Atch 1PWS Redacted.pdf

PDF 791 KB Posted

Attached to
LAN DROPS Federal contract opportunity
Solicitation number
FA282323Q0015
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to LAN DROPS, newest first.
File Type Posted
96TW-2022-00259 B60 T001 12JUL22 FLOOR PLAN_Redacted.pdf PDF
Atch 3 96 CS Design Guide .pdf PDF
Atch 4 Site Visit Instructions .pdf PDF
Atch 2 SF 1449.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAN Drop for IT Section Task Order Performance Work Statement (PWS)

Organization:

Address:

Eglin AFB, FL 32542

1. Purpose

Customer is requesting 8 total NIPR cables to room .

Specific Task Objectives:

Contractor shall submit product submittals line items and qualities with part numbers for approval before installation.

The contractor shall provide all materials and perform all work in strict adherence to the attached SOW and 96 CS Design Guide.

In comm room , reuse CAT 6 patch panel D ports 13-21 (punch down). Reuse 4-inch sleeve into the telephone room.

From the telephone room to the outside wall of , reuse the existing cable tray above the drop ceiling. Core concrete and install a 2-inch fire rated sleeve from the hallway into Install j-hooks approx. 35-feet from the hallway through attaching to the block wall above the drop ceiling. Core drywall and install a 2-inch fire rated sleeve from . Install the approx. 20-feet of j-hooks in to the new work area outlet locations.

Install 8-total Plenum UTP Non-secure Internet Protocol Router (NIPR) white CAT 6 data cabling and jacks from comm . 2-total 4 port work area outlets shall be installed flush. Downward sloped 4 port face plates shall be used. All CAT 6 terminations shall be TIA-568A. mounted in the drywall. Refer to drawing T001 for new locations and pathway

All new work area outlets shall have a j-hook placed either above the ceiling or with in close proximity to an under the floor outlet and a minimum of 12-inches of slack provided on the j-hook.

Category 6 network wiring shall be tested per industry standards, such as DB loss, head room, wire map, attenuation and length of the cable between the telecommunications room and the work area outlet or connection point. The test results shall be documented with equipment having a current calibration date.

The government reserves the right to refuse final acceptance until all discrepancies have been resolved to the satisfaction of the government.

2. General Technical Requirements

The following design criteria provides additional requirements and guidance for Eglin AFB installations. These specific requirements are to be implemented by means of all applicable publications and documents referenced within this guide:

2.1. Inside Plant:

Common Patch Panel configuration with Modular style terminations. Site survey will be used to determine best arrangement to fit customer needs and system standards. Ladder rack and cable tray will be included in the TR design to properly facilitate cable routing. All cabinets, racks, ladder rack and cable tray will be grounded per Industry Standard, ANSI 607.

2.2. Telecomm Outlets/Jacks:

Single Gang Outlet Box - Flush Mount. (Single Gang Faceplate Mounting Bracket for Low Voltage Applications, 1-1/4" Maximum Wall Thickness, Finish:

Pre-galvanized.)

Single Gang Outlet Box - Surface Mount. (Single gang two-piece screw together outlet box. Box accepts Pan-Way® Screw-On Faceplates or any NEMA standard single gang faceplate. For use with Pan-Way® LD profile raceway.

5.19in L x 3.45in W x 1.75in H (131.9mm x 87.7mm x 44.4mm). Breakouts for 1/2in, 3/4in, or 1in diameter conduit, International White)

Single Gang 4 Port Faceplate. (4 port minimum. Mini Com Classic series single gang downward sloped faceplate that accepts four modular jacks, Off White)

Data Jack. (The Category 6, RJ45, 8-position, 8-wire, UTP Mini-Com® universal jack module has TG-style termination. Off white)

Blank Inserts. (Mini-Com® 1-port blank module, reserves space for future use, White)

Surface Mount Raceway System. Tamper resistant two-piece latching surface raceway. Supplied with pre-punched mounting holes and factory applied adhesive tape. Available in 6', 8', and 10' lengths, Off White. Compatible with surface mount outlet box. Additionally, all surface mounted raceway systems shall be screwed to the wall to prevent adhesive from detaching from mounted surface.

2.3. Telecommunications Cabling:

Riser CAT 6. (CAT6+ (600MHz), 4-Pair, U/UTP-Unshielded, Riser-CMR, Premise Horizontal Cable, 23 AWG Solid Bare Copper Conductors, Polyolefin Insulation, X Spline, Ripcord, PVC Jacket)

Plenum CAT 6. Copper Cable, Giga SPEED XL 2071E, 23 AWG, 4 Pair, Unshielded, UTP, Solid Bare Copper Conductor, FEP/PVC, CMP, White jacket )

2.4. Cat 6 Connector Block (Patch Panel):

24/48 Port. Constructed for maximum strength and durability. Supports both T568A and T568B wiring configurations using an easy to read color-coded wiring label. Rack-mount modular panels shall include an integrated cable management requirement for cable routing and strain relief. Provide a complete modular system from patch panel to work area outlet.

Strain Relief Requirements. All Strain relief bars shall consist of a metal bar that mounts to the rear of a standard EIA 19" rack to support a minimum of 24 cables exiting from the back of a patch panel with a 2-inch to 5-inch inward mounted offset. Cables shall be secured with integrated adjustable clips, hook and loop strips or cable ties. Optional quick release brackets shall provide an easy way to remove the strain relief bar without the use of tools.

3.0 Singularly Managed Infrastructure with Enterprise Level Security (SMI-ELS)

3.1 Infrastructure Implementation and Operation

3.2 Network Services and Solutions

3.2.1 Site Preparation and Installation Services

The contractor shall perform site preparation and installation activities to support implementation of required services and solutions under this contract at any AF, DoD or other Federal Agency location.

3.2.2. Requirements Analysis and Conceptual Design

3.2.3 Site Survey

The contractor shall perform site surveys at required locations. The findings of the site survey and any actions required in preparation for system installation shall be documented.

3.2.4 Installation

The contractor shall engineer, install, configure, modify, relocate or remove Communication and Information (C&I) systems for operational use. The systems and equipment installations or modifications must comply with established architectures. The contractor shall perform validation and verification testing on the system, assist users in configuring the system to meet their system requirements and provide all applicable operating manuals/system management guides. Further, the contractor shall provide pre-cutover and post-cutover on-site training IAW with TOs. The government will identify personnel who will receive this training. The training shall provide for in-depth hands-on maintenance, operations and database administration.

3.2.5 Inside Plant

The contractor shall, (as required by each TO), install and configure all the components for inside the plant (e.g., power, groundings, racks, fiber optic distribution panels, equipment, internal cabling, comm. closet, etc.). The contractor shall install and test all cable and components IAW accepted industry standards, unless superseded by a Government approved IS indicated within the TO. Electrical and communications cable, conduits, and circuits shall be installed IAW the National Electric Code (NEC). The contractor shall clearly label each end of every individual cable in accordance with the floor plans or engineering drawings. The contractor shall provide attached labels that are durable and legible. For any deviations to the specific installation specification, the contractor shall submit a proposal to the CO for approval.

3.2.6 Tools and Testing Support

The contractor shall provide all tools, installation materials and test equipment required to perform any required product installation and maintenance as called for by the TO. All tools and test equipment shall remain the property of the contractor. Any damage caused by the contractor to existing site facilities or equipment which might occur during site preparation, installation, testing or cutover of the system will be repaired at the expense of the contractor unless otherwise directed by the government. The site shall be restored to the original condition which existed prior to the event unless otherwise directed. The TO will specify testing and inspection requirements. The contractor shall demonstrate that the system design meets the reliability/availability/maintainability requirements of the TO.

4.0. DELIVERABLES

As-Built Documentation. Contractor format for deliverables is subject to Government acceptance. The installer shall provide accurate As-Built documentation of the entire install (i.e. rack elevations, cable route drawings, etc.)

with type of cable path variations identified clearly. All deliverables shall be produced using recommended software tools/versions as accepted by the Government.

Standard Air Force NIPR/SIPR Data/Voice Wall-Mount Rack Elevation

Standard Air Force NIPR/SIPR Data/Voice Rack Elevation

5.0 Test and Acceptance Documentation.

The Contractor shall submit test reports within 3 duty days prior to final test and acceptance. The test reports shall show the tests performed to verify compliance with the specified performance criteria. Test reports shall include record of the physical parameters verified during testing. The contractor shall correct any errors or performance deficiencies detected by testing. The government reserves the right to refuse final acceptance until all discrepancies have been resolved to the satisfaction of the government.

APPLICABLE DOCUMENTS

APPLICABLE STANDARDS CONTRACTORS & INSTALLERS SHALL ADHEAR TO:

National Electrical Code (NEC) and National Electrical Manufacturers Association (NEMA) Standards: NFPA 70

Unified Facilities Criteria: (UFC) 3-520-1, 3-580-1, 4-010-06 dated most recent.

American National Standards Institute/Telecommunications Industry Association (ANSI/TIA) Standards: 568, 569, 606, 607 dated most recent.

National Electrical Contractors Association/Fiber Optic Association: (NECA/FOA) 301-2016 Installing and Testing Fiber Optics

96th Communications Squadron Cyber Infrastructure Design Guide, to include Applicable Publications and Standards referenced in Attachment G, dated FEB 2020

All DoD and Industry standards/guidelines shall be used to provide a complete system, from end to end. Note: Since Standards are continually being revised, contractors and installers should refer to the latest version of any relevant standard for compliance.

Communications Deliverables: Contractor/Installer shall provide for review final ISP/OSP copper or fiber test report(s) and as-built/as-installed drawings prior to scheduling a final quality assurance inspection. Note: Deliverable guidance can be found in the 96 CS Cyber Infrastructure Design Guide.

and remain government property and shall be maintained and disposed of IAW AFMAN 33-363, Management of Records; AFI 33-364, Records Disposition – Procedures and Responsibilities; the Federal Acquisition Regulation, and/or the Defense Federal Acquisition Regulation Supplement, as applicable. Nothing in this section alters the rights of the government or the contractor with respect to patents, data rights, copyrights, or any other intellectual property or proprietary information as set forth in any other part of this PWS or the NetOps and Infrastructure Solutions contract of which this PWS is a part (including all clauses that are or shall be included or incorporated by reference into that contract).

6.3 Security Management

6.3.1 Safeguarding Classified Information

The contractor shall transmit and deliver classified material/reports IAW the National Industrial Security Program Operations Manual (NISPOM) and the National Industrial Security Program Operating Manual (DoD 5220.22-M). These requirements shall be accomplished as specified in the TO. All Classified Contracts must have at a minimum, the Clause 52.204-2 Security Requirement, incorporated into the contract.

Each base will follow its own classified process IAW with the proscribed Federal guidance of the NISPOM and FAR “Subpart 4.4 along with DD Form 254. When transmitting classified information ensure all classified information is properly sanitized and/or degaussed of all sensitive/classified information IAW AFSSI 5020.

6.3.2 Personnel Security

Individuals performing work under these TOs shall comply with applicable program security requirements as stated in the TO. NETCENTS-2 will support the following levels of security: Unclassified; Unclassified, But Sensitive; Secret (S); Secret Sensitive Compartmented Information (S/SCI); Top Secret (TS) and Top Secret Sensitive Compartmented Information (TS/SCI).

6.3.3 Travel Requirements

The contractor shall coordinate specific travel arrangements with the individual CO or COR to obtain advance, written approval for the travel about to be conducted. The contractor’s request for travel shall be in writing and contain the dates, locations and estimated costs of the travel in accordance with the basic contract clause H047.

If any travel arrangements cause additional costs to the TO that exceed those previously negotiated, written approval by CO is required, prior to undertaking such travel. Costs associated with contractor travel shall be in accordance with

FAR Part 31.205-46, Travel Costs. The contractor shall travel using the lower cost mode transportation commensurate with the mission requirements. When necessary to use air travel, the contractor shall use the tourist class, economy class or similar accommodations to the extent they are available and commensurate with the mission requirements. Travel will be reimbursed on a cost reimbursable basis; no profit or fee will be paid.

6.3.4 Other Direct Cost (ODC)

The contractor shall identify ODC and miscellaneous items as specified in each TO. No profit or fee will be added; however, DCAA approved burdened rates are authorized.