Atch 01_PWS_W80RA6-04-25C.pdf

PDF 137 KB Posted

Attached to
C&RS and Upgrade the of Smartscope Quest 600
Solicitation number
PANRSA-25-P-0000-010270
Issued by

About this file

This Performance Work Statement (PWS) outlines the U.S. Army Test, Measurement and Diagnostic Equipment Activity's (USATA) requirement for commercial repair and calibration of an Optical Gaging Products (OGP) Smartscope Quest 600 (Serial Number: SQ6001210). The contractor must perform a comprehensive repair service including a preliminary evaluation, part replacement with original manufacturer components, software updates, and reinstallation, strictly adhering to manufacturer specifications and contract turn-around times.

The maintenance will be conducted on-site at the U.S. Army TMDE Support Center in Rock Island, IL, with a performance period of 60-90 days after contract award. The U.S. Army TMDE Activity at Redstone Arsenal, AL will be responsible for receiving, inspection, and acceptance of the serviced equipment through DFAS Wide Area Workflow (WAWF). No government-furnished equipment is required, and no specific quality requirements are outlined in the document.

View the file

Other files

File Type Posted
Request for Information(W80RA6-04-25C).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USATA-W80RA6-04-25C

PERFORMANCE WORK STATEMENT

FOR REPAIR AND CALIBRATION OF OPITICAL GAGING PRODROUCTS, MODEL

OGP SMARTSCOPE QUEST 600

1.0 GENERAL. The U.S. Army Test, Measurement and Diagnostic Equipment Activity (USATA) has a requirement to acquire commercial repair and calibration of the following test, measurement and diagnostic equipment manufactured by Optical Gaging Products

(OGP).

2.0 CONTRACTOR TASKS.

2.1 A preliminary evaluation, on the Model OGP Smartscope Quest 600, SN:

SQ6001210 indicates the unit requires repair and calibration, to include reinstallation and software reconfigurations of the OGP Smartscope Quest 600 after repairs are completed. The contractor shall provide repair, calibration, software updates and reinstallation to the unit per manufacturer’s specifications.

2.2 The contractor shall replace defective parts, as required, with original equipment manufacturer parts only. The contractor shall strictly comply with turn-around-time to repair as stated in the contract.

2.3 The contractor shall not provide any repair or other services outside the scope of this contract without authorization from the government Contracting Officer listed at page 1 of the contract. The contractor shall not relocate equipment to contractor’s facility outside without authorization from the Contracting Officer.

3.0 GOVERNMENT TASKS.

The U.S. Army TMDE Activity, Redstone Arsenal, AL (Acceptance DODAAC: W80RA6) shall be responsible for receiving, inspection and acceptance in DFAS Wide Area Workflow (WAWF) for the unit.

4.0 PLACE OF PERFORMANCE. Shall take place at the government’s facilities respectively located at Rock Island, IL as an on-site maintenance call, as follows:

4.1 U.S. Army TMDE Support Center, Bldg. 131 Gillespie St. Rock Island, IL 61299

5.0 PERIOD OF PERFORMANCE. 60-90 days after receipt of award.

6.0 GOVERNMENT-FURNISHED EQUIPMENT. None.

7.0 QUALITY REQUIREMENTS. Not Applicable.

File details come from the government source that posted it. Updated .