Atch 1 Specifications.pdf
PDF 308 KB Posted
- Attached to
- Cryogenic x-y-z Positioner Federal contract opportunity
- Solicitation number
- NB672030-23-01962
About this file
This document provides specifications for a cryogenic x-y-z positioner solicitation issued by the National Institute of Standards and Technology. The solicitation seeks a low-power positioning stage with 20mm x and y travel range and 4mm z travel range for use at temperatures as low as 10mK. Key requirements include non-magnetic materials, repeatable positioning within 2um, dissipating less than 40mJ/mm of energy per unit of travel at 4K, encoders using less than 100nW of power, and z-positioners capable of lifting 100g at cryogenic temperatures. Vendors must also provide a closed-loop motion controller, software, and cabling. The delivery date is 24 weeks after receipt of order and inspection and acceptance is not to exceed 30 days. Training and warranty, calibration, and maintenance services are also required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ NB672030-23-01962 Cryogenic XYZ Positioner.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: Cryogenic x-y-z Positioner
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Radio Frequency Technology Division Radio Frequency Electronics Group, 672.03
General Statement of Need:
NIST needs a low-power X-Y-Z positioning stage for direct use at 20 mK in a dilution refrigerator with accurate position encoding and a closed-loop controller. The stages must be usable at 20 mK and result in minimal heating of the stage, reducing warmup and keeping the time to cool the temperature of the mixing stage back to 20 mK as short as possible. The materials must be non-magnetic as superconducting circuits sensitive to magnetic fields will be tested.
Current solutions are primarily based on piezoelectric positioners. The power P dissipated in piezoelectric positioners with a capacitance C and loss tangent tan(δ) driven by a sinusoidal signal with frequency f and RMS voltage V in the piezoelectric actuators is given by P = V2 f C tan(δ). If the positioners travel a step size ∆s during each cycle of the sinusoidal drive signal, the total time ∆t to move the positioners a distance d is given by ∆t = d/(f ∆s). Thus, the energy dissipation E required to move a distance d is E = P ∆t = P d/(f ∆s) = V2 C tan(δ) (d/∆s).
To reduce power dissipation at low temperatures to an acceptable level, NIST requires that the energy dissipated in the positioner per unit length of travel E/d = V2 C tan(δ) / ∆s be less than 40 mJ/mm at 4 K for a piezoelectric drive voltage V capable of exerting force of 100 g and drive speed of f ∆s > 0.1 mm/s.
In addition, the power dissipated at the positioner required to determine the position of each encoder must be less than 100 nW and the Z positioners used in the stage must be able to lift 100 g at cryogenic temperatures. Finally, the encoders and closed-loop positioning algorithm must be able to repeatably place each positioner within ±2 um.
Item Specifications and Quantities:
Item 1: Cryogenic x-y-z Positioner Quantity: 1 Specifications: 1.1 20 mm x and y travel range, 4 mm z travel range
1.2 Closed-loop positioning repeatability within ±2 um on all axes.
1.3 Non-magnetic materials.
1.4 Positioners and encoders designed to operate and meet
specifications to 10 mK and in high vacuum environment.
1.5 The energy dissipated in the positioner per unit length of travel E/d = V2 C tan(δ) / ∆s is less than 40 mJ/mm at 4 K for a piezoelectric drive voltage V capable of exerting force of 100 g and drive speed of f ∆s > 0.1 mm/s.
1.6 The power required to determine the position of each
encoder is less than 100 nW.
1.7 The Z positioners must be capable of lifting 100 g at
cryogenic temperatures.
1.8 Positioners suitable for use in high-vacuum environment
without outgassing.
1.9 All screws, wiring and mounting hardware required.
Item 2: Motion controller, software and cabling Quantity: 1 Specifications: 2.1 Offers closed-loop of cryogenic positioners.
2.2 Must include software and interfaces to allow for
programmed motion through USB or over LAN.
2.3 Cabling needed to connect controller to positioners.
Procurement Support Information and Ancillary Services:
[Provide input for each section Below or Mark Not Applicable (N/A)]
Section Requirements/Specifications
Planning Considerations ☐ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
325 Broadway Boulder, CO 80305
☐ [Alternate Shipping Address] Shipping Criteria:
☒ Partial Delivery Acceptable ☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☒ Delivery Shall Be Competed No Later Than:
24 Weeks ARO ☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☐ N/A
[Enter Electronic Media Requirements by Item.]
☒ Software ☐ Electronic Manuals ☐ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☒ US Government Email Address for Software Delivery:
dylan.williams@nist.gov
Installation ☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: TPOC shall be the coordination POC.
Facility / Utility Considerations ☐ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☒ Power Available
Voltage: 110 (V) Maximum Current: 15 (A) Phase: [Choose Phase]
Frequency: 60 (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site
☐ Acceptance Expected to Not to Exceed 7 Business Days
☒ Acceptance Expected to Exceed 7 Business Days:
30 days. Testing is complex time consuming.
☐ Inspection and Acceptance Plan:
[Explanation]
[Enter Other Requirements]
Training
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: TPOC shall be coordination POC.
Warranty ☐ N/A
Standard manufacturer warranty acceptable Warranty Length: 1 year What is included?
☒ Labor ☒ Parts ☒ Travel ☒ Cost and Liability for Returns
☐ Other [Enter Other Requirements]
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Government Furnished Material / Equipment ☒ N/A
List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .