Atch 1 - PWS - 13 ATF Life Support Area - March ARB - 24 June 2025.pdf

PDF 460 KB Posted

Attached to
13 ATF Life Support Area - March ARB Federal contract opportunity
Solicitation number
FA462125Q0032
Issued by
Department of the Air Force Air Mobility Command

About this file

This Performance Work Statement (PWS) details requirements for a life support area (LSA) at March Air Reserve Base in California from 26 July to 10 August 2025. The contractor must provide comprehensive support for 260 personnel, including 14 latrines with handwashing stations, 2 40-foot dumpsters, 2 500-gallon potable water buffaloes, and 11 workspace tents ranging from 250-700 square feet. Each tent must be weather-resistant, equipped with Environmental Control Units or HVAC systems, generators, electrical receptacles, interior and exterior lighting, and specific furnishings like tables and chairs.

The PWS specifies detailed requirements for each tent type, including two Emergency Operations Centers, a communications relief tent, a Mortuary Affairs/Casualty Collection Point tent, and others with varying personnel capacities. The contractor must provide a dedicated site manager available from 6 AM to 6 PM with an emergency on-call contact outside those hours. Maintenance responsibilities include 24-hour support with a 6-hour response time, generator refueling, and ensuring all equipment meets California Environmental Protection Agency emission requirements. Strict base access and security protocols will be enforced, requiring contractors to undergo comprehensive vetting and identification processes.

View the file

Other files for this federal contract opportunity

Other files attached to 13 ATF Life Support Area - March ARB, newest first.
File Type Posted
13 ATF Life Support Area - Q A.pdf PDF
Solicitation Amendment FA462125Q00320001 SF 30.pdf PDF
Atch 1 - PWS - 13 ATF Life Support Area - March ARB - 2 July 2025.pdf PDF
Solicitation - FA462125Q0032.pdf PDF
Atch 2 - WD 2015-5629 Rev 26 - 2 Jun 25.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

13 ATF LIFE SUPPORT AREA

AT

MARCH ARB, CA

24 June 2025

Overview:

The Contractor shall provide all equipment, personnel, facilities, and maintenance required to set up, maintain, and teardown a life support area (See Appendix A) in support of 260 personnel to include latrines, hand wash stations, dumpsters, water buffaloes, 11 workspace facilities, and provide the maintenance to support 24/7 operations in these tents from 26 July 2025 to 10 August 2025.

Site Manager:

The contractor shall provide a dedicated site manager for the duration of the Period of Performance and be available from 6 AM to 6 PM. Outside of normal operating hours, the contractor shall provide an emergency on-call contact for maintenance support.

Key Milestones:

Setup Start Setup Complete

Exercise Teardown Start Teardown Complete

27 Jul 30 Jul 1 Aug – 8 Aug 9 Aug 10 Aug

LSA Requirements (See Appendix A for proposed layout)

- 14 Latrines o Provide latrines sufficient to support 260 personnel o Provide handwashing stations outside port-a-potties, stocked with soap

(and/or hand sanitizer), paper towels, and trash receptacles. Minimum of 2 handwash stations recommended per location o Provide service to ensure supplies (water, soap, paper towels) are replenished at least every 2 days o Provide service to remove debris (black/gray water, wastewater, and trash from handwash stations) every 2 days to include stocking new paper towels/toilet paper.

- 2 40-foot dumpster o Dumpster and all debris within will be collected at the end of the performance period and disposed of in accordance with California State Law for disposal of non-hazardous materials

- 2 500-gallon potable water buffaloes o The Contractor shall ensure that the water buffalos are filled by an approved source. Contact information for the 452d Bioenvironmental Engineering at March ARB will be provided upon Contract Award for any additional questions o The contractor shall refill the water buffalos by request from the KO throughout the performance period, no greater than 5 times.

o Per 452d Bioenvironmental Engineering, the requirements for water buffaloes are:

The contractor shall ensure all water buffalos are properly sanitized and treated NLT 24 hrs prior to delivery and shall provide the documentation to the KO of water buffalo sanitation.

The Contractor shall ensure the appropriate amount of chlorine is added to maintain required levels

Prior to use, the Contractor shall test each buffalo for Bac-T, pH, total chlorine, and turbidity. These tests may need to be repeated throughout the period of performance to ensure chlorine levels remain within acceptable limits; at a minimum, Total Chlorine and pH shall be checked daily

Additional guidance can be found in Appendix B

There shall be 11 workspace tents, lined, weather resistant, with a recommended square footage of 250-700 square feet (SF).

The tents shall all have Environmental Control Units (ECUs) or Heating, Ventilation, and Air Conditioning (HVAC) systems.

Additionally, the tents shall have power provided via generator (grounded) and electrical receptacles throughout (60 Hz, 120V/240V) as well as appropriate interior lighting available for working (recommended 50 lumens per square foot). Additionally, the Contractor shall provide exterior lighting to support operations during nighttime hours, such as light carts.

The large tents shall be a minimum of 550 SF with 24 receptacles and the small tents shall be a minimum of 250 SF with 12 receptacles.

The Contractor shall ensure the power cables are either able to be elevated or tucked into the tent lining or covered with cable protectors to prevent tripping hazards, additionally, power strips or extensions cord may be required depending on the layout of the tent interior.

Not all tents will be collocated; therefore, the Contractor shall provide the appropriate power distribution system to support the tents at the various locations illustrated in Appendix A. For the tents that are collocated, they shall be no less than 12 feet apart (in accordance with AFPAM 10-219v6 and fire safety standards).

The Contractor shall ensure each tent has a minimum of 1 fire extinguisher in the event of a fire.

Each tent shall have at minimum 1 standard sized trash receptacle with sufficient trash bags throughout the period of performance.

LARGE TENTS (550-700 SF)

- 1 x communications relief tent o This tent shall have tables and chairs to support 25 personnel o The tent shall also have two additional generators (grounded) placed in the vicinity of this tent for use by the Government for providing power to two Government furnished/maintained tents. The Contractor shall provide instructions to the Government on proper use procedures for these generators. The Contractor shall still provide maintenance and refueling services for these generators.

- 2x Emergency Operations Center o These tents shall have tables and chairs to support 24 personnel including power strips and extension cords to support power requirements at each workstation.

o The Contractor shall provide 2x 80” tvs per tent on rolling wheels with Bluetooth and wifi capabilities disabled.

- 1x Alternate Wing Operations Center o These tents shall have tables and chairs to support 24 personnel including power strips and extension cords to support power requirements at each workstation.

o The Contractor shall provide 2x 80” television on rolling wheels with Bluetooth and wifi capabilities disabled.

- 2x Temporary Sensitive Compartmented Information Facility (t-SCIF) o These tents shall be cordoned with flagging tape 30 feet from all sides.

o The Contractor shall provide 1x 80” television per tent on rolling wheels with

Bluetooth and wifi capabilities disabled o These tents shall have tables and chairs to support 7 personnel including power strips and extension cords to support power requirements at each workstation.

- 1x Mortuary Affairs/Casualty Collection Point Tent o There shall be a partition segregating the tent in half, ensuring the capability of egress from either side of the partition.

o This tent shall have tables and chairs to support 6 personnel on both sides of the tent

- 1x CABS Overflow Tent o This tent shall have tables and chairs to support 20 personnel o There shall be partitions segregating the chairs/tables into 4 groups of 5 workspaces with point of egress accessible from o If the electrical receptacles are not able to be placed within 3 feet of each workspace within each partition, the contractor shall provide the extension cords and power strips

- 1x 39 AS Tent o This tent shall have tables and chairs to support 24 personnel

- 1x MUNS Tent o This tent shall be cordoned with flagging tape 50 feet from all sides.

o This tent shall have tables and chairs to support 10 personnel

- 1x 57 IAS Tent o This tent shall have tables and chairs to support 10 personnel (minimum of 3 tables)

SMALL TENTS (250-550 SF)

- 2x Entry Control Point tents o These tents shall have tables and chairs to support 4 personnel

BLDG 1244

- See Appendix A for schematic of the partitioning for Bldg 1244

- The 335 OG side of the hangar shall have tables and chairs sufficient for 30 personnel

- The 335 OG side the hangar shall have additional partition walls with the ability to further divide the space into 4 smaller areas.

- The northwest corner of the 335 OG side of the hangar shall be partitioned off using flagging tape and stanchions. The Contractor shall provide 500’ of flagging tape for the Government to utilize for cordoning

- The 335 MXG side of the hangar shall have tables and chair sufficient for 20 personnel

- Outside the east side of the hangar is where the generators, latrines, handwash stations, dumpster, and water buffalo shall be placed.

- The interior of the building will still have the same electrical, air conditioning, and lighting requirements as 5 large tents. Additional portacoolers (or similar), electrical, and lighting, shall be placed in Rooms 103, 105, 106, and 107A/B.

Maintenance Requirements:

The Contractor shall provide 24-hour on-call maintenance support with the ability to respond within 6 hours of notification.

Additionally, the Contractor shall provide all Corrective Maintenance requests or provide a replacement unit within 12 hours.

The Contractor shall also provide regular refueling services for the generators, maintenance for power distribution system(s) and ECU units. The generators will be operating 24/7 throughout the exercise period. The Contractor shall provide their refueling plan to the KO no later than (NLT) 1 week prior to the beginning of the period of performance and their record of latest Preventive Maintenance Checks and Services (PMCS) records for the units intended to be utilized on the site. Lastly, the Contractor shall provide confirmation that the generators all meet California Environmental Protection Agency Emission requirements.

Base Access:

The contractor shall comply with all requirements and procedures IAW FAR 5352.242-9000, Contractor Access to Air Force Installations included herein. All contractor employees shall always carry contractor photo identification. Contractor employees shall comply with any base security measures implemented at all times, to include, but not limited to, vehicle and goods searches, and identification checks during times of increased security. The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provision of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.

Strict security and personnel access control is enforced at March ARB. All employees desiring access must be identity proofed and vetted. All Contractors and sub-contractors must pass a Criminal History Report Inquiry [CHRI] through National Crime Information Center [NCIC], National Law Enforcement Telecommunication System [NLETS], state and local law enforcement databases.

The primary contractor will ensure all employees are U.S. citizens or possess proper credentials allowing them to work in the United States. The use of E-Verify is mandatory IAW E.O 12989. Identification required for identity proofing is as follows but not limited to:

Those employees that are foreign nationals must present (2) forms of identification. Foreign passports with a current arrival-departure record (Form I-94) bearing the same name as the passport and containing an endorsement of the alien’s nonimmigrant status, if it authorizes the alien to work for the employer. In the case of a nonimmigrant alien authorized to work for a specific employer incident to status, a foreign passport with Form I-94 or Form I-94A bearing the same name as the passport and containing an endorsement of the alien’s nonimmigrant status, as long as the endorsement has not yet expired and the proposed employment is not in conflict with any restrictions or limitations identified on the form. Please allow an additional 5 days to process.

The application for a pass/credential if driving must be accompanied by a valid REAL ID compliant driver’s license, state vehicle registration and proof of insurance. Contractor vehicles and equipment may be escorted during exercise operations and may be rendered immobile when not in operation by the removal of ignition keys or by other readily reversible means. All contractor vehicles are subject to search prior to entering and exiting the base and while on the base. Contract personnel are subject to random personal and vehicle searches. If contract personnel refuse to be searched, they will be denied entry to the base. Denial of entry to personnel who refuse to be searched, or detention of personnel found to be in possession of contraband or weapons may result in loss of base driving privileges, debarment from the base, or other administrative or criminal actions.

Valid forms of identification include:

a. United States Passport

b. Permanent Registration Card/Alien Registration Receipt Card [Fm I-551]

c. Foreign Passport with a temporary [I-551] stamp or temporary [Fm I-551] printed notation on machine readable immigrant visa

d. Employment authorization document that contains a photograph [Fm I-766]

e. Current /Valid REAL ID compliant Driver’s License

f. Identification card issued by federal, State or Local Government

g. Social Security Card

Base Access Credentials:

The Contractor shall submit a request to the Contracting Officer containing all mandatory information on each employee as indicated below. The information submitted will be reviewed and signed by personnel authorized to submit and sign as sponsors. The following information must be submitted with each request for access

(sub-paragraphs a-f)

a. Complete name as it appears on identification (last, first, middle initial)

b. Complete address; (Street, Apt number, City, state, Zip)

c. Social Security Number

d. Date of Birth

e. Driver’s license or identification number & issuing authority

f. Company or vendor name

Employees will be identity proofed and vetted each time a pass/credential is issued. Security Forces may conduct random screenings at any time; if, disqualifying information as prescribed in DoD, Air Force, or local directives is found, employees may denied access.

Appendix A

Appendix B

Field Drinking Water Treatment:

Table 2-7, Recommended Minimum Chlorine Residuals

Treated/Potable Water Intended for Drinking

Chlorine Residual Comments

Delivery to dry water points and unit- level storage containers (for example, water buffaloes, 5-gal containers)

1 mg/L FAC If between 0.2 and 1 mg/L, rechlorinate to 1 mg/L and deliver.

If less than 0.2 mg/L, rechlorinate to 2 mg/L and ensure that at least 1 mg/L FAC remains after 30 mi

Table 2-8. Potable Water Tank Disinfection Methods [13]

Methods for disinfecting potable water tanks1

METHOD 1

Use when both water and the required amount of chemicals are plentiful

METHOD 2

Use if either water or the required chemicals are in short supply

METHOD 3

This is a less corrosive method using a lower concentration of chlorine

Fill tank to overflow level Prepare 5 gal of 100-mg/L FAC water

Fill tank to overflow level

Add calcium hypochlorite solution to achieve 100 mg/L FAC throughout the tank2

Add calcium hypochlorite solution to achieve 10 mg/L FAC residual

Mix or slosh the solution so it contacts all the surfaces

Swab the interior walls of the tank every 10 min or as often as necessary to keep the walls wet with the solution for 1 hour

Mix or slosh the solution so it contacts all the surfaces

Run some of the solution through valves and spigots

Run some of the solution through valves and spigots

Run some of the solution through valves and spigots

Keep interior surfaces wet for at least 60 minutes

Keep disinfected surfaces wet with chlorine solution for a minimum of 30 minutes

Hold this solution for 24 hours

Drain disinfecting solution to sanitary sewer or other approved location (not a lake, stream, or storm drain)3

Refill the tank with potable water with required chlorine residual and rinse the spigots twice

Perform bacteriological testing of the water in the tank

Upon satisfactory bacteriological test results, water may be distributed/delivered to the system

Notes:

1Table reads from top to bottom, not right to left.

2Do not add calcium hypochlorite granules directly to the water in metal containers. The chemical may not dissolve before contacting the metal, and it becomes very corrosive as it sits on the bottom of the container and dissolves. Always dissolve the required amount of chemical in a bucket or other smaller container of water and then add the resulting solution to the water in the container to be disinfected.

3Local requirements may require dechlorination prior to discharging. Dechlorination can be accomplished using several chemicals. If dechlorination is required, contact higher level PM support for assistance.

When there is no residual chlorine found in water trailers, trucks, tanks or in other storage and distribution points, personnel will need to add chlorine. To do this, chlorine dose calculations and measurements will need to be determined. Tables 2 - 9 and 2 - 10 provide various measurable volumes of liquid bleach, dry HTH, and a concentrated HTH solution that, when added to the indicated volume of water, will provide the approximate chlorine dose (in mg/L) indicated [13]. Keep in mind, the chlorine residual achieved using these values will depend on the chlorine demand exerted by the water that is chlorinated. The greater the chlorine demand, the lower the residual will be.

Table 2-9. Five-Percent Bleach Chlorine Dose Measurements [13]

5-percent liquid (typical household) bleach volumes that will provide approximately the indicated chlorine dose when added to the corresponding volume of water*

Gallons to be chlorinated

1 mg/L 2 mg/L 5 mg/L 10 mg/L 100 mg/L

5 6 dp 0.75 mL 1.9 mL 3.8 mL 8 tsp

10 0.75 mL 1.5 mL 3.8 mL 1.5 tsp 16 tsp

25 2 mL 3.8 mL 2 tsp 4 tsp 1 cp

36 3 mL 5.5 mL 2.75 tsp 2 tbls 1.25 cp

50 4 mL 1.5 tsp 4 tsp 3 tbls 1.75 cp

100 7.7 mL 3 tsp 3 tbls 5 tbls 3.25 cp

400 2 tbls 4.25 tbls 0.75 cp 1.5 cp 3 qt

500 3 tbls 0.33 cp 1 cp 1.75 cp 1 gal

800 0.26 cp 0.51 cp 1.3 cp 2.6 cp 1.6 gal

1000 0.32 cp 0.64 cp 1.75 cp 3.25 cp 2 gal

2000 0.64 cp 1.28 cp 3.5 cp 6.5 cp 4 gal

5000 1.6 cp 3.2 cp 2 qt 1 gal 10 gal

*For other than 5% liquid, multiply the value in the table by the ratio of the actual percent to 5 (e.g., for 12% bleach, multiply the value shown in the table by 12/5, or 2.4 times)

Table 2-10. Seventy Percent HTH Chlorine Dose Measurements [13]

70-percent available HTH (or solution concentrate) volume that will provide the indicated chlorine dose when added to the corresponding gallons of water

Gallons to be chlorinated

1 mg/L 2 mg/L 5 mg/L 10 mg/L 100 mg/L

5 0.9 mL 1.7 mL 4.1 mL 8.3 mL 0.25 tsp

10 1.7 mL 3.3 mL 8.3 mL 16.6 mL 0.5 tsp

25 4.1 mL 8.3 mL 20.7 mL 41.4 mL 1.25 tsp

36 6 mL 11.9 mL 29.8 mL 0.9 mL 1.75 tsp

50 8.3 mL 16.6 mL 0.6 mL 0.25 tsp 2.5 tsp

100 16.6 mL 33 mL 0.25 tsp 0.5 tsp 5 tsp

400 0.92 mL 1.9 mL 1 tsp 2 tsp 19 tsp

500 1.3 mL 0.5 tsp 1.25 tsp 2.5 tsp 0.5 cp

800 1.9 mL 0.75 tsp 2 tsp 3.75 tsp 0.78 cp

1000 0.5 tsp 1 tsp 2.5 tsp 5 tsp 1 cp

2000 1 tsp 2 tsp 5 tsp 10 tsp 2 cp

5000 2.4 tsp 4.7 tsp 3.9 tbls 0.5 cp 4.9 cp

Note: The shaded area of the table indicates the volume of a concentrated solution made from dissolving 1 tsp of HTH in a half canteen cup (1½ cups) of water

Field Drinking Water Surveillance

PERIODIC FIELD DRINKING WATER SURVEILLANCE

Table 2-23. Periodic Sampling Parameters and Frequencies [14]

Periodic Sampling Parameters and Frequencies

Parameter

Raw Water Source1

Testing During this Period of Approved Distribution

Field Tests in Conj.

With AWT

Sample Collection

Distribution Systems and Storage Tanks4

30-day Provisional and 30-day PM STP1

Long-Term

AWT/PM

Confirmed LTP2

Coliforms5

(total and E. coli)

Weekly2 Monthly X Monthly

TDS6 Daily Daily Monthly X Weekly

Chlorine residual6 Daily7 Daily Monthly X Weekly pH6 Daily Daily Monthly X Weekly

Turbidity6 Daily Daily Monthly X Weekly

Arsenic Quarterly X

Cyanide Quarterly X

Magnesium X

Chloride X

Sulfate X

AWT Parameters (Submit Samples)8

Annually

Collected during initial PM testing

Annually

Chemical agents Threat- Based9

Threat-Based9 Threat-Based9

Legend: TDS = total dissolved solids; P/A = presence/absence; AWT = advanced water testing

1 These tests (except for coliforms) are conducted by water point operators.

2 These tests are performed by the supporting PM element.

3 Tests performed by personnel collecting and submitting the AWT sample.

4 Includes representative points in piped systems and all water storage tanks (for example, trucks, trailers, hard- wall tanks, and onion-skin tanks). Statistical sampling representative of a large number of tanks is acceptable such that all tanks are sampled at least annually (for example, X percent/week/month/etc.).

5 Microbiological testing should be performed weekly, if possible, during the initial phase of field operations, and monthly as the theater matures and the water system is stabilized. Sampling should occur at the point of production and representative points within the distribution system to include 10% or more of storage containers, on a rotating basis.

6 These parameters should be monitored daily at the point of production and representative points within the distribution system to include up to 10% of storage containers, on a rotating basis. Where test equipment is not available, at a minimum, measure and document the chlorine residual.

7 Collect and analyze if using municipal water system as the source, where chlorine residual is expected.

8 AWT samples are collected using the appropriate deployment field water sample kit, untreated or treated, available from APHC and submitted to a fixed facility laboratory for analysis. Both treated and untreated water annually.

9 See Chemical Agent Testing Frequencies, Table 2-21. Chemical Agent Testing Frequencies based on Threat and MOPP.

-Total Chlorine and pH needs to be checked daily to ensure that the tank is holding a chlorine residual, to ensure that no bacteria is growing

-A Bac-t test needs to be conducted after all buffalos are sanitized, filled and ready for operational use.

File details come from the government source that posted it. Updated .