This is an environmental requirements document for contractors working on Barksdale Air Force Base, issued by the Installation Management office (2CES/CEI) in May 2025 as Attachment 4 to contract FA460826B0001.

The document establishes mandatory environmental compliance standards across multiple disciplines including air quality, drinking water, hazardous materials, hazardous waste, solid waste recycling, herbicides, lead-based paint, polychlorinated biphenyls (PCBs), sanitary sewage, storage tanks, and stormwater management. Key requirements include: contractors must coordinate pre-construction air permits through CE Environmental for activities such as concrete batch plants, paint booths, and combustion devices; drinking water system work requires super chlorination and testing through Bioenvironmental Engineering before resumption of service; all hazardous materials must be listed on forms provided in Attachment 1 with current Safety Data Sheets submitted to HAZMART prior to work commencement; hazardous waste must be containerized in DOT-approved containers and picked up through the Central Accumulation Point; no dumping of any kind is permitted on base, with yard waste requiring disposal at state-approved composting facilities and construction/demolition debris requiring reporting of weights and types recycled or disposed. The document designates POL (petroleum oil and lubricants) Management as the critical "significant aspect" requiring particular contractor attention. Contractors must comply with spill reporting procedures detailed in Attachment 3, maintain spill kits appropriate to largest container capacity, and follow specific notification protocols based on spill quantity. Additional requirements address storm water permits for sites disturbing 1 or more acres, underground and aboveground storage tank coordination, protection of historical and cultural resources with immediate work cessation procedures upon discovery of human remains, fish and wildlife habitat protection, urban tree preservation with 12-foot clearance requirements, and coordination with the Environmental Restoration Program for activities at formerly contaminated sites. The document includes four attachments: Contractor Information Sheet for Hazardous Material Reporting, HAZMAT Usage Log, Site Specific Spill Plan with follow-up reporting forms and inspection logs, and references to appendices for inspection checklists.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENVIRONMENTAL REQUIREMENTS

FOR

CONTRACTORS

WORKING ON

BARKSDALE AIR FORCE BASE

Installation Management

2CES/CEI

334 Davis Avenue West Suite 208

Barksdale AFB LA 71110-2078

May 2025

FA460826B0001

Attachment 4

The Contractor shall follow the requirements of all federal, state, local, and Air Force environmental regulations and instructions.

ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

(POC: Mr. Forest Rogers, 2 CES/CEIEC, 456-5256)

1. Air Force Global Strike Command, activated August 7, 2009, is headquartered at Barksdale Air Force Base, Louisiana, in the Shreveport-Bossier City community. AFGSC is responsible for the nation’s three intercontinental ballistic missile wings, the E-4B National Airborne Operations Center, the nation’s entire bomber force, to include B-52, B-1 and B-2 wings, the B- 21 Raider program, the LGM-35A Sentinel program, the USQ-225 Air Force Nuclear Command, Control and Communications (NC3) systems, the UH-1N and MH-139A helicopters, and operational and maintenance support to organizations across the nuclear enterprise. Our professionals are assigned to two Numbered Air Forces, 11 active duty, Air National Guard, and Air Force Reserve wings; and the Joint Global Strike Operations Center.

As the Air Component, we provide strategic deterrence, nuclear and conventional global strike capability, and combat support to USSTRATCOM and other geographic combatant commands.

We enable the command and control (C2) of fielded forces for USSTRATCOM through all phases of conflict and continually demonstrate that capability to our allies and adversaries.

2. At Barksdale Air Force Base, protecting the environment is one of our highest priorities and will be a major factor in decision-making. We are dedicated to continual improvement of our processes to prevent and reduce waste generation. We are committed to reducing pollution at the source of generation and compliance with local, state, federal environmental laws, and other requirements through our focus on aspects that can significantly impact the environment. We are dedicated to protecting the local waterways from accidental releases of petroleum oil and lubricants (POLs) and Aqueous Fire Fighting Foam (AFFF). The framework for setting and reviewing environmental objectives and targets includes considering significant environmental aspects and other factors most important to the base and surrounding areas. Annually, the Environmental, Safety and Occupational Health Council will review all objectives and targets to verify progress.

In all our activities, we will strive to:

a. Promote the conservation and sustainable use of natural and manmade materials.

b. Prevent environmental waste and pollution on BAFB and the surrounding local areas.

c. Continuously improve the EMS on BAFB to comply with all relevant laws, regulations, Executive Orders, DoD and Air Force policies.

d. Build environmental information into all levels of management to ensure environmental compliance.

e. Achieve continual improvements in environmental performance and maintain compliance with all federal, state, and local regulations.

f. Work in partnership with all stakeholders to promote good stewardship with base personnel, contractors, the community, and regulatory agencies.

The contractor shall also ensure that personnel understand that all base activities were scored and those that scored highest were considered to be critical and identified as “significant aspect/s”.

Currently, there is one and that is POL Management. With this in mind, contractors should take particular care in activities that could impact this area.

ENVIRONMENTAL COMPLIANCE

Environmental compliance can be an overwhelming subject. The POCs for each discipline are here to help. Don’t hesitate to call or visit any of the compliance POCs for additional information.

AIR

(POC: Mrs. Nikki Melancon, 2 CES/CEIEC, 456-4694)

The contractor will ensure all pre-construction Air Permits are coordinated through CE Environmental. Items of interest include, but are not limited to concrete batch plants, paint booths, abrasive blasting, storage tanks, electric generators, solvent tanks, facility boilers and other combustion devices. Also, any changes to the scope of work of any current project will be presented to CE Environmental, allowing reasonable time for review and if needed modification to applicable Air Permits. Questions can be directed to Ms. Nikki Greer, Compliance/Air Program Manager.

The Contractor shall follow the requirements of all local, state, federal and Air Force environmental regulations and instructions. This includes, but is not limited to: 40 CFR Parts 50

– 82, 40 CFR Parts 85 – 89; LAC 33:V 03; Environmental Requirements for Contractors; and

AFI 32-7002.

Prior to the beginning of any process that will generate an Emission, the Contractor will inform CEIEC of the proposed action, the duration of the action and the amount of the emission which will be generated. All Air Quality related wastes will be handled and stored in strict compliance with federal, state and, local laws/regulations. Contractors will be held fully liable for any negligence which results in a Notice of Violation or other penalty.

DRINKING WATER

(POC: Mr. Ronnie Kay, 2 CES/CEIEC, 456-2770)

The drinking water program is managed by three shops; Bioenvironmental Engineering, (2 AMDS/SGPB), 456-6730; Environmental, (2 CES/CEIE), 456-3498; and Utilities, (2 CES/CEOIU), 456-8919.

After construction or maintenance on any portion of the drinking water system, super chlorination is normally required prior to putting the system back in operation. Contact Bioenvironmental Engineering to schedule the required system test if super chlorination is performed.

In the event a drinking water system loses pressure below 20 psi, a water line break, or the water quality becomes questionable, a boil advisory may be enacted. Call each of the three shops as soon as possible if water pressure is lost or water quality becomes questionable.

HAZARDOUS MATERIALS

(POC: Mr. Paul Black, 2 CES/CEIEC, 456-5293)

The contractor will comply with The Emergency Planning and Community Right-to-Know Act (EPCRA); LA Department of Public Safety, Office of State Police, LAC 33:V.Chapter 101, Hazardous Material Information Development, Preparedness and Response Act; and AFI 32- 7086, Hazardous Materials Management.

The contractor will furnish CES/CEIEC and HAZMART a list of all Hazardous Materials and corresponding Safety Data Sheets (SDSs) prior to commencement of work on base. Reporting will be accomplished on the form provided in Attachment 1. The contractor will be responsible for keeping this list and SDSs current.

The HAZMART is located in Building 5946. Their phone is (318) 456-7045. Hours of operation are Monday-Friday 0700-1600.

Hazardous material usage log (Attachment 2) will also be annotated and turned into Hazardous Material Program Manager, Ms. Nikki Greer and/or Mr. Bill Lee in the Environmental Management office.

The contractor will be responsible for the safe handling of all potentially hazardous materials while on Barksdale Air Force Base. In the case of a release of a HAZMAT into the environment, the contractor will immediately notify the Base Fire Department (911) and 2 CES/CEIEC, (318) 456-3498. If it can be done safely, the contractor should stop the spill and initiate clean-up actions. If base personnel are involved in clean-up operations, the contractor’s responsibility will include the reimbursement of all costs incurred by the government to include supplies, man-hours, and disposal of the waste.

Please note: If you dial 911 from a cell phone on base, it will ring downtown.

You must tell them you are on Barksdale AFB and need emergency response contact on base.

HAZMAT is defined as any item or class of items referenced in Federal Standard 313D, paragraph 3.2 and all Class I and Class II Ozone Depleting Substance.

HAZARDOUS WASTE

(POC: Mr. Bill Lee, 2 CES/CEIEC, 456-5273)

The Contractor shall follow the requirements of all local, state, federal and Air Force environmental regulations and instructions. This includes, but is not limited to: 40 CFR Parts

260 - 265 and 266 - 282; LAC 33:V; Environmental Requirements for Contractors; and AFMAN 32-7002

Prior to the beginning of any process that will generate a Hazardous Waste (HW), the Contractor will inform CEIEC of the proposed action, the duration of the action and the amount of waste which will be generated. All HW will be handled and stored in strict compliance with federal, state and, local laws/regulations. Contractors will be held fully liable for any negligence which results in a Notice of Violation or other penalty.

HW will be defined as a solid waste which exhibits a characteristic such as flammability, corrosivity, reactivity, or toxicity, as identified in LAC:33.V.4901, or is otherwise listed in LAC:33.V.4901. Any mixture of a solid waste and a listed HW is also considered a HW. If in doubt, please contact CEIEC Hazardous Waste Program Manager, Mr. Bill Lee to determine if the waste is hazardous. It must be understood that proper management of any waste generated;

hazardous or non-hazardous will be the responsibility of the contractor. Hazardous waste generated by the contractor on BAFB will be disposed of by the base. The contractor is responsible for collecting and containerizing all HW generated in a Department of Transportation (DOT) approved container compatible with the waste. The contractor will call the Central Accumulation Point (CAP) (318) 456-8580, hours of operation Mon-Friday 0700- 1600 to schedule pick-up or turn-in of containerized hazardous waste. Questions can be directed to the Hazardous Waste Program Manager at (318) 456-5273.

NON-HAZARDOUS SOLID WASTE, RECYCLING and C&D (POC: Mr. Paul Black, 2 CES/CEIEC, 456-5293)

Solid Waste Landfills There are NO permitted landfills on base; any reference to disposal at a landfill means an approved off-base landfill. All leaves, branches and limbs shall be removed from the base and disposed of at a state approved composting facility. At no time will yard waste be mixed with other types of waste generated by the contractor. The contractor shall provide the government a copy of the disposal ticket within five days of the end of the month. ABSOLUTELY NO

DUMPING OF ANY KIND WILL BE PERMITTED ON BARKSDALE AIR

FORCE BASE!!!

Construction and Demolition Debris (C&D) (POC: BAFB Recycle Program 2CES/CEIEC, 456-5293)

Construction and Demolition (C&D) debris is generated from construction, renovation, or demolition activities. Although C&D debris is usually considered a single waste stream, the composition actually varies with each activity and the type, size, and location of the structures involved. Disposing of C&D debris in landfills consumes enormous amounts of space and is both economically and environmentally costly. All efforts should be made to recycle C&D debris from projects. In accordance with AFMAN 32-7002 and BAFB’s Integrated Solid Waste Management Plan (ISWMP), WEIGHTS AND TYPES OF C&D MATERIALS (ie concrete)

RECYCLED AND DISPOSED MUST BE REPORTED TO THE RECYCLE PROGRAM

FA460826B0001

http://www.deq.louisiana.gov/portal/LinkClick.aspx?link=planning%2fregs%2ftitle33%2f33v05.pdf&tabid=1674

MANAGER, Mr. Paul Black at 456-5293 OR TO THE CONTRACTING OFFICER IN

CHARGE OF THE PROJECT.

RECYCLE

(POC: BAFB Recycle Program, 2CES/CEIEC 456-5293)

In accordance with AFMAN 32-7002, 10 USC 2577, and 40 CFR Part 246 recycling should take place whenever possible. The base recycles scrap metals (aluminum, iron, steel, tin) cardboard, office paper, concrete, asphalt, used oil, and lead acid batteries. Separate and place all ferrous and nonferrous metals in approved containers, sell recycled items, or donate to BAFB Recycling Center. All items recycled shall be reported to 2CES/CEIE Recycle Program Manager, Mr. Paul Black at 456-5293, report by weight and recyclable type. The base may also supply containers and transportation for some products if recyclable. Please contact 2CES/CEIEC at the above work number prior to beginning your construction project to get your recycling efforts to a successful start.

HERBICIDES

(POC: Entomology Shop, 2 CES/CEOUE, 456-1814)

Only herbicides authorized by the Environmental Protection Agency (EPA) shall be used.

Contractor personnel applying herbicides shall have all proper certificates necessary for herbicide application in the State of Louisiana. The contractor shall submit on an AF Form 3000, for approval, the type of herbicide to be used and the manufacturer’s application instructions. These materials shall be approved by 2 CES (entomology). Any license or certificates needed by the contractor or his employees for the application of herbicides must be submitted to the Contracting Officer on an AF Form 3000 prior to application of the herbicide.

The contractor is required to turn in, on a monthly basis, documentation as to the type and amount of herbicide applied, location used, and reason for application. Storage of Herbicides and all associated application equipment shall be in strict compliance with all Federal and State requirements regulating such items.

LEAD BASED PAINT (LBP)

(POC: Mr. Bill Lee, 2 CES/CEIEC, 456-5273)

The contractor will determine the existence of LBP prior to removal of paint. If it is found that LBP exists, follow the requirements of 40CFR745 and 29CFR1926.62 . For disposal purposes, a hazardous waste determination will be made on all LBP waste. Paint chips will be collected and analyzed to determine if the waste should be disposed of as a hazardous waste or an industrial waste.

POLYCHLORINATED BIPHENYL (PCB)

(POC: Mr. Bill Lee, 2 CES/CEIEC, 456-5273) http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&tpl=/ecfrbrowse/Title40/40cfr745_main_02.tpl http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10641

The contractor shall not remove any fluid containing electrical device (transformer, regulator, switch, etc.) from BAFB without prior coordination with 2 CES/CEOUE Exterior Electric (318) 456-8197, and the CE Environmental Office (318) 456-5273.

SANITARY SEWAGE

(POC: Mr. Ronnie Kay, 2 CES/CEIEC, 456-2770)

All industrial and domestic sewage from BAFB is treated at the Bossier City Red River Waste Water Treatment Plant. BAFB and contractors working on the base must comply with the Bossier City Industrial Wastewater Discharge Permit. Call Mr. Ronnie Kay at 456-2770, to determine if a proposed sanitary sewer discharge may be prohibited.

If a sanitary sewer overflow or spill of raw sewage occurs, immediately notify the Environmental Office (318-456-2770 or 318-456-4694) upon discovery.

STORAGE TANKS

(POC: Ms. Nikki Melancon, 2 CES/CEIEC, 456-4694)

Aboveground Storage Tanks Installation of Above Ground Storage Tanks (AST) or day tanks will be coordinated with the Tanks Program Manager, Ms. Nikki Melancon. All ASTs will be installed according to manufacturer’s specifications and comply with all federal, state and local regulations.

All contractor fuel tanks with a capacity greater than 55 gallons must have secondary containment or have a specific contingency plan to minimize spills and address the cleanup of spills in their Storm Water Pollution Prevention Plan.

All sites with above ground storage of fuels and other regulated materials must meet all Spill, Prevention and Control (SPC) and Spill, Prevention and Spill Prevention, Control, and Countermeasures Plan (SPCC) requirements found in LAC 33:IX Chapter 9 and 40 CFR 112, respectively.

An SPC/SPCC Plan must be developed and implemented for sites where there is a minimum aboveground storage capacity of 1,320 gallons for two or more individual containers in aggregate within a common storage area, or 660 gallons for an individual container of oil, as defined in LAC 33:IX Chapter 9. For this reason, it is highly recommended that you NOT meet or exceed these volume thresholds. In the event that your site requires an SPC/SPCC Plan, you must file a copy of the plan with the Base Tanks Program Manager, Ms. Nikki Melancon (318) 456-4694.

Regardless of the quantity of petroleum products on site, the contractor shall have spill kits available on site and shall clean-up all spills immediately. Spill kit contents shall be sufficient to control and clean-up a spill equivalent to the largest container on site that does not have secondary containment. Spill debris shall be properly containerized and disposed of by the

FA460826B0001

Attachment 4

CARLSON, MATTHEW A CIV USAF AFGSC 2 CES/CEIEC

Removed mention of reporting to the LDEQ and the 1,000 gallon threshold (no RQ for sewage)

CARLSON, MATTHEW A CIV USAF AFGSC 2 CES/CEIEC

Changed this section to include Louisiana requirements for spill plan development, which establishes a lower volume threshold for the development of an SPC Plan

Contractor. If the spill debris is hazardous waste, disposal shall be in accordance with the hazardous waste section of this document.

Underground Storage Tanks All work associated with USTs will be coordinated with Tanks Program Manager, Ms. Nikki Melancon, at the above work number. The contractor is responsible for completing all required Louisiana Department of Environmental Quality (LDEQ) forms and conducting all Underground Storage Tank (UST) related work in accordance with the appropriate regulations and manufacturers’ specifications. In the case of UST closure, the contractor will prepare a closure report which meets LDEQ/UST Division requirements. The contractor is responsible for disposal of removed USTs and associated piping in an LDEQ/UST Division-approved manner.

STORM WATER

(POC: Mr. Ronnie Kay, 2 CES/CEIEC, 456-2770)

The contractor shall not pollute any streams, rivers, or waterways through direct discharge or by storm water runoff. The contractor shall comply with all applicable federal, state, local laws and the BAFB Storm Water Pollution Prevention Plan and BAFB Spill Control and Countermeasures Plan (SPCC). The BAFB plans may be reviewed during normal working hours at the CEI office in Building 3433, Suite 208. As stated in the BAFB SPCC plan, contractors that cause a non-emergency spill will be responsible for cleanup of the spill. Contractors that cause an emergency spill are still responsible, but should not attempt the cleanup.

Contractors at sites that will disturb 5 or more acres of soil must follow all applicable requirements of LPDES Storm Water General Permit for Construction Activity, Permit No. LAR 100000. Included are requirements to:

� Develop a SWPPP prior to NOI submittal � Submit a Notice of Intent to LDEQ with payment � Post a notice a site entrance � Perform scheduled self-inspections.

If needed, the Base Storm Water Program Manager has a fill-in-the-blank template available for the SWPPP. Whether you choose to use the template or your own form, a copy of your plan must be submitted to the Base Storm Water Program Manager before you may begin ground disturbance. The permittee is no longer required to submit a Notice of Termination (NOT), as the termination of coverage under the permit is automatic and determined by the number of years selected by the permittee on the NOI. An NOT is required if Part 1.F applies. If an extension is needed, the permittee may file a Notice of Extension (NOE). Permits, NOIs, and NOEs are available from the LDEQ Water Permits Division. The Base Environmental Office requires that the contractor furnish the Base Storm Water Program Manager, Mr. Ronnie Kay, (318) 456-2770 with copies of the NOI and SWPPP.

Contractors for construction sites that disturb at least 1 acre, but less than 5 acres of soil must comply with the LPDES Storm Water General Permit for Small Construction Activities, FA460826B0001

Attachment 4

KAY, RONALD H CIV USAF AFGSC 2 CES/CEIEC

Additional SWPPP information added on requirements (Develop a SWPPP “prior to NOI submittal”)

KAY, RONALD H CIV USAF AFGSC 2 CES/CEIEC

I added another “0” to the permit number. The permit has 5 not 4 “0’s”.

KAY, RONALD H CIV USAF AFGSC 2 CES/CEIEC

I added language to the NOT requirements. An NOT is required IF part 1.F isn’t met.

Permit No. LAR 200000 available from the LDEQ Water Permits Division. Included are requirements to:

� Develop a SWPPPP prior to NOI submittal � Post a notice at site entrance � Perform scheduled self-inspections � Submit a Small Construction Activity Completion Report (SCACR)

If needed, the Base Storm Water Program Manager has a fill-in-the-blank template available.

Whether you choose to use the template or your own form, a copy of your plan must be submitted to the Base Storm Water Program Manager before you may begin ground disturbance.

Please be advised that scheduled self-inspections are also part of this state requirement. There is NO application or fee for this permit. When a construction project is complete and the site has been stabilized in accordance with permit Part III.D.2.a.2, the permittee shall submit a Completion Report form (see Appendix B of the permit). The form must be signed and dated and submitted to the Permits Division within sixty (60) days after completion.

Contractors for construction sites that disturb less than 1 acre must still prevent the discharge of pollutants from their site per the Base’s LPDES permit No. LA0007293.

Projects that have a footprint greater than 5000 square feet must implement EISA Section 438 which requires site planning, design, construction, and maintenance strategies to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow. US EPA guidance for compliance can be found at Storm Water Compliance Sec 438.

In addition to the permitting and plan requirements noted above, the contractor staging area and work area(s) shall be maintained in a neat and orderly manner and cleaned up at the end of each duty day. The contractor shall not store petroleum, chemical, or waste containers where the contents will be exposed to rainfall. Containers shall remain closed at all times except when dispensing materials from or transferring materials to other containers. Drip pans shall be placed under dispensers when in use.

If an oil/fuel spill does occur, please follow the BAFB reporting requirements in the table below.

See Appendix 3 for the for Site Specific Spill Plan requirements.

Quantity of Spilled Oil/Fuel: in Gallons

Surface spilled upon:

pavement, non-paved, or water

Contained and cleaned up:

Yes or No

Internal CEIE Notification at 456-2770 or 456-4694 and Completion of Barksdale Spill Report to 2CES/CEIE:

Less than 5 gal Paved and/or Non-paved

Yes None Required

No Call CEIE.

More than 5 gal Paved and/or Non-paved Yes or No

Call CEIE.

Complete Barksdale Spill Report to 2CES/CEIE.

FA460826B0001

Attachment 4 http://www.epa.gov/owow/nps/lid/section438/

KAY, RONALD H CIV USAF AFGSC 2 CES/CEIEC

Under LAR200000, I added “prior to NOI submittal” after Develop a SWPPP.

Any Amount Water (or Storm Drain) Yes or No

Immediately call CEIE: 456- 4694 or 456-2770.

Complete Barksdale Spill Report to 2CES/CEIE.

HISTORICAL, CULTURAL AND NATURAL RESOURCES

Preservation of Historical, Archeological, and Cultural Resources (POC: Mr. Simon Zika, 2 CES/CENPP, 456-4064)

The Contractor will take precautions to preserve all pre-existing historical, archeological and cultural resources. If during project execution the contractor observes unusual items that might have historical, or archeological value, such observations shall be reported as soon as possible to the Contracting Officer. An important SOP pertaining to inadvertent discovery of human remains/funerary items can be found below.

Inadvertent Discovery of Native American Remains and/or Funerary Items (POC: Mr. Simon Zika, 2 CES/CENPP, 456-4064)

Purpose: To outline procedures to be followed in the case of inadvertent (Accidental) discovery of Native American remains and/or funerary items on Barksdale AFB.

Applicability: This SOP applies to all organizations and activities operating on Barksdale AFB (both public and private).

Authority: Comprehensive Agreement Between Barksdale Air Force Base (AFB), Louisiana and the Caddo Indian Tribe of Oklahoma (Caddo Nation), Native American Graves Protection and Repatriation Act of 1990 (P.L. 101-601, 104 STAT. 3048, 25 USC 3001-3013 and 43 CFR 10)

Procedure: During excavation or maintenance work, if bones or funerary items are found, work shall immediately cease. Funerary items are defined as pottery vessels or pieces of vessels, bits of cloth, ceramic figurines or ornaments.

If the Cultural Resources Manager (CRM) cannot be contacted, the Programs Development Manager (PDM) shall be contacted at 456-3119.

Nothing in the excavation shall be moved or touched after discovery. Cover, or otherwise protect the site from the elements. Follow all instructions from the CRM or PDM. Depending upon the material discovered, the site may be off limits during archeological or criminal investigation analysis. Work at the site may not resume, until official approval is given by the CRM or PDM.

Protection of Fish and Wildlife

FA460826B0001

Attachment 4

CARLSON, MATTHEW A CIV USAF AFGSC 2 CES/CEIEC

Added this table to include reporting requirements for oilfuel spills

(POC: Mr. Mark Gates, 2 CES/CEIEA, 456-1963)

The contractor shall perform all work required to minimize interference or disturbance to fish and wildlife. The contractor will not be allowed to alter water flows or disturb native habitat adjacent to the work area that in the opinion of the Wildlife Biologist are critical to fish and wildlife. Contractors are not allowed to work in the areas open to hunting on the East Reservation during managed deer or turkey firearm hunts. Contractors need to contact the Wildlife Biologist, Mr. Mark Gates at the above number for managed hunt dates.

Urban Tree Protection (POC: Mr. Mathew Stroupe, 2 CES/CEIE, 456-2397)

The contractor shall take all necessary precautions to preserve the existing Urban Forest assets on Barksdale Air Force Base. Prior to beginning any project involving work near or around trees the contractor shall contact the Natural Resource Manager at the above number for review and approval of work to be accomplished around trees. Do not store equipment or materials next to trees. Keep a 12 foot clearance around each tree; no digging, free of dirt, equipment, materials, or any other object.

Timber Resources (POC: Mr. Troy Turner, 2 CES/CEIEA, 456-3353)

The contractor shall contact the base Forester at the above number if projects involve damage or removal of timber resources. Prior to beginning any project on the East Reservation involving possible damage to or the removal of timber, the contractor shall contact forestry for review and approval of the work involving timber resources.

ENVIRONMENTAL RESTORATION PROGRAM (ERP)

(POC: Mr. James “Wes” Jones, AFCEC/CZOW, 456-8544)

The Environmental Restoration Program oversees the identification, investigation, research and development, and cleanup of contamination from hazardous substances and pollutants or contaminants at formerly used sites on the base. These sites include former bombing ranges, disposal pits, spill areas, UST sites, fire training areas, and landfills. There are many potential below-ground issues at these sites, including Unexploded Ordnance, contaminated soils and groundwater, and landfill disposal debris.

Any proposed activities at or adjacent to ERP sites, including digging or trenching activities that require completion of Air Force Form 103 Base CE Work Request Clearance Request (Dig Permit) must be coordinated with Mr. James “Wes” Jones prior to initiating the activity.

Information concerning the location and status of ERP sites can be obtained through the CEI office.

Attachment 1

Contractor Information Sheet for Hazardous Material Reporting

PROJECT NAME:

PROJECT NUMBER:

COMPANY NAME:

DATES OF CONTRACT:

LOCATION ON BASE:

PHONE NUMBER (On-Base if available):

NAME OF CONTACT:

SHOP CODE (Assigned by

HAZMART):

INFORMATION

Material Name

Container

Type

QTY

Size

Total Qty to be

Used (Estimated)

NSN/LSN

completed by

HAZMART

Barcode #s completed by

HAZMART

Attachment 2

HAZMAT USAGE LOG

DATE: _____________ CONTRACTOR:________________ PROJ#:________________

BARCODE

ITEM

AMOUNT

USED

(ounces)

DATE

USED

CUMULATIVE

QUANTITY

(if needed)

NAME of

USER

Attachment 3

Site Specific Spill Plan

Name of Facility/Shop and Organization: ____________________________________________ Building Number & Address: ______________________________________________________ Facility Phone: _________________________________________________________________ Satellite Accumulation Point Manager: _____________________________________________ Location of Spill Response Kit: ____________________________________________________ Fire Dept Phone Number: 911 Environmental Compliance Flight: 456-4694 or 456-2770 Central Accumulation Point: 456-8580

You must have the means to manage the largest capacity spill with appropriate spill response materials and have a method in place to ensure the supply of spill response materials is maintained. We recommend making a list of the spill response materials and safety gear needed to respond to a worst case spill for your facility as well as having periodic spill kit inspections. An optional Inspection Log and checklist are available in Appendix A - C. It is your responsibility to have the appropriate type and quantity of spill materials available for your facility. If you need guidance on spill prevention or clean up, please call the Environmental Office (2 CES/CEIE) 318-456-4694 or 318-456-2770.

Spill Response Procedures

• Notify appropriate agencies:

• If injury, fire or potential fire, spill of a hazardous substance, danger, or emergency- call

911. If dangers are present, move away from area and initiate evacuation of immediate area.

• If no immediate danger exists, immediately call 2 CES/CEIE. (318) 456-4694, (318) 456- 2770, After Hours Emergency Contact: 911 (transfer to Barksdale Fire Dept.)

• Identify product and determine the extent of the spill.

• Block the spill from coming in contact with drains or permeable surfaces. Use drain covers, absorbents, sock booms, or spill pads to stop the spill from entering the drains or permeable surfaces.

o If oil reaches a storm drain (exterior drain) – Immediately call Environmental.

They have a time limit to report to Louisiana Dept. of Environmental Quality.

• Use absorbent boom to contain spill. Use booms to direct the spill away from any immediate hazards.

• Absorb spilled material using spill pads, speedy dry, cat litter, etc.

• Containerize petroleum-based oil/fuel contaminated absorbents and contact the Central

Accumulation Point (CAP), (318) 456-8580, for proper disposal and questions. If spilled oil is cooking oil, absorbents may be disposed of in the trash without contacting the CAP.

• Complete a Barksdale Internal Spill Report. Email Spill Report to the Environmental Flight, 2 CES/CEIE, Building 3433. Spill managers: Ronnie Kay (Ronald.Kay.1@us.af.mil) or Nikki Melancon sherron.melancon@us.af.mil.

• Restock Spill Kits mailto:Ronald.Kay.1@us.af.mil mailto:sherron.melancon@us.af.mil

Barksdale AFB Spill Incident Follow-up Report - Submit to 2 CES/CEIE

Installation name: Barksdale Air Force Base

Location of spill:

(Be descriptive. Include building number, landmarks, direction of flow, etc.)

Nearest waterbody:

(Mack’s bayou, Cooper’s bayou, Red Chute bayou, Flat River, other drainage element, etc.)

Substance spilled:

Amount spilled:

(Provide best estimate of volume.)

Date and time of spill:

When ended:

Total area of spill (sq ft):

Cause of spill:

Corrective action taken:

POC and phone number:

• Email Spill report to the Asset Management Flight, 2 CES/CEIE, Building 3433. Spill manager: Ronnie Kay (Ronald.Kay.1@us.af.mil) Nikki Melancon sherron.melancon@us.af.mil. for any questions.

FA460826B0001

Attachment 4 mailto:Ronald.Kay.1@us.af.mil mailto:sherron.melancon@us.af.mil

Site Inspection Log

A = Acceptable U = Unacceptable If any items are unacceptable attach Inspection Form (Appendix B) with details.

Inspection Date Inspector Name Spill Kit Complete? Storm Drains clear? Items Fixed?

Site Inspection Form

Acceptable Unacceptable

Spill Kit Complete?

Have any items been used from the spill kit? If items are missing, is there an associated entry in the Spill Log? Are there any items missing that are currently on order? Is the spill kit stored where it is supposed to be stored? Is there a sufficient supply of daily cleanup materials?

Storm Drains?

Is there a buildup of sediment in the drain traps? Is there any evidence of drain clogging? Are the drain filters still intact? Any need replacing? Have they been replaced?

Items Fixed?

Have all deficiencies previously noted been fixed or made acceptable?

List any issues, deficiencies, or failures in detail:

Site Spill Log

Date of

Spill

Location of Spill

Size of Spill

(Approx gal)

Prevention

Measures

Taken?

Spill Kit

Materials

Reordered?

Was the Spill Kit

Adequate?

(List any deficiencies, i.e.

missing equipment, etc.)

HERBICIDES
(POC: Entomology Shop, 2 CES/CEOUE, 456-1814)
LEAD BASED PAINT (LBP)
(POC: Mr. Bill Lee, 2 CES/CEIEC, 456-5273)
POLYCHLORINATED BIPHENYL (PCB)
(POC: Mr. Bill Lee, 2 CES/CEIEC, 456-5273)
Aboveground Storage Tanks
STORM WATER
(POC: Mr. Ronnie Kay, 2 CES/CEIEC, 456-2770)
Inadvertent Discovery of Native American Remains and/or Funerary Items
Attachment 1
Attachment 2
DATE: _____________ CONTRACTOR:________________ PROJ#:________________
Spill Response Procedures