SECTION I – CONTRACT CLAUSES
I.1. MASTER CONTRACT CLAUSES
The following clauses apply to the master contract only.
| 52.219-9 |
| Small Business Subcontracting Plan |
| AUG 2018 |
| 52.219-9 |
| Small Business Subcontracting Plan Alternate II |
| NOV 2016 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.219-28 |
| Post-Award Small Business Program Re-representation |
| JUL 2013 |
| 52.204-15 |
| Service Contract Reporting Requirements for Indefinite-Delivery Contracts |
| OCT 2016 |
| 52.243-1 |
| Changes – Fixed-Price |
| AUG 1987 |
| 52.243-1 |
| Alternate I |
| APR 1984 |
| 52.249-2 |
| Termination For Convenience of the Government (Fixed-Price) |
| APR 2012 |
| 52.249-8 |
| Default (Fixed-Price Supply and Service) |
| APR 1984 |
I.1.1. FAR 52.216-18 Ordering (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the master contract’s Notice-to-Proceed through 5 years and one (five-year) option that may extend the cumulative ordering period to 10 years.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
(End of clause)
I.1.2. FAR 52.216-19 Order Limitations (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than the Simplified Acquisition Threshold, as amended, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of : Not Applicable
(2) Any order for a combination of items in excess of : Not Applicable
(3) A series of orders from the same ordering office within 365 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
I.1.3. FAR 52.216-22 Indefinite Quantity (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 5 years after the master contract’s 10 year ordering period expires.
(End of clause)
I.1.4. FAR 52.217-8 Option to Extend Services (NOV 1999) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
(End of clause)
I.1.5. FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed the ordering period of 10 years for task orders issued under the master contract plus 5 years after the master contract’s ordering period expires for task order performance.
I.1.6. GSAR 552.216-74 Task-Order and Delivery-Order Ombudsman (JAN 2016)
(a) GSA has designated a Task-Order and Delivery-Order Ombudsman who will review complaints from contractors and ensure that they are afforded a fair opportunity for consideration in the award of task or delivery orders under Indefinite Delivery/Indefinite Quantity (ID/IQ) contracts, consistent with the procedures in the contract. Written complaints shall be submitted to the Ombudsman, with a copy to the Contracting Officer.
(b) In the case that the contractor is not satisfied with the resolution of the complaint by the GSA Task-Order and Delivery-Order Ombudsman, the contractor may follow the procedures outlined in subpart 33.1.
(c) The GSA Ombudsman is located at the General Services Administration (GSA), Office of Government-wide Policy (OGP), Office of Acquisition Policy (MV). Contact information for the GSA Ombudsman can be found at: http://www.gsa.gov/ombudsman.
(End of Clause)
I.2. MASTER CONTRACT/TASK ORDER CLAUSES AND PROVISIONS
The following clauses and provisions apply at the master contract level and the task order level, as applicable. These clauses and provisions automatically flow down to task orders solicited and awarded under the master contract unless otherwise stated by the OCO at the task order level.
Subject to FAR 52.204-19, the Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
The OCO will be provided a copy of any Contractor’s Section K, representations and certifications, in full text, upon request. The ASTRO CO may request an updated Section K during the term of the master contract.
I.2.1. Federal Acquisition Regulation (FAR) Clauses:
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions on Subcontractor Sales to the Government |
| SEP 2006 |
| 52.203-6 |
| Restrictions on Subcontractor Sales to the Government Alternate I |
| OCT 1995 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds For Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price or Fee Adjustment for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation on Payments to Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| OCT 2015 |
| 52.203-14 |
| Display of Hotline Poster(s) |
| OCT 2015 |
| 52.203-16 |
| Preventing Personal Conflict of Interest |
| DEC 2011 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirements to Inform Employees of Whistleblower Rights |
| APR 2014 |
| 52.203-19 |
| Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements |
| JAN 2017 |
| 52.204-2 |
| Security Requirements |
| AUG 1996 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2018 |
| 52.204-12 |
| Unique Entity Identifier Maintenance |
| OCT 2016 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2018 |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| JUL 2016 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications |
| DEC 2014 |
| 52.204-21 |
| Basic Safeguarding of Covered Contractor Information Systems |
| JUN 2016 |
| 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities |
| JUL 2018 |
| 52.204-25 |
| Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment |
| AUG 2019 |
| 52.207-3 |
| Right of First Refusal of Employment |
| MAY 2006 |
| 52.207-5 |
| Option to Purchase Equipment |
| FEB 1995 |
| 52.208-8 |
| Required Sources of Helium and Helium Usage Data |
| AUG 2018 |
| 52.208-9 |
| Contractor Use of Mandatory Sources of Supply or Services |
| MAY 2014 |
| 52.209-6 |
| Protecting the Government’s Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| OCT 2018 |
| 52.209-10 |
| Prohibition on Contracting with Inverted Domestic Corporations |
| NOV 2015 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.211-5 |
| Materials Requirements |
| AUG 2000 |
| 52.215-2 |
| Audit and Records —Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence – Uniform Contract Format |
| OCT 1997 |
| 52.215-14 |
| Integrity of Unit Prices |
| OCT 2010 |
| 52.215-15 |
| Pension Adjustments and Asset Reversions |
| OCT 2010 |
| 52.215-16 |
| Facilities Capital Cost of Money |
| JUN 2003 |
| 52.215-17 |
| Waiver of Facilities Capital Cost of Money |
| OCT 1997 |
| 52.215-18 |
| Reversion or Adjustment of Plans for Postretirement Benefits (PRB) other than Pensions |
| JUL 2005 |
| 52.215-19 |
| Notification of Ownership Changes |
| OCT 1997 |
| 52.215-21 |
| Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data-Modifications |
| OCT 2010 |
| 52.215-21 |
| Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data-Modifications Alternate IV |
| OCT 2010 |
| 52.215-23 |
| Limitations on Pass-Through Charges |
| OCT 2009 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| OCT 2018 |
| 52.222-1 |
| Notice to the Government of Labor Disputes |
| FEB 1997 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-17 |
| Nondisplacement of Qualified Workers |
| MAY 2014 |
| 52.222-19 |
| Child Labor-Cooperation with Authorities and Remedies |
| JAN 2020 |
| 52.222-20 |
| Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 |
| MAY 2014 |
| 52.222-21 |
| Prohibition of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction |
| APR 2015 |
| 52.222-29 |
| Notification of Visa Denial |
| APR 2015 |
| 52.222-30 |
| Construction Wage Rate Requirements-Price Adjustment (None or Separately Specific Method) |
| AUG 2018 |
| 52.222-35 |
| Equal Opportunity For Veterans |
| OCT 2015 |
| 52.222-36 |
| Equal Opportunity For Workers With Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports Veterans |
| FEB 2016 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-41 |
| Service Contract Labor Standards |
| AUG 2018 |
| 52.222-50 |
| Combating Trafficking in Persons |
| JAN 2019 |
| 52.222-51 |
| Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements |
| MAY 2014 |
| 52.222-54 |
| Employment Eligibility Verification |
| OCT 2015 |
| 52.222-55 |
| Minimum Wages Under Executive Order 13658 |
| DEC 2015 |
| 52.222-62 |
| Paid Sick Leave Under Executive Order 13706 |
| JAN 2017 |
| 52.223-2 |
| Affirmative Procurement of Biobased Products Under Service and Construction Contracts |
| SEP 2013 |
| 52.223-5 |
| Pollution Prevention and Right-To-Know Information |
| MAY 2011 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-10 |
| W Waste Reduction Program |
| MAY 2011 |
| 52.223-11 |
| Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons |
| JUN 2016 |
| 52.223-15 |
| E Energy Efficiency in Energy-Consuming Products |
| DEC 2007 |
| 52.223-17 |
| A Affirmative Procurement of EPA-designated Items in Service and Construction Contracts |
| AUG 2018 |
| 52.223-18 |
| Encouraging Contractor Policies to Ban Text Messaging While Driving |
| AUG 2011 |
| 52.223-19 |
| Compliance with Environmental Management Systems |
| MAY 2011 |
| 52.223-20 |
| Aerosols |
| JUN 2016 |
| 52.223-21 |
| Fo Foams |
| JUN 2016 |
| 52.224-1 |
| Privacy Act Notification |
| APR 1984 |
| 52.224-2 |
| Privacy Act |
| APR 1984 |
| 52.224-3 |
| Privacy Training |
| JAN 2017 |
| 52.225-1 |
| Buy American-Supplies |
| MAY 2014 |
| 52.225-3 |
| Buy American-Free Trade Agreements-Israeli Trade Act |
| MAY 2014 |
| 52.225-5 |
| Trade Agreements |
| OCT 2019 |
| 52.225-9 |
| Buy American-Construction Materials |
| MAY 2014 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.225-19 |
| Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission Outside the United States |
| MAR 2008 |
| 52.225-26 |
| Contractors Performing Private Security Functions Outside the United States |
| OCT 2016 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-1 |
| Authorization and Consent Alternate I |
| APR 1984 |
| 52.227-2 |
| Notice and Assistance Regarding Patent and Copyright Infringement |
| DEC 2007 |
| 52.227-3 |
| Patent Indemnity |
| APR 1984 |
| 52.227-4 |
| Patent Indemnity-Construction Contracts |
| DEC 2007 |
| 52.227-10 |
| Filing of Patent Applications-Classified Subject Matter |
| DEC 2007 |
| 52.227-11 |
| Patent Rights-Ownership by the Contractor |
| MAY 2014 |
| 52.227-13 |
| Patent Rights-Ownership by the Government |
| DEC 2007 |
| 52.227-14 |
| Rights in Data—General |
| MAY 2014 |
| 52.227-16 |
| Additional Data Requirements |
| JUN 1987 |
| 52.227-17 |
| Rights in Data-Special Works |
| DEC 2007 |
| 52.227-18 |
| Rights in Data-Existing Works |
| DEC 2007 |
| 52.227-22 |
| Major System-Minimum Rights |
| JUN 1987 |
| 52.228-3 |
| Workers’ Compensation Insurance (Defense Base Act) |
| JUL 2014 |
| 52.228-4 |
| Workers’ Compensation and War-Hazard Insurance Overseas |
| APR 1984 |
| 52.228-5 |
| Insurance – Work on a Government Installation |
| JAN 1997 |
| 52.228-7 |
| Insurance-Liability to Third Persons |
| MAR 1996 |
| 52.228-8 |
| Liability and Insurance-Leased Motor Vehicles |
| MAY 1999 |
| 52.229-3 |
| Federal, State, and Local Taxes |
| FEB 2013 |
| 52.230-2 |
| Cost Accounting Standards |
| OCT 2015 |
| 52.230-3 |
| Disclosure and Consistency of Cost Accounting Practices |
| OCT 2015 |
| 52.230-4 |
| Disclosure and Consistency of Cost Accounting Practices-Foreign Concerns |
| OCT 2015 |
| 52.230-6 |
| Administration of Cost Accounting Standards |
| JUN 2010 |
| 52.232-23 |
| Assignment of Claims |
| MAY 2014 |
| 52.232-33 |
| Payment by Electronic Funds Transfer-System for Award Management |
| OCT 2018 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-1 |
| Disputes Alternate I |
| DEC 1991 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law For Breach of Contract Claim |
| OCT 2004 |
| 52.234-1 |
| Industrial Resources Developed Under Title III, Defense Production Act |
| SEP 2016 |
| 52.236-5 |
| Material and Workmanship |
| APR 1984 |
| 52.236-7 |
| Permits and Responsibilities |
| NOV 1991 |
| 52.237-3 |
| Continuity of Services |
| JAN 1991 |
| 52.239-1 |
| Privacy or Security Safeguards |
| AUG 1996 |
| 52.242-1 |
| Notice of Intent to Disallow Costs |
| APR 1984 |
| 52.242-3 |
| Penalties for Unallowable Costs |
| MAY 2014 |
| 52.242-5 |
| Payments to Small Business Subcontractors |
| JAN 2017 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.244-2 |
| Subcontracts |
| OCT 2010 |
| 52.244-5 |
| Competition in Subcontracting |
| DEC 1996 |
| 52.245-1 |
| Government Property |
| JAN 2017 |
| 52.245-9 |
| Use and Charges |
| APR 2012 |
| 52.246-16 |
| Responsibilities for Supplies |
| APR 1984 |
| 52.246-25 |
| Limitation of Liability – Services |
| FEB 1997 |
| 52.251-1 |
| Government Supply Sources |
| APR 2012 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
I.2.2. Federal Acquisition Regulation (FAR) Provisions:
| 52.219-1 |
| Small Business Program Representations |
| OCT 2014 |
| 52.203-11 |
| Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions |
| SEP 2007 |
| 52.203-18 |
| Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation |
| JAN 2017 |
| 52.204-3 |
| Taxpayer Identification |
| OCT 1998 |
| 52.204-5 |
| Women-Owned Small Business (Other than Small Business) |
| OCT 2014 |
| 52.204-7 |
| System for Award Management |
| OCT 2018 |
| 52.204-16 |
| Commercial and Government Entity Code Reporting |
| JUL 2016 |
| 52.204-17 |
| Ownership or Control of Offeror |
| JUL 2016 |
| 52.204-20 |
| Predecessor of Offeror |
| JUL 2016 |
| 52.204-24 |
| Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment |
| DEC 2019 |
| 52.204-26 |
| Covered Telecommunications Equipment or Services-Representation |
| DEC 2019 |
| 52.209-2 |
| Prohibition on Contracting with Inverted Domestic Corporations-Representation |
| NOV 2015 |
| 52.209-5 |
| Certification Regarding Responsibility Matters |
| OCT 2015 |
| 52.209-7 |
| Information Regarding Responsibility Matters |
| OCT 2018 |
| 52.209-13 |
| Violation of Arms Control Treaties or Agreements-Certification |
| JUN 2018 |
| 52.222-22 |
| Previous Contracts and Compliance Reports |
| FEB 1999 |
| 52.222-25 |
| Affirmative Action Compliance |
| APR 1984 |
| 52.222-38 |
| Compliance with Veterans’ Employment Reporting Requirements |
| FEB 2016 |
| 52.222-48 |
| Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification |
| MAY 2014 |
| 52.222-52 |
| Exemption from Application of the Service Contract Labor Standards for Certain Services-Certification |
| MAY 2014 |
| 52.222-56 |
| Certification Regarding Trafficking in Persons Compliance Plan |
| MAR 2015 |
| 52.223-1 |
| Biobased Product Certification |
| MAY 2012 |
| 52.223-22 |
| Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation |
| DEC 2016 |
| 52.225-7 |
| Waiver of Buy American Statute for Civil Aircraft and Related Articles |
| FEB 2016 |
| 52.225-20 |
| Prohibition on Conducting Restricted Business Operations in Sudan-Certification |
| AUG 2009 |
| 52.225-25 |
| Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certification |
| AUG 2018 |
| 52.230-1 |
| Cost Accounting Standards Notices and Certifications |
| OCT 2015 |
| 52.230-7 |
| Proposal Disclosure-Cost Accounting Practice Changes |
| APR 2005 |
| 52.237-8 |
| Restriction on Severance Payments to Foreign Nationals |
| AUG 2003 |
I.2.3. General Services Administration Regulation (GSAR) Clauses:
| 552.203-71 |
| Restriction on Advertising |
| SEP 1999 |
| 552.204-9 |
| Personal Identity Verification Requirements |
| OCT 2012 |
| 552.215-70 |
| Examination of Records by GSA |
| JUL 2016 |
| 552.215-73 |
| Notice |
| JUL 2016 |
| 552.216-74 |
| GSA Task-Order and Delivery-Order Ombudsman |
| JAN 2017 |
| 552.223-73 |
| Preservation, Packaging, Marking, and Labeling of Hazardous Materials (HAZMAT) for Shipments |
| JUN 2015 |
| 552.228-5 |
| Government as Additional Insured |
| JAN 2016 |
| 552.232-1 |
| Payments (DEVIATION FAR 52.232-1) |
| NOV 2009 |
| 552.232-23 |
| Assignment of Claims |
| SEP 1999 |
| 552.232-25 |
| Prompt Payment (DEVIATION FAR 52.232-25) |
| NOV 2009 |
| 552.232-39 |
| Unenforceability of Unauthorized Obligations (DEVIATION FAR 52.232-39) |
| FEB 2008 |
| 552.232-78 |
| Commercial Supplier Agreements-Unenforceable Clauses |
| FEB 2018 |
| 552.237-71 |
| Qualifications of Employees |
| MAY 1989 |
| 552.237-73 |
| Restriction on Disclosure Of Information |
| JUN 2009 |
I.2.4. Defense Federal Acquisition Regulation (DFAR) Clauses:
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition on Persons Convicted of Fraud or Other Defense-Related Felonies |
| DEC 2018 |
| 252.203-7002 |
| Requirements to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7004 |
| Display of Hotline Posters |
| AUG 2019 |
| 252.204-7000 |
| Disclosure of Information |
| OCT 2016 |
| 252.204-7003 |
| Control of Government Personnel Work Product |
| APR 1992 |
| 252.204-7008 |
| Compliance with Safeguarding Covered Defense Information Controls |
| OCT 2016 |
| 252.204-7009 |
| Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information |
| OCT 2016 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| DEC 2019 |
| 252.209-7004 |
| Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponser of Terrorism |
| MAY 2019 |
| 252.215-7002 |
| Cost Estimating System Requirements |
| DEC 2012 |
| 252.223-7004 |
| Drug-Free Workforce |
| SEP 1988 |
| 252.227-7000 |
| Non-Estoppel |
| OCT 1966 |
| 252.227-7013 |
| Rights in Technical Data-Noncommercial Items |
| FEB 2014 |
| 252.227-7014 |
| Rights in Non Commercial Computer Software and Noncommercial Computer Software Documentation |
| FEB 2014 |
| 252.227-7019 |
| Validation of Asserted Restrictions-Computer Software |
| SEP 2016 |
| 252.227-7020 |
| Rights in Special Works |
| JUN 1995 |
| 252.227-7025 |
| Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends |
| MAY 2013 |
| 252.227-7026 |
| Deferred Delivery of Technical Data or Computer Software |
| APR 1988 |
| 252.227-7027 |
| Deferred Ordering of Technical Data or Computer Software |
| APR 1988 |
| 252.227-7039 |
| Patents-Reporting of Subject Inventions |
| APR 1990 |
| 252.228-7001 |
| Ground and Flight Risk |
| JUN 2010 |
| 252.228-7003 |
| Capture and Detention |
| DEC 1991 |
| 252.228-7005 |
| Mishap Reporting and Investigation Involving Aircraft, Missiles, and Space Launch Vehicles |
| NOV 2019 |
| 252.234-7002 |
| Earned Value Management System |
| MAY 2011 |
| 252.239-7018 |
| Supply Chain Risk |
| FEB 2019 |
| 252.242-7004 |
| Material Management and Accounting System |
| MAY 2011 |
| 252.242-7005 |
| Contractor Business Systems |
| FEB 2012 |
| 252.242-7006 |
| Accounting System Administration |
| FEB 2012 |
| 252.244-7001 |
| Contractor Purchasing System Administration-Basic |
| MAY 2014 |
| 252.245-7001 |
| Tagging, Labeling, and Marking of Government-Furnished Property |
| APR 2012 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| DEC 2017 |
| 252.245-7003 |
| Contractor Property Management System Administration-Basic |
| MAY 2014 |
| 252.245-7004 |
| Reporting, Reutilization, and Disposal |
| DEC 2017 |
| 252.246-7001 |
| Warranty of Data-Basic |
| MAR 2014 |
| 252.246-7003 |
| Notification of Potential Safety Issues |
| JUN 2013 |
| 252.246-7007 |
| Contractor Counterfeit Electronic Part Detection and Avoidance System |
| AUG 2016 |
| 252.246-7008 |
| Sources of Electronic Parts |
| MAY 2018 |
| 252.247-7023 |
| Transportation of Supplies by Sea-Basic |
| FEB 2019 |
| 252.251-7000 |
| Ordering From Government Supply Sources |
| AUG 2012 |
I.2.5. Defense Federal Acquisition Regulation (DFAR) Clauses:
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| NOV 2011 |
| 252.204-7008 |
| Compliance with Safeguarding Covered Defense Information Controls |
| OCT 2016 |
| 252.204-7016 |
| Covered Defense Telecommunications Equipment or Services-Representation |
| DEC 2019 |
| 252.204-7017 |
| Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation |
| DEC 2019 |
| 252.209-7002 |
| Disclosure of Ownership or Control by a Foreign Government |
| JUN 2010 |
| 252.215-7013 |
| Supplies and Services Provided by Nontraditional Defense Contractors |
| JAN 2018 |
| 252.219-7000 |
| Advancing Small Business Growth |
| SEP 2016 |
| 252.239-7017 |
| Notice of Supply Chain Risk |
| FEB 2019 |
I.3. SPECIFIC TASK ORDER PROVISIONS AND CLAUSES
The master contracts cannot predetermine all the contract provisions/clauses for individual task order requirements due to the variety of work that may fall within the scope of the master contract.
When adding provisions and clauses that do not flow down from Section I.2., the OCO should consider those provisions and clauses that are specific to the task order’s requirements (e.g., Customer agency supplemental regulations, Cost or Pricing Data, Construction, Service Contract Labor Standards, Buy American, Trade Agreements, Insurance, Taxes, OCONUS locations, Software Licensing, Warranties, Technical Data, Inspection, Delivery, Payments, Funds, Changes, Termination, Contract Type, Etc.).
These additional provisions and clauses may require the OCO to “fill-in” applicable information within the provision or clause.
The OCO must identify in the task order solicitation whether FAR Part 12 commercial clauses/provisions apply or do not apply. If FAR Part 12 applies, the OCO must include all applicable commercial provisions and clauses in the task order solicitation.
For T&M and/or L-H task orders only, the OCO must identify one of the following provisions in the task order solicitation.
| 1. | FAR 52.216-29 Time-and-Materials/Labor-Hour Proposal Requirements—Non-Commercial Item Acquisition With Adequate Price Competition. (Note: For organizations within DoD, when selecting FAR 52.216-29, the OCO must also identify DFARs 252.216-7002, Alternate A). |
| 2. | FAR 52.216-30 Time-and-Materials/Labor-Hour Proposal Requirements—Non-Commercial Item Acquisition Without Adequate Price Competition |
| 3. | FAR 52.216-31 Time-and-Materials/Labor-Hour Proposal Requirements—Commercial Item Acquisition |
(END OF SECTION I)