Atch 01 Pressure Bodies SOW.pdf

PDF 660 KB Posted

Attached to
Burst Diaphragm Pressure Bodies Federal contract opportunity
Solicitation number
FA910121Q0061
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to Burst Diaphragm Pressure Bodies, newest first.
File Type Posted
Atch 01 Pressure Bodies SOW Rev 1.pdf PDF
Questions and Answers.pdf PDF
Atch 06 Drawing 82-1140.pdf PDF
Atch 07 FAR 52.204-24 Representation.pdf PDF
Atch 05 Drawing 82-1132.pdf PDF
Atch 02 Drawing 82-1166.pdf PDF
Atch 04 Drawing 82-1133.pdf PDF
Atch 03 Drawing 84-1644.pdf PDF
FA9101-21-Q-0061 Pressure Bodies RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Distribution A.

Approved for public release; distribution is unlimited. (IRA # 3367 & AEDC PA # 2017-221)

Wednesday, May 5, 2021

STATEMENT OF WORK

FOR

MACH 8 AND MACH 10 DIAPHRAGM

AREA PRESSURE BODIES

ARNOLD ENGINEERING DEVELOPMENT COMPLEX

ARNOLD AIR FORCE BASE, TN 37389-9998

ARNOLD ENGINEERING DEVELOPMENT COMPLEX – WHITE OAK SITE

FEDERAL RESEARCH CENTER AT WHITE OAK

10905 NEW HAMPSHIRE AVE

SILVER SPRING, MD 20903-1050

Table of Contents-1

Table of Contents

1. SCOPE

2. DELIVERABLES

3. REQUIREMENTS

4. PERIOD OF PERFORMANCE

Appendix A – Submittal Procedure

Page-1

1. SCOPE

1.1. The scope of this effort is to fabricate Tunnel 9 Diaphragm Area Hardware to meet the operational needs of the Tunnel 9 facility. The fabricator shall manufacture the items listed in Table 1 according to their corresponding drawings. Drawings are attached within this file. The fabricator shall supply a copy of the required reports specified in each drawing. The fabricator shall supply a 100% inspection report for each part. The fabricator shall supply a certificate of compliance for each part. Drawings and parts subject to distribution statement as contained in the drawings.

Table 1. Tunnel 9 Diaphragm Area Hardware Item

Drawing Number Description Material Quantity Identification

Number

1 82-1166 Thermocouple Ring (Mach 8/10)

Steel, AISI 4340 Vacuum Arc Remelted

(AMS-6414)

1 -

2 84-1644 Flow Restrictor

Housing (Mach 8/10)

Steel, AISI 4340 Vacuum Arc Remelted

(AMS-6414)

1 -

3 82-1133 Separator Body

Upstream (Mach 8/10)

Steel, AISI 4340 Vacuum Arc Remelted

(AMS-6414)

1 -

4 82-1132 Separator Body

Downstream (Mach 8/10)

Steel, AISI 4340 Vacuum Arc Remelted

(AMS-6414)

1 -

5 82-1140 Housing Particle

Separator (Mach 8)

Steel, AISI 4340 Vacuum Arc Remelted

(AMS-6414)

1 -

2. DELIVERABLES

2.1. 1x Thermocouple Ring (Mach 8/10) per Drawing 82-1166

2.2. 1x Flow Restrictor Housing (Mach 8/10) per Drawing 84-1644

2.3. 1x Separator Body Upstream (Mach 8/10) per Drawing 82-1133

2.4. 1x Separator Body Downstream (Mach 8/10) per Drawing 82-1132

2.5. 1x Housing Particle Separator (Mach 8) per Drawing 82-1140

2.6. Material Certifications for Each Part

2.7. Heat Treat Certifications for Each Part

2.8. 100% Inspection Report & Certificate of Compliance for Each Part

Page-2

3. REQUIREMENTS

3.1. Submittals: The Contractor shall submit all documentation in accordance with Appendix A – Submittal Procedure.

3.2. AEDC can furnish electronic CAD solid models of the parts on request in various formats such as STEP, IGES, and native Pro/E. Note that the accuracy of these files is not certified for driving CNC programming. If Vendor wishes to Drive CNC machining of the base parts with these files it is strongly urged to verify the accuracy of the file prior to machining the parts.

3.3. The above referenced drawings contain Export Controlled (Unclassified) information. Therefore, Vendors must be listed as “active” in the Defense Logistics Agency – Logistics Information Service – Joint Certification Program (JCP U.S./Canada) in order to be eligible for this contract. (See https://public.logisticsinformationservice.dla.mil/jcp/search.aspx to verify the vendor certification or contact DLA Customer Interaction Center at 1-888-352- 2255).

3.4. Drawings and parts subject to distribution statement as contained in the drawings. Use DoD Secure Access File Exchange (SAFE) for securely exchanging files related to this project. Do not email attached files related to this project through unsecured email. DoD Safe Access File Exchange Website: https://safe.apps.mil/

4. PERIOD OF PERFORMANCE

4.1. The fabricator shall deliver the finished parts 180 calendar days after the contract is awarded.

4.2. Upon completion, all parts will be shipped to the Arnold Engineering Development Complex, Federal Research Center at White Oak, 10905 New Hampshire Ave, Silver Spring, MD 20903-1050.

Appendix A-1

APPENDIX A

SUBMITTAL PROCEDURE

PART 1 GENERAL

1.1 DESCRIPTION OF REQUIREMENTS. This section specifies procedural requirements for non-administrative submittals, including but not limited to shop drawings, product data, manufacturer’s certificate, design data, calculations, and verifications, manufacturer’s instructions, manufacturer’s field service reports, samples, operation and maintenance manuals, and other miscellaneous work-related submittals. These submittals are required to amplify, expand, and coordinate other information contained in the contract.

Non-work-related submittals are addressed elsewhere in the contract rather than in the specification and may include items such as: contract progress schedule, permits, payment applications, performance and payment bonds, insurance certificates, and progress reports.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections of the specification or statement of work.

1.2 SUBMITTAL PROCEDURE

A. Definition: For the purposes of this section, the term “Contractor” denotes the prime contractor.

B. Listing: The statement of work contains a summarized listing of item submittals requiring approval for the work. The listing is included for the convenience of users of the contract documents. The listing may not be all inclusive and additional item submittals may be required.

C. Risk: Do not proceed with the part of the work covered by an item submittal including purchasing, fabricating, and delivering until approval is received.

Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection. Any fabrication or other work performed in advance of the receipt of accepted item submittals and approvals shall be entirely at the Contractor’s risk and expense.

D. Transmittal Timing: Coordinate the preparation and processing of item submittals with the performance of the work. Prepare and transmit each item submittal to the Contracting Officer sufficiently in advance of the performance of related work and other applicable activities. Transmit related item submittals for the same unit of work so that processing will not be delayed by the Government's need to review submittals concurrently for

Appendix A-2 coordination. No delay damages or time extensions will be allowed for time lost in late submittals.

E. Content: Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Complete AF Form 3000 and attach as cover sheet for each submittal. Contractor may include multiple item numbers on an AF Form 3000.

F. Language: All item submittals shall be written in English, including documents, notes on drawings, sketches, and/or samples, calculations, manuals, and all other instances of written text and communication.

G. Units: All item submittals shall be marked or show dimensions and values in the same units as specified in the contract documents.

H. Review Time: Allow sufficient time so that contract performance will not be delayed as a result of the time required to properly process submittals, including time for re-submittals, if necessary. Allow 10 working days for initial Government processing of each submittal. No extension of time will be authorized because of the Contractor's failure to transmit submittals to the Government sufficiently in advance of the work.

I. Contractor Certification: All submittals shall be carefully reviewed by an authorized representative of the Contractor prior to submission to the Government. Each submittal shall be dated, signed, and certified by the Contractor as being correct and in strict conformance with the contract documents. No consideration for review by the Government of any Contractor’s submittal will be made for any items which have not been so certified by the Contractor. All noncertified submittals will be returned to the Contractor without action taken by the Government, and any delays caused thereby shall be the total responsibility of the Contractor.

J. Deviations: Should any item submittals required by the contract documents show deviations from the contract requirement, the Contractor shall make specific mention of such deviations in the letter of transmittal, including stating cost effects, and product and system limitations which may adversely affect the work, in order that if acceptable, suitable action may be taken for proper adjustment of the contract; otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance with the contract documents and the approved submittals. Contractor shall clearly mark the proposed variation in all documentation and specifically point out deviations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government. Deviations from contract requirements require Government approval and will only be considered when advantageous to the Government. When proposing

Appendix A-3 deviations, deliver written request to the Contracting Officer, with documentation of the nature and features of the deviation and why the deviation is desirable and beneficial to the Government. If lower cost is a benefit, include an estimate of the cost savings. In addition to documentation required for deviation, include the submittal information required for the item. Allow an additional 10 working days beyond normal submittal review period for consideration by the Government of submittals with deviations.

K. Approved Submittals: The part of the work covered by the approved item submittal may proceed provided it complies with the requirements of the contract documents. Final acceptance will depend upon that compliance.

The term “Approved” shall only indicate that there is no exception taken to the submittal. Approval of the item submittal shall not be construed as a complete check, and indicates only that the general method or other information appears to meet the contract requirements. Approval does not relieve the Contractor of the responsibility for any error which may exist.

After item submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment, or changes to any other information will be considered unless accompanied by an explanation of why a substitution or change is necessary.

L. Disapproved Submittals: Contractor shall correct disapproved item submittals and resubmit for approval within timeframe noted. If no date is given, Contractor shall submit corrected submittal within 10 working days.

If the Contractor considers any correction or notation on the returned submittal to constitute a change to the contract drawings, specification, or statement of work the Contractor shall notify the Contracting Officer.

M. Responsibility: The Government’s review of Contractor submittals shall not relieve the Contractor of the entire responsibility for the correctness of details and dimensions and conformance to the specifications. The Contractor shall assume all responsibility and risk for any mistakes and/or costs due to any errors in submittals.

N. Inconsistencies: If a conflict or inconsistency arises between an approved item submittal and the contract documents, the contract documents shall govern.

1.3 SPECIFIC SUBMITTAL DESCRIPTIONS AND REQUIREMENTS: Submittal requirements for individual units of work are specified in the Statement of Work (SOW). Except as otherwise indicated in the SOW, comply with the following requirements for each type of submittal.

A. Shop Drawings: These are technical drawings and data specially prepared for this contract including fabrication and installation drawings, setting and

Appendix A-4 seaming diagrams, and coordination drawings (for use on-site). Shop drawings include drawings, diagrams and schedules specifically prepared to illustrate some portion of the work, diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project, or drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated. Information required on shop drawings includes dimensions, identification of specific products and materials which are included in the work, compliance with specified standards, and notations of coordination requirements with other work.

Provide special notations of dimensions that have been established by field measurements. Highlight, encircle, or otherwise indicate deviations from the contract documents on the shop drawings. Furnish one hard copy and one electronic copy.

B. Product Data: This data includes standard printed information on manufactured products that has not been specially prepared for this contract, including manufacturers' product specifications illustrating size, physical appearance and other characteristics of materials, installation instructions, standard color charts, catalog cuts, illustrations, schedules, standard wiring diagrams, standard product operating and maintenance manuals, and samples of warranty language when the contract requires extended product warranties. General information required specifically as product data includes manufacturers' standard printed recommendations for application and use, compliance with recognized standards of trade associations and testing agencies, the application of their labels and seals (if any), special notation of dimensions which have been verified by way of field measurement, and special coordination requirements for interfacing the material, product, or system with other work. Furnish three hard copies and one electronic copy.

C. Design Data: Design data includes design calculations, mix designs, analyses or other data pertaining to a part of work. Refer to statement of work for required quantities, formats, and signatures or certifications required. Furnish three hard copies and one electronic copy.

D. Test Reports: These include reports signed by an authorized official of a testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with the specified requirements. Testing shall have been within three years of date of contract award for the project. Reports also include findings of tests required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to the job site, findings of tests made at the job site or on a sample taken from the job site, investigation reports, daily logs and checklists, and final acceptance test

Appendix A-5 and operational test procedures. Furnish three hard copies and one electronic copy of each such report required.

E. Certificates: These include statements printed on the manufacturer’s letterhead and signed by the responsible officials of the manufacturer of a product, system or material attesting that the product, system or material meets specification requirements. Certificates include documentation required of the Contractor, or of a manufacturer, supplier, installer or subcontractor through the Contractor, to further demonstrate the quality of orderly progressions of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications. Certificates shall be dated after award of the project contract and clearly name the project.

Furnish three hard copies and one electronic copy of each certificate required.

F. Manufacturer’s Instructions: Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.

Furnish three hard copies and one electronic copy.

G. Operation and Maintenance Data: Data furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer’s help and product line documentation necessary to maintain and install the equipment, and needed by operating and maintenance personnel for the safe and efficient operation, maintenance, and repair of the item. The data is intended to be incorporated in an operations and maintenance manual or control system. Furnish two hard copies and one electronic copy.

H. Miscellaneous Submittals: These are work-related, non-administrative submittals that do not fit in the previous categories, including the following:

1. Maintenance agreements. Furnish one hard copy and one electronic copy.

2. Maintenance tools, spare parts, and overrun or maintenance stock.

Refer to SOW for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys, and similar physical units to be submitted.

3. Qualification certificates. Furnish one hard copy and one electronic copy.

4. Warranties.

END OF SOW

84-1644

84-1644-2

82-1133

82-1133-2

82-1132

82-1132-2

82-1140

82-1140-2

82-1140-3