ASHE201071

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Rubber removal and sustain runway markings
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE201071AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
RUBBER REMOVAL
1Runway rubber removal
Idrosgommatura pista di atterraggioIT. No. Art. n.4.1m²0.000.000.000.00
Total Rubber removal0.000.000.000.00
TOTAL Rubber removal0.000.000.000.00
MARKINGS SUSTAINMENT0.000.00
2Surface preparation
Preparazione superficie per verniciaturaIT. No. Art. n.4.2Ls0.000.000.00
3WHITE refractive painted LINES 90 cm (3 feet) width
Linee bianche rifrangenti larghezza 90 cm (3 feet)IT. No. Art. n.4.3m0.000.000.00
4WHITE refractive painted AREAS
Aree bianche rifrangentiIT. No. Art. n.4.3m²0.000.000.00
5YELLOW refractive painted lines 15 cm (6 inches) width
Linee gialle rifrangenti larghezza 15 cm (6 pollici)IT. No. Art. n.4.3m0.000.000.000.00
6YELLOW refractive painted AREAS
Aree gialle rifrangentiIT. No. Art. n.4.3m²0.000.000.00
7BLACK non-refractive painted LINES 15 cm (6 inches) width
Linee nere non rifrangenti larghezza 15 cm (6 pollici)IT. No. Art. n.4.4m0.000.000.00
Total markings sustainment0.000.000.000.00
SUMMARY / Riepilogo
Rubber removal
Markings sustainment
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1 $ = 0,8703 €)

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P

GRAND TOTAL

ASHE 20-1052 - CNS TAXIWAY BRAVO ACCESS ROAD, AREA F - AVIANO AB, ITALY
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS€0.00$0.00
TOTAL LABOR COSTS€0.00$0.00
TOTAL OTHER DIRECT COSTS€0.00$0.00
TOTAL DIRECT COSTS€0.00$0.00
OVERHEAD5%€0.00$0.00
SUBTOTAL€0.00$0.00
PROFIT5%€0.00$0.00
TOTAL PRICE€0.00$0.00
DATENovember 2020FIRM NAMESO.IN.CI S.R.L.
TITLEMANAGING DIRECTORBYMASSIMO CANTAGALLO
INSTRUCTIONS TO OFFERORS

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

File details come from the government source that posted it. Updated .