ASCW SOW_Security Gates and Perimeter Fencing repair.pdf

PDF 139 KB Posted

Attached to
Special Notice Intent to award USCG Airsta Clearwater Repair Perimeter Fencing
Solicitation number
20150PR250000101
Issued by

About this file

This is a Statement of Work for security gates and perimeter fencing repair at the US Coast Guard Air Station Clearwater in Florida. The work involves repairing the station's perimeter security fence and 5 motorized vehicle gates (Fuel Farm Entry/Exit Gates, Annex Gate, Rotary Wing Hangar Gate, and Fixed Wing Hangar Gate), including installation of new concrete posts, photo beams, and reflectors for UL325 compliance at all gates.

The contractor must conduct thorough inspections of mechanical and electrical components, repair hurricane damage to the Fuel Farm Cantilever Sliding Gate, fix damaged fencing between fuel truck gates, and perform complete servicing of all gates including limit switch and chain tension adjustments. Work must be completed within 45 days of contract award, during normal operating hours of 7:00 AM to 3:00 PM Monday through Friday. The contractor must provide advance personnel information for security clearance, employ only US citizens or permanent residents, and follow strict base regulations including a 10 mph speed limit and protocols during flag ceremonies. The Coast Guard will provide power and water utilities but will not store contractor materials on site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

For

USCG Air Station Clearwater (ASCW)

Security Gates and Perimeter Fencing Repair

Facilities Engineering Air Station Clearwater

15100 Rescue Way

Clearwater, FL 33762

General: United States Coast Guard Air Station Clearwater is accepting proposals for qualified individuals to repair Air Station Clearwater’s perimeter security fence and 5 motorized vehicle gates. Work includes furnishing all labor, trades, equipment, components, materials, tools, and supervision. Further items listed are intended to clarify the statement of work (SOW), indicate general arrangement of the system, and alert the contractor of existing conditions. The contractor shall report any inconsistency or apparent conflicts in the work being proposed.

Recommendations or modifications may be considered, but only upon Contracting Officer review and approval.

Prior to submitting a quote, it is mandatory to examine the scope of work and it is highly recommended to visit the facility to take field measurements, conduct any necessary evaluations and become familiar with existing conditions under which the work will be performed. After the award of the contract, an on-site meeting will be held prior to starting the work.

Location:

United States Coast Guard Air Station Clearwater

15100 Rescue Way

Clearwater, FL 33762

A site map and photos are included as enclosures to this document.

1. Continuity of Facilities Operation: Schedule work to minimize interference with the facility operations and during the normal operating hours of 7:00 am to 3:00 pm Monday thru Friday, excluding federal holidays. Work may be conducted during other hours if approved in advance by coordinating with the facility Point of Contacts (POC) listed below.

2. Notification of Start and Completion of Work: The Contractor shall provide a simple and general schedule of work. For example, “Begin work at ____ on _______. Work is expected to last __ days and be complete on _______.”

3. Coast Guard Points of Contact: The Contractor shall coordinate with the following personnel to arrange access the facility. POC’s are listed in order of preference.

Name Email / notes Phone Number

CWO Will Stevenson William.K.Stevenson@uscg.mil 727-423-7586 (cell phone)

727-535-1437 x1572

MKC Mike Hemmingway Jonathan.M.Hemmingway@uscg.mil

727-535-1437 x1573

Engineer of the Watch Duty watch-stander (24/7 available) 352-362-1918 (cell phone) mailto:William.K.Stevenson@uscg.mil mailto:Jonathan.M.Hemmingway@uscg.mil

4. Recycling and Disposal of Refuse: Minor refuse and waste materials resulting from operations may be disposed of in Air Station Clearwater dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. No Hazardous Waste or bulk waste may be disposed of in Air Station Clearwater dumpsters.

5. Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA State and Federal regulations. Immediate notification to the

Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The

Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.

6. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the contract specifications.

7. Operations and Storage: The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. The Coast Guard will not accept shipments and no materials may be stored on site by the contractor. The contractor is responsible for the protection of existing structures, utilities and vegetation. Any damage shall be repaired at the contractor’s expense.

8. Utilities: Contractor is authorized to use Air Station Clearwater power and water while conducting the work efforts outlined in this document. Any other use of power in not authorized. The unit POC’s listed above will designate available utility connection points if necessary.

9. General Regulations while onboard Coast Guard Air Station Clearwater:

1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flagpole & maintain silence and all vehicles & equipment will halt during these brief events.

2. Contractors are welcome to eat breakfast & lunch on Base in the base galley at published meal rates. Breakfast is served from 0600-0730 daily & lunch will be served from 1100-

1230 daily in the galley. All personnel desiring meal service shall be in clean, non-soiled clothing. The Coast guard reserves the right to refuse service to anyone it deems dirty.

3. Contractors are welcome to utilize the Base’s Exchange store; however, contracted personnel are prohibited from purchasing any uniform, alcohol or tobacco products in it.

4. Traffic Regulations:

a. 10 mph speed limit

b. No use of cell phones is permitted while driving vehicles or operating heavy machinery.

c. All personnel shall obey all marked traffic signals including stop signs & stoplights.

5. Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned outages, including any pool closure and expected duration.

6. Contractors are welcome to utilize the restrooms in the area they are currently working in providing they are clean and do not track mud, dirt or any other debris into the restrooms.

7. No personnel other than the Contracting Officer has the authority to alter the terms of any contract or to issue any change orders. Accordingly, the contractor shall not complete any work that would incur additional cost to the government without written approval from the Contracting Officer.

10. SECURITY REQUIREMENTS:

1. The contractor shall provide a consolidated list of all contractor personnel who will be working on Air Station Clearwater Facilities at least 1 week prior to work. This is for routine/ standard background checks of all personnel entering the base. Information required is: full name, date of birth, and last 4 digits only of Social Security Number.

2. Only American citizens and permanent resident aliens are allowed onboard Air Station

Clearwater Facilities. Absolutely no foreign nationals are permitted on the premises.

Appropriate identification shall be provided at the front gate to attain base entry.

3. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractor is subject to orders to evacuate the property at any time.

4. Absolutely no firearms or weapons of any kind are allowed onboard Air Station

Clearwater.

5. The contractor and subcontractor personnel shall at all times wear company identification and carry photo identification on their person. Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance.

11. SCOPE OF WORK: A site visit will be provided upon request and is highly recommended prior to providing a bid for this work; contact the Contracting Officer with any questions or for further detail. Contractor shall provide all labor, trades, equipment, components, materials, tools, and supervision necessary to repair perimeter security fencing and 5 motorized vehicle gates. All work shall be completed in accordance with industry and manufacture standards. All work shall be completed 45 days after contract being awarded. Further details and enclosures are provided below.

1. The Following gates shall be inspected, repaired, and serviced.

a. Fuel Farm Entry Gate

b. Fuel Farm Exit Gate

c. Annex Gate

d. Rotary Wing Hangar Gate

e. Fixed Wing Hangar Gate

2. Contractor shall install new concrete with posts to install photo beams and reflectors for

UL325 requirements at all gates listed.

3. Contractor shall re-Position Fuel Farm Entry Gate operator on concrete pad for proper function.

4. Contractor shall remove Fuel Farm Cantilever Sliding Gate so mounting posts can be straightened and put back into correct alignment after hurricane damage.

5. Contractor shall repair damaged fencing located between fuel truck entrance and exit gates, to include new concrete and posts.

6. Contractor shall conduct a thorough inspection of all mechanical and electrical components (Rollers, Roller Chain, Belts, Bushings, Drive Sprocket, Safety Transmitter, U-Bolts, etc.) Identify which components require replacement due to failure or excessive deterioration.

7. Contractor shall replace all items identified in the above line item (6).

8. Contract shall perform a complete servicing of each gate upon completion of repairs including limit switch adjustments and chain tension adjustments.

9. Repairs that would exceed the already agreed upon total cost shall not be conducted unless authorized by the Contracting Officer.

10. Contractor shall provide casualty found report for major discrepancies with estimate for repairs to Air Station Clearwater POC.

11. Each gate shall be tested upon completion of service and repairs.

12. Contractor is responsible for any and all permits and disposal.

12. ACCEPTANCE OF WORK: When the contractor has completed all work, they shall notify the Coast Guard (COR) for a final inspection with least a 24-hour notice. If there are any project discrepancies noted, they shall be corrected within 5 business days of discovery. The work will be accepted as complete upon verified correction of any/ all noted discrepancies. After work acceptance, the contractor shall submit final invoice to the Coast Guard as directed by the COR.

ENCLOSURES:

File details come from the government source that posted it. Updated .