This is a Statement of Need for portable vehicle barriers required by the 22nd Security Forces Squadron (SFS) at McConnell Air Force Base, Kansas.

The Air Force requires two portable vehicle barriers to augment force protection operations at the Building 2086/Housing Gate. The barriers must feature a 12-foot opening that deploys upon sentry activation to block vehicle traffic, and must be Department of Defense Science and Technology Management crash-rated to stop vehicles from gaining installation access. Each barrier system shall include a hydraulic pump to operate a hinge crash plate or equivalent assembly, require no ground preparation as they are completely surface-mounted, and be capable of setup within 30 minutes. Power options include commercial 110V/20-amp or solar panel battery power, with a 300-foot power cable required for commercial power operation. The system must include a Department of Transportation-compliant trailer assembly with trailer hitch for mobility and rapid deployment, a remote open/close push button system with control cable, and reflective white/yellow marking tape on the barrier face plate. The gross vehicle weight shall range from 10,000 to 20,000 pounds. Notably, no barrier system requiring personnel to manually push, pull, or position it into traffic lanes will be considered. Contractors must submit pictures of the proposed barriers, provide all necessary personnel, materials, equipment, and transportation for delivery to McConnell AFB, and furnish setup and troubleshooting instruction guides. A minimum one-year warranty covers defects not caused by government damage or misuse, with replacement at no cost to the government. Delivery of each barrier must be completed within 60 calendar days of order receipt.

View the file

Other files

File Type Posted
Solicitation - FA462126Q0018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02 April 2026

Statement of Need Portable Vehicle Barriers McConnell AFB, Kansas

1. Overview

1.1. The 22 SFS requires two (2) Portable Vehicle Barriers to augment Force Protection operations at the Building 2086/Housing Gate, McConnell AFB.

2. Description

2.1. The Portable Vehicle Barriers must have the following features:

12-foot opening for vehicles to pass through, upon activation by posted sentry the barriers will deploy blocking vehicle traffic from being able to proceed.

Barriers must be Department of Defense Science and Technology Management (DOD STM) crash rated for use to stop vehicles from gaining access to the installation.

Hydraulic pump to operate hinge crash plate or like assembly.

Barriers will not require any digging or any pavement preparation; completely surface mounted.

Ability to set up in 30 minutes.

Ability to run off commercial power 110V/20-amp or solar panel battery power.

Department of Transportation trailer assembly with trailer hitch required for system to be moved/towed and rapidly deployed.

Remote open/close push button system with control cable.

300 foot power cable for commercial power required.

Gross Vehicle Weight: 10,000 to 20,000 pounds.

Reflective white/yellow marking tape affixed to barrier face plate.

Provide setup and system trouble shooting instruction guide.

No barrier or barrier system which must be pushed, pulled or positioned into the lane of traffic by posted personnel will be considered.

2.3. Pictures of Portable Vehicle Barriers must be submitted.

2.4. The contractor shall provide all necessary personnel, materials, equipment, transportation or any other items and services necessary to deliver to McConnell AFB.

02 April 2026

3. Warranty

3.1. The contractor shall provide a minimum of 1 year warranty for each container. Any defect that is not caused by government damage or misuse shall be replaced by the contractor at no cost to the government.

4. Delivery

4.1 The contractor shall complete delivery of each line item no later than 60 calendar days after receipt of the order.