This document provides details on a federal contract solicitation for installation of a water treatment system at Aviano Air Base in Italy. The solicitation seeks proposals for project work involving categories OG01, OS22, and/or OG11, with a magnitude of construction between $250,000 and $500,000. Interested vendors must possess the relevant Statement of Accreditation certification and register with SAM. The work includes installing a water treatment system for the HMU facility at location F on the Aviano Air Base flightline. Proposals are due by the date specified in the solicitation. The performance period requires delivery of a complete project on a lump sum basis. The Department of the Air Force United States Air Forces in Europe - Air Forces Africa is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13909
14270
11607
10106
13040
11731
12043
12041
12042
12052
14234
14071
91603
91602
91604
12371
12372
921A
72701
13044
83111
14313
10163
10997
13846
71183
10461
13265
1135B
14231
11812
14684
78030
78350
78301
11720
10161
12273
10296
13845
11985
14033
13046
78270
12272
11401
13844
14314
1135E
15023
13050
14305
11894
14309
71192
11895
1135A
13812
14303
71905
14304
77190
13047
11361
10233
1135F
11892
10516
10514
14081
14311
10271
14307
71188
11982
10515
12002
10505
14312
10506
78702
14666
14302
10517
11226
13816
1362PB
1135C
13809
81019
10295
70905
91601
10108
11225
14310
13049
10232
13045
71196
13048
11891
14906
71189
1027A
11893
71193
89801
14641
11981
14901
10504
1135D
14315
71098
11986
71099
14686
71270
14301
10372
10462
12004
71388
918A
14611
14612
14084
10509
10510
14306
DEL PROGETTO
UBICAZIONE
LOCATION
PROJECT
ASHE 20-1016 INSTALL WATER TREATMENT
U.S. AIR FORCE
31ST CES/CENM
AVIANO AIR BASE
SYS FOR HMU FAC.933
AREA F, AVIANO AB, ITALY
FINAL (100% DESIGN) - REVISION 01
FEBRUARY 08 , 2021
TH
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
G-001
KEY PLAN
PIANTA CHIAVE
LOCATION MAP
MAPPA GENERALE
LOCAL AREA MAP
INQUADRAMENTO AREA
GENERAL / GENERALI
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
INDEX OF DRAWINGS / INDICE DELLE TAVOLE
G-002_rev01
CIVIL / CIVILI
SURVEY / RILIEVO
ELECTRICAL / ELETTRICHE
A
A st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
EXISTING CONDITIONS - GENERAL PLAN - SURVEY
STATO DI FATTO - PLANIMETRIA GENERALE - RILIEVO
V-101
NEW WORK KEYNOTE
NOTA CHIAVE NUOVI LAVORI
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
EXISTING CONDITIONS - GENERAL PLAN - SURVEY
STATO DI FATTO - PLANIMETRIA GENERALE - RILIEVO
CD101_rev01
GENERAL NOTES/NOTE GENERALI
LEGEND / LEGENDA:
A
Q A.C.
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
ENEW CONDITIONS - GENERAL PLAN
STATO DI PROGETTO - PLANIMETRIA GENERALE
C-101
NEW WORK KEYNOTE
NOTA CHIAVE NUOVI LAVORI
FLIGHT OPERATION CONSTRAINTS VERIFICATION
VERIFICA DEI VINCOLI RICEVUTI DA FLIGHT OPERATION
Q A.C.
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
NEW CONDITIONS - GENERAL PLAN
STATO DI PROGETTO - PLANIMETRIA GENERALE
C-102
Q A.C.
Q A.C.
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
NEW CONDITIONS - ENLARGED PLAN
STATO DI PROGETTO - PIANTA INGRANDITA
KEY PLAN
PIANTA RIFERIMENTO
C-103
NEW WORK KEYNOTE
NOTA CHIAVE NUOVI LAVORI
DRAINING FIELD CALCULATION
CALCOLO CAMPO DRENANTE
PROJECT DATA / DATI DI PROGETTO
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
C-301 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-302
NOTES
NOTE
PHASE 0: EXISTING CONDITIONS
FASE 0: STATO DI FATTO
PHASE 1: CUTTING AND REMOVAL EXISTING PORTION OF SLAB
FASE 1: TAGLIO E RIMOZIONE PORZIONE ESISTENTE SOLETTA
PHASE 2: DIGGIN SECTION & SOIL COMPACTING
FASE 2: SEZIONE DI SCAVO E COMPATTAMENTO TERRENO
PHASE 3: LEAN CONCRETE AND BASEMENT CONSTRUCTION
FASE 3: MAGRONE E COSTRUZIONE BASAMENTO
PHASE 0 - 1: EXISTING CONDITION - PLAN
FASE 0 - 1: STATO DI FATTO - PIANTA
GENERAL NOTES/NOTE GENERALI
KEY PLAN
PIANTA RIFERIMENTO
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-501_rev01
PHASE 4: SLOT CHANNEL POSITIONING
FASE 4: POSIZIONAMENTO CANALINA A FERITOIA
PHASE 5: CONTAINMENT WALL CONSTRUCTION
FASE 5: REALIZZAZIONE MURETTI DI CONTENIMENTO
PHASE 6: LEAN CONCRETE FILLING
FASE 6: RIEMPIEMENTO CON MAGRONE
PHASE 7: RECONSTRUCTION NEW APRON SLAB
FASE 7: REALIZZAZIONE NUOVA SOLETTA APRON
NOTES
NOTE
PHASES 6-7: NEW CONDITION - JOINTS DETAILS
FASI 6-7: PROGETTO - DETTAGLI GIUNTI
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-502
90°
PRECAST MANHOLE
(800X800 OR SUPERIOR)
POZZETTO PREFABBRICATO
(800X800 O SUPERIORE)
SCALE: 1:25
DRAINAGE CHAMBERS - DETAIL
DETTAGLIO BACINI DRENANTI
BENCHING DETAIL
(FOR MANHOLE)
DETTAGLIO GETTO DI
SECONDA FASE (PER POZZETTI)
SCALE: 1:25
TYPICAL TRENCH SECTION
FOR PVC PIPE
SEZIONE TIPO DI SCAVO PER
TUBAZIONI IN PVC
SCALE: 1:25
PVC PIPE DETAIL
PARTICOLARE TUBAZIONE IN PVC
N.T.S.
NOTES
NOTE
NOTES
NOTE
NOTES
NOTE
NOTES
NOTE
NOTES
NOTE
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-503
NOTES
NOTE
NEW CONCRETE SLOT CHANNEL - PLAN
NUOVA CANALINA A FERITOIA - PLANIMETRIA
NEW CONCRETE SLOT CHANNEL
NUOVA CANALINA A FERITOIA
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-504
I II
P
GAC FILTER SYSTEM DETAIL
DETTAGLIO IN PIANTA SISTEMA
FILTRAZIONE A CARBONE ATTIVI
SCALE: 1:25
NOTES
NOTE
NOTES
NOTE
CLAMP SADDLE INSTALLATION DETAIL
DETTAGLIO INSTALLAZIONE PRESA A STAFFA
N.T.S.
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-505
EU
S
II
P
I II
P
EU
I
U
U
E
E
B
B
I II
P
P
S
S
I
II
P
SEDIMENTATION TANK
VASCA DI DISSABBIATURA
SCALE: 1:25
10 OIL SEPARATOR
VASCA DI DISOLEAZIONE
SCALE: 1:25
NOTES
NOTE
NOTES
NOTE
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-506
SCALE: 1:25
DIVERT VALVES INSTALLATION DETAIL
DETTAGLIO INSTALLAZIONE VALVOLE DEVIATRICI
NOTES
NOTE
SECTION "A-A"
SEZIONE "A-A"
A
A A st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-507
QUARTZITE AND ACTIVE CARBON TANK DIAGRAM
SCHEMA INSTALLAZIONE COLONNA
QUARZITE E CARBONE ATTIVO
N.T.S.
NOTES
NOTE
3A
4A
2A
1A
3B 2B
1B 4B
START STOP
DON'T WASH
W A S H
WASHING PROCEDURE:
WHEN NO WASHING OPERATION IS GOING ON, THE DRAIN
VALVES ARE IN "NORMALLY CLOSED" STATUS.
BEFORE STARTING THE WASHING THE OPERATOR MUST PUSH
THE "START" BUTTON. THE DN150 VALVE OPENS AND THE LED
GREEN PANEL "WASH" SWITCHES ON. NOW THE WASHING
OPERATIONS CAN START.
AT THE END OF THE WASHING, THE OPERATOR MUST PUSH
THE "STOP" BUTTON AND THE LED PANEL SIGNAL "DON'T
WASH" SWITCHES ON, TO INDICATE THE DRAIN CLOSURE.
IN CASE OF RAIN, THE RAIN SENSOR OPENS THE DN400 VALVE.
THE SENSOR CLOSES THE VALVE 15 MIN AFTER THE RAIN
STOPS.
IN CASE OF RAIN, THE RAIN SENSOR WILL ALSO CHECK
WHETHER THE DN150 VALVE IS CLOSED OR NOT. IN CASE IT’S
STILL OPEN, IT FORCES VALVE CLOSURE.
PROCEDURE DI LAVAGGIO
LE VALVOLE DI SCARICO SARANNO "NORMALMENTE CHIUSE",
E LA PRESSIONE DEL PULSANTE "START" DA PARTE
DELL’OPERATORE FARÀ APRIRE LA VALVOLA DN150 E IL
PANNELLO A LED "WASH" CON SCRITTA VERDE SEGNALERÀ
ALL'OPERATORE LA POSSIBILITÀ DI POTER LAVARE. AL
TERMINE DEL LAVAGGIO LA PRESSIONE DEL PULSANTE "STOP"
FARÀ CHIUDERE LA VALVOLA E ACCENDERE IL PANNELLO A
LED "DON'T WASH" CON SCRITTA ROSSA AD INDICARE LA
CHIUSURA DELLO SCARICO. IN CASO DI PRECIPITAZIONE IN
CORSO, IL SENSORE PIOGGIA FARÀ APRIRE LA VALVOLA
DN400 E LA CHIUDERÀ CON UN RITARDO DI 15 MIN. ALLA
CESSAZIONE DELL’EVENTO. NEL CASO DI PIOGGIA IL SENSORE
OLTRE A FAR APRIRE LA VALVOLA DN400 CONTROLLERÀ CHE
LA VALVOLA DN150 SIA STATA CHIUSA, ALTRIMENTI
PROVVEDERÀ A FARLO FORZATAMENTE.
EMERGENCY PROCEDURE:
IN CASE OF EMERGENCY PUSH THE MUSHROOM BUTTON.
THE BUTTON PROVIDE TO CLOSE EACH MOTORIZED VALVE.
ALSO CLOSE MANUALLY THE VALVE INSTALLED IN THE
MAHNOLE CLOSE TO THE APRON.
PROCEDURE DI EMERGENZA:
IN CASO DI EMERGENZA, PREMERE IL PULSANTE DI ALLARME
CHE PROVVEDERA' A CHIUDERE TUTTE LE VALVOLE.
INOLTRE CHIUDERE MANUALMENTE LA VALVOLA INSTALLATA
NEL POZZETTO IN PROSSIMITA' DELL'APRON.
ALARM
A
SIDE VIEW
VISTA LATERALE
A
A st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-508_rev01
AREA 1 - PHASE 3: LEAN CONCRETE AND BASEMENT CONSTRUCTION
AREA 1 - FASE 3: MAGRONE E COSTRUZIONE BASAMENTO
AREA 2 - PHASE 3: LEAN CONCRETE AND BASEMENT CONSTRUCTION
AREA 2 - FASE 3: MAGRONE E COSTRUZIONE BASAMENTO
NOTES
NOTE
GENERAL NOTES/NOTE GENERALI
NOTES
NOTE
GENERAL NOTES/NOTE GENERALI
KEY PLAN
PIANTA RIFERIMENTO
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
C-509
FeZn CABLE TRAY, IP4X st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
NEW CONDITIONS - GENERAL PLAN
STATO DI PROGETTO - PLANIMETRIA GENERALE E-101
M D
P
JB JB
JB
JB
JB
JB
JB
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E
E-102
NEW WORK KEYNOTE
NOTA CHIAVE NUOVI LAVORI
GAC FILTER SYSTEM DETAIL
DETTAGLIO DELL'IMPIANTO DI FILTRAZIONE
GENERAL NOTES
NOTE GENERALI
LEGEND AND NOTES
LEGENDA E NOTE
QF4
H1,H2,H3
MDP
MAIN DISTRIBUTION PANEL
QUADRO GENERALE
FU2QS.SPD
QF
FU1
QF7
SPD
Id
QS.M
QF1 QF2 QF3 QF5 QF6
QF.ROOM
Id
QF.EQP
Id
QF9QF8
K
E
I II
M G
B
JB
JB
JB
JB
JB
JB
ELECTRICAL BONDING
EQUIPOTENZIALIZZAZIONE
NOTE
NOTA
st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
100%
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
U .S
. A
IR
F O
R C
E-601_rev01
| Fogli e viste |
| G-001 |
| Fogli e viste |
| G-002 |
| Fogli e viste |
| V-101 |
| Fogli e viste |
| CD101 |
| Fogli e viste |
| C-101 |
| Fogli e viste |
| C-102 |
| Fogli e viste |
| C-103 |
| Fogli e viste |
| C-301_C-302 |
| Fogli e viste |
| C-301_C-302 |
| Fogli e viste |
| C-501 |
| Fogli e viste |
| C-502 |
| Fogli e viste |
| C-503 |
| Fogli e viste |
| C-504 |
| Fogli e viste |
| C-505 |
| Fogli e viste |
| C-506 |
| Fogli e viste |
| C-507 |
| Fogli e viste |
| C-508 |
| Fogli e viste |
| C-501 |
| Fogli e viste |
| E-101 |
| Fogli e viste |
| E-102 |
| Fogli e viste |
| E-601 |
File details come from the government source that posted it. Updated .