ATCH_2_PWS_7SEPT2023.pdf

PDF 250 KB Posted

Attached to
Repair of the ATD-150 Controller Display Unit on the UH-1N Helicopter
Solicitation number
FA852424R0009
Issued by

About this file

This document is a Performance Work Statement (PWS) for the depot-level repair of the ATD-150 Controller Display Unit, National Stock Numbers 7025-01-648-6852 and Part Number 70-2520, used on the Air Force's UH-1N helicopter. The key objectives are to return the units to serviceable condition to support the Special Operations Forces mission. The contractor shall meet delivery schedule requirements, achieve quality standards, and comply with government property management and counterfeit prevention requirements. The period of performance is 5 years with four 1-year ordering periods. The contractor must provide a repair facility with the necessary equipment and capabilities. The government will provide the reparable units as Government Furnished Property. The contractor shall report any lost or damaged government property, and obtain approval for condemnation or cannibalization of units. Delivery of repaired units is required within 120 calendar days of induction, with no more than two late deliveries per quarter.

View the file

Other files

File Type Posted
ATCH_6_WageDet_2015-5351_1May2024.pdf PDF
ATCH_3_Pkgrqmt_Report.pdf PDF
ATCH_4_CAVAF_REPORTING_REQ.pdf PDF
ATCH_5_DD2875_SYSTEM_AUTH.pdf PDF
FA852424R0009.pdf PDF
ATCH_1_Exhibit_A_CDRLs.pdf PDF
ATCH_7_GFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-20-00448 PWS 1

Performance-based Work Statement (PWS)

FD2060-23-00448

for Repair of the ATD-150 Controller Display Unit.

Date: 07 September 2023

PR: FD2060-20-00448 PWS 2

1.0 Description of Services

1.1 Objective(s): This PWS is for the depot level repair of the ATD-150 Controller Display Unit, National Stock Numbers 7025-01-648-6852, and Part Number 70-2520. The extent of repair work required shall be determined by the initial inspection/bench check and required disassembly to return each item in serviceable condition to be efficiently used to serve the intended purpose. Original design of the end item and parts thereof, or the design functional capabilities of the end item, shall not be changed, modified, or altered unless such changes are authorized in writing by the Procuring Contracting Officer (PCO). No government personnel or equipment shall be used for testing after repair of items. The contractor shall meet delivery schedule for all requirements and CAVAF reporting shall be timely and accurate. The war fighter shall benefit from having more aircraft available with fully ATD-150 Controller Display Unit.

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by having available assets to fully support Special Operation Forces (SOF)/Personnel Recovery, SOF mission. The war fighter will benefit by having more aircraft available with a fully functional UH–1N to perform the Special Operation Forces (SOF) mission.

1.3 Background: The UH-1N helicopter functions primarily as a light-lift utility platform. It performs missions including airlift of emergency, security and disaster response forces, emergency evacuation of government officials, support for school training and testing, airlift for distinguished visitors and transport/security for Intercontinental Ballistic Missile (ICBM) support personnel. Other roles include airborne cable inspections, security surveillance of off-base nuclear weapons convoys, response to search and rescue operations, and medical evacuation and transport. The UH-1N has the ability to easily change mission packages to support this diverse set of functions. The capability of flight during inclement weather or nighttime conditions allows it to operate in most situation. The ATD-150 Controller Display Unit is used on Air Force UH-1N aircraft that perform for various missions as noted in background. The ATD-150 Controller Display Unit is part of the Traffic Collision Avoidance Device (TCAS) system, which consists of processor (TAS605A), transponder coupler, antenna, and the controller display unit.

The unit displays Traffic Advisories (TA) and Proximity Advisories (PA) to the flight crew.

2.0 Services Summary (SS):

Performance Objective

PWS Reference Performance Threshold

Quality of repair

4.9 Repaired assets shall pass DCMA inspection

with no more than two (2) failure per contract year.

PR: FD2060-20-00448 PWS 3

At a minimum, 95% of repaired assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt. This metric will be calculated monthly. There shall be no more than one (1) PQDRs and/or QDRs per contract year.

3.0 Government Property and Services: The reparable assets being provided to the Contractor are identified and tracked as Government Furnished Property (GFP) and will be referenced as such.

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.

3.2 Government Property to be Provided: Government property to be provided includes the ATD-150 Controller Display Unit, National Stock Numbers 7025-01-648-6852, and Part Number 70-2520.

3.3 Reporting of Government Property: The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) Government property in its possession in accordance with FAR 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil, as stipulated by DFARS 252.245-7002. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/.

3.4 Loss of Government Property

3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.

PR: FD2060-20-00448 PWS 4

3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

4.0 Technical Requirements. The contractor is required to perform depot level repair of the ATD-150 Controller Display Unit, National Stock Numbers 7025-01-648-6852, and Part Number 70-2520. There shall be no more than one late delivery per quarter. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date specified in the contract. In the event there is a need for long-lead time parts, the contractor shall notify the government PCO within ten calendar days.

4.1 Period and Place of Performance

4.1.1 Contract/Order Period of Performance: The period of performance for the contract is five

(5) years (Basic with four 1-year ordering periods).

4.1.2 Place of Performance: These services shall be performed at the contractor’s facility.

4.2 Contract Data Requirements List(s) (CDRL)

Document Identifier Base Year

Ordering Period

Ordering Period

Ordering Period

Ordering Period

DID Title PWS Reference(s)

A001 B001 C001 D001 E001 DI-

PSSS-

81995

Contract Depot Maintenance Production Report

4.4

A002 B002 C002 D002 E002 DI-

MGMT-

81803A

Item Unique Identification (IUID) Marking Plan

4.6.1.3

A003 B003 C003 D003 E003 DI-

MGMT-

81804A

Item Unique Identification IUID) Marking Activity, Validation and Verification Report

4.6.1.4

PR: FD2060-20-00448 PWS 5

A004 B004 C004 D004 E004 DI-

MGMT-

81838

Commercial Asset Visibility

(CAVAF)

Reporting

4.3

A005 B005 C005 D005 E005 DI-

MISC-

81832

Counterfeit Prevention Plan

4.7.1

A006 B006 C006 D006 E006 DI-

MGMT-

80441D

Government Property Inventory Report

4.5

A007 B007 C007 D007 E007 DI-

SAFT-

81563

Accident/Incident Report

5.5.2

A008 B008 C008 D008 E008 DI-

QCIC-

81794

Quality Assessment Report

5.8

4.2.1 Quality of CDRL Deliverable: There shall be no more than one (1) rejection of any deliverable. There shall be no more than two (2) total rejection(s) of deliverables per contract quarter. The Government will reject a deliverable if two (2) or more technical errors or two or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within ten (10) business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Wide Area Workflow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than two (2) late submission(s) of deliverables per contract quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 Commercial Asset Visibility (CAV) Reporting. The Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract and shall report production in CAV-AF. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250). The Contractor shall provide data on the actions conducted for each unit and report as actions occur. The contractor shall provide data on the actions conducted for each CDRL. (CDRL A004, B004, C004, D004, E004, DI- MGMT-81838, Commercial Asset Visibility (CAV) Reporting

4.4 Contract Depot Maintenance (CDM) Production Report: Contract Depot Maintenance Production Report will be utilized and is to be a contractual requirement. The report is a two-part report which provides the government with monthly maintenance of transit, induction, PR: FD2060-20-00448 PWS 6 condemnation and production figures, status and accountability of assets at a contractors’ facility, performance to schedule, and the summary of unresolved problems at the end of the report period. The PMS shall compare report data to CAV AF reporting actions to identify variances timely and communicate to contractor of required CAV AF corrective actions are accomplished with 24 hrs of notification. PMS confirms actions have been taken, if no compliance PMS engages CO to enforce reporting requirements with the contractor, IAW (CDRL A001, B001, C001, D001. E001, DI-PSSS-81995, Contract Depot Maintenance (CDM) Production Report)

4.5 Government Property Inventory Report: The Contractor shall conduct a 100% physical inventory once per contract year of all GFP. The report shall be in Contractor’s format but compatible with .xls or .xlsx format. The report shall include any Contractor held or subcontractor inventories where GFP has been provided by the government for a Contractor’s or subcontractor’s repair performance. Once an annual physical inventory has been accomplished, the contractor shall provide their internal property management control records in accordance with FAR Part 52.245-1(f)(1)(iv), Physical Inventory. (CDRL A006, B006, C006, D006, E006 , DI-MGMT-80411D, Government Property Inventory Report C)

4.6 Repair

4.6.1 Item Unique Identification

4.6.1.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR.

4.6.1.2 IUID Requirements: In accordance with DFARS 252.211-7003(a), Item Identification and Valuation / Definitions, “DoD unique item identification’ means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items.” Unique item identification is required for all items that meet the criteria established by DFARS 211.274-2, Policy for unique item identification.

4.6.1.3 IUID Marking Plan: The Contractor shall mark items in accordance with DFARS 211.274-2, DFARS 252.211-7003, and Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property. The plan must be approved by the Government Engineering organization, prior to implementation. (CDRL A002, B002, C002, D002, E002, Item Unique Identification (IUID) Marking Plan DI-MGMT-81803A)

4.6.1.4 IUID MARKING ACTIVITY and VERIFICATION REPORT: The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A003, B003, C003, D003, E003, Item Unique Identification (IUID) Marking Activity, Validation and Verification Report DI-MGMT-81804A)

4.6.2 Reporting in IUID Registry

PR: FD2060-20-00448 PWS 7

4.6.2.1 Transmission of Government property must be recorded in the IUID Registry. The Government is required to record the transfer of GFP to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.

4.6.2.2 In accordance with the DoD Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government user will add item(s) to the DoD IUID Registry. The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.

4.7 Counterfeit Prevention Plan (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and for disposition of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with the Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD.

The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies.

4.7.1 The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. (CDRL A005, B005, C005, D005, E005, DI-MISC-81832, Counterfeit Prevention Plan (CPP).

4.7.2. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

4.7.3. Definitions. The Contractor shall utilize definitions per AS5553B to ensure consistency.

Any contractor-derived definitions must be included in an appropriate CPP appendix or annex.

(Ref. AS5553B, paragraph 3, 3.1, 3.2, 3.3, appendix H).

4.7.4. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553B, paragraph 4.1.1, 4.1.2.e., appendix A).

4.7.5. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate

PR: FD2060-20-00448 PWS 8

office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553B, paragraph 4.1.2, 4.1.3, appendix B, C, D).

4.7.5.1. Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received.

4.7.5.2 The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553B, paragraph 4.1.2, 4.1.3, appendix B, C, D).

4.7.6. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per Office of Deputy Assistant Secretary of Defense (ODASD) Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553B, paragraph 4.1.4, 4.1.5, appendix E).

4.7.7. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553B, paragraph 4.1.4, appendix E).

4.7.8. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies, and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts is not possible. The Contractor shall identify the specific systems, assemblies, subassemblies, and parts beyond the Contractor’s control. The Contractor shall be

PR: FD2060-20-00448 PWS 9

responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government.

(Ref. AS5553B, paragraph 4.1.6, appendix F).

4.7.9. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI).

The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI.

Additionally, the Contractor shall within the same 30-day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553B, paragraph 4.1.7, appendix G).

4.7.10. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training.

The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.

4.8 Condemnation and Repair: The contractor shall be required to repair all end items unless the Procuring Contracting Officer (PCO) through the Administrative Contracting Officer (ACO) provides written direction. Requests for condemnation shall be submitted in writing through the ACO to the PCO within (10) ten calendar days following initial inspection/functional testing.

Condemnations shall not be requested due to unavailability of replacement parts.

Condemnations may only be granted if the item inducted for repair manifests one or more of the following conditions:

a. Physical damage that affects greater than 75 percent of the material within the end item (i.e., crushed).

b. Burn damage that affects greater than 80 percent of the internal electrical components and connections of the end item.

c. Repair cost is greater than 75 percent of the cost for a new end item.

d. Beyond Economical Repair (BERs): Requests for condemnations

PR: FD2060-20-00448 PWS 10

Shall be submitted in writing to the Government PCO within five workdays of the intent to condemn. Condemnation authority shall be requested when the cost to Repair the asset exceeds 75 percent of the unit’s replacement cost. The contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated BERs CLIN. The PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number.

The results of any electrical testing performed on the end item shall also be submitted for review.

The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.

4.8.1 The Contractor shall induct units for repair within (3) three working days of receipt or a funded order, whichever is later. Turn Around Time (TAT) shall be 120 calendar days. A No Fault Found (NFF) is defined as when the Contractor is unable to duplicate the failure of a specific unit. The Contractor shall notify the Procuring Contracting Officer (PCO) as the method for reporting this to the Government. The Contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated NFF or Teardown Test & Evaluation (TT&E) actions.

4.8.2 The Government is authorized to replace condemned end items with replacement reparable end items of the same NSN at no additional cost. The contractor is authorized reclamation from condemned units. The contractor shall request authorization from the PCO prior to reclaiming any items from the condemned unit. The contractor shall report the use of reclaimed items to the

PCO.

4.8.3 Accessory and Component Reuse, Repair and Replacement: Items received which are misidentified, misdirected, or have Air Force recoverable subassemblies missing shall be reported through the ACO to the PCO, to 411 SCMS/GULAB for disposition instructions.

Missing Repairable Expendability, Reparability, Recoverability Code (ERRC) T subassemblies or ERRC Code T subassemblies that are generated as part of the Next Higher Assembly (NHA) and subsequently require condemnation, will be replaced by the government. The replacement item may be repairable or serviceable. The Repair (if required) and the installation of the replacement item into the NHA will be accomplished at no additional cost IAW T.O. 00-25-234.

4.8.4 Upon approval by the Government, the contractor is authorized to cannibalize Repair Shop Replaceable Unit (SRU) necessary to accomplish timely Repair to meet production schedule and/or accomplish Repair of Mission Capable (MICAP) requirements. All cannibalized components will be returned to a pre-cannibalized condition. The contractor shall maintain a record of part numbers cannibalized including the serial number of the units from which the part was removed and installed.

4.8.5 Facility Requirements: The contractor shall provide a repair facility. The facility shall serve as the depot to carry out the repair and will include contractor owned test equipment, fixtures, adapters and workbenches needed for repair of the assets.

PR: FD2060-20-00448 PWS 11

4.8.6 Repairable components will be repaired to Original Equipment Manufacturer (OEM) specifications.

4.9 Quality:

4.9.1 The Contractor’s quality program shall be established and maintained IAW FAR 52.246-11 or equivalent. The Contractor’s quality program shall meet the requirements of ISO 9001:2008 or equivalent.

4.9.2 Repaired assets shall pass DCMA inspection with no more than two (2) failure per contract year. At a minimum, 95% of repaired assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt. This metric will be calculated monthly. There shall be no more than one (1) PQDRs and/or QDRs per contract year.

4.9.3 When requested, the contractor shall assist the cognizant Contract Administration Office in evaluating Product Quality Deficiency Reports (PQDR) and exhibits for defects reported on items Repaired under this contract to determine the root cause for deficiencies.

These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the contractor’s Quality Program.

4.10 Packaging

4.10.1 The Contractor shall package and mark end items and components in accordance with the contract (basic or order, as applicable) Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129R, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL-STD-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1E, Standard Practice for Military Packaging. The Contractor shall ensure that classified material is packaged, marked, and shipped in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety, and environmental concerns.

4.10.2 The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to static discharge damage in accordance with MIL-STD-1686C, Military Standard: Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).

4.10.3 In accordance with MIL-STD-2073-1E, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.

PR: FD2060-20-00448 PWS 12

4.11 Shipping

4.11.1 The Contractor shall ship overhauled (or repaired) assets within five (5) business days by fastest, traceable means after DCMA accept. Contractor shall contract the SP for shipping instructions three (3) days prior to shipment of serviceable end item.

4.12 Delivery of repair: There shall be no more than two (2) late delivery(ies) per quarter. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government. In the event there is a need for long-lead time parts, the contractor shall notify the government PCO within ten (10) calendar days.

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Service Manager (FSM) has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Security Clearance: The Contractor shall ensure all security requirements are met.

5.2.2 Security Regulations: The Contractor shall comply with all applicable Government regulations including, but not limited to, Department of Defense Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; Department of Defense (DoD) Manual 5205.02, DoD Operations Security (OPSEC) Program Manual;

and DoD 5220.22-M, National Industrial Security Program Operating Manual

(NISPOM).

5.2.3 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities use OPSEC to protect critical information for specified contracts, subcontracts, and information used in the performance of duties in support of Air Force requirements/missions. The Contractor shall ensure Contractor personnel who perform work on (or in) a Government facility comply with the OPSEC procedures and training requirements of the facility as specified in AFI 10-701.

5.2.4 Access to Government System(s): Access to Government system(s) will not be required to perform tasks under the contract/order.

5.2.5 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or Controlled Unclassified Information (CUI) in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), § 117.7(a).

PR: FD2060-20-00448 PWS 13

Applicable equipment shall be safeguarded, maintained, and operated in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), § 117.7(a).

5.3 Environmental Management System (EMS): These services shall not be performed at a Government facility; therefore, the EMS requirement does not apply.

5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.

5.5 Safety Requirements

5.5.1 Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.01E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan (SHP). The Contractor shall require all subcontractors to comply with required safety, health and fire standards.

5.5.2 Mishap Notification/Investigation: In accordance with DAFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF assets/interests. The Contractor shall ensure the USAF is notified of mishaps. The Contractor shall contact the Contracting Officer (CO) or the Contracting Officer’s Representative (COR), if available, or another MFT member by telephone within eight (8) hours of any damage to government property where the dollar value exceeds $600,000.00, and within two workdays for any damage to government property less than $600,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

a. Contract, contract number, name and title of person(s) reporting

b. Date, time and exact location of accident/incident

c. Brief narrative of accident/incident (events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident.

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated CO or COR, the Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the Government’s safety office. Such release shall be accomplished through the Contracting Officer. The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 48 hours of the mishap (CDRL A007, B007, C007, D007, E007, Accident/Incident Report, DI-SAFT-81563).

PR: FD2060-20-00448 PWS 14

5.5.3 Voluntary Protection Program (VPP): Contractor personnel performing work on a USAF installation shall participate in the local VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html.

5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

5.7 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.

5.8 Quality Management System (QMS): The Contractor shall ensure the quality of services through a quality and/or inspection system. The Contractor shall submit a Quality Control Plan (QCP) addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. The plan shall include the schedule of quality assurance/control inspections planned by the Contractor. 100% compliance with the QMS is required. (CDRL A008, B008, C008, D008, E008, DI-QCIC-81794 Quality Assurance Program Plan)

5.9 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip.

5.10 Service Contract Reporting (SCR): The contract does not meet the DoD Contract Reporting criteria or reporting dollar threshold; therefore, SCR does not apply.

6.0 Plan for Corrective Action

6.1 Unsatisfactory Contractor performance will result in the issuance of a negative PAR. The program office will set a suspense date and forward the PAR to the Procuring Contracting Officer (PCO) for submission to the Contractor. The PCO will submit the PAR to the Contractor for corrective action. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. The Contractor shall sign and return a negative PAR to the PCO by the suspense date.

6.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the program office will initiate the corrective action report (CAR) process. However, the Multi-Functional Team (MFT) reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The PCO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR, with a corrective action plan, to the PCO for http://www.osha.gov/dcsp/vpp/index.html http://www.state.gov/j/tip

PR: FD2060-20-00448 PWS 15

acceptance by the Multi-functional Team (MFT) by the suspense date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT. The CAR will become part of the PCO contract file. If the CAR process fails to resolve the deficiency, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

7.0 Contractor Responsibilities

7.1 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on DCMA’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.

7.2 Maintains an inspection process acceptable to the Government and records of inspections, which shall be made available to the Government as long as the contract requires in accordance with the Inspection of Supply/Services clause(s) identified in the contract/order.

7.3 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, and applicable Government regulations.

7.4 Signs and returns a positive PAR within five business days. Signs and returns a negative PAR with corrective action identified by the suspense date. Signs and returns a CAR with a corrective action plan by the suspense date.

8.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract does not equal or exceed $1,000,000.00; therefore, CPARS reporting is not required.

9.0 Appendices

9.1 Appendix: References

Publication Title of Publication

Date of Publication Section(s) that Apply

PR: FD2060-20-00448 PWS 16

00-25-234

General Shop Practice Requirement for the Repair Maintenance and Test of Electrical Equipment

Sept. 22, 2013

Change 1 March 23, 2014

Entire

DoDD 4715.1E Environmental, Safety, and Occupational Health

(ESOH)

March 19, 2005 http://www.dtic.mil/whs/directives /corres/pub1.html

Entire

DoD Manual 5205.02-M

DoD Operations Security (OPSEC) Program Manual

November 3, 2008 http://www.dtic.mil/whs/directives /corres/pub1.html

Entire

FAR and supplements

Federal Acquisition Regulation https://www.acquisition.gov/

Sections applicable to contract and

PWS

OSD

Memorandum

Enterprise-wide Contractor Manpower Reporting Application

Nov 28 2012 http://www.acq.osd.mil/dpap/polic y/policyvault/Enterprise-wide_Contractor_Manpower_Rep orting_Application_memorandum.

pdf

Entire

Public Law 91-

Occupational Safety and Health Act of 1970

December 29, 1970 as amended through January 1, http://www.osha.gov/pls/oshaweb/ owadisp.show_document?p_id=27 43&p_table=OSHACT

Entire

SAF/AQ

Memorandum

Implementation of FY11 NDAA Section 8108, Contractor Inventory

Nov 13 2012 https://cs.eis.af.mil/airforcecontrac ting/knowledge_center/Documents /AFFARS_Library/5337/2012-11- 13_saf-aq-memo.pdf

Entire

00-35D-54 USAF Deficiency Reporting, Investigation, and Resolution

Sept. 1, 2015 Entire

AS5553B

Fraudulent /Counterfeit Electronics Parts;

Avoidance, Detection, Mitigation, and Disposition

Sept. 9, 2016 none Department of Defense Guide to Uniquely Identifying Items

September 15, 2012 http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=2743&p_table=OSHACT http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=2743&p_table=OSHACT http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=2743&p_table=OSHACT

PR: FD2060-20-00448 PWS 17

Assuring Valuation, Accountability and Control of Government Property, Version 2.5 www.acq.osd.mil/dpap/UID/attach ments/DoDUIDGuideVer2_5.pdf

GIDEP

Operations Manual S0300-

BT-PRO-010

Government-Industry Data Exchange Program

September 2009 http://www.gidep.org/

Chapter 2, Participation Requirements

MIL-STD-

129R

Department of Defense / Standard Practice / Military Marking for Shipment and Storage

Feb. 18, 2014

MIL-STD-

130N

Department of Defense / Standard Practice / Identification Marking of U.S. Military Property

17 Dec. 2007 http://www.acq.osd.mil/dpap/pdi/u id/docs/MIL-Std130N_Ch1.pdf

Entire

2073-1E

Department of Defense / Standard Practice for Military Packaging

May 23, 2008

1686C

Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)

25 Oct 1995 http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.gidep.org/ http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf

File details come from the government source that posted it. Updated .