Statement Of Work

SEAL AROUND METAL AND CONCRETE BRACKET

FREEDOM CHAPEL ATRIUM

JBSA LACKLAND

1.PROJECT SCOPE: The contractor shall furnish all supervision; labor, transportation materials, tools, incidentals, dumpsters, equipment, and quality assurance to Seal around vertical bracket to prevent bats from roosting in the Atrium area and pressure wash concrete pillars, windows and concrete floor at Freedom Chapel at Lackland Air Force Base
2.PROJECT DESCRIPTION: The requirements of this project are but not limited to the following: The facility will be occupied under construction operations. The facility will be occupied while the work required by this contract is performed. The contractor shall provide all lifting equipment for parts and personnel, specialty tools, parts and qualified technicians, barriers and signs to prevent unauthorized personnel from entering the work area while the Contractor is removing and installing equipment or material. Contractor will work in conjunction with 502 CES.
Requirements-

· Contactor shall seal around all metal vertical bracket with water resistant polyurethane spray foam insulation and Water resistant Sealant NP 1 Polyurethane to seal where bat roosts inside the Atrium area.

· Pressure wash concrete pillars and Concrete Floor approx. 12000 S.F. Pressure wash Metal roof is approx. 5800 S.F. and Pressure wash Window approx. 800 S.F. inside Atrium area

· Contractor shall move benches and tables inside Atrium if needed to get where they need too with the lift and shall put back benches and tables if moved.

NOTE: Contractor needs to do site visit to make sure what kind of Boom Lift they need to use to do the job.

3.GENERAL: The project will be coordinated with the contractor by the Facility Manager, Contracting Officer or CE Project Manager 24 hours before the actual work is to commence to minimize mission impact or deficiencies that may occur during the normal work week, Monday through Friday 7:00 a.m. to 5:00 p.m.
4.GOVERNMENT FURNISHED SERVICES: The government will provide utilities (water and electricity) and emergency, fire and security police response
5.TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations, and are subject to random vehicle speed control checks. Contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on military installations in San Antonio, TX.
6.HAZARDOUS AND/OR TOXIC MATERIALS: A hazardous material (HAZMAT) is one that poses a risk to the health and safety of the public, and/or the environment if not properly controlled during the handling, storage, manufacture, processing, packaging, use, disposal, or transportation. Hazardous materials may be elements or compounds, and can be found as gases, solids, liquids, or a hazardous material (HAZMAT) is one that poses a risk to the health and safety of the public, and/or the environment. Hazardous chemical are defined under Sec. 1910.1200 (c) of Title 29 of the Code of Federal Regulation. Contractor shall identify and report HAZMAT usage to the HAZMAT Pharmacy according to local procedures. All HAZMAT brought to the job site shall require the contractor to fill out an AF Form 3952 for each item for submission to the Hazardous Material Pharmacy. Additionally the contractor is required to submit Material Safety Data Sheets (MSDS) as directed by the clause entitled Hazardous Material Identification and Material Safety Data (FAR 52.223-3). The Contractor shall submit a monthly actual usage report of all hazardous/toxic materials brought onto the base during the preceding month to the HAZMAT Pharmacy (IAW AFI 32-7086, Hazardous Material Management) no later than the 5th calendar date of each month.
7.SITE CONDITIONS: The Contractor shall furnish and maintain adequate barricades, and warning signs, at the job site. The contractor shall clean up debris on a daily basis.
8.CODES AND REGULATIONS: All work shall be accomplished in accordance with the CEO Contract Specifications, applicable Uniform Building Codes, Air Force Base Regulations, and OSHA Requirements.
9.INSPECTION AND ACCEPTANCE: A representative from 502 CES will conduct a inspections of work progress to be at 50% completion of the project. A final inspection of completed work will be conducted by the project manager, contractor and designated 502 CES personnel. Discrepancies identified during inspections shall be corrected prior to final payment.
10.HOURS OF WORK: Normal duty hours are from 7:00 Am to 5:00 PM, Monday through Friday, except on government holidays. Contractor should coordinate work with 502d CES Project Government Representative.
11.PERIOD OF PERFORMANCE: The performance period is estimated to be completed 45 calendar days
12.CLEAN-UP: At the end of each working day, the Contractor shall clean up the work site by removing all debris. Clean up of the work site shall include the repair area(s), stage area(s), parking and eating area(s) and any other area(s), affected by the repair process. Any dirt or mud tracked on the any base Street, parking area, sidewalk, patio, driveway, or building shall be cleaned daily.

13. CONTRACTOR FURNISHED SERVICES: All required tools, parts, materials and supplies shall be supplied by the contractor and should be on hand before beginning work

14. CONTRACTOR: All Contractor generated refuse and waste shall be stored in a waste container provided by the Contractor and hauled from the project site to a disposal area to be selected by the Contractor and shall be located outside the physical boundaries of the project. Refuse disposal shall comply with the current disposal environmental requirements. The work site shall be kept neat, orderly and safe for workmen at all times. On-site dumpsters, if furnished by the Contractor, shall be coordinated with CE Project Manager. All manifests shall be obtained prior to the transportation of refuse off-site.