These are specifications for maintenance of roads in the Custer Gallatin National Forest by the U.S. Forest Service. The document outlines detailed technical requirements for various road maintenance activities, including road grading, culvert installation and cleaning, drainage dip construction, vegetation cutting, asphalt patching, riprap placement, and equipment rental. Key maintenance requirements include:

Maintenance procedures cover multiple road surface types (native, aggregate, and paved) and involve precise technical specifications for each activity. The contract allows for various equipment rentals including motor graders, backhoes, dozers, and excavators, with specific performance standards for each. Payment will be made on a per-unit basis depending on the specific maintenance task, such as by mile, cubic yard, ton, or each individual completed unit. The specifications provide comprehensive guidelines for ensuring proper road maintenance, drainage management, and surface preservation across different road conditions in the national forest.

View the file

Other files

File Type Posted
Ashland RD roads FY25 Plans.pdf PDF
Experience Questionnaire.pdf PDF
1240LU25Q0097 Ashland RD roads.pdf PDF
Wage Determinations mt79.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUSTER GALLATIN NATIONAL

FOREST

SPECIFICATIONS FOR

MAINTENANCE OF ROADS

TYPICALS

801-1 ILLUSTRATION OF ROAD MAINTENANCE TERMS………………………………….4

834-1 DITCH RELIEF CULVERT AND CATCH BASIN MATENTANCE……………………..5

838-1 CROSS DITCH……………………………………………………………………………..6

838-3 HAZARD REMOVAL……………………………………………………………………….7

838-4 TREATMENT OF SLIDES AND SLOUGH……………………………………………….8

838-5 TREATMENT OF SLUMPS AND ROADBEDCRACKS………………………………...9

SIGNS AND BARRICADES………………………………………………………………………10

DRAIN DIP DETAIL………………………………………………………………………………..11

CULVERT DETAIL…………………………………………………………………………………12

OUTLET DITCH DETAIL………………………………………………………………………….13

CONTRACT INFORMATION

DEFINITIONS………………………………………………………………………………………15

ABBREVIATIONS………………………………………………………………………………….18

QUANTITY MEASUREMENT TERM……………………………………………………………19

REQUIREMENTS ON PROJECT SITE…………..…………………………………………….21

SPECIFICATIONS

SERVICE WORK

109, 110, 119 & 120 MOBILIZATION / EQUIPMENT MOVING………...…………………..24

105, 114, 115, 116 & 117 EQUIPMENT RENTAL…………………………………………26

101 & 102 ROAD GRADING…………………………………...……………………………29

103 COMPACTION ROLLING SURFACED ROADS………………………………………32

104 CUTTING ROADSIDE VEGETATION………………….……………………………….33

106, 107, & 108 SPOT SURFACING……………………………………………………..35

111 DRAINAGE STRUCTURE MAINTENANCE…………………………………………...37

112 & 113 MAINTENANCE OF CATTLEGUARDS……………….……………………

118 IMPORTED BACKFILL…………………………………………………………………..40

129 DRAINAGE DIP…………………………………………………………………………...54

LIGHT CONSTRUCTION WORK

121 & 122 SUPPLY AND INSTALL 18 INCH CMP 7 24 INCH CMP…………………….41

123 RESET EXISTING 18 INCH CMP & 24 INCH CMP…………………………………..43

124 SUBRGRADE REINFORCEMENT………...…………………………………………...44

125 BOULDER COLLECT AND INSTALL……………………..…………………………

126 HAUL (REMOVE AND END HAUL MATERIALS)…..…………………………………46

127 RIPRAP PLACEMENT.....……………………………………………………………….48

128 ASPHALT PAVEMENT PATCHING…………………………..…………………………51

fkuramata Rectangle

A(ft) B(ft) R(ft)

GRADE

TYPE I

TYPE II TYPE III

LENGTH TAPER ROUNDING

0-5

6-9

10-12

LENGTH TAPER ROUNDING LENGTH TAPER ROUNDING

0-5

6-9

10-12

0-5

6-9

30 30

30 50

30 60

2020 25

20 40

20 50

10 - 30

NOTES:

1. CROSS SLOPE OF THE LOW POINT DRAINLINE SHALL BE 5%.

2. SKEW OF DRAINLINE SHALL BE 0-25 DEGREES.

3. WHEN RIPRAP IS SPECIFIED AT OUTLET, IT SHALL BE SHAPED TO

ASSURE WATER GOES ONTO RIPRAP, NOT AROUND.

4. RIPRAP TOP ELEVATION SHALL BE AT TOP OF FINISHED OUTLET

GRADE, NOT SUBGRADE.

5. TAPER LENGTHS SHALL BE WITHIN 10% OF LISTED LENGTHS.

6. UNLESS OTHERWISE SPECIFIED DO NOT INTERCEPT THE

ROADWAY DITCH.

A(ft)

B(ft) R(ft)

A(ft)

B(ft)

R(ft)

B A B

R

R

DRAIN DIP PROFILE

EXISTING ROAD PROFILE

DRAIN DIP

NOT TO SCALE

GRADE

GRADE

10 - 30

M

I N

DWG SHEET NO.

OF

SHEET

9/2 8/1

8 0 7:

M

AR

KL

F

CA

D

ST

AN

DA

RD

S\

AG

EN

CY

S

TA

ND

AR

DS

\F

OR

ES

T

SE

RV

IC

E\

NF

S-

CT

B.

DW

G;

CHECKEDDESIGNERDATE

DRAWING TITLE

'Project Name'

United States Department of Agriculture Forest Service

NO. DATEBYREVISION DESCRIPTION

NORTHERN REGION

'Project Name'

CUSTER GALLATIN

'District Name'

DRAIN DIP DETAIL

'Date' <FILL IN> <FILL IN>

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

DWG SHEET NO.

OF

SHEET

9/2 8/1

8 0 7:

M

AR

KL

F

CA

D

ST

AN

DA

RD

S\

AG

EN

CY

S

TA

ND

AR

DS

\F

OR

ES

T

SE

RV

IC

E\

NF

S-

CT

B.

DW

G;

CHECKEDDESIGNERDATE

DRAWING TITLE

'Project Name'

United States Department of Agriculture Forest Service

NO. DATEBYREVISION DESCRIPTION

NORTHERN REGION

'Project Name'

CUSTER GALLATIN

'District Name'

CULVERT DETAIL

'Date' <FILL IN> <FILL IN>

T

RIPRAP DETAIL

NOT TO SCALE

INSTALL

RIPRAP

WHERE

SPECIFIED

A

A

V

H

SECTION A-A

MIN 2

OR D'

CULVERT

ROADWAY

FINISHED

GRADE

RIPRAP

RIPRAP CLASS "T"

0 1'-0"

1 1'-6"

2 2'-6"

3 3'-0"

4 3'-6"

5 4'-0"

R H A

L H A

12 in Min.D

D

D

R H B

L H B

D

NON-WOVEN

GEOTEXTILE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text 4 ft min.

AutoCAD SHX Text Stream Channel

AutoCAD SHX Text exceed 3/4 of pipe span

AutoCAD SHX Text 1% of pipe length not to

AutoCAD SHX Text than surrounding material

AutoCAD SHX Text layers to density greater

AutoCAD SHX Text Six inch compacted

AutoCAD SHX Text of the pipe

AutoCAD SHX Text and shaped to fit the bottom

AutoCAD SHX Text material, uniformly compacted

AutoCAD SHX Text Bedding shall be suitable

AutoCAD SHX Text 2D or

AutoCAD SHX Text ight and head

AutoCAD SHX Text eft and head

AutoCAD SHX Text 2D or 4' minimum

AutoCAD SHX Text

%%UTYPICAL TRENCH DETAIL

AutoCAD SHX Text

%%UBACKFILL AND BEDDING DETAIL

AutoCAD SHX Text 12 in Min.

AutoCAD SHX Text

%%UTYPICAL CATCH BASIN DETAIL

AutoCAD SHX Text Top of cut slope

AutoCAD SHX Text as Staked

AutoCAD SHX Text Transition

AutoCAD SHX Text Normal ditch line

AutoCAD SHX Text as Staked

AutoCAD SHX Text Transition

AutoCAD SHX Text Culvert prior to

AutoCAD SHX Text

%%UTYPICAL INSTALLATION FOR CAMBER

AutoCAD SHX Text than surrounding material

AutoCAD SHX Text untill density greater

AutoCAD SHX Text Compact embankment

AutoCAD SHX Text 9 ft max.

AutoCAD SHX Text 2D or

AutoCAD SHX Text 12 in Min.

AutoCAD SHX Text 0.1D Min.

AutoCAD SHX Text 6 in Layers

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

%%UTYPICAL INSTALLATION IN STREAM CHANNEL

AutoCAD SHX Text natural flowline

AutoCAD SHX Text Lay culvert on

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text Camber

AutoCAD SHX Text Culvert

AutoCAD SHX Text settlement

AutoCAD SHX Text

%%UDITCH BLOCK: SECTION B-B

AutoCAD SHX Text

%%UDITCH BLOCK

AutoCAD SHX Text Road Surface

AutoCAD SHX Text Ditch Block

AutoCAD SHX Text 24 in

AutoCAD SHX Text B

AutoCAD SHX Text Ditch Bottom

AutoCAD SHX Text 6 in Min.

AutoCAD SHX Text 6 in Min.

AutoCAD SHX Text ight and ack

AutoCAD SHX Text

%%UCULVERT SKEW

AutoCAD SHX Text

DITCH BLOCK

AutoCAD SHX Text B

AutoCAD SHX Text eft and ack

AutoCAD SHX Text Road Surface

AutoCAD SHX Text than the grade of the

AutoCAD SHX Text 2% grade and not less

AutoCAD SHX Text Lay culvert on at least

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

%%UTYPICAL INSTALLATION IN CUT SECTION

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text Culvert

AutoCAD SHX Text Culvert

AutoCAD SHX Text ditch

AutoCAD SHX Text adjacent back slopes

AutoCAD SHX Text not steeper than

AutoCAD SHX Text Recessed back slope

AutoCAD SHX Text Direction of travel toward end of project.

AutoCAD SHX Text CULVERT BANDS: Bands with dimpled projections

AutoCAD SHX Text being higher than the invert at the inlet.

AutoCAD SHX Text parabolic curve, with no point along the invert

AutoCAD SHX Text the foundation or bed. Camber shall be on a

AutoCAD SHX Text to compensate for any anticipated settlement in

AutoCAD SHX Text CAMBER: Pipes shall be cambered as necessary

AutoCAD SHX Text are not acceptable.

AutoCAD SHX Text %%uGENERAL NOTES

AutoCAD SHX Text Lay outlet on natural ground

AutoCAD SHX Text Culvert

AutoCAD SHX Text Structural backfill and labor is incidental to 60201 in the schedule of items

OUTLET DITCH

NOT TO SCALE

A

A

ROAD SURFACE

CULVERT

EXISTING GROUND

D

IT

C H

G R

A D

E

C U

L V

E R

T G

R A

D E

A N

D G

R A

D E

T O

D A

Y L

IG

H T

SECTION ALONG CENTERLINE CULVERT/OUTLET DITCH

SECTION A-A

CULVERT

DIA.

H

H

EXCAVATED MATERIAL

FROM DITCH SECTION.

SEE NOTE THIS SHEET

CULVERT

EXISTING GROUND

DWG SHEET NO.

OF

SHEET

9/2 8/1

8 0 7:

M

AR

KL

F

CA

D

ST

AN

DA

RD

S\

AG

EN

CY

S

TA

ND

AR

DS

\F

OR

ES

T

SE

RV

IC

E\

NF

S-

CT

B.

DW

G;

CHECKEDDESIGNERDATE

DRAWING TITLE

'Project Name'

United States Department of Agriculture Forest Service

NO. DATEBYREVISION DESCRIPTION

NORTHERN REGION

'PROJECT NAME'

CUSTER GALLATIN NATIONAL FOREST

'DISTRICT NAME'

OUTLET DITCH DETAIL

16JAN2024 ARD <FILL IN>

GRADE TO DAYLIGHT

NOTES:

1. MATERIAL SHALL BE DEPOSITED

UNIFORMLY ON BOTH SIDES OF DITCH

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

CONTRACT INFORMATION

DEFINITIONS

Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

1. Agreed or Approved - Official agreement or approval by use of a written document issued by the Government. Agreements also require signature of Contractor's Representative and are dated.

2. Base Course - The layer or layers of specified or selected material of designed thickness placed on a subbase or a subgrade to support a surface course. (See Drawing 801-1, Illustration of

Road Maintenance Terms)

3. Berm - A curb or dike which controls roadway runoff water, or delineates traffic direction. Berms are commonly placed parallel to road centerline; however, on Limited Use Roads (Section 838) may be placed diagonally across the roadbed. (See Drawing 801-1, Illustration of Road

Maintenance Terms)

4. Broad Based Dip – A shallow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by high clearance vehicles; usually placed diagonal to the centerline.

5. Catch Basin – The area immediately adjacent to inlet invert of the culvert.

6. Channel - A natural waterway leading into or away from a culvert or bridge.

7. Contract Amendment - A bilateral written supplemental agreement between the Government and the Contractor, documenting a modification outside the scope of the contract and establishing an equitable adjustment therefor.

8. Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract.

9. Culvert - Any structure, not classified as a bridge that provides an opening under the roadway.

10. Cross Ditch - A shallow ditch placed across the roadbed to remove water from the roadbed surface which can be driven across by full-size pickups or other high clearance vehicles; usually placed diagonal to the centerline. (See Section Drawing 838-1, Cross Ditching of Limited use

Roads)

11. Lead-off Ditch - A ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.

12. Ditch - A relatively long narrow excavation placed to collect or disperse water, located parallel to and abutting the roadbed. (See Drawing 801-1, Illustration of Road Maintenance Terms)

13. Drainage Ditch – A ditch located parallel to and abutting the roadbed.

14. Drainage Structure - A term identifying man-made devices placed to control water movements.

15. Drawings - Illustrations showing detailed maintenance required.

16. Equipment - All machinery, operating supplies and tools necessary for the proper performance and acceptable completion of the work.

17. Excess Material - Material from the roadway excess to that needed for maintenance of roadway.

18. Fore Slope - The slope of the ditch section nearest to the traveled way. (See Drawing 801-1, Illustration of Road Maintenance Terms)

19. Government - The Contracting Officer or the duly authorized Contracting Officer's

Representative (COR) with authority to sign orders.

20. Grade - The vertical alignment of the top surface of the road.

21. Grade Sag – A shallow drainage structure constructed within the roadbed surface to form a uniform depression that allows routine passage of vehicles while diverting water from the traveled way.

22. Highway Vehicles – Vehicles such as passenger cars and high clearance vehicles.

23. High Clearance Vehicles – Vehicles such as pickups, 4x4s, and log trucks.

24. Hydrologic Function – Physical properties of the occurrence and movement of water on the earth’s surface in particular that part which crosses transportation systems.

25. Inspector - The Government's authorized representative designated in writing, assigned to make detailed inspections of contract performance, but not to sign orders to the Contractor.

26. Materials - Any substances specified for use in the performance of the work.

27. Measurement – The process of identifying the dimensions, quantity, or capacity of an item.

28. Nominal Dimensions or Weights - The numerical values shown on the drawings or in the specifications as measurements for the work.

29. Order - A written order by the Government directing fulfillment of work requirements under the terms of the contract.

30. Original Contract Quantities - Those estimated quantities shown in the Schedule of Items as awarded.

31. Patching - Minor repairs to the roadway surface.

32. Paved Surface or Pavement - Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.

33. Reasonably Close Conformity - Means compliance with customary maintenance tolerances where working tolerances are not specified.

34. Right-of-Way - A general term denoting land, property, or interest therein acquired for or devoted to a road. (See Drawing 801-1, Illustration of Road Maintenance Terms)

35. Roadbed - The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade. (See Drawing 801-1, Illustration of Road

Maintenance Terms)

36. Road Listing - A preliminary listing of road locations and any established work priorities.

37. Rolling Dip – A drainage structure constructed within the roadbed surface to form a uniform depression that allows routine passage of vehicles while diverting water from the traveled way.

38. Roadside – All area within the right-of-way excluding the traveled way and shoulders (See

Drawing 801-1, Illustration of Road Maintenance Terms)

39. Schedule of Items - Schedule containing a listing and description of maintenance items, quantities, units of measure, unit price, and amount.

40. Shoulder – As used in this contract, the term is restricted to roads having a paved surfacing. The portion of the roadway contiguous to the traveled way for the accommodation of stopped vehicles, for emergency use, and for lateral support of the pavement structure (See Drawing 801-1, illustration of Road Maintenance Terms)

41. Slough or Slide - Material deposited on the roadway which may need to be repositioned or removed.

42. Slump - A localized portion of the roadbed which has slipped or otherwise become lower than that of the adjacent roadbed and constitutes a hazard to traffic.

43. Special Project Specifications - Specifications which detail conditions and requirements to a particular individual project.

44. Standard Specifications - Specifications for specific divisions of work.

45. Subgrade - Top surface of roadbed upon which subbase, base course, or surface course was constructed. (See Drawing 801-1, Illustration of Road Maintenance Terms)

46. Traveled Way - The portion of the roadway for the movement of vehicles. For purpose of this contract, traveled way includes turnouts and curve widening. (See Drawing 801-1, Illustration of

Road Maintenance Terms)

47. Turnouts - A short auxiliary lane on a one-lane road provided for passage of meeting vehicles.

48. Unit of Measure - The unit and fractions of units shown in the Schedule of Items.

49. Unsuitable Material - Material removed during maintenance which must be disposed of in designated locations. Includes material with substantial amounts of vegetation or other objectionable material.

50. Waterbar - A deeper type cross ditch which is not intended for passage of standard passenger vehicles. This structure intercepts runoff from both the road surface and ditch adjacent to the roadbed.

51. Work Schedule - The Contractor's current schedule for work progression.

ABBREVIATIONS

Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

(Reference to a specific standard or specification shall mean the latest addition or amendment thereto in effect on date of Invitation for Bids.)

1. AASHTO - American Association of State Highway and Transportation Officials.

2. CS - Commercial Standard Issued by U.S. Department of Commerce.

3. EPA - Environmental Protection Agency.

4. FAR - Federal Acquisition Regulation System.

5. FED SPEC - Federal Specifications.

6. FSS - Federal Specifications and Standards.

7. MSHA - Mine Safety Health Administration.

8. MUTCD - Manual of Uniform Traffic Control Devices.

9. NBS - National Bureau of Standards.

10. OSHA - Occupational Safety and Health Act.

11. PS - Product Standard issued by the U.S. Department of Commerce.

12. UL - Underwriter's Laboratories, Inc.

13. ASTM – American Society for Testing and Materials

QUANTITY MEASUREMENT TERMS

Measurement under the contract shall be according to the United States standard measure.

The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawing.

1. All items which are measured by the linear foot, will be measured parallel to its longitudinal centerline, unless otherwise shown on the drawings.

2. A station when used as a definition of term or measurement will be 100 linear feet

3. Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline.

4. The term "ton" will mean the short ton consisting of 2,000 pounds avoirdupois. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the

Contractor from certified scales will be used to determine weight measurements.

5. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.

6. Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes.

The measured slope distance for width will be multiplied by the length treated and converted to a standard 43,560 square foot acreage value of the surface area treated.

7. Volume of bituminous products will be measured at 60° F, using ASTM D-1250 for asphalts except the quantity of emulsified asphalt will be determined by measuring the emulsified asphalt at a temperature of 60° F, or by converting the gallonage measured at another temperature to gallonage at 60° F by means of the following formula:

Gallons. at 60° F = Gallons at A° F

1+0.00025 (A° F − 60° F)

In which A° F is the temperature of the material at the time the gallonage is measured.

8. The term "lump sum" when used in the Schedule of Items will mean the complete unit as required by or described in the contract.

REQUIREMENTS ON PROJECT SITE LOCATIONS

• Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are:

(a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

• Each piece of equipment shall have a reflectorized “slow moving vehicle” sign attached.

• Each piece of equipment shall have a chemical fire extinguisher meeting one of the following specifications: 2 ½ pound size or larger dry chemical type; 4 pound size or larger carbon dioxide type.

• Each piece of equipment shall have one serviceable round point shovel.

• Extinguisher and shovel shall be mounted as to be readily available.

• The operators must exercise due caution and care when working to prevent undue conflict with public users of the roads.

• The Contactors shall post warning signs on both ends of the road section being worked to warn road users of the work in progress.

• Signs will be moved, not to precede the work area more than 1/4 mile. Signs shall be posted only when equipment is actually working.

• All signs shall conform with Section 6B-22 of the “Manual on Uniform Traffic Control Devices”.

• Work shall be scheduled to provide for completion of segments on a daily basis.

• Berms left overnight or over weekends, due to weather or breakdown, shall be posted as a hazard and visibly illuminated at night in accordance with the “Manual on Uniform Traffic Control Devices”.

• Service Truck and repair, parts and mechanical labor shall be at the Contractor’s expense (incidental to the Pay Item). Repairs shall be made promptly and equipment returned to use within 24 hours after breakdown. In lieu of repairing equipment, contractor may furnish similar replacement equipment within the time specified.

SPECIFICATIONS

109, 110, 119 & 120 MOBILIZATION / EQUIPMENT MOVING

1. DESCRIPTION

Mobilization – Unit prices for Mobilizations shall include demobilization. Includes work to move personnel, equipment, materials, supplies and incidentals to each project site.

Equipment Moving – No Equipment Moving pertains to this project.

2. REQUIREMENT

a. Make equipment available for inspection before it is used on National Forest System lands.

b. Moving is complete, when the contractor has moved from the present work site to the ordered work site.

c. Equipment will be clean and weed free before it arrives on National Forest System lands.

3. LOCATION OF WORK

As specified on roads listed on the Road Listing, Shown on the Plans, or as ordered by the

Contracting Officer.

4. MEASUREMENT

Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.

Mile: work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.

5. PAYMENT

a. The accepted quantities will be paid at the contract price per unit of measurement for the pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started.

Payment will be full compensation for the work prescribed in this Section. Mobilization is incidental unless ordered for a specific project at a specific time.

b. Payment will be made under:

Pay Item Description Pay Unit

109 / 119 Mobilization Lump Sum

110 / 120 Equipment Moving Mile

105, 114, 115, 116 & 117 EQUIPMENT RENTAL

1. DESCRIPTION

This Section establishes the basis for the Government to equipment with operators to accomplish road maintenance work.

2. PERFORMANCE STANDARD

• Make equipment available for inspection and approval before use.

• Hourly Equipment Rental – Backhoe / Endloader o Engine with a minimum of 70 horsepower.

o Bucket width of 18 inches with teeth.

o Shall have rubber tires.

o Backhoe reach of 14 feet.

o Loader bucket 1 cy capacity.

o Shall have rollover protection.

• Hourly Equipment Rental – Motor Grader o 125 DrawBar Horsepower.

o Tandem drive.

o Hydraulic shift moldboard not less than 12 feet in length.

o Enclosed Cab.

o Replacement cutting edge available for immediate installation.

• Hourly Equipment Rental - Dozer o Equipment shall be minimum size CAT D5 or equal.

• Hourly Equipment Rental – Skid-Steer Loader o Engine with a minimum of 70 horsepower.

o Shall have rollover protection.

• Hourly Equipment Rental – Track Mounted Hydraulic Excavator o Minimum 130 Horsepower.

o Minimum weight of 40,000 pounds.

3. LOCATION OF WORK

As specified on roads listed on the task orders, shown on the plans, or as ordered by the

Contracting Officer.

4. ACCEPTABLE QUALITY LEVELS

a. Equipment shall be weed free before used on National Forest System Lands, see contract section H Control of Noxious Weeds-Cleaning of Equipment.

b. Equipment shall be well maintained, free of leaks, capable of operating at least 90% of the time, and meet all state and federal regulations.

c. Equipment under this Section, shall be provided fully operated by the Contractor and includes subcontractor equipment performing work under the contract. The equipment shall be operated by a fully trained, qualified, and competent operator at all times.

5. HOURS OF OPERATION

Hours of operation shall be the same as for the Contractor's regular work shift, unless otherwise directed in writing by the Government.

6. MEASUREMENTS

a. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.

b. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.

c. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.

d. Moving of equipment will be paid at the established hourly rate. Pay item for Mobilization may be used if additional transport is shown in the task order.

7. PAYMENT

a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.

b. Payment will be made under:

Pay Item Description Pay Unit

Hourly Equipment Rental – Motor Grader

Hour

Hourly Equipment Rental – Backhoe / End Loader

Hour

Hourly Equipment Rental – Dozer

Hour

Hourly Equipment Rental – Skid Steer Loader

Hour

Hourly Equipment Rental -Track Mounted Excavator

Hour

101 & 102 ROAD GRADING

This work consists of

a. Surface blading native or aggregate roadbed to a condition to facilitate traffic and provide proper drainage.

b. Smooth blading to remove loose surfacing materials from the wheel paths and store the removed materials in a recoverable windrow.

Blading includes shaping the crown or slope of traveled way, berms, and drainage dips in accordance with this specification. Compaction is required when ordered by the

Contracting Officer.

2. MAINTENANCE REQUIREMENTS

a. Timing

Surface blading shall be performed during the contract period as ordered by the

Government.

b. General

1) The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise shown in the Road Listing, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width. Surfacing materials shall be thoroughly loosened to no less than 2 inch depth or the depth of potholes or corrugations. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.

2) Existing native, rock or aggregate surfaced drainage dips shall be shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.

3) The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than two (2) inches above the adjacent surface unless otherwise provided in the contract. Material not meeting this dimension shall be removed and placed outside the roadbed so as not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.

4) Road Maintenance shall consist of reshaping and finish blading the roadbed, including shoulders and turnouts, to provide adequate water runoff and restore, maintain the original cross section and grade of the road. Work includes removing ruts, washes, slough, and other irregularities that prevent normal runoff from the road surface. Ditches shall be cleaned where they are plugged or full of debris and need to be pulled to maintain drainage.

5) Road maintenance includes cleaning of existing drainage facilities and the disposal of excess materials. The drainage facilities include roadside drainage ditches, drainage dips, lead-out ditches, and other drainage and erosion control facilities.

6) Upon completion of the last pass with the grader, the finished road will be crowned and free of rock 2 inches or greater in diameter. Roads without adequate surfacing or with no surfacing shall be crowned, where possible, and be free of larger rocks (4 inches or greater in diameter) that would inhibit vehicle travel, unless otherwise approved by the COR. The road ditches and lead- out ditches will be clean and functioning properly, with no obstructions to impede the flow of water. No berms will be left on either side of the road, unless agreed to by the COR. No surfacing material will have been wasted. The ruts and potholes will have been cut out, where feasible, and existing drain dips will have been cleaned and re-shaped as necessary.

7) Upon completion of blading the roadway shall have been bladed shoulder to shoulder, will be free of berms on both sides, existing crowned (2%-6% from centerline), outsloped roads will have slope of 2%-4%, no surfacing or road material will be wasted, will have ruts/potholes, cut out, drain dips will be cleaned and reshaped as necessary, all ditches and lead-out ditches shall be free of obstructions and functioning properly.

c. Compaction

Unless otherwise specified, all traveled ways requiring compaction shall be compacted by breaking track while operating equipment on the traveled way.

d. Intrusions

Where the minimum width shown in the Special Project Specifications is not available, the Contractor will construct berms where ordered and marked on the ground. Material to provide berms will come from sources designated in the Special Project

Specifications.

e. Undercutting

Roadway back slope shall not be undercut.

f. Intersections

1) At intersections, the roadbeds of side roads which are not closed or restricted from vehicular use shall be bladed to assure smooth transitions.

Field evidence of closure or restrictions shall be considered to be signing, cross ditching in the road surface (traveled way), earth berms or other devices placed to discourage or eliminate use by passenger cars, also roads listed for work under to discourage or eliminate use by passenger cars.

2) Side roads listed for work under this Section shall be considered as not restricted.

g. Cleaning of Structures

Materials resulting from work under this Section shall not be allowed to remain on or in structures, such as bridges, culverts, cattleguards, or drainage dips.

h. Berms

Existing berms shall be maintained to the condition of adjacent segments when ordered by the Government.

3. MEASUREMENT

a. Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.

b. Measurement for blading will be lane measured along the centerline of the roadway.

Measurement will be measured to the nearest one-tenth (0.1) mile.

c. Each intersection bladed under 2.g. will be equivalent to one-tenth (0.1) single-lane mile; however, when the intersecting side road is scheduled for subsequent blading under this Section, no measurement will be made.

d. Berm maintained or established will be measured by linear foot.

e. For roads needing compaction with special compaction equipment (ie. pneumatic or steel roller), use pay item 103 pay item for additional compaction efforts.

4. PAYMENT

a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.

101 Road Grading Native and Pitrun Roads Mile

102 Road Grading Surfaced Roads Mile

103 COMPACTION ROLLING SURFACED ROADS

This work consists of compaction rolling or surfaced roads using rolling equipment identified in the task order.

2. MATERIALS

Equipment required for compaction will be identified as ie pneumatic or steel drum, dynamic force of minimum 40,000 pounds, 20 ton compression-type roller, or dynamic force of minimum 30,000 pounds as identified in the task order.

3. MAINTENANCE REQUIREMENTS

a. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second.

b. Compact each layer of material full width with the number of roller passes identified in the task order and until there is not visible evidence of further consolidation.

c. Four roller passes or as identified in the task order of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.

d. Eight roller passes or as identified in the task order of a 20-ton compression type roller.

e. Eight roller passes or as identified in the task order of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibration per minute.

4. MEASUREMENT

a. Measurement for compaction rolling will be lane measured along the centerline of the roadway. Measurement will be measured to the nearest one-tenth (0.1) mile.

5. PAYMENT

a. The quantities will be paid for at the contract unit price as shown in the Schedule of Items.

103 Compaction Rolling Surfaced Roads Mile

104 CUTTING ROADSIDE VEGETATION

This work consists of cutting all vegetative growth including trees and other vegetation less than four (4) inches in diameter.

2. MAINTENANCE REQUIREMENTS

a. General

1) Brush, trees, and other vegetation less than four (4) inches in diameter within each area treated shall be cut to a maximum height of six (6) inches above the ground surface or obstruction such as rocks or existing stumps. When work is performed under this

Section, the Contractor shall remove all limbs which extend into the treated area or over the roadbed to a height shown in the Special Project Specifications or as identified in the task order.

2) Signs, markers, and other road appurtenances are designated to be retained. Other items to remain will be marked on the ground.

3) The width of the vegetation to be cut shall be as shown in the Special Project

Specifications or as identified in the task order.

4) Work may be performed either by hand or mechanically unless specifically shown in the

Road Listing and Schedule of Items. Self-propelled equipment shall not be allowed on cut and fill slopes or in ditches.

5) Damage to trunks of standing trees caused by Contractor's operation shall be corrected by Contractor, either by treatment with a commercial nursery sealer or by removing the tree as directed by the Government.

6) Mechanical brush cutters shall not be operated when there are non-Contractor personnel or occupied vehicles within a hazardous distance of immediate operating area.

7) Trees within the cutting limits which are over four (4) inches in diameter shall be limbed in lieu of cutting

8) When trees are limbed, limbs shall be cut within four (4) inches of the trunk

b. Cutting Side Vegetation

1) Side mile work will be ordered in uniform width for the length of the listed segments of roads.

2) Unless otherwise included in Special Project Specifications work shall commence at the edge of the traveled way and proceed away from the road centerline. For roads without a defined traveled way the starting point for cutting will be marked in the field or defined in

Special Project Specifications or identified in the task order.

3) Transitions between differing increments of cutting width shall be provided. Transitions shall be accomplished in a taper length of not less than fifty (50) nor more than seventy

(70) feet

c. Requirement Table (Minimum Width 4 feet and Minimum Height 15 feet).

The width and height of the vegetation cutting shall be:

Road No.

From Mile To Mile Width Height

d. Debris

1) Materials resulting from the cutting operation in excess of one (1) foot in length or three

(3) inches in diameter, shall not be allowed to remain on roadway slopes within the treated area, in ditches, or within water courses.

2) Limbs and chunks in excess of three (3) inches in any dimension shall be removed from the traveled way and shoulders.

3) Materials may be scattered downslope from the roadbed, outside of the work area and drainages. Concentrations shall be rescattered or removed.

3. MEASUREMENT

a. Measurement for cutting side vegetation by the side mile will be the length of roads or segments ordered and accepted. The length will be determined to the nearest one-tenth

(1/10) mile on each side of each road.

b. No reduction in the mileage between road terminal shown on the road listing will be made for areas where there is little or no vegetation to be cut.

4. PAYMENT

a. The accepted quantities will be paid at the unit price shown in the Schedule of Items.

104 Cutting Side Vegetation Side Mile

106, 107 & 108 SPOT SURFACING

This work consists of placing surface aggregate as staked on the ground, or designated by the

Government. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.

2. MATERIALS

a. Materials will be Government furnished when stated in the task order.

• Haul for Government Furnished Surfacing shall not exceed 30 miles.

• The cost of pit development and loading by Contractor is included in the unit cost of the pay item for Government Furnished Aggregate / Scoria.

b. Materials furnished by the Contractor shall conform to the gradation requirements shown in the task order.

• Surfacing material shall be from a commercial source, approved by the

Contracting Officer before hauling begins.

• The Contractor is responsible for any royalties, pit development/restoration costs and haul road maintenance.

• Material shall be of the size and type normally used locally in the construction and maintenance of roads by County, State or Federal Agencies. Nominal size to be

1 ½” minus unless otherwise agreed to.

• If scoria is used for surfacing, it will be 3” maximum size, suitable for surface course. No oversized material will be allowed to remain on the road after processing the scoria.

3. MAINTENANCE REQUIREMENTS

The area to be spot surfaced shall be thoroughly loosened to a minimum depth of one inch (1") prior to placement of aggregate.

• Contractor shall shape the roadbed, at the spot surfacing location, before applying the surfacing.

• Surfacing shall be “compacted in place” quantity. Contactor shall make appropriate adjustments in loose quantities needed to obtain the contract quantity.

• The Contractor is responsible for determining the proper size and type of equipment needed.

4. MIXING AND PLACING

a. The material shall otherwise be spread on the prepared area in layers no more than four

(4) inches in depth. When more than one (1) layer is required, each layer shall be shaped and compacted before the succeeding layer is placed. Upon completion, the spot surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.

b. Compaction of the surfacing shall be accomplished by breaking track while operating haul and spreading equipment over the full width of each layer.

5. MEASUREMENT

a. The quantity will be the weight of the actual aggregate placed in tons, cubic yards of aggregate measured in place, or square yards of aggregate measured in place, whichever is shown in the Schedule of Items.

b. Hauling is considered incidental.

c. Quantities shall be “Compacted in Place” quantities.

6. PAYMENT

a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items

b. For payment by weight, certified weight ticket shall be submitted to the Contracting Officer.

c. Payment will be made under:

Spot Surfacing, Contractor Furnished Aggregate

Cubic Yard

Spot Surfacing, Contractor Furnished Scoria

Cubic Yard

Spot Surfacing, Government Furnished Aggregate / Scoria

Cubic Yard

111 DRAINAGE STRUCTURE MAINTENANCE

This work consists of cleaning and reconditioning culverts and other drainage structures.

2. MAINTENANCE REQUIREMENTS

a. Drainage structures, inlet structures, culverts, catch basins, and outlet channels shall be cleaned when required by the Government. Catch basins shall be cleaned by removing the material within the area shown on Drawing 834-1.

b. The transition from the ditch line to the catch basin shall be cleaned a distance of ten (10) feet. Outlet channels and lead-off ditches shall be cleaned a distance of six (6) feet. Debris and vegetation shall be removed and placed so as to not enter the channel or ditch or obstruct traffic. Debris and vegetation ordered to be hauled shall be hauled to a designated disposal area in accordance with Section 126 Haul (Remove and End Haul Materials).

c. Hydraulic flushing of drainage structures is not allowed unless provided for in Special Project Specifications.

d. Cleaning and reconditioning is limited to the first four (4) feet of inlet and outlet determined along the top of the structure. Damaged culverts shall be reported to the Government in writing upon completion of work on each road in the Road Listing. Any damaged by the Contractor shall be repaired.

3. MEASUREMENT

a. Measurement will be the number of units of each culvert type including cleaning of inlet and outlet ditches or channels and catch basins completed and accepted.

b. Reconditioning and cleaning of drainage structures will be incidental to cleaning.

c. Ordered haul of materials will be measured under Haul (Remove and End Haul Materials) Pay Item.

4. PAYMENT

a. Quantities as determined above will be paid at the contract unit price.

111 (1) Clean Culverts 24” Diameter and Under

Each

111 (2) Clean Culverts 24’ through 48” Diameter

Each

111 (3) Clean Culverts Over 48” Diameter

Each

112 & 113 MAINTENANCE OF CATTLEGUARDS

This work consists of cleaning and restoring cattleguards and appurtenances.

2. MATERIALS

a. The Government may furnish replacements for damaged or defective cattleguard components which can be replaced incidental to reassembly. Government-furnished materials and location are listed in Special Project Specifications.

b. Barbed or smooth wire, welding materials, tools, fasteners, and other materials shall be incidentally furnished by Contractor.

c. Government will furnish component replacements when specified in the task order.

a) Components availability shall be coordinated between the Contractor and the

Contracting Officer.

b) Contractor shall be responsible for loading and transport of the furnished components and returning old components to the Government unless documented as missing prior to Contractor’s work, or was ordered to be disposed of by the

Contracting Officer.

3. MAINTENANCE REQUIREMENTS

a. Disconnecting and removal of wings, gates object markers, fencing and other appurtenances shall be done so as not to damage the items. These items shall be reinstalled and replaced if damaged.

b. The cattleguard deck shall be removed prior to cleaning and reinstalled upon completion.

c. Where there is no bypass at a one-lane installation, delay for traffic shall not exceed two (2) hours contingent on at least two (2) week days advance notice to the

Government of the planned work.

d. The area beneath the cattleguard deck shall be cleaned of dirt and other materials to the full depth of the foundation over the entire width of the installation. Where there are existing leadoff or drainage ditches, cleaning shall include removing material from the ditch to provide for water flow through the installation.

e. Materials removed from the area beneath the cattleguard deck and any ditches shall be placed down slope from the road within 200 feet of the installation and shaped to drain unless removal and end haul is ordered in the task order.

f. Cleaning includes re-establishing the drain features if necessary so that water will drain away from the structure.

g. After cleaning, the structure including aprons, wings, signs, deck and fence will be put back in the original position, unless otherwise directed by the COR.

h. Roadbed and surfacing materials disturbed by Contractor's operations shall be conserved separately, replaced and compacted by tamping to provide support and surface texture consistent with the abutting traveled way. Upon completion of deck reinstallation the deck surface shall be flush with or not more than one half (1/2) inch above the adjacent traveled way surface and parallel with the normal road gradient.

i. Cattle guard openings will not be left unattended without adequate barricades.

j. Contractor will be required to make minor repairs or modifications to reattach the wings.

k. Loose fasteners on the cattleguard and rigid gate shall be tightened. Ruptured welds shall be rewelded and localized cracks welded

l. On cattle guards with more than 1 grid, the grids, shall be replaced so there is no separation between the grids. Grids shall be bolted back together.

m. Attached fences and barbed wire gates within the roadway shall be maintained by tightening the wires or resplicing. Wire splices shall have at least one (1) foot of overlap on each wire. Apparent wire sag shall be eliminated between posts. Wire gates shall be able to be opened and closed.

n. The Contractor shall inspect the cattleguard components, fences and gates, and report remaining deficiencies to the Government.

4. MEASUREMENT

Measurement will be the number of cattleguards cleaned.

5. PAYMENT

a. The quantity accepted will be paid at the unit price shown in the Schedule of Items.

112 Cleaning One-Lane Cattleguard Each

113 Cleaning Two-Lane Cattleguard Each

118 IMPORTED BACKFILL

This work consists of furnishing and hauling backfill material to the project site.

a. Material to come from a commercial source, approved by the Contacting Officer before hauling begins.

b. The source shall be inspected by the Government and determined to be free of Noxious weeds before Contracting Officer approval.

c. Material shall be free of refuse, stumps, brush, rocks larger than 6”.

3. MAINTENANCE REQUIREMENTS

4. MEASUREMENT

Measurement of drainage dips maintained will be the number of units of each type completed and accepted.

118 Imported Backfill Cubic Yard

121 & 122 SUPPLY AND INSTALL 18 INCH CMP & 24 INCH CMP

This work consists of supplying and installation of 18 inch or 24 inch corrugated metal pipe culvert.

Supply and install new 18 inch or 24 inch corrugated metal pipe as described in the task order, 0.064” thickness for steel wall thickness.

Metallic-Coated Corrugated Steel Pipe. Furnish new, Pipe, special sections(such as elbows, branch connections and prefabricated flared end sections) and coupling bands conforming to

AASHTO M36 and either AASHTO M 218, AASHTO M 274, or AASHTO M 289 for the dimensions and thicknesses specified.

3. MAINTENANCE REQUIREMENTS

a. Install as staked by Forest Service.

b. Maximum burial depth 48 inches (uphill side of road).

c. Bedding material.

• Well-graded

• Maximum particle size – 1.5 inches

d. Backfill material.

• Well-graded

• Maximum particle size – 3 inches

• Backfill in lifts not exceeding 6 inches and mechanically compact until no visible deformation occurs

e. Minimum 1 foot cover over pipe in the roadway.

4. MEASUREMENT

Measurement of supply and install 18 inch CMP and 24 inch CMP will by the linear foot of pipe measured along the invert.

121 Supply and Install 18 inch CMP LF

122 Supply and Install 24 inch CMP LF

123 RESET EXISTING 18 INCH CMP & 24 INCH CMP

1. DESCRIPTION

This work consists of removal and reinstall existing 18-24 inch corrugated metal pipe culvert.

2. MATERIALS

Materials used in maintenance shall conform to the requirements of the applicable Sections for the materials within the structure.

3. MAINTENANCE REQUIREMENTS

d. Remove and reinstall existing 18-14 inch CMP as staked by Forest Service.

e. Removal and install will be at the same area, but may be a different orientation/depth.

f. Maximum burial depth 48 inches (uphill side of road).

g. Bedding material

• Well-graded

• Maximum particle size – 1.5 inches

h. Backfill material

• Well-graded

• Maximum particle size – 3 inches

• Backfill in lifts not exceeding 6 inches and mechanically compact until no visible deformation occurs.

• Minimum 1 foot cover over pipe in the roadway.

4. MEASUREMENT

Measurement of reset existing 18 inch CMP and 24 inch CMP will by the linear foot of pipe reset measured along the invert.

5. PAYMENT

a. The quantities will be paid for at the contract unit price as shown in the Schedule of Items.

b. Payment will…