This document is a Statement of Work (SOW) for the project to pump and clean eight identified oil-water separators (OWS) at Holloman Air Force Base in New Mexico.
The SOW outlines the general and specific requirements for the work, which includes furnishing all necessary vehicles, tools, equipment, materials, transportation, and labor to accomplish the tasks. The Contractor must be a licensed OWS maintenance company and perform the work in accordance with manufacturers' recommendations and all applicable environmental laws and regulations. The work involves pumping, cleaning, and removing waste from eight OWS units of varying capacities located at different facilities on the base. The Contractor is responsible for all sampling, analysis, documentation, and proper off-base disposal of the regulated and unregulated waste materials. The performance period is 90 days, with work to be conducted Monday through Friday between 7:00 am and 5:00 pm.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 3 - OWS map for the SOW_8.pdf | ||
| Combo - Final.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PROJECT NAME: PUMP AND CLEAN EIGHT INDENTIFIED OIL-WATER SEPARATORS
HOLLOMAN AIR FORCE BASE, NEW MEXICO
WORK TASK #14218774
26 MARCH 2024
1. PROJECT SPECIFIC INFORMATION
a. Location: Facilities 193, 231, 304, 309, 818, 844, 856, 1073
b. User Contact: Gary V. Stratton
c. Performance Period of Contract: 90 Days
d. Working Hours: Monday-Friday (7:00 am to 5:00 pm)
e. Restricted Area (as defined in HAFB Instruction 31-102): No
2. SCOPE OF WORK
General Requirements:
1. The Contractor shall furnish all vehicles, tools, equipment, materials, transportation, personal protective equipment (PPE), personnel, labor, technical expertise, supervision, and management necessary to accomplish the work.
2. Work shall be performed by a licensed Oil-Water Separator(s) (OWS) maintenance company In Accordance With (IAW) manufacturers’ recommended levels of cleaning and all Federal, State, and Local Environmental laws and regulations.
3. The Contractor shall be responsible to remove and reinstall lids, covers, grates, or similar, and their fasteners.
4. Any damaged areas shall be restored to match the existing site condition/landscape.
5. The work areas shall be kept reasonably clean at all times. The Contractor shall perform a complete cleanup of the individual work area at the end of that site’s work.
Specific Requirements:
1. There are eight OWS requiring cleaning. The cleaning includes sample analysis, pumping, cleaning the chamber, and removing all waste material. The following table lists the OWS’ nomenclature, location, and capacity of each unit in gallons. See attached map.
| Oil Water Separator (OWS) |
| Location (Building) |
| Capacity (Gallons) |
| OWS 8B Bldg193 |
| Bldg 193 North Side |
| 930 gals |
| OWS 35B Bldg231 |
| Bldg 231 South Side |
| 1100 gals |
| OWS 19B Bldg304 |
| Bldg 304 West Side |
| 870 gals |
| OWS 10B Bldg309 |
| Bldg 309, South Side |
| 680 gals |
| OWS 64 Bldg818 |
| Bldg 818 South Side |
| 700 gals |
| OWS 36B Bldg844 |
| Bldg 844 East Side |
| 930 gals |
| OWS 38 Bldg856 |
| Bldg 856 SW Side |
| 1000 gals |
| OWS 32 Bldg1073 |
| Bldg 1073 East Side |
| 6300 gals |
2. Each OWS shall be tested for regulated waste according to the Multiservice Oil/Water Separator Guidance Manual 11Jun1999 and AFMAN 32-1067. This shall be accomplished within 15 days prior to cleaning the OWS.
3. Regulated waste shall not be mixed with un-regulated waste. Sample analysis will be reported to HazWaste Program Manager in CEIE Environmental Office address in number 6. below.
4. All water, oil, semi-solid materials, solid materials, and absorbent media shall be disposed of off base by the Contractor to an approved site IAW all applicable Federal, State, and Local Environmental laws, ordinances, and regulations. Department of Transportation (DOT) approved vehicles and containers shall be used to transport the waste materials.
5. The Contractor shall be responsible for creating, maintaining, and delivering all documentation, including weight tickets, waste manifests, etc. for this disposal process. The Contractor shall provide the original record or a reproducible copy five (5) working days of receipt of the request to the project manager or Contracting Officer Representative (COR), unless otherwise specified prior to payment.
6. Manifest / Bill of Lading (BOL) Generator Address: 49CES/CEIE 550 Tabosa Ave Holloman AFB, NM 88330
END OF STATEMENT OF WORK