Performance Work Statement Summary

This Performance Work Statement (PWS) details preventative maintenance services for Aircraft Structural Maintenance (ASM) equipment at Grand Forks Air Force Base, North Dakota, located in Building 622. The contractor must provide all management, tools, supplies, equipment, and labor necessary to maintain facility equipment, including four quarterly scheduled visits between 0700-1500 hours Monday through Friday, with coordination required at least 14 days in advance. The contractor shall also provide unscheduled response services for unforeseen equipment failures, limited to a maximum of two incidents per year, with damage assessments completed within three duty days and repairs performed within three duty days of parts delivery.

The scope encompasses maintenance of two paint booths and one sanding booth with 3-stage filtration systems, Air Make-up Units (Titan brand), Variable Frequency Drive exhaust fan motors, electrical components, and structural integrity inspections. Additionally, the contractor must maintain three blasting media cabinets, two Atlas Copco compressors with air dryer systems, one breathing air system, and one Ingersoll-Rand compressed air reservoir tank. Critical requirements include providing replacement filters meeting NESHAP compliance standards with 30-day delivery, collecting and testing breathing air samples quarterly per Air Force Technical Order 42B-1-22 to maintain Grade D air quality, and submitting detailed quarterly reports to the Contracting Officer Representative. Contractor personnel must obtain base access, complete Level 1 Antiterrorism Training and OPSEC training within 90 days, possess appropriate certifications and Personal Protective Equipment, and comply with all hazardous material handling regulations. Performance thresholds establish that no more than three discrepancies are acceptable per quarter across major systems.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

Aircraft Structural Maintenance (ASM) Preventative Maintenance Program Grand Forks Air Force Base, ND

1. General

1.1 Description of Services: The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide equipment preventative maintenance for the Aircraft Structural Maintenance section located on Grand Forks Air Force Base, ND.

1.2 Basic Services: The contractor shall provide services for the ASM (Building 622) equipment.

1.3 Handling of Hazardous Material (HAZMAT): All contracted personnel will be required to use and dispose of HAZMAT in accordance with applicable federal, state, and base regulations with the exception of contaminated filters. Grand Forks AFB will provide the boxes and dispose of contaminated filters via the Central Accumulation Point (CAP). Contractor personnel shall coordinate with Aircraft Structural Maintenance personnel for any determination on the disposal of hazardous materials.

1.4 Service of Equipment: The contractor shall ensure all equipment is serviced at regular intervals as required by the manufacturer and prescribed in this PWS. The contractor shall provide COR with a detailed report of any and all services provided during the four (4) quarterly scheduled & any unscheduled visits to include follow-up maintenance/remedies. Scheduled quarterly visits will be between the hours of 0700-1500, Monday – Friday. Scheduled visit will be coordinated with COR at least 14 days prior to work being performed

1.5 Unscheduled Response: The contractor shall provide unscheduled response services for unforeseen equipment failures, up to a maximum of two (2) incidents per year. Incidents will encompass damage assessment as well as repair to equipment failure to fully operational status with all labor associated. The contractor will coordinate all unscheduled response activities with the COR. Upon notification of an unforeseen equipment failure, the contractor will conduct a damage assessment within three (3) duty days. A quotation for any necessary replacement parts will be submitted to the COR. The government (COR) will order and purchase replacement parts for the contractor to perform necessary repairs within (3) duty days of notification of delivery of parts.

1.6 Paint Booth

1.6.1 Filter Change: The paint booth is equipped with a filtration system consisting of single stage pre-filters located in the booth doors that flow into a 3-stage exhaust filtration system consisting of a blanket-style filter, cartridge style filter, and final pocket-style stage filters. These filters serve to remove any solid particulate matter from exhaust air. The filters are monitored by a set of Magnehelic gauges to track the performance of each stage of filtration. All replacement particulate filters are required to meet/exceed National Emission Standards for Hazardous Air Pollutants (NESHAP) compliance standards and Original Equipment Manufacturer (OEM) specifications. Contractor will be required to supply the following filters to support the changes (defined in table 1.4.1) delivery is expected within 30 days of request of filters. Military personnel will complete the actual changing of the filters and dispose of old filters.

1.6.2 Air Make-up Unit (AMU). The paint booth insert is supplied by one (1) large Titan brand AMU that supplies air from outside the facility via ducts to the front of the paint booth inside the facility. The AMU also has provisions to heat exterior air via natural gas burners to supply heated air in the winter months. It also has to meet the air flow requirements per the American Conference of Governmental Industrial Hygienists (ACGIH) vent manual. Contractor will be required to monitor, change, and service the following items quarterly (90 days):

1.6.2. 16 AMU intake filters (quarterly cleaning)

1.6.2.2 Any wear and tear items that have exceeded serviceability or will prior to next scheduled visit quarterly (quarterly)

1.6.2.3 Lube of all components as required by the manufacturer (motor, shafts, etc.).

(quarterly)

1.6.2.4 Heating components (quarterly)

1.6.3 Variable Frequency Drive (VFD) Exhaust Fan Motor. The exhaust from the booth is controlled by one (1) VFD exhaust fan motor. This fan is responsible for maintaining the cross draft required inside the paint booth for painting operations. The fan directs the exhaust out of the facility. Contractor will be required to inspect and service the following items:

1.6.3.1 Fan motor drive belt(s) (quarterly)

1.6.3.2 Any wear and tear items that have exceeded serviceability or will prior to next scheduled visit (quarterly)

1.6.3.3 Lube of all components as required by the manufacture. (quarterly)

Table 1.4.1 Description Change frequency (per year)

P/N QTY

Pre-Filter (Blanket)

4 GFS 1017789 4 rolls

2nd stage filters (Panel)

2 GFS 1011569 10 boxes

3rd stage filters (Pocket)

1 GFS 1011573 228

Intake filters 4 GFS 1011606 10 boxes

1.6.3.4 Ensure proper function (quarterly)

1.6.4 Electrical Items. The booth has many electrical components to include but not limited to light bulbs, warning sensors, breakers, and control panels. The main booth control panel is located in the southeast corner of the building outside of the entrance to the sanding booth.

1.6.4.1 Electrical Components for serviceability IAW DPC-480-AB-C-Dual paint booth manual (quarterly)

1.6.4.2 Booth control panel IAW Operators Manual (quarterly)

1.6.5 Structural Integrity of Booth and Auxiliary Structures. Contractor will be required to inspect and service the following items:

1.6.5.1 All ducts and flashing and exhaust stacks attached to facility (semi-annually)

1.6.5.2 Replace/repair any unserviceable door seals and windows (quarterly)

1.7 Sanding Booth

1.7.1 Filter Change: The sanding booth is equipped with a filtration system consisting of single stage pre-filters located in the booth doors that flow into a 3-stage exhaust filtration system consisting of a blanket-style filter, cartridge style filter, and final pocket-style stage filters. These filters serve to remove any solid particulate matter from exhaust air. The filters are monitored by a set of Magnahelic gauges to track the performance of each stage of filtration. All replacement particulate filters are required to meet/exceed National Emission Standards for Hazardous Air Pollutants (NESHAP) compliance standards and Original Equipment Manufacturer (OEM) specifications. Contractor will be required to supply the following filters to support required filter changes of each type of filter in table 1.5.1. Military personnel will complete the actual changing of the filters and dispose of old filters.

1.7.2 Air Make-up Unit (AMU). The sanding booth insert is supplied by one (1) large Titan brand AMU that supplies air from outside the facility via ducts to the front of the paint booth

Table 1.5.1 Description Change frequency (per year)

P/N QTY

Pre-Filter Blanket (Blanket)

4 GFS 1017789 4 rolls

2nd stage filters (Panel)

2 GFS 1011569 10 boxes

3rd stage filters (Pocket)

1 GFS 1011573 228

Intake filters 4 GFS 1011606 10 boxes inside the facility. The AMU also has provisions to heat exterior air via natural gas burners to supply heated air in the winter months. It also has to meet the air flow requirements per the American Conference of Governmental Industrial Hygienists (ACGIH) vent manual. Contractor will be required to monitor, change, and service the following items:

1.7.2.1 16 AMU intake filters (quarterly cleaning)

1.7.2.2 Any wear and tear items that have exceeded serviceability or will prior to next scheduled visit quarterly (quarterly)

1.7.2.3 Lube of all components as required by the manufacturer (motor, shafts, etc.).

(quarterly)

1.7.2.4 Heating components (quarterly)

1.7.3. Variable Frequency Drive (VFD) Exhaust Fan Motor. The exhaust from the booth is controlled by one (1) VFD exhaust fan motor. This fan is responsible for maintaining the cross draft required inside the sanding booth for sanding operations. The fan directs the exhaust out of the facility. Contractor will be required to inspect and service the following items:

1.7.3.1 Fan motor drive belt(s) (quarterly)

1.7.3.2 Any wear and tear items that have exceeded serviceability or will prior to next scheduled visit (quarterly)

1.7.3.3 Lube of any and all components as required by the manufacture. (quarterly)

1.7.3.4 Ensure proper function (quarterly)

1.7.4 Electrical Items. The booth has many electrical components to include but not limited to light bulbs, warning sensors, breakers, and control panels. The main booth control panel is located in the southeast corner of the building outside of the entrance to the sanding booth.

Contractor shall be required to replace such items not defined in this paragraph as needed after coordinating with COR for approval.

1.7.4.1 Electrical Components for serviceability (quarterly)

1.7.4.2 Booth control panel (quarterly)

1.7.5. Structural Integrity of Booth and Auxiliary Structures. Contractor will be required to inspect and service the following items:

1.7.5.1 All ducts and flashing and exhaust stacks attached to facility (semi-annually)

1.7.5.2 Replace/repair any unserviceable door seals and windows (quarterly)

1.8 Blasting Media Cabinets

1.8.1 Grand Forks AFB Aircraft Structural Maintenance has three blast media cabinets that are of Abrasive Blast Systems, Inc. design. Two cabinets are for aluminum parts and one is for steel parts. Contractor will be required to monitor, change, and service the following items at their prescribed intervals:

1.8.1.1 Perform scheduled maintenance and inspections to maintain operation IAW owner’s manual (Quarterly)

1.8.1.2 Maintain all seals, filters, electrical components, and filtration within standards set forth by the ACGIH. All replacement particulate filters are required to meet/exceed National Emission Standards for Hazardous Air Pollutants (NESHAP) compliance standards IAW owner’s manual (Quarterly)

1.8.1.2.1 Ensure proper function of all safety features IAW PRC 6050 blast cabinet maintenance manual (Quarterly)

1.8.1.2.2 Verify structural integrity of Cabinets (Quarterly)

1.8.1.2.3 Replace/repair any unserviceable door seals and windows (Quarterly)

1.8.1.2.4 Provide replacement filters required by owner’s manual to facilitate change out twice a year.

1.9 Facility Compressed Air System

1.9.1 The Aircraft Structural Maintenance (ASM) facility compressor system is composed of two

(2) Atlas Copco GA37 VSD AP Air Compressor with a Atlas Copco FX225N air dryer and a UD240 2” combination oil removal particulate filter assembly. and reservoir tank, and one (1) Hankinson EnMet MedAir 2200 breathing air system. The tool air compressor supplies air to meet the demand of the entire facility to include lines that support the sanding and paint booths.

The Work on the Compressor and air dryer must be accomplished by a certified Atlas Copco technician as to not void warranty.

1.9.2 Compressed Air System (Tool Air). Contractor will be required to inspect and service the following items at their prescribed intervals IAW Atlas Copco Technical Manual:

1.9.2.1 Oil level (quarterly)

1.9.2.2 Controller display readings (quarterly)

1.9.2.3 Air filter service indicator (quarterly)

1.9.2.4 Check that condensate is discharged during operation of the compressor (quarterly)

1.9.2.5 Drain condensate (quarterly)

1.9.2.6 Check the pressure dew point temperature (quarterly)

1.9.2.7 Check coolers. Clean if necessary. (quarterly)

1.9.2.8 Check cooling fins of electric motor(s). Clean if necessary. (quarterly)

1.9.2.9 Remove the air filter element and inspect. If necessary, clean using an air jet.

(quarterly)

1.9.2.10 Replace damaged or heavily contaminated compressed air system elements (to include oil water inline filters)

1.9.2.11 Check the filter element of the electric cabinet. Replace if necessary.

1.9.2.12 Check and adjust compressor settings as required.

1.9.2.13 Accomplish all preventative maintenance services as required by the applicable operator manuals.

1.9.3 Supplied Breathing Air System: Contractor will be required to inspect and service items within the prescribed intervals detailed within the CBA Series SPXFLOW Catalite Breating Air Purifiers and MEDAIR 2200 maintenance Manual. Sample service items include, but are not limited to, the following:

1.9.3.1 Check readings on display

1.9.3.2 Check if condensate is discharged during operation

1.9.3.3 Drain condensate

1.9.3.4 Check the dew point

1.9.3.5 Check the pressure drop over the filters

1.9.3.6 Inspect the air inlet filters for cleanliness/damage and replace as required

1.9.3.7 Check and clean the coolers

1.9.3.8 Check and adjust compressor programming as required

1.9.4 Collect and test air sample from breathing air systems in accordance with Air Force Technical Order (TO) 42B-1-22 in order to provide air sampling with results to ensure Grade D breathing air is maintained in the facility. This testing is to occur at a minimum of once per quarter not to exceed more than 90 days. 90-day time period includes sampling, shipping, testing, and processing of results through the Wright- Patterson AFB, or equivalent laboratory per TO 42B-1-22 paragraph 2.27, to ensure no lapses in coverage occur. The Government can provide this TO if Contractor does not or is not able to obtain. The contractor will be expected to take the necessary samples with the equipment provided in order for the Corrosion Control Facility (CCF) supervision to ship the samples for tested within the requirements listed above. If contractor is approved to test samples to the standards called out in TO 42B-1-22 on their own, shipment to Wright-Patterson AFB will not be necessary.

1.10 One (1) Ingersoll-Rand Compressed air reservoir tank: Contractor will be required to inspect and service the following items (Quarterly):

1.9.1 Inspect for and drain moisture accumulation within reservoir tank

1.9.2 Inspect overall unit for serviceability

1.9.3 Inspect automatic drain for functionality

1.9.4 Clean/Remove any debris in tank drain line preventing moisture removal

1.11 Atlas Copco FX225N/UD240 oil particulate filter

1.10.1 Contractor will be required to inspect and service items as called out in the owner manual at the link below at the prescribed intervals. Required tasks are as follows:

https://www.atlascopco.com/distributor/en/download

1.10.1.1 Quarterly (every 90 days)

1.10.1.1.1 Check that condensate is discharged during operation

1.10.1.1.2 Drain cleaning: Clean drain as needed (remove foreign matter, rust etc.)

1.10.1.2 Drain inspection: press the test button on top of the electronic water drain

(EWD)

1.10.2.2.1 Clean the condenser

1.10.1.3 Yearly (every 365 days)

1.10.1.3.1 Inspect and replace electronic water drain parts

1.10.1.3.2 inspect UD240 Particulate filter and replace if needed

1.12. Site Visit and Schedule of Maintenance Plan

1.11.1 The Contractor shall schedule and complete an initial site visit within thirty (30) calendar days of the contract award date or period of performance start date (whichever comes first). This initial site visit shall establish the date for all quarterly inspection periods. Contractor shall submit schedule plan to COR for approval within 14 calendar days of contract award.

2. GENERAL INFORMATION

2.1 QUALITY CONTROL. The contractor shall be responsible for quality control for all work accomplished during the performance of the task. The contractor shall provide and maintain a Quality Control Plan (QCP) which ensures the requirements in this PWS are met. The QCP will be considered acceptable and approved unless the contractor is notified by the Contracting Officer (CO) prior to award. The QCP shall be included in the quote submission for technical evaluation and acceptance. As a minimum, the contractor shall develop quality control procedures that address the areas identified in section 2, Service Summary.

2.1.2 The Contractor shall perform a site survey with personnel from the aircraft structural maintenance shop (ASM) no later than thirty (30) days after the Contract Award Date.

2.2. QUALITY ASSURANCE. The government will periodically evaluate the contractor’s performance by appointing a Contracting Officer Representative (COR)(s) to monitor performance to ensure services are received. The COR will evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP) for this requirement.

2.3 HOURS OF OPERATION: 0700-1500, Monday-Friday (not including federal holidays).

Unscheduled visits will be coordinated and approved through the COR.

2.4 Holidays Observed.

New Year's Day Martin Luther King Day President's Day Memorial Day Juneteenth Independence Day Labor Day Columbus/Indigenous People’s Day Veterans Day Thanksgiving Christmas Day New Year's Day

2.5 BASE ENTRY PROCEDURES AND AIRFIELD SECURITY REQUIREMENTS:

Minimum Security Requirements (All Areas Including Base Entry). Contractor shall provide COR required documents to obtain base access in a timely manner. As of 7 May 2025, Contractor will need a REAL ID compliant driver’s license or two forms of ID from the following:

- United States Passport or Passport Card, not expired

- Driver’s License or other state photo ID card issued by DMV or equivalent, IAW REAL

ID enforcement schedule

- An ID card issued by Federal, State or local government agencies with the all the required REAL ID Act information

- Personal Identification Verification (PIV) card issued by Federal Government

- Veterans Health Identification Card issued by U.S. Department of Veterans Affairs

- Interoperable (PIV-I) cards issued by No-Federal Government entities

- Certificate of Naturalization/ Certificate of Citizenship (form N-550)

- Permanent Resident Card/Alien Registration Receipt Card (Form I-551)

- DHS “Trusted Traveler” Cards (Global Entry, NEXUS, SENTRI, FAST)

- Border Crossing Card (Form DSP-150)

- An employment authorization document that contains a photograph (Form I-766)

- U.S. Coast Guard Merchant Mariner Cards Credentials

- U.S. Refugee travel document or other travel document or evidence of immigration status issued by DHS containing a photograph

- A Foreign Government Issued Passport

- US Military ID (including retirees and dependents)

- Transportation Worker Identification Credential (TWIC)

2.5.1 Contractor shall also successfully pass a background investigation conducted by 319 SF to obtain base access.

2.5.2 Sponsoring Squadrons for approved contracts will submit a SF-74 to the Pass and Registration Office no later than 10 days prior to the contract start date. The SF-74 must include the following: employee full name, driver's license number, date of birth, country of citizenship, and contract start and end date.

2.5.3 Sponsoring Squadrons for approved contracts with more than 10 employees will submit a Large Volume Issuance Request (LVIR) to the Pass and Registration office no later than 10 days prior to the contract start date.

2.5.4 LVIR MUST include the following: employee full name, driver’s license state/number, social security number, date of birth, country of citizenship, contract start/end date, authorized day/times for base access, authorized locations, and sponsors contact information.

2.5.5 Contractors and employees that are foreign nationals must undergo additional background checks and processing before being issued a visitor's pass. This includes all non-U.S. citizens who hold a foreign passport and are not a U.S. permanent resident.

2.5.5.1 Foreign nationals must submit a temporary worker visa that has been approved by the United States through the sponsoring squadron to the Pass & Registration office no later than three days in advance for processing.

2.5.5.2 All Foreign Workers will have ESCORTED access and must always remain with the sponsor while on the installation. Request for UNESCORTED access can take up to 15 additional days to receive approval.

2.5.6 Sponsoring Squadrons for approved contracts with less than 10 employees will submit a properly filled out Standard Forms 74s for each employee to the Pass and Registration office no later than three days prior to the contract start date.

2.5.7 Upon completion of the screening process, Pass and Registration will notify the Sponsoring Squadron of the results.

2.5.8 Approved contractor and employees will then be notified to pick up their DBIDS card (visitor pass) from the Main Visitor Control Center and/or the Commercial Visitor Control Center no earlier than 24 hours prior to the contract start date.

2.5.9 Denied contractors and employees that are deemed ESSENTIAL to the completion of contract may present factors in extenuation, mitigation, or defense in a rebuttal packet to the sponsoring squadron. Only official police/court documentation will be accepted for proof of severity or disposition.

2.5.10 Sponsor’s squadron will submit the rebuttal requests through their Chain of Command to the Visitor Control Center. Rebuttal requests are reviewed and considered by the 319th Mission Support Group and/or 319th Reconnaissance Wing Commander for final determination.

2.5.11 Although contractors will not be issued vehicles passes vehicles are subject to search while on the installation. Employee privately owned vehicles will not be allowed access to restricted/controlled areas without a free zone being established. Company vehicles will be allowed access to restricted/controlled areas.

2.5.12 All Contractor vehicles should have markings with the company name for quick identification of ownership and notification if they are involved in an incident.

2.5.12 Conduct Requirements. The contractor shall ensure that his/her employees comply with all base traffic regulations and properly conduct themselves while on the base.

2.6 Performance of Services During Crisis Declared by the National Command Authority or Overseas Combatant Commander. No services addressed in this PWS shall be deemed essential during crisis declared by the National Command Authority or Overseas Combatant Commander.

2.7 Special Qualifications. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in performance of this PWS Contractor shall possess all necessary skills and any qualifications/licenses required to fulfill tasks stated in this PWS.

2.7.1 Site workers shall ensure they arrive at the work site with appropriate Personnel Protective Equipment (PPE) to complete the task safely due to the proximity to an active airfield. Jet aircraft operating on the runways, taxiways, and aprons make the area of inspection a zone of high-level noise. Individuals are responsible for inspecting and keeping PPE in good condition.

2.8 AIR FORCE ANTITERRORISM (AT) PROGRAM

All contractor employees requiring access to any Federally controlled facility and logical access to Federally controlled information systems except for “national security systems” as defined by 44 U.S.C. 3542(b)(2), should be certified in Level 1 Antiterrorism Training. In accordance with AFI 10-245 paragraphs 2.18 and paragraph 2.25, DOW contractors and sub-contractor personnel shall be offered Level 1 - AT Awareness Training. AT Awareness Training may be accomplished by either a Level I - qualified instructor, or by completing the "Force Protection" computer based training (CBT) course on the Advanced Distributed Learning System (ADLS) https://golearn.csd.disa.mil/kc/login/login.asp or at https://jkodirect.jten.mil for individuals without access to NIPR, possessing a CAC card, nor enrolled in DEERS. The AT coordinator for the 319 AMXS/Security Manager is responsible for coordinating this training. The contractor is responsible for ensuring that the training has been satisfactorily completed and that valid https://golearn.csd.disa.mil/kc/login/login.asp https://jkodirect.jten.mil/ certificates of completion have been submitted to the Contracting Officers Representative (COR) with a copy furnished to the Contracting Officer. The Certificates are valid for one year;

therefore, training shall be completed every year for the duration of the contract.

2.8.1 Unit anti-terrorism managers will be responsible for organizing this level 1 training.

2.9 MANPOWER REPORTING: The Contractor shall report all contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for “U.S. Air Force” via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address http://sam.gov/content/home/. Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the Systems of Award Management (SAM) help desk.

2.10 OPSEC

2.10.1 General. Contractors who have access to mission critical information require a general knowledge of threats, vulnerabilities and their responsibilities associated with protecting critical information. This is accomplished through initial and annual OPSEC training. Standardized AF OPSEC awareness training located on the AF Advanced Distributed Learning Service (ADLS) is the baseline training required for all personnel. Organization specific training will be provided in addition to this training to ensure all personnel in the Air Force are aware of local threats, vulnerabilities and critical information unique to their duty assignment.

2.10.2 The 319 OG/Security Manager will provide OPSEC training or training materials to contract employees within 90 days of employees’ initial assignment to the contract.

2.10.3 If it is determined that a contract document contains critical information and/or indicators associated with the performance of the contract, the requesting organization will develop an OPSEC Plan to protect the critical information and/or indicators associated with the contract from cradle to grave.

2.10.4 The requesting organization will work with Unit OPSEC coordinators to ensure contractors who require access to critical information receive computer-based OPSEC awareness training (CBT) and understand requirements to protect the critical information and/or indicators.

The OPSEC Awareness for Military Members, DoD Employees and Contractors GS130.16 course is available at the Center for Development of Security Excellence (CDSE), Defense Counterintelligence and Security Agency website:

https://www.cdse.edu/Training/eLearning/GS130/

2.10.5 DoW Contractors with OPSEC requirements within a contract must ensure employees receive OPSEC training as specified in the contract. Accomplishment of training must not exceed 90 days from initial assignment to a contract with OPSEC requirements. Access to mission critical information will not be allowed until OPSEC education has been completed and documented.

http://sam.gov/content/home/ https://www.cdse.edu/Training/eLearning/GS130/

3.SERVICE SUMMARY

Performance Objective

PWS Paragraph(s)

Performance Threshold

1. Provide required filters four (4) times a year for both booths (blanket, 2nd stage, 3rd stage).

1.4.1 & 1.5.1 Contractor shall have filters delivered within 30 days of notification

2. Properly service/maintain AMU as described during each quarterly visit.

1.4.2 & 1.5.2 Contractor shall not have more than 3 discrepancies per quarter.

3. Properly service/maintain blasting media cabinets as described per quarterly visit.

1.6 Contractor shall not have

more than 3 discrepancies per quarter

4. Properly service/maintain facility compressed air system as described per each quarterly visit.

1.7.1 Contractor shall not have

more than 3 discrepancies per quarter

5. Properly service/maintain & collect/test breathing air as required during each quarterly visit.

1.7.2. Contractor shall not have

more than 3 discrepancies per quarter

6. Properly service/maintain air dryer as described per each quarterly visit.

1.9 Contractor shall not have

more than 3 discrepancies per quarterr

4. INCIDENTALS The Government shall provide basic essentials such as telephone access, potable water, and restroom facilities. The Government shall also provide needed man lifts required for Contractor as needed to fulfill objectives within this PWS.

5. GOVERNMENT REMEDIES. Preferred method of resolving complaints is reperformance.

Re-performance will be completed within 24 hours of COR inspection. Re-performances will be at no additional cost to the government. If re-performance is unacceptable or contractor refuses to reperform it will be a deficiency. Deficiencies may result in deductions. Contractor will not be paid for any work deemed unacceptable. Deductions will be calculated for each area found unacceptable

6. APPENDICES.

A. Maps and/or Site Plans

Appendix A

Building 622 Facility Map