PERFORMANCE WORK STATEMENT (PWS)
FOR
FY21 SIDETRACK ROADBED MAINTENANCE
AT
U.S. GOVERNMENT SIDETRACK
NO. 342 AND 343, TSURUMI
FLCY-Tsurumi
10 Mar 2021
The attached PWS is being provided in accordance with (IAW) Section 801, 10 USC 2330. Any contract or task order resulting from this request is to be acquired using performance-based principles.
Attachment 1 to PO No. FA520921P0059
1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform maintenance and repairs to the sidetrack roadbed portion of U.S. Government Sidetrack No. 342 and 343, Tsurumi, in a manner that will ensure continuous and reliable railroad operational condition. The performance period shall be from 01
April 2021 through 31 March 2022.
1.1. MAINTENANCE AND REPAIR SERVICES. The maintenance and repair services shall be in accordance with (IAW) the Japan Freight Railway Company’s (JFRC) rules and regulations as specified in the Agreement between the United States of America and JFRC for Handling Military Sidetracks, dated 01
Apr 1987, paragraphs 2, 4, 6 and its first Supplementary Agreement dated 13 July 1987, paragraph 5 entitled
“Maintenance”, and the second Supplementary Agreement dated 16 March 1988, subparagraphs 5.e and 5.f.
All construction debris or waste generated from this contract shall be removed IAW all Japanese laws and regulations, Japan Environmental Governing Standards (JEGS, https://www.usfj.mil/Portals/80/2018%20JEGS.PDF?ver=2018-04-26-195301-487), commercial practices, and local standards.
1.2. The Contractor shall perform maintenance and repairs to the sidetrack roadbed portion of U.S.
Government Sidetrack No. 342 and 343, Tsurumi, as identified in Appendices D through I to ensure reliable and continuous operation. The work shall include but is not limited to:
(a) Item 0001: Maintenance of Sidetrack OU-2 (No. 342) IAW Appendices D, F and G.
(b) Item 0002: Maintenance Sidetrack OU-1 (No. 343) IAW Appendices E, F, G, H and I.
(c) Item 0003: Emergency Repair IAW Paragraph 1.3.
1.2.1. Environmental Protection Plan (EPP). Prior to initiating any work on site, the Contractor will meet with the Contracting Officer to discuss the proposed Environmental Protection Plan (EPP) and develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural/cultural/historical resources, required reports, and other measures to be taken. Submit the proposed
Environmental Protection Plan for further discussion, review, and approval. Commencement of work will not begin until the environmental Protection Plan has been approved. (See Appendix A)
1.2.2. WEED CONTROL. Weeds on the sidetrack shall be maintained using only non chemical methods
(pulling, moving, chaining, etc.).
1.2.3. NAVFAC-FE, ENVIRONMENTAL OFFICE (PRY4 PWD ENVIRONMENTAL). The
Contractor shall be familiar with Environmental Management System (EMS) at Commander, Fleet
Activities, Yokosuka (COMFLEACT Yokosuka) which applies to all COMFLEACT Yokosuka departments, tenant organizations, and their contractors and its subcontractors within COMFLEACT
Yokosuka’s fence line; and knowledge of environmental that are applicable to operations similar to those of this contract. EMS is available at ECATTS website, https://environmentaltraining.ecatts.com/.
1.2.3.1. The Contractor and the subcontractor shall perform work under the contract consistent with
COMFLEACT Yokosuka’s EMS goals and policy.
1.2.3.2. The Contractor and the subcontractor shall maintain monitoring and measurement information to address the EMS goals and policy.
1.2.3.3. The Contractor and the subcontractor shall complete the latest EMS Awareness Training prior to performance of the scheduled work at COMFLEACT Yokosuka by ECATTS training modules on ECATTS website https://environmentaltraining.ecatts.com/ and/or by equivalent training method. The Contractor and its subcontractor shall submit certifications to the KO prior to performance of the scheduled work; and shall retain training records and make them available upon request.
1.2.3.4. In case any hazardous materials are used, the Contractor shall accomplish the following:
Attachment 1 to PO No. FA520921P0059 https://www.usfj.mil/Portals/80/2018%20JEGS.PDF?ver=2018-04-26-195301-487
If this is a best value type contract, another proposed Contractor’s Work Plan should be submitted with proposal. It can help us to evaluate the technical and the cost of the pest control portion of the contractor proposal.
(a) Submit the latest SDS with Contractor Hazardous Material Inventory Log (See Appendix B) to
PWD Yokosuka Environmental Division (PRY4).
(b) Input Material name, Manufacture name, SDS number, Material State (i.e., Liquid, Solid, Gas), and
Daily Storage Quantity (Average and Max) into the log.
(c) A SDS information file shall be maintained on site.
(d) Hazardous material dispensing areas must be properly maintained.
(e) Drums/containers must not be leaking.
(a) Drip pans/absorbent materials must be placed under containers when necessary to collect drips or spills.
(b) Container contents must be clearly marked.
(c) Dispensing areas must be located away from catch basins and floor/storm drains.
(d) In case a Hazmat is stored, follow the appropriate requirements.
(e) HAZMAT shall be properly used and stored IAW SDS.
(f) Flammable Hazmat and Corrosive Hazmat shall be stored separately in appropriate lockers and acids are stored separate from alkali.
1.2.4. HAZARDOUS WASTE (HW).
1.2.4.1. No HW shall be brought onto the government property from off-base nor shall no HW be abandoned on government property.
1.2.4.2. The Contractor shall identify construction activities that will generate HW and identify, segregate, containerize, label, handle, accumulate/store, and dispose of it IAW the current JEGS, installation regulations and requirements such as HW Management Plan (HWMP), and all the applicable Japanese national and local regulations and requirements. If the work requires the temporary storage/collection of
HWs on site overnight, the Contractor shall request the establishment of a Contractor Hazardous Waste
Accumulation Point (HWAP) at the point of generation and operate the Contractor HWAP to comply with the applicable regulations and requirements. When HW will be removed from the job site properly daily, the
Contractor HWAP is not required. For further guidance, contact the CFAY PWD Environmental
(Extension: 243-3186/4886 or Commercial: 046-816-3186/4886).
1.2.4.3. Any HW generated from this work will be properly disposed of through on-base Hazardous Waste
Storage Area (HWSA), located in Bldg. 1822 in COMFLEACT Yokosuka, or at an approved off-base disposal facility IAW the current JEGS, installation regulations and requirements, and all the applicable
Japanese national and local regulations and requirements. In general, the Contractor shall dispose of HWs, excluding asbestos containing material (ACM) waste and contaminated soil or unless specified in this contract, at the HWSA while it shall dispose of HWs, such as ACM waste and contaminated soil in addition to specified waste in this contract, at off-base disposal facility with the Government’s approval. HWs that are turned into the HWSA shall be accompanied by a completely filled Hazardous Waste Disposal Request
Form with a properly established disposal Job Order Number (JON) from the KO. Contact the HWSA
(Extension: 243-5777 or Commercial: 046-816-5777) for coordination or to schedule HW turn-in. Turn-in arrangement with the HWSA shall be made at least three (3) working days in advance. Off-base disposal coordination shall be performed by the Contractor properly. Legible copies of Waste Disposal Manifest (at least a copy of receipt “A” at the time of shipping and a copy of receipt “E” upon completion of disposal) shall be submitted to the CFAY PWD Environmental via the KO in a timely manner. To obtain further disposal instructions and guidance, the Contractor shall coordinate with the CFAY PWD Environmental via the KO.
1.2.5. REQUIREMENT FOR HANDLING SOIL, SOLID WASTES, AND RECYCLABLE
MATERIALS.
1.2.5.1. The soil in entire OU1 and OU2 are “contaminated”. Soil in OU1 and OU2 were determined to be contaminated with following these chemicals or heavy metals everywhere. “Lead”, “Arsenic”, “Diesel/Waste Oil”, “Fluorine”, and “Mercury” were exceeded the contaminated soil disposal criteria of
JEGS 2016 and Japan Soil Contamination Countermeasure Law. Soil sampling test in Tsurumi OU1 and
OU2 were conducted in July 2000, Aug 2005, May 2009, May 2011, and Jul 2013.
1.2.5.2. Per CNFJ “Contaminated Soil Excavation and Management Policy”, soil generated from the excavation may be backfill into the same spots where the soil comes from. Soil testing is not required when the excavated soil is backfill in the original location. Excavated soil shall not be moved to other locations without testing. Excavated soil shall not be mixed and shall be segregated from other material. Rocks, concrete waste, and other material shall not be separated from contaminated soil in the process of loading or transporting. Excess contaminated/suspected/unknown soil disposed through off-base shall be tested by a certified laboratory and properly disposed of off-base IAW JEGS and Japan Soil Contamination
Countermeasure Law. A legible copy of soil testing results shall be submitted to CFAY Soil Manager through the Subject Matter Experts (SMEs).
1.2.5.3. During the temporary storing of excavated soil until off-base disposal or backfill, the excavated soil shall be covered with vinyl sheets to prevent the soil from run-off by rain, and the label that indicates
“Project Name”, “Contract Number”, “Contractor’s Name”, and “POC phone number” shall be posted on the vinyl sheet. For further soil disposal guidance, contact CFAY PWD Environmental at 243-5180/6720
(Extension) or 046-816-5180/6720 (Commercial).
1.2.5.4. Soil excavated from different locations shall be segregated based on the waste characteristics to prevent mixing. However, this requirement shall not apply when the contaminated soil is processed in a facility that is capable of treating soils with different waste characteristics. Contaminated soil shall not be unloaded except at an appropriate contaminated soil processing facility.
1.2.5.5. Soil sampling plan shall include sampling methods, sampling equipment and container, number of samples to be tested, sample volumes (minimum quantity required per container), preservation techniques, holding times and chain of custody (COC) to CFAY PWD Environmental Soil Program Manager at 243-
5180 (Extension) or 046-816-5180 (Commercial) prior to sampling even if excess soil will be disposed of off base or placed at a different location.
1.2.5.6. Any non-hazardous solid/industrial/construction/waste/debris other than recyclable scrap metals generated from this operation shall be properly segregated and transported/disposed of permitted off-base solid industrial waste disposal/landfill facility by government-approved solid/industrial waste transportation/disposal contractor IAW local and prefectural solid industrial waste transportation and disposal laws and regulations (i.e. Wooden ties, railroad spikes, and weeds). A legible copy of Waste
Disposal Manifest (a copy of receipt “E”) with the completion date of landfill and the CFAY Solid Waste
Tonnage Report (See Appendix C) SHALL BE submitted to Solid Waste Manager, CFAY PWD
Environmental through the SMEs. The CFAY Solid Waste Tonnage Report shall include the totals of (1) the accurate weight unit (Kg) and (2) monetary unit** (Both Dollar and Yen with the timely exchange rate).
**If the material disposed or recycled off-base was sold for profit, you must indicate the amount the material was sold for, using < > symbols around the amount (i.e., <$150> or <¥15,000>).
1.2.5.7. Non-hazardous solid/industrial waste storage containers provided at the operation site shall be leak-proof, water-proof, and vermin-proof including sides, seams, and bottoms; and be durable enough to withstand anticipated usage and environmental conditions without rusting, cracking, or deforming in a manner that would impair serviceability. Storage containers shall have functional lids or equal to cover.
Containers should be stored in the avoidable area from physical damage and on a firm, level, well-drained surface that is large enough to accommodate all of the containers and that is maintained in a clean, spillage-free condition.
1.2.5.8. Scrap metals other than the items with contamination of hazardous substances or other than the
Contractor’s property SHALL BE recycled through Bldg. 4856, CFAY Qualified Recycling Program
(QRP), in COMFLEACT Yokosuka through coordination with the SMEs. Off-base recycling is required justification to be submitted and approved by CFAY QRP before recycling off-base.
1.2.5.9. The scrap rails shall not exceed the maximum allowable size of 2.5 meter wide, 6.0 meter length, and 2.5 meter height; and 4,000 kg when the Contractor turns in the scrap rails to CFAY QRP.
1.2.6. COMPLETION REPORTS. The Contractor shall submit reports to the SMEs upon completion of each maintenance item specified in Appendices D and E. At minimum, the report shall include the following: Maintenance item completed, date of completion, pictures of the item completed, signature of the Contractor’s representative. The reports shall be approved by JFRC prior to submission to the SMEs.
1.3. EMERGENCY REPAIR. In the event that action is required to correct a safety issue or protect lives and/or properties, the KO may verbally instruct the Contractor to proceed with the emergency repairs by issuance of a supplemental agreement pursuant to FAR 52.212-4, Contract Terms and Conditions -
Commercial Items in this contract. All repair work shall be IAW the JFRC’s rules and regulations. This effort is not included in the basic price.
1.4. JFRC’S INITIAL INSPECTION. After completion of the Contractor’s scheduled work cited in the contract, initial inspection shall be performed by JFRC prior to inspection by the Government. Inspection of services will be accomplished by the SMEs based on the JFRC’s certification of inspection.
1.5. ROAD-RAIL VEHICLES (Kirikusha). In case that using the road-rail vehicles which can operate both on rail tracks and a public road is necessary. Access to OU1 and OU2 by road-rail vehicle can be available for the Contractor at the rail-crossing at the public-road-side of OU1 and OU2.
1.6. INTERFERENCE WITH GOVERNMENT OPERATIONS. The Contractor shall make every effort to schedule its maintenance activities so as not to interfere with U.S. Government operations. In the event such interference is necessary, the Contractor shall provide the KO and SMEs with a minimum of five
(5) working days advance notification of the proposed work by written copies.
1.7. WORK SCHEDULE. The Contractor shall submit an annual work schedule to the KO and SMEs prior to commencement of the subject contract. Additionally, the Contractor shall submit a monthly work schedule to the KO and SMEs prior to the beginning of the month.
1.8. HUMANITARIAN ASSISTANCE AND DISASTER RELIEF (HADR). The scope of this contract includes services to respond to requirements in a contingency environment including humanitarian assistance and disaster relief.
1.9. GENERAL INFORMATION.
1.9.1. QUALITY CONTROL. The Contractor shall develop and maintain a quality control program to ensure the services are performed IAW the PWS, the standards of the contract, and the JFRC’s regulations.
A QCI (Quality Control Inspector) shall be responsible for inspecting, identifying, and preventing defects in the quality of service performed.
1.9.2. QUALITY ASSURANCE. The Government will evaluate all of the Contractor’s performance IAW the Quality Assurance Surveillance Plan (QASP) by KO to monitor performance to ensure services are received. The SMEs will send a monthly report to the KO on the Contractor’s service.
1.9.3. GOVERNMENT REMEDIES. The KO will follow FAR 52.212-4, Contract Terms and Conditions
- Commercial Items for the Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
1.9.4. CONTRACTOR PERSONNEL.
(a) CONTRACT MANAGER (CM). The Contractor shall provide a CM who shall be responsible for the performance of the work. The name of this person and an alternate or alternates, who shall act for the Contractor when the manager is absent, shall be designated in writing to the KO. The
CM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract and shall be individuals who are capable of conversing in and comprehending English.
(b) CONTRACTOR EMPLOYEES. Contractor personnel shall be easily recognizable as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the Contractor’s company name and the employee’s name.
(c) REMOVAL OF CONTRACTOR’S EMPLOYEES. The Contractor shall utilize only experienced, responsible, and capable employees in the performance of this contract. The KO may require that the Contractor remove from the Government job any of his/her employees who endanger persons or properties, or whose continued employment under this contract is inconsistent with the interests of military security.
(d) OTHER COUNTRY NATIONALS (OCN). The Security Forces on each base control entry to the base. Under certain circumstances, the OCN might be denied entry. It is the Contractor’s responsibility to coordinate with the Security Forces at each base when there is a question about particular circumstances.
(e) The Contractor shall not employ any persons who are employees of the U.S. Government and/or
Master Labor Contract employees if employing that person would create a conflict of interest or become in violation of the Procurement Integrity Act (See Federal Acquisition Regulation Section
3.104). Additionally, the Contractor shall not employ any persons who are employees of the
Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DOD 5500.7-R, the Joint Ethics Regulation (JER).
1.9.5. SUBCONTRACTING. The Contractor shall submit a list of its subcontractors to the KO. The subcontractors shall meet the standards required by this contract to perform the service. The prime
Contractor is responsible for the performance of the subcontractors.
1.9.6. INSTALLATION BASE PASSES. For access to U.S. Installations, the U.S. Government will issue all required Gate Passes/Vehicle Passes to contractor personnel at no cost to the Contractor. To obtain passes, the Contractor is required to submit documents IAW each installation instruction. The prime
Contractor shall be responsible for all passes issued to his/her own or his/her subcontractor’s employees under this contract. The Contractor shall return all applicable passes upon termination of employment or completion of this contract to the Installation Pass Office.
(a) GATE PASSES. In order to obtain Gate Passes, the Contractor may be required to (i) submit certificates of residence, abstracts of family registers, and an ID photo, in addition to application forms which could vary depending on each installation, and (ii) make appointments at the
Installation Pass Offices to take ID photos and pick up issued passes. The Contractor is responsible for the expenses and costs that it would incur in order to obtain Gate Passes.
(b) VEHICLE PASSES. In order to obtain Vehicle Passes, the Contractor shall submit the proof of valid liability insurance that must cover the automobile liability insurance in the types and minimum amounts of (i) Bodily Injury - ¥30,000,000 per person per occurrence, in addition to the
Japanese Compulsory Insurance (JCI), and (ii) Property Damage - ¥3,000,000 per occurrence.
1.9.7. HOURS OF OPERATION.
(a) WORK HOURS. Contractor work hours are from 0800 to 1630 Monday through Friday including
Japanese holidays, but excluding U.S. legal holidays. The Contractor shall finish their work before sunset for safety reasons.
(b) U.S. LEGAL HOLIDAYS. Recognized U.S. legal holidays are listed below. Holidays falling on a Saturday may be observed on the preceding Friday. Holidays falling on a Sunday may be observed on the following Monday.
DATE HOLIDAY
1st January New Year’s Day
3rd Monday in January Martin Luther King’s Birthday
3rd Monday in February President’s Day
Last Monday in May Memorial Day
4th July Independence Day
1st Monday in September Labor Day
2nd Monday in October Columbus Day
11th November Veteran’s Day
4th Thursday in November Thanksgiving Day
25th December Christmas Day
1.9.8. REPORTS OF DAMAGES, DESTRUCTION, INJURY, OR DEATH.
(a) The Contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract. For the purposes of this clause, the term “property” includes equipment or property of any type, whether Government owned or not. The term “Contractor” includes the Contractor, its agents, servants, or employees.
(b) The Contractor shall submit these reports to the SMEs and KO as follows:
(1) A preliminary report shall be made as soon as practicable after the time the incident occurs.
Report may be either verbal or facsimile.
(2) A complete written report shall be submitted within 96 hours after occurrence of the incident.
A copy of this report shall be furnished to the SMEs and KO.
2. SERVICES SUMMARY (SS).
The following SS identifies the performance objectives and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective PWS Paragraph Performance
Threshold
Method of
Assessment
SS 1: Repair and Maintain Sidetrack Roadbed Portion
a. Replacement of Regular (Wooden) Tie (No.342 / OU2).
b. Replacement of Iron Tie (No.342 / OU2).
c. Replacement of Switch Tie (No.342 / OU2).
d. Replacement of Curve Sign (No.342 / OU2).
e. Replacement Boundary Line Sign (No.342 / OU2).
f. Cleaning of Flange Way (No.342 / OU2).
g. Oiling of Switching Point (No.342 / OU2).
h. Weed Control (No.342 / OU2)..
i. Industrial Waste Disposal (No.342 / OU2).
j. Replacement of Regular (Wooden) Tie (No.343 / OU1).
k. Replacement of Iron Tie (No.343 / OU1).
l. Removal / Restoration of Asphalt (No.343 / OU1).
m. Replacement of Fastening Device (No.343 / OU1).
n. Replacement of Switch Tie (No.343 / OU1).
o. Cleaning of Flange Way (No.343 / OU1).
p. Oiling of Switching Point (No.343 / OU1).
q. Weed Control (No.343 / OU1).
r. Industrial Waste Disposal (No.343 / OU1).
Ensure reliable and continuous condition IAW the JFRC’s rules and regulations.
1.1. – 1.2. Zero (0) defect. 100% Inspection
SS 2: Emergency Repair
(No. 342 & 343/ OU2 & OU1) Ensure reliable and continuous condition IAW the JFRC’s rules and regulations.
1.3. Zero (0) defect. 100% Inspection
SS 3: Required Submittals
Submit the AF From 3000 (Appendix J, except for
1.2.6) along with required submittals.
1.2.1., 1.2.3.3., 1.2.5.6., 1.2.6., 1.7., 1.9.4., and
1.9.5.
Zero (0) defect. 100% Inspection
3. GOVERNMENT-FURNISHED PROPERTIES AND SERVICES.
3.1. UTILITIES. Water, electricity, and sewage, where available from existing work sites, will be provided to the Contractor without cost. Wastewater contained chemical and paint shall not be discharged into the sewage and storm line.
3.2. SECURITY FORCES AND FIRE PROTECTION. Upon request for assistance, the following units will provide services on base as necessary:
(a) Base Security Forces Telephone 046-816-0911
(b) Base Fire Department Telephone 046-816-0911
4. APPENDICES.
A. Environmental Protection Plan
B. Sample Contractor Hazardous Material Inventory Log.
C. CFAY Solid Waste Tonnage Report
D. FY21 Tsurumi Terminal Sidetrack Maintenance Quantity Table, OU2 (No. 342)
E. FY21 Tsurumi Terminal Sidetrack Maintenance Quantity Table, OU1 (No. 343)
F. FY21 Maintenance Instruction of US Military Sidetrack (reference)
G. Sketch of Repair/Maintenance Work at U.S. Military Sidetrack of Tsurumi (No. 342/343), OU2/OU1
H. FY21 Maintenance Instruction of US military Sidetrack of Tsurumi (No. 343), OU1 (reference)
I. FY21 Maintenance Instruction of US military Sidetrack of Tsurumi (No. 343), OU1 (reference)
J. Submit the AF From 3000 (Appendix H) along with required submittals.
APPENDIX A
Environmental Protection Plan (EPP)
Environmental Protection Plan (EPP)
Project Name
Contract #
Contractor Name
FEAD Project Manager and Phone #
Date Prepared or Revised
Version
Date of Project Commencement
Date of Project Completion
Section 1. General Overview and Purpose
1-1. Project and Site Information (Describe the site and the work to be performed at the site.)
*Attach a map showing the site location to the end of the EPP. The map should point out where each type of work will be performed. It should also point out where hazardous waste, asbestos wastes, solid waste, and recyclables will be stored.
1-2. Environmental Manager
Name: Telephone #: Email Address:
1-3. Environmental Manager Duties (List the duties and the level authority assigned to the environmental manager.)
1.
2.
*Attach a letter, signed by an officer of the firm, appointing the Environmental Manager and stating that he/she is responsible for managing and implementing the Environmental Program as described in this contract, to the end of the EPP. Include the Environmental Manager's responsibility in this letter to ensure environmental compliance.
1-4. Environmental Manager Training (List the training classes/courses the Environmental Manager has taken.)
1.
2.
*Attach training records/certificates to the end of the EPP.
Project Name
Contract #
1-5. Training Methods (Describe the communication and training procedures that the Environmental Manager will use to convey environmental requirements to contractor employees and subcontractors.)
1-6. Employee-training Records (List the employee training records that are available for review.)
1.
2.
*Attach training records/certificates to the end of the EPP.
Section 2. Management of Natural Resources Not Applicable
2-1. Describe the methods that you will use to protect natural resources on the site. Provide measures for all types of natural resources, including: land resources and landscape features, trees, stream crossings, fish and wildlife resources, drainages, and wetland areas.
1.
2.
3.
Section 3. Protection of Historical and Archaeological Resources Not Applicable
3-1. Describe the methods you will use to protect of historical and/or archeological resources on the site.
1.
2.
Section 4. Air Emissions/Ozone-Depleting Substances (ODS) Not Applicable
4-1. Does the project include removal of any refrigerants containing Ozone Depleting Substance (ODS) listed in Japan Environmental Governing Standards (JEGS) Table C2.T1.?
Yes No
4-2. Describe disposal methods for removal of refrigerants.
Section 5. Drinking Water Not Applicable
5-1. Describe how drinking water is protected from contamination during installation of new water main or repairing existing water mains.
Section 6. Storm Water and Wastewater Not Applicable
Storm Water
6-1. Current Conditions (Describe the ground cover at the site is and if there are erodible soils at the site.)
6-2. Erosion Control Methods (Describe temporary and permanent measures to minimize erosion, including mechanical retardation, revegetation and mulching.)
1.
2.
6-3. Potential Sources of Stormwater Pollution (Identify potential sources of pollution (e.g., sediment/dust, chemicals, etc.) which may be expected to affect the quality of storm water discharge from the site.)
6-4. Stormwater Best Management Practices (BMPs) (For each potential source of stormwater pollution, describe management procedures or BMPs that you will use to prevent stormwater pollution.)
1.
2.
1.
2.
Wastewater
6-5. Types of Wastewater:
(List of all types of wastewater the contractor expects to generate.
Wastewater includes, but is not limited to: wash water, rinse water, soapy water, and oily water.)
Disposal Method:
(Describe how you plan to dispose of the wastewater (e.g., off-base treatment, hazardous waste yard, discharge to the sewer, use of
OWS).)
1.
2.
1.
2.
6-6. Wastewater Sampling
Sampling Analytes:
(List the analytes that the wastewater will be sampled for, e.g., lead, arsenic.)
Laboratory Method:
(List the laboratory method that will be used to sample each analyte.)
Preservation Method:
(Describe the method that will be used to preserve samples, including holding time and container type.)
1.
2.
1.
2.
1.
2.
*Contact CFAY PWD Environmental for on-base discharge criteria.
*Attach a copy of the laboratory’s certificate to the end of the EPP.
Section 7. Hazardous Materials Not Applicable
7-1. Are Hazardous Materials (HAZMAT) to be brought on site for daily use? Yes No
7-2. Have the latest Safety Data Sheet(s) (SDSs) been submitted to CFAY PWD Environmental with Hazardous Material Inventory Sheet?
Yes No
7-3. Types of HAZMAT Anticipated:
(List the types of HAZMAT that you expect to use this project.)
7-4. Daily Average Amount of HAZMAT Expected:
(Provide the approximate weight or volume of each HAZMAT that you expect to use.)
1.
2.
1.
2.
7-5. Describe how to temporary store HAZMAT on site.
When a HAZMAT is used, follow the guidance below.
1) A SDS information should be maintained on site.
2) HAZMAT should be properly used and stored in accordance with SDS/MSDS.
3) Dispensing areas must be properly maintained.
4) Dispensing areas must be located away from catch basins and floor/storm drains.
5) Containers must not be leaking.
6) Contents must be clearly marked on a container.
7) Drip pans/absorbent materials must be placed under containers to prevent spills.
8) When a HAZMAT is stored, follow the appropriate requirements.
9) Flammable HAZMAT and corrosive HAZMAT are stored separately in appropriate lockers, and acids are stored separately from alkali.
Section 8. Solid Waste, Industrial Waste, and Recyclable Waste Not Applicable
8-1. Types of Solid Waste and Industrial Wastes Anticipated (List the types of solid waste that you expect to generate during this project.)
8-2. Disposal Method for Solid Waste and Industrial Waste (Describe the proposed method for disposal for each type of the solid waste listed (i.e. land-filled, treated, incinerated, off-site processing, etc.). Include the name, location, and phone number of each disposal/processing site.)
1.
2.
1.
2.
*Attach a copy of all applicable transportation and disposal permits, certifications, and licenses to the end of the EPP.
8-3. Types of Recyclable Material Anticipated (List the types of recyclable material that you expect to generate during this project.)
8-4. Recycling Facility (List where the recyclable materials will be recycled, at the CFAY PWD QRP (Bldg 4856) or recycled via a Japan Government approved off-site recycling facility. If the materials cannot be recycled at the CFAY PWD QRP, explain why not. Also explain whether the material can be used in its current form.)
A legible copy of Waste Disposal Manifest (a copy of receipt"E") with the completion date of landfill, and CFAY Solid Waste Tonnage Report MUST BE submitted Solid Waste Manager, CFAY PWD Environmental. The CFAY Solid Waste Tonnage Report must include the totals of, 1) the accurate weight unit (Kg), 2) monetary unit (Both Dollar and Yen with the timely exchange rate).
1.
2.
1.
2.
*Contact CFAY PWD Environmental for a list of materials that MUST BE recycled through Bldg 4856 CFAY Qualified Recycling Program (QRP). Justification for off-base recycling is required to be submitted and approved by CFAY QRP before recycling off-base.
Section 9. Hazardous Waste Not Applicable Note 1: Wastes generated from non-government furnished materials must be disposed of properly by the contractor.
Note 2: Complete Section 10 for Asbestos Containing Material (ACM) wastes and section 11 for Polychlorinated Biphenyl (PCB) wastes.
9-1. List all hazardous wastes (HWs) that you expect to generate, provide the approximate weight or volume of each HW that you expect to generate, list who transports each HW to a disposal facility, and provide the name and location (city and prefecture) of the permitted/licensed facility where each HW will be disposed of.
Hazardous Waste Expected:
Amount/volume Expected:
Transporter (name): Disposal Facility (name, city and prefecture):
1.
2.
3.
*Attach copies of the laboratory certifications and laboratory results and copies of the HW transportation and disposal permits and licenses at the end of this EPP. When HWs will be turned into the Hazardous Waste Storage Area (HWSA) at Bldg. 1822, disposal permits and licenses are not required.
9.2. Hazardous Waste Accumulation and Management Methods
(Explain a) where HW will be accumulated, b) how it will be accumulated and managed, including but are not limited to types of containers, labeling and marking, secondary containment system, and security on site, and c) how long it will be accumulated until removal for disposal.)
9-3. Hazardous Waste Accumulation Point (HWAP)
Will any HW be accumulated on site overnight? Yes No (Skip to 9-4)
HWAP Establishment Date Completed/Anticipated
a. Read and acknowledge Contractor HWAP documentation for requirements
b. Submit the following to the CFAY PWD Environmental via the Contracting Office:
1) Completed Contractor HWAP Documentation Form with a location map of proposed HWAP
2) ECATTS Training certificates of the following modules (note: * indicates when applicable):
Asbestos for Contractors * Hazardous Waste for Contractors PCBs Management for Contractors * Pollution Prevention Spill Response for Contractors Waste Management Guidelines for Contractors
*A site visit inspection will be performed, and the requested HWAP must be approved prior to its use.
Plan accordingly because this process may take a few weeks or more depending on the quality of submittals from the contractor.
9-4. Hazardous Waste Transportation Methods (Explain how HW will be transported to disposal facility (the HWSA or off-base disposal facility).)
9-5. Hazardous Waste On-Base Disposal Job Order Number (JON) (Provide assigned JON for on-base disposal at the HWSA. State “NA” for off-base disposal and complete Section 9-6.)
9-6. Hazardous Waste Off-Base Disposal Methods (Explain how HW will be disposed of at the off-base disposal facility. State “NA” for turn-in to the
HWSA.)
*Legible copies of Waste Disposal Manifest (“A” and "E") with appropriate stamp or signature and date must be submitted to CFAY PWD Environmental via the Contracting Office upon completion of disposal.
Section 10. Asbestos Containing Material (ACM) Not Applicable
10-1. Have Asbestos abatement plan been submitted to CFAY PWD Environmental? Yes No
10-2. List all ACM wastes that you expect to generate; provide the approximate weight or volume of each ACM waste that you expect to generate; name Type I or Type II for each ACM waste, list who transports each ACM waste to a disposal facility, and provide the name and location (city and prefecture) of the permitted/licensed facility where each ACM waste will be disposed of.
ACM Waste Expected:
Amount/volume Expected:
Type (I or II): Transporter (name): Disposal Facility (name, city and prefecture):
1.
2.
3.
*Attach copies of the laboratory certifications and laboratory results and copies of ACM waste transportation and disposal permits and licenses at to the end of this EPP.
10-3. ACM Waste Accumulation and Management Methods (Explain a) where ACM waste will be accumulated, b) how it will be accumulated and managed, including but are not limited to types of containers, labeling and marking, secondary containment system, and security on site, and c) how long it will be accumulated until removal for disposal.)
10-4. Hazardous Waste Accumulation Point
Will any ACM waste be accumulated on site overnight? Yes (Complete 9-3) No
10-5. ACM Waste Transportation Methods (Explain how ACM waste will be transported to disposal facility (the HWSA or off-base disposal facility).)
10-6. ACM Waste On-Base Disposal Job Order Number (JON) (Provide assigned JON for on-base disposal at the HWSA. State “NA” for off-base disposal and complete Section 10-7.)
10-7. ACM Waste Off-Base Disposal Methods (Explain how ACM waste will be disposed of at the off-base disposal facility. State “NA” for turn-in to the
HWSA.)
*Legible copies of Waste Disposal Manifest (“A” and "E") with appropriate stamp or signature and date must be submitted to CFAY PWD Environmental via the Contracting Office upon completion of disposal.
Section 11. Lead Based Paint (LBP) Not Applicable
11-1. Have LBP abatement plan been submitted to CFAY PWD Environmental? Yes No
11-2. For disposal of LBP (contaminated) wastes, complete Section 9, Hazardous Waste.
Section 12. Polychlorinated Biphenyl (PCB) Not Applicable
12-1. Newly Procured Transformer and Equipment Containing Dielectric or Hydraulic Fluid (List all applicable transformers and equipment containing dielectric or hydraulic fluid including fluorescent light ballasts. State “NA” when 12-1 is not applicable.)
1.
2.
*Attach 1) a manufacturer’s certification that the transformer/equipment contains no detectable PCBs at the time of shipment and 2) a copy of permanent label(s) affixed the transformer/equipment stating it is PCB-free (no detectable PCBs).
12-2. Will any PCB waste be generated? Yes (Complete the rest) No (Skip to next section)
List all PCB wastes that you expect to generate and provide the approximate weight or volume of each PCB waste that you expect to generate.
PCB Waste Expected: Amount/volume Expected:
1. 1.
2. 2.
*Attach copies of the laboratory certifications and laboratory results to the end of this EPP.
12-3. PCB Waste Accumulation and Management Methods (Explain a) where PCB waste will be accumulated, b) how it will be accumulated and managed, including but are not limited to types of containers, labeling and marking, secondary containment system, and security on site, and c) how long it will be accumulated until removal for disposal.)
12-4. Hazardous Waste Accumulation Point
Will any PCB waste be accumulated on site overnight? Yes (Complete 9-3) No
12-5. PCB Waste Transportation Methods (Explain how PCB waste will be transported to disposal facility (the HWSA or off-base disposal facility).)
12-6. PCB Waste On-Base Disposal Job Order Number (JON) (Provide assigned JON for on-base disposal at the HWSA. State “NA” for off-base disposal and complete Section 12-7.)
12-7. PCB Waste Off-Base Disposal Methods (Explain how PCB waste will be disposed of at the off-base disposal facility and provide the name and location (city and prefecture) of the permitted/licensed facility where each PCB waste will be disposed
of. State “NA” for turn-in to the HWSA.)
*Attach copies of PCB waste transportation and disposal permits and licenses at the end of this EPP.
Legible copies of Waste Disposal Manifest (“A” and "E") with appropriate stamp or signature and date must be submitted to CFAY PWD Environmental via the Contracting Office upon completion of disposal.
Section 13. Contaminated Soil & Sludge Not Applicable
13-1. Temporary Storage Methods of Excavated Soil/Sludge (Describe the methods on how the project stores excess soil/sludge during the temporary storing of excavated soil until off base disposal or backfill. Provide location of the temporary laydown area and erosion control measures for the grubbing, excavation, grading and other land work that will disturb the soil and create the potential soil run-off at the project sites.)
13-2. Where will be final location of the excavated soil /sludge at the end of the project?
Back to the original location (Skip to next section)
Off-Base Disposal Facilities (Complete the rest)
13-3. Have Soil/Sludge Sampling Plan been submitted to CFAY PWD Environmental? Yes No
*Soil/Sludge Sampling Plan shall include sampling methods, sampling equipment and container, number of samples to be tested, sample volumes (minimum quantity required per container), preservation techniques, holding times, and chain of custody (COC) to CFAY PWD Environmental Soil Program Manager at (243-5180) prior to sampling even if excess soil will be off base disposal.
13-4. Excess Soil/Sludge From The Excavation Disposal and Ditches (Describe how the project disposes of excess soil from the excavation and ditches.)
13-5. Contaminated Soil/Sludge Treatment/Disposal Method And Location (List the name and location of the permitted facility(ies) where the contaminated soil will be treated and disposed.)
*Attach a copy of the treatment/disposal facility’s certification(s) at the end of the EPP.
Section 14. Aboveground Storage Tanks and Underground Storage Tanks Not Applicable
14-1. Aboveground Storage Tank (AST) Containing Fuel (Provide information in below table if any ASTs are involving in the project.)
Tank ID Location Tank Capacity
(GAL)
Contents
Type of Work (Installation, Demolition, Repair or Tank Cleaning etc.)
14-2. Newly-installed AST
14-2-1. Secondary Containment System (Describe what types of secondary containment system to be installed.)
14-2-2. Sign Board
14-3. Underground Storage Tanks (USTs) (Provide information in below table if any USTs are involving in the project.)
Tank ID Location Tank Capacity
(GAL)
Contents
Type of Work (Installation, Demolition, Repair or Tank Cleaning etc.)
14-4. POL USTs To Be Newly Installed
14-4-1. Explain how each tank is protected from corrosion.
14-4-2. Describe spill/overfill prevention system.
14-4-3. Provide leak detection to be equipped if all pressurized piping or suction piping appeared in each tank.
14-5 Explain how the exposed free product and/or obviously contaminated soil in the immediate vicinity of the tank are appropriately removed and managed.
14-6. USTs To Be Modified/Constructed/Relocated/Replaced/Closed/Removed (Explain (1) how the all of the product and sludge in the tank are appropriately removed and managed,
(2) how the tank is emptied and cleaned if the product stored in the tank is changed, and (3) how the corrosion protection and leak detection systems are operated and maintained if tank is temporarily closed.)
Section 15. Pesticides and Herbicides Not Applicable
15-1. Have Contractor’s Work Plan been submitted to NAVFAC FE Pest Management Consultant via PWD Environmental Pest Management Coordinator?
Yes No
15-2. Complete Section.7 to provide information for all pesticides and herbicides to be brought on site.
Section 16. Spill Prevention and Control Not Applicable
16-1. Spill Prevention and Control Equipment (Describe equipment that will be used to prevent and control any spills/releases to the environment.
Equipment may include, but are not limited to, on-site spill equipment, absorbent mats, secondary containment, drip pans, etc.)
1.
2.
16-2. Spill Prevention Methods (Describe procedures to prevent any spills/releases to the environment.)
16-3. Spill Control Methods When Responding (Describe procedures to control any spills/releases to the environment when responding.)
16-4. Spill Notification Procedure (Describe who and how you notify the government in the event of a spill/release to the environment.)
Include all relevant attachments at the end of the EPP, including:
Letter designating the Environmental Manager
Work site map(s) Transportation and disposal permits/licenses for Solid Waste Transportation and disposal permits/licenses for Industrial Waste Transportation and disposal permits/licenses for Hazardous Waste Transportation and disposal permits/licenses for ACM waste Transportation and disposal permits/licenses for PCB waste Transportation and disposal permits/licenses for Contaminated Soil HWAP establishment request form with required documents (when ready) Laboratory certifications and analysis results for hazardous waste, ACM wastes, PCB wastes, and/or wastewater Manufacturer’s certification that the equipment contains no detectable PCBs at the time of shipment and a copy of permanent label(s) affixed the transformer/equipment stating they are PCB-free (no detectable PCBs).
Certification/roster sheet of the latest CFAY EMS (Environmental Management System) Awareness Training
APPENDIX B
Sample Contractor Hazardous Material Inventory Log
APPENDIX C
CFAY Solid Waste Tonnage Report
APPENDIX D
FY21 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
Item No. Description Unit Qty Remarks
#4 Track=1(Seam Point)
※Location indicated by yellow paint.
#1 Track=1 A=1)#8 Track=3(A=3)
※Location indicated by yellow paint.
P118(220=2 310=2 including ajusting of BG) Refer to sketch on the attach sheet.
※Location indicated by yellow paint.
9Track around BCC3k728m
R200 S=15 C=5
#8 Track 3k777m
6 Cleaning of Flange Way m 54 Flange way (on base) 13m×twice a year NISSEKI RAILWAY CROSSING =14m×twice a year
Once per Month
(P118、P21イ、P21ロ、P22イ、P22ロ、P1、P2、P3)
Required submit a SDS to the U.S. NAVY
5,662.5㎡ xtwice a year Include NISSEKI Railway Crossing (Start point:62.5㎡, Final point:80㎡)
2 Replace Iron Tie EA 4
TSURUMI TERMINAL OU2 (No.342)
Replace Wooden Tie (Regular
Tie)
EA 1
3 Replace Switchig Tie EA 4
4 Replacement of Curve Sign POINT 1
8 Weeding ㎡ 11,325
5 Replacement of Boundary Sign POINT 1
7 Oiling Switching Point SET 8
APPENDIX E
FY21 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
Item No. Description Unit Qty Remarks
Iriku-line=8 (Including Replacement of NCS-40N)
※Location indicated by yellow paint.
Iriku-Line=4(AP Chock=2)(AP=2)
※Location indicated by yellow paint.
Iriku-Line
For construction range,refer to the separate sheet.
#3Track=10 #4Track= 6(Including Seams Point=2)
※Location indicated by yellow paint.
P29(250 2本) Refer to sketch on the attach sheet.
※Location indicated by yellow paint.
NISSEKI CALTEX RAILWAY CROSSING 80m×2times / year
Flang Way 16m×4times / year
Once per Month(P29,P4)
Required submit a SDS to the U.S. NAVY
995.075㎡ x twice a year
5 Replace Switchig Tie EA 2
2 Replace Iron Tie EA 4
3 Remove / Restore Asphalt m2 20.9
4 Repalce Rail Fastening EA 16
8 Weeding ㎡ 1990.15
TSURUMI TERMINAL OU1 (No.343)
Replace Wooden Tie (Regular Tie)
7 Oiling Switching Point SET 2
224mCleaning of Flange Way6
1 EA
FY21 Maintenance instruction of US military sidetrack(reference)
Replacement of Iron Tie breakdown list
入出区線 Iriku-Line
3番線 #3 Track
4番線 #4 Track
1番線 #1 Track
2番線 #2 Track
3番線 #3 Track
4番線 #4 Track
5番線 #5 Track
入区線 Iriku-Line
8番線 #8 Track
9番線 #9 Track
☆特記事項 Special Note
(1)工事施工は、JR貨物社内の【設計確認】受理確認後の施工となる。The construction is after accepting of design valildaction at JRF.
(2)交換箇所は、黄色にて塗色してあるため、請負業者にて再確認すること。 Paint(Yellow) replacement tie at construction field. Contractor must reconfirm.
(3)線ばねAは、スラックS=0~10、線ばねBは、S=10~20である。Spring clip A: S=0~10,Spring clip B: S=10~20.
(4)交換箇所のスラック設定は、《0,5,10,15,20》にて計画している。To set up slack of replacement place is planned as below . Set up value(0,5,10,15,20)
(5)交換箇所は砕石補充を行い、十分につき固めを行うこと。Replacement place is replenished with ballast and make sufficient tamping.
(6)発生する木まくらぎ及び鋼クズ等は、作業終了後に契約業者が場外処分する。Constractors responsibly dispose wooden ties and still filings occurred.
Replacement of regular tie breakdown list
Unit No.
番線名
No.
OU1
入出区線 Iriku-Line
OU1
3番線
#3 Track
OU1
4番線
#4 Track
OU2
1番線
#1 Track
OU2
2番線
#2 Track
OU2
3番線 #3
Track
OU2
4番線
#4 Track
OU2
5番線
#5 Track
OU2
入出区線 Iriku-Line
OU2
8番線
#8 Track
OU2
9番線
#9 Track
Total
220 250 280 310 340 370 400
OU1 29 - 2 - - - - -
OU2 118 2 - - 2 - - -
2 2 0 2 0 0 0 ☆特記事項(1)発生する木まくらぎ及び鋼クズ等は、作業終了後に契約業者が場外処分する。
Contractors responsibily dispose wooden ties and steel filings ccurred.
OU2 sub Total 4 0 00
Total
1 No7継目
記 事 Remarks
レールNo2 2本 レールNo3 2本 レールNo5 4本
4 0
Regular Tie
Total
Replacement of switchtie breakdown list
Unit No.
Turnout
No.
BG調整含む
その他 etc.
分 岐 ま く ら ぎ 種 別 (本)Classification of track tie(Job)
Total
-3
計 Total
記 事 (レール種別・曲線半径)
Remarks
線ばねBspring Clip B
S=0 S=15 S=20S=10
線ばねA Spting ClipA
鉄まくらぎ種別 (本) Classification of iron tie (Job)
AP
AP
40Nレール R=140
- - - 50Nレール
- - - - 50Nレール
- - 2
OU1
チョック付
Unit No. 番線名 No.
OU1 Sub Total 0 0
OU2
1 -
50Nレール R=120
50Nレール
- 50Nレール
- 50Nレール
- - 50Nレール
50Nレール
50Nレール
R=120
- - 50Nレール
APPENDIX F
Sketch of Repair / Maintenance work,FY2021 Appendix G 2021年度 施工位置略図
Replace of switching Tie =4本(220×2【内2,3】310×2【内31,32】BG調整含)
Peplacement of curve sign=1 Replace of iron tie=1本
Replace of iron tie=3本 Replacement of boudary sign=1
【Location indicated by yellow paint.】 Replace of regular tie → 並
To HAMAKAWASAKI Reolace of iron tie Spring ClipA → A
Spring ClipB → B AP鉄まくらぎ→ AP
Cleaning of Flangeway 13m(twice a year)
Weeding(2locatins) 142.5㎡ Replace of regular tie=1本(継目1本含む) (A: 2.5m×25m=62.5㎡) (B: 2.5m×32m=80.0㎡) ・Weeding 11,325㎡
(Around NISSEKI RAILWAY CROSSING Start P:62.5㎡ Final P:80㎡)
・OILING SWITCHING PONT 8set(once a month)
Claning Flange way 14m(twice a year)
(片側7m×2m) Cleaning Flangeway(4times / year) 16m
安 善
方
・Oiling Switch point 2SET(omce year)
Remove/Restore OF ASPHALT 20.9m2 Replace Rail Fastening =10
Replace Rail Fastening=6(継目2個含む) Replace of switchig tie=2本(250×2【内23,24】) Cleaning Of Flangeway(twice a year)80m
Replace of regular tie=8本
Replace of iron tie=4本
第4種制走堤
第4種制走堤
CITY ROAD
(Iriku)
FY21 Sketch of Repair / Maintenance OU2(No.342)
Weeding 1,990.15㎡
OU1(No.343)
第2種鉄
第2種鉄
第2種鉄
第2種鉄
第2種鉄
第2種鉄
第2種鉄
21ロ
22イ
Passway
22ロ
21イ
鶴見方
3 1
2 (Iriku)
(1Track)
(2Track)
(3Track)
(4Track)
(8Track)
(9Track)
(7Track)
JR ANZEN
STATION
To
HAMAANZEN
NISSEKI
RAILWAY
CROSSING
TOWA ROAD
RAILWAW
29
4
(3Track)
(4Track)
28
27
26
(5Track)
Boarder Line・29
114ロ
C A N A
LPLAT FORM
A
B
2021年度 保守工事指示書参考資料 OU1 入出区線 まくらぎ交換図及びアスファルト舗装撤去復旧展開図 No1
レールNo2 レールNo3
凡例
レールNo5 レールNo6
交換まくらぎ
踏切タイプレート(NCS-40N)
アスファルト舗装撤去復旧範囲
APチョック
AP AP
APチョック 木 木 木 木
踏切タイプレート付(NCS-40N)
3,900
11,000
木 木 木 木
4,500
継目から1,300継目から3,200
踏切タイプレート付(NCS-40N)
ガードレール
40Nレール
タイプレート犬クギ配置図(犬クギはタイプレート用を使用)
①
② ③
④
⑤
⑥
⑦
APPENDIX H
FY21 Maintenance Instruction of US Military Sidetrack of Tsurumi (No.343),OU1
2021年度 保守工事指示書参考資料 OU1 入出区線 アスファルト舗装構成図及び面積計算書 No2
アスファルト撤去復旧工面積計算書 舗装構成⑤以外
① 3.9m×0.8m=2.12m2
② 0.9m×0.8m×0.5=0.36m2
③ 3.9m×0.8m=2.12m2
④ 11m×0.5m=5.5m2
⑤ 4.5m×0.8m=3.6m2
⑥ 4.5m×0.8m=3.6m2
⑦ 4.5m×0.8m=3.6m2
合計 20.9m2
舗装構成⑤
*アスファルト、乳剤は日本道路協会規格とする。
不織布
140mm密粒アスファルト
不織布
密粒アスファルト
租粒アスファルト
50mm
90mm
140mmアスファルト乳剤
APPENDIX I
FY21 Maintenance Instruction of US Military Sidetrack of Tsurumi (No.343),OU1