ATC Mower Purchase Description 15 June.pdf
PDF 115 KB Posted
- Attached to
- Mower with accessories
- Solicitation number
- W91ZLK23Q0024
About this file
This document outlines requirements for a mower purchase by the U.S. Army Aberdeen Test Center. The Center requires an industrial grade mower with a minimum 32.5 HP engine and 68" mower deck attachment that can cut at heights between 3-4 inches. Additional needed accessories include a canopy for overhead protection, foot pegs, front fenders, slope rating between 20-30 degrees, digital slope indicator, and weight transfer system. Delivery is expected within 90 days of order placement to Building 358 at the Aberdeen Proving Ground in Maryland. The related federal contract opportunity is solicitation number W91ZLK23Q0024 issued by the Department of the Army Materiel Command Army Contracting Command to fulfill this mower and accessory requirement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATC Mower Purchase Purchase Description
15 June 2023
I. Background
The U.S. Army Aberdeen Test Center (ATC) utilizes mowers in efforts to manage weeds, other vegetation, and tick populations due to high grass.
To support these efforts, ATC is looking to procure a mower and equipment in accordance with industry standards and government property maintenance.
II. Equipment List
The following is a list of mower and equipment needs relevant to the scope of work.
a. Industrial grade mower with minimum of:
i. 32.5 HP engine
ii. Slope rating 20-30° (including dual wheel kit & digital slope indicator options)
iii. 68” mower deck attachment with 3-4” cut height, mount system, tilt up deck
iv. Canopy for overhead protection
v. SDLA Hand Controls
vi. Front Fenders
vii. Foot pegs
viii. Weight Transfer
ix. 1-year limited warranty III. Delivery Address
US Army Aberdeen Test Center 6850 Lanyard Road, Building 358 Aberdeen Proving Ground, MD 21005-5059 United States
IV. Expected Delivery Date
90 days from ordered date
File details come from the government source that posted it. Updated .