000 lbs.
Click here to enter text.
5f. Describe/explain your ability to provide security for handling sensitive, classified, HAZMAT cargo.
Click here to enter text.
6. Rail Operation
6a. Does your company have the ability to provide direct rail access for loading and unloading US Military cargo?
Click here to enter text.
6b. Explain your capabilities to successfully and efficiently conduct rail operations without causing damage to any Government cargo. Describe your management plan to safety load or discharge the Governments cargo per its requirements.
Click here to enter text.
6c. Explain the capabilities you have for cargo disposition via rail? Are railheads in close or general proximity of staging areas, or piers?
Click here to enter text.
6d. During rail operation there may be a need for portable end ramps (weight capacity of 140 tons), and steal spanner plates. Please show evidence and describe your access to the named items above, (photos accepted).
Click here to enter text.
6e. Government cargo as stated elsewhere is unique and loading or discharging rail cars takes a broad range of MHE and skilled labor, Please describe (photos accepted) your ability to handle loading and unloading RO/RO and describe how you would handle dead lined or inoperable vehicles weighing from 15,000 to 150,000 lbs.
File details come from the government source that posted it. Updated .