Atch 1 - Specifications.pdf

PDF 292 KB Posted

Attached to
Compressors Federal contract opportunity
Solicitation number
NB672060-25-02174
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This Requirements / Specification Document from the National Institute of Standards and Technology (NIST) details procurement requirements for two helium compressors to support Josephson Voltage Standard (JVS) systems. The procurement seeks one water-cooled and one air-cooled compressor, both designed to pair with Sumitomo RDK-205D2 coldheads for operation at 4 K. Key specifications include power consumption between 3.6-5.6 kW, approximately 30,000-hour operation time before maintenance, and compatibility with specific cooling requirements (water or air). Both compressors must be established commercial products with proven field performance, new units covered by the original manufacturer's full warranty, and not sourced from "gray market" components.

The compressors will be delivered to NIST's Boulder, Colorado location within 8 weeks after receipt of order. The water-cooled compressor requires 4-9 L/min cooling water at 5-25°C and helium gas pressures of 200 psig (equalization) and 275-315 psig (operating), while the air-cooled compressor needs 17.6 m3/min of cooling air at 60Hz. These compressors are critical components for the Superconductive Electronics Group's development and demonstration of JVS systems, which serve as a primary reference for the SI volt. The procurement emphasizes reliability, with requirements for established commercial products and specific operational parameters.

View the file

Other files for this federal contract opportunity

Other files attached to Compressors, newest first.
File Type Posted
NB672060-25-02174 Compressor RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: Compressors

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Superconductive Electronics Group (672.06)

General Statement of Need:

The National Institute of Standards and Technology (NIST), particularly the Superconductive Electronics Group (672.06), develops and disseminates Josephson Voltage Standard (JVS) systems as a primary reference for the SI volt. To effectively support the development and showcasing of the JVS systems, there is a distinct need for both a water-cooled and an air-cooled helium compressor. The compressors are essential components of the larger JVS system and are required to pair with Sumitomo RDK-205D2 coldheads to enable operation at 4 K. The water-cooled compressor enables flexibility in the lab for simultaneous system operations, while the air-cooled model is ideal for demonstrations at conferences, offering portability and ease of setup without requiring extensive cooling infrastructure.

Item Specifications and Quantities:

Item 1: Water-Cooled Compressor Quantity: 1 EACH Specifications: 1.1 Support an RDK-205D2 two-stage Gifford-McMahon

Cryocooler (0.5 W @ 4.2 K)

1.2 Power Consumption:

3.6-4.8 kW at 50 Hz or 4.6-5.6 kW at 60 Hz

1.3 Approximately 30,000-hour operation time before

maintenance

1.4 Accepts 4-9 L/min cooling water at 5-25 °C

1.5 Helium gas pressure:

200 psig (equalization pressure for gas lines) 275-315 psig (operating pressure)

1.6 The compressor must be an established commercial product

with at least one unit of comparable complexity operating successfully in the field.

Experimental items are not acceptable.

1.7 The compressor shall be a new (not refurbished or

reconditioned) item covered by the original manufacturer’s full warranty.

The use of “gray market” components not authorized for sale in the U.S. by the proposer is not acceptable.

Item 2: Air-Cooled Compressor Quantity: 1 EACH Specifications: 2.1 Support an RDK-205D2 two-stage Gifford-McMahon

Cryocooler (0.5 W @ 4.2 K)

2.2 Power Consumption:

3.6-4.8 kW at 50 Hz or 4.6-5.6 kW at 60 Hz

2.3 Approximately 30,000-hour operation time before

maintenance

2.4 Accepts 17.6 m3/min of cooling air at 60Hz

2.5 The compressor must be an established commercial product

with at least one unit of comparable complexity operating successfully in the field.

Experimental items are not acceptable.

2.6 The compressor shall be a new (not refurbished or

reconditioned) item covered by the original manufacturer’s full warranty.

The use of “gray market” components not authorized for sale in the U.S. by the proposer is not acceptable.

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: TBD

Mail Stop: TBD 325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.]

☐ Direct Delivery to OU Building Required [Explain Need for Requirement] Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement]

Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

8 weeks After Receipt of Order (ARO) ☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:

[Enter Details] NOTE: SME shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: 120 (V) Maximum Current: [Enter max current draw] (A) Phase: Three phase

Frequency: 60 (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P)

Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

☒ Acceptance Not Expected to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

[Duration]

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials] ☐ Other [Enter Other Training Requirements]

NOTE: SME shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable Warranty Length: > 1 year What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance [Describe Maintenance Requirements Per Item]

☒ N/A Maintenance Plan Length: [i.e. 3 - Years]

What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished Material / Equipment ☒ N/A

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.