Atch_1_Specifications.pdf

PDF 1 MB Posted

Attached to
BADL Fence Panels Federal contract opportunity
Solicitation number
140P6324Q0018
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document appears to be the Specifications for the Badlands National Park Supply Continuous Panels for Boundary Fence contract opportunity. The contractor will be responsible for supplying and delivering 100 continuous fence panels to replace the park's boundary fence. The panels must be 20 feet long, 7-rail, 57 inches tall, made of 14-gauge steel with no paint or coating, and come with 7-rail connectors. In addition, the contractor must provide 1,000 steel clips/fasteners of at least 14-gauge. The delivery location is the construction site south of Wall, SD, and the contractor must coordinate the delivery at least 3 business days in advance. The related federal contract opportunity, solicitation number 140P6324Q0018, is for Badlands National Park Fence Panels, issued by the Department of the Interior National Park Service Midwest Region.

View the file

Other files for this federal contract opportunity

Other files attached to BADL Fence Panels, newest first.
File Type Posted
Sol_140P6324Q0018_Amd_0001.pdf PDF
Sol_140P6324Q0018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications Badlands National Park

Supply Continuous Panels for Boundary Fence

Contractor will be responsible for supplying and delivering the materials to complete the replacement of 100 continuous fence panels for the update of the Boundary Fence.

FOB Destination: Wall SD 57780 Delivery location will be to the construction Site, South of Wall SD. Please make arrangements to meet for delivery and or directions a minimum 3 business days in advance of delivery.

Directions to Bison Corrals from exit 110 Wall SD

• Take exit 110 off I-90 Wall.

• Head south on highway 240 for 1.5 miles.

• Take a right on Sage Creek Road.

• Veer left in 5.5 miles.

• Enter Badlands National Park at 9 miles.

• Veer right at 9.5 miles.

• Go through steel pipe gate to bison corrals at 10.5 miles.

• Travel a half mile to corrals.

Contractor will provide the following Materials:

1. Continuous Fence Panels: (Quantity 100)

• Panels will be 20 feet in length.

• Panels will be 7 Rail (Horizontal Bars)

• Panels will be 57 inches tall.

• Panels will be constructed with 1 ¼ inch Round Metal Rod

• Panels will have 6 Vertical ¾ inch Round Metal Rod Braces

• Minimum gauge steel to be uses is 14 gauge.

• Panels will be made from Steel with no paint or powder coating.

• Panels must be free from rust, holes, and gouges.

• Panels will come with 7 rail connectors to make panels “continuous”.

2. Clips/Fasteners: (Quantity 1000)

• Fasteners will be a minimum of 14 gauge.

• Fasteners will be made of steel.

• Fasteners will not be coated or painted.

Submittals:

-Send photo of completed panel, clip, and connector.

Pictures and Examples:

MAPS:

Directions to Bison Corrals from exit 110 Wall SD

File details come from the government source that posted it. Updated .