Atch 1 - Scope of Work - BB Court Resurface.pdf
PDF 129 KB Posted
- Attached to
- Outdoor Basketball Court Resurface
- Solicitation number
- FA445221Q0033
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 1 - Scope Basketball Court Resurface (rev 8-23).pdf | ||
| Amendment 01.pdf | ||
| FA445221Q0033 - BB Court QnR.pdf | ||
| Atch 3 - Site Visit Location.pdf | ||
| Atch 2 - Reps and Certs.docx | DOCX document | |
| Combined Synopsis Solicitation-BB Court Resurface.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basketball Court Resurface
Scope of Work
The 43 Air Mobility Operations Group (AMOG) has identified the necessity to repair the full-length basketball court on the south side of the Dormitory Campus next to building 298.
The current basketball court has a rubber coating that has started cracking and bubbling making the court nearly unplayable and unsafe to use. The underlying court surface is not level and has large dips that hold water after rain showers.
The goal is to create an area where Airmen can play basketball and hang out by fixing the court, replacing the basketball hoops and installing bleachers. The requirements follow:
Requirements:
- Remove all rubber coatings down to pavement surface
- Level Out Pavement Surface (85x50ft)
- Cover Pavement with plastic or rubber court surface (85x50ft)
- Paint standard basketball court lines on court.
- Install 2 new inground basketball hoops on each side of court; Height: 10 feet;
Backboard: 60” Acrylic
Optional Bleacher Requirement:
- Install gravel and level 85x10ft area on North Side of the court next to building 298 for bleacher installation.
- Install 3 sets of 4 tier bleachers along the North Side of the court next to building 298.
All construction debris and garbage will be the contractor’s responsibility to remove from the site and dispose of IAW applicable Federal, State, and Local laws and regulations.
The awarded Contractor will coordinate daily access to the facility and the work schedule with the Government POC, to be provided after award. The Contractor will also coordinate with the Government POC requirements for onsite storage of project specific construction materials and tools.