Asbestos Removal Spec_EGRHS&NESHAP_8-31-26.pdf

PDF 6 MB Posted

Attached to
Asbestos Abatement Advertisement
Solicitation number
RFP EGRP 260000002592 1
Issued by
Kent County, Grand Rapids City, Michigan

About this file

Asbestos Remediation Technical Specification Summary

This technical specification document, prepared by MicroAir Consulting, LLC for East Grand Rapids Public Schools, outlines requirements for asbestos removal services at East Grand Rapids High School located at 2211 Lake Drive, SE in East Grand Rapids, Michigan. The project encompasses removal and disposal of asbestos-containing materials (ACM) identified in confirmed positive locations throughout the 1963 and 1967 construction areas, specifically including 12"x12" vinyl floor tile in Room 10H (1,000 square feet) and 9"x9" vinyl floor tile in multiple locations totaling 4,750 square feet. A voluntary walkthrough was scheduled for September 15, 2026, at 3:30 PM, with requests for information due by September 17, 2026, at 2:00 PM and sealed bids due by September 24, 2026, at 9:00 AM. Post-bid interviews were scheduled to commence September 29, 2026, at 9:00 AM. The project includes two mobilization periods with the first mobilization beginning April 4, 2027, and completing by June 16, 2027, and the second mobilization running from June 29, 2028, through July 26, 2028. Three sealed bid copies must be submitted to Mr. Anthony Morey, Assistant Superintendent of Finance and Operations at East Grand Rapids Public Schools, 2915 Hall Street, SE, Grand Rapids, MI 49506. The base bid must include three mobilizations with an additional unit rate requirement.

The contractor must possess a current Michigan Abatement Contractor's License and maintain a minimum of five million dollars in environmental pollution liability insurance. All employees assigned to the project must complete physical examinations with pulmonary function testing, possess current Michigan Asbestos Abatement Supervisor and Worker Accreditation Cards valid through project completion, and maintain current respirator training and fit test certifications. The contractor is responsible for all labor, materials, equipment, decontamination supplies, worker training, employee physicals, and compliance with federal (OSHA, EPA, DOT), state (MIOSHA, Michigan Public Act 55, 147, and 440), and local regulations. Work must comply with NESHAP notification requirements, including notification to Michigan Department of Environment, Great Lakes, and Energy and Michigan Department of Labor and Economic Opportunity at least ten days prior to commencement. All asbestos waste must be double-bagged with proper labeling and transported in enclosed vehicles to EPA-approved landfills, with waste manifests submitted to the owner within 35 calendar days of disposal. The contractor must establish and maintain negative pressure enclosures with minimum 0.02" water column pressure, provide continuous air monitoring following NIOSH 7400 A methodology, ensure worker decontamination with heated shower facilities maintaining at least 70 degrees Fahrenheit, and coordinate with the owner's representative industrial hygienist throughout the project. All work must cease if negative pressure drops below 0.02" or if personal breathing zone samples exceed the permissible exposure limit of 0.10 fibers/cc.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Site:

East Grand Rapids High School 2211 Lake Drive, SE in East Grand Rapids, Michigan

M icroAir Project No.: MA-101-26

MicroAir Consulting, LLC ▫ Greenville, Michigan 48838 ▫ (616) 302-0819 ▫ www.microairconsulting.com

TECHNICAL SPECIFICATION

FOR ASBESTOS REMEDIATION

Prepared For:

East Grand Rapids Public Schools

East Grand Rapids Public Schools

East Grand Rapids High School

Technical specifications prepared by:

Chris Decker, MS Industrial Hygienist Michigan Asbestos Project Designer, A26685 MicroAir Consulting, LLC

MicroAir Consulting, LLC ▫ Greenville, Michigan 48838 ▫ (616) 302-0819 ▫ www.microairconsulting.com

TABLE OF CONTENTS

1.0 Bidder Submittals

2.0 Contractor Submittals

2.1 Asbestos

2.2 General (Required)

2.3 General (If Requested)

3.0 Project Conditions

3.1 Asbestos

3.2 Contractor Responsibilities

4.0 General Project Conditions

4.1 Legal Requirements

4.2 Referenced Standards

4.3 Worker Protection

4.4 Worker Decontamination

4.5 Prohibited Activities

4.6 On-Site Industrial Hygienist Responsibilities

4.7 Negative Pressure Enclosure

4.8 Methods of Asbestos Removal Within the NPE

4.9 Decontamination of the NPE

4.10 Asbestos Waste Disposal Requirements

5.0 Scope of Work

5.1 Contractor Responsibilities

6.0 Project Notes

Appendices Appendix A – Bid Forms Appendix B – Contract Agreement Draft Appendix C – Additional Asbestos Abatement Specification Information Appendix D – Construction Drawings Appendix E – NESHAP Asbestos Building Inspection Report

1.0 Bidder Submittals

1.1 The Contractor shall submit a base bid and any alternates, unit prices and other forms (Familial, Iran, Debarment Acknowledgment) for the asbestos abatement as outlined in the scope of work section, as described in these project specifications. (Appendix A – Bid Forms).

1.2 The Contractor will acknowledge that they have reviewed the Construction Drawings (Appendix C – Construction Drawings) and acknowledge that they can meet the scope of work requirements.

1.3 The Contractor will acknowledge that they have read and reviewed the Pre-Renovation NESHAP Asbestos Inspection (Appendix D – Asbestos Inspection Report) conducted by Owner’s Representative.

1.4 Schedule

1. Voluntary Walkthrough:

2. RFI’s Due:

3. Bid’s Due (Bid opening):

4. Post Bid Interview(s):

5. Project Start:

September 15, 2026, at 3:30 PM (Door #1 – South side) September 17, 2026, by 2:00 PM September 24, 2026, by 9:00 AM September 29, 2026, starting at 9:00AM April 4, 2027 (1st Mobilization) June 29, 2028 (2nd Mobilization)

6. 1st Mobilization Completion: June 16, 2027 2nd Mobilization Completion: July 26, 2028

1.5 All RFI’s are to be submitted via email to Mr. Chris Decker (microairconsulting@gmail.com) and Mr. Anthony Morey (amorey@egrps.org) of EGRPS.

1.6 Three copies of the bid must be submitted, in a sealed opaque envelope, bearing the following information clearly marked on the outside:

Attention: Mr. Anthony Morey Assistant Superintendent of Finance and Operations East Grand Rapids Public Schools 2915 Hall Street, SE Grand Rapids, MI 49506

Sealed bid for: EGRHS Asbestos Abatement

The envelope shall also bear on the outside, the name of the bidder, his/her address and telephone number, and his/her license number, if applicable.

2.0 Contractor Submittals

The successful bidder shall provide the following information to Owner’s Representative and the owner's representative prior to commencing any tasks related to this project. These tasks include area preparation, equipment mobilizing, etc. Additional submittals may be required for the Construction Manager award.

2.1 Asbestos

1. Michigan Abatement Contractor's License.

2. Proof that each of the employees assigned to this project has completed a physical complete with pulmonary functions testing.

3. Copies of Michigan Asbestos Abatement Supervisor and Asbestos Abatement Worker Accreditation Cards as issued by the Michigan Department of Labor and Economic Opportunity. The Accreditation period shall not expire prior to the project's scheduled completion date.

4. Current Proof of Asbestos Worker Training or Asbestos Supervisor Training.

5. Proof that non-asbestos workers assigned to this project (for general labor, bag-out, etc.) have received 2-hour asbestos awareness training.

6. Proof of employee respirator training, and most recent fit test certification.

7. Copies of the Environmental Protection Agency (EPA) and/or designated state agencies Notification of intent to Renovate/Demolish as required under 40 CFR 61.22 (d).

8. Detailed work plan describing the number of employees who will be assigned to the project, the schedule (start and completion dates and times for each of the work tasks), equipment to be used within the work area, equipment, and recyclable materials decontamination, fire prevention procedures, and methods of removal of ACM. This document will be reviewed and signed off prior to work commencing.

9. Name and address of landfill proposed by Contractor.

10. A listing of all violations or citations by any regulatory agency in the last year.

2.2 General (Required)

1. Prior to execution of an agreement, the successful bidder will be expected to provide proof of insurance coverage as stipulated herein. Costs associated with these coverages shall be reflected in the bid. In addition, insurance coverage may be secured in an occurrence or claims made format. This insurance shall pay or defend all established claims, regardless of the date on which the claim was made. Comply with all state regulations regarding insurance. Additionally, the chosen abatement contractor(s) shall possess and maintain at least five million dollars ($5MM) in contractor environmental pollution liability insurance. The requirements for additional inures are listed herein and must be met by the Abatement Contractor before work can proceed.

2.3 General (If Requested)

1. Written Hazardous Communication program and proof of employee training for working around ACM.

2. Written confined space entry program and proof of employee training (if needed).

3. Written hot work program and proof of employee training (if needed).

4. A written respiratory protection program.

5. Safety Data Sheets (SDS) for all materials brought on-site.

6. A written silica exposure control program.

7. Proof of employee Drug Testing Program.

8. Proof that each representative of the Contractor has undergone a background check.

3.0 Project Conditions

3.1 Asbestos

Removal shall not occur until the 10-day notification has taken effect if a notification is required for the work. Before asbestos abatement activities start, the Contractor shall:

1. Effectively isolate the abatement area from all other areas of the building. The Contractor shall isolate and seal all air ducts, doors, hallways, and other openings into the abatement area.

2. Post warning signs and barrier tape at all entrances or openings to the removal area in accordance with applicable regulations and in all languages spoken by the labor force.

Provide in accordance with 29 CFR 1910.1001(f) of OSHA’s Asbestos standard:

DANGER ASBESTOS

MAY CAUSE CANCER CAUSES DAMAGE TO LUNGS

AUTHORIZED PERSONNEL ONLY

In addition, where the use of respirators and protective clothing is required in the regulated area, the warning signs shall include the following:

WEAR RESPIRATORY PROTECTION AND PROTECTIVE CLOTHING

IN THIS AREA

3. Construct a decontamination area, per regulations and require that all non-emergency access to the abatement be limited through the decontamination area. The location of the decontamination area shall be determined by the Contractor with the approval of the Owner’s Representative on site.

4. The Contractor shall supply a sufficient number of Air Filtration Devices (AFD) to provide a minimum of 4 air changes per hour and negative pressure of .02" water column in the project areas where required. The Contractor shall provide a means to measure water column pressure throughout the project. Negative pressure of at least 0.02” must be maintained at all times. All work must stop if negative pressure drops below 0.02” at any and all times.

5. The Contractor shall assume full responsibility for the conduct of each of his/her employees, including subcontractors, while under contract for this project. Absolutely no employee will be allowed on the premises while under the influence of alcohol, controlled substances, or prescription medication, which may impair the employee in any way. This site will require additional background checks and fingerprinting prior to the first day on site.

6. The Contractor shall establish emergency and fire exit routes from the work area. Emergency response personnel (fire, police, and emergency technicians) shall have immediate access to the work area. In an emergency, preservation of life and treatment of seriously injured workers shall have priority over decontamination.

7. The Contractor shall comply with all federal, state, and local laws, standards, and regulations while carrying out this project.

8. The Contractor will provide and make all arrangements necessary to access utilities on site:

a) Access to sufficient electrical power shall be provided by the Owner.

b) Access to sufficient cold running water for decontamination and water for asbestos removal shall be provided by the Owner. The Contractor is responsible for supplying hot water for the purpose of decontamination. The Contractor shall ensure all residual water used in abatement or worker decontamination is filtered and disposed of in the City sanitary sewer.

9. Damage to the Owner's services or property caused as a result of the Contractor's actions or subcontractor of the Contractor, as a result of this project shall be repaired to the Owner's satisfaction. All expenses resulting from repairs of damage shall be at the Contractor's expense.

10. The Contractor shall ensure that the dumpsters maintained on-site are locked at all times when not attended. In addition, the dumpsters shall have a hardtop and be appropriately labeled.

11. All waste shall be transported to a EPA approved landfill.

3.2 Contractor Responsibilities

1. The Contractor shall provide all items, articles, materials, operations, or methods listed, required to be furnished or accomplished by reason of the plans or any other Contract Documents, including all labor, materials, equipment, and incidentals required or necessary for their completion.

2. Should any error or inconsistency be found by the Contractor in the Specifications or drawings, the Contractor shall contact Owner’s Representative and the Owner before proceeding with the work for proper adjustment. In no case shall the Contractor proceed with the work until so authorized.

3. The Contractor shall be held to provide all labor and materials necessary for the entire completion of the work described in the Bid Documents and reasonably implied therefrom.

4. Quantities listed in this document are for general information only and will not relieve the Contractor from the removal of all asbestos materials under their quoted price.

5. A copy of the waste manifest shall be submitted to the Owner after the completion of the project within 35 calendar days of disposal.

4.0 General Project Conditions

4.1 Legal Requirements

1. The Contractor shall be licensed for asbestos abatement work in the State of Michigan as required by Michigan Public Act 55, effective June 8, 1993. All licensing must be current and up to date.

2. The Contractor shall use only employees who have received health and safety training, which, as a minimum, fulfills the training required by Michigan Public Act 147 (1986) and OSHA 29

CFR 1926.62.

3. The Contractor shall furnish all labor, supervision, materials (lien-free), employee training, employee physicals, insurance, and equipment necessary to carry out asbestos abatement procedures in accordance with OSHA, EPA, MIOSHA, EGLE and other applicable federal, state, and local government regulations.

4. The Contractor shall obtain approval prior to deposit of asbestos-containing waste at a EPA approved landfill.

5. The Contractor shall provide project notification to the Michigan Department of Environment, Great Lakes, and Energy (EGLE) and Michigan Department of Labor and Economic Opportunity (MLEO), Asbestos Programs at least 10 days prior to commencement of asbestos abatement work, if required.

6. The Contractor shall comply with all items listed in the General Requirements and in the General Conditions contained in this specification document.

4.2 Referenced Standards:

1. OSHA: U.S. Department of Labor, Occupational Safety and Health Administration, (OSHA), including but not limited to:

a. Occupational Exposure to Asbestos, Tremolite, Anthophyllite, and Actinolite; Final Rules Title 29, Part 1910, Section 1001 and Part 1926, Section 1101 of the Code of Federal Regulations

b. Respiratory Protection Title 29, Part 1910, Section 134 of the Code of Federal Regulations

c. Construction Industry Title 29, Part 1926, of the Code of Federal Regulations

d. Subpart J, Fire Prevention Title 29, Part 1926

e. Subpart T, Demolition Title 29, Part 1926

f. Access to Employee Exposure and Medical Records Title 29, Part 1910, Section 2 of the Code of Federal Regulations

g. Hazard Communication Title 29, Part 1910, Section 1200 of the Code of Federal Regulations

h. Specifications for Accident Prevention Signs and Tags Title 29, Part 1910, Section 145 of the Code of Federal Regulations

2. EPA: U. S. Environmental Protection Agency (EPA), including but not limited to:

a. National Emission Standard for Hazardous Air Pollutants (NESHAPS)

b. National Emission Standard for Asbestos Title 40, Part 61, Sub-part A, and Sub part

M (Revised Sub-part B) of the Code of Federal Regulations

3. DOT: U.S. Department of Transportation, including but not limited to: Hazardous Substances

a. Title 29, Part 171 and 172 of the Code of Federal Regulations

4. State Requirements:

a. MIOSHA Rule 2205

b. Michigan Public Act 55 Michigan Public Act 147 Michigan Public Act 440

5. Local Requirements:

Abide by all local requirements which govern asbestos abatement work or hauling and disposal of asbestos waste materials. The contractor is also responsible for adhering to any policy or procedure as mandated by EGRPS.

6. Contractor Responsibility:

The Contractor shall assume full responsibility and liability for the compliance with all standards pertaining to work practices, hauling, disposal, and protection of workers, visitors to the sites, and persons occupying areas adjacent to the sites.

4.3 Worker Protection

1. All individuals entering the removal area during the project must comply with OSHA standard 29 CFR 1910.134 respiratory protection, including the selection of an approved respirator with HEPA filters or an approved supplied-air respirator. The individuals must have passed a medical examination as specified in the respiratory standard, must have completed a pulmonary function test, must have their doctor's permission to engage in activities while wearing a respirator, and must have passed a respiratory fit test as specified in 29 CFR 1910.134.

2. Any facial hair that interferes with the fit of a negative pressure respirator must be removed before the individual dons the respirator.

3. The minimum respiratory protection for workers shall be a half-mask air-purifying respirator equipped with HEPA filter cartridges approved by the National Institute for Occupational Safety and Health (NIOSH).

4. The Contractor shall have established a respirator usage program as specified in 29 CFR 1910.134, and shall have proof of formal employee training in respirator usage.

5. The Contractor shall have a sufficient quantity of replacement HEPA respirator filter cartridge stored on the worksite and shall be easily accessible to workers and Consultant.

6. The Contractor shall enforce proper worker decontamination and cleaning of worker respirators each time they exit the work area.

7. The Contractor shall keep a bound, written, and dated log of employees, regulators, and any other persons who enter the work area wearing respirators. The log shall be kept on-site at or near the enclosure for periodic review or with project documents held by the project supervisor.

8. Should air sampling indicate that the airborne asbestos fiber concentration within the abatement area is in excess of the safe allowable limits for the respiratory protection worn, the Contractor shall provide for his/her employees with respiratory protection that will allow for safe working conditions. The Contractor will consult with Owner’s Representative prior to returning back to work to make sure that adequate respiratory protection is provided.

9. The Contractor shall communicate the results of the air sampling to his/her employees by posting the air sampling results on the job site or in writing within 24 hours.

10. In the event the results of the personal breathing zone samples exceed the Permissible Exposure Limit (PEL) of 0.10 fibers/cc for asbestos or the Excursion Limit (EL) of 1.0 f.cc, work will be stopped until the cause can be isolated.

11. Asbestos abatement personnel shall wear a powered air-purifying respirators (PAPR) respiratory protection until sufficient data has been collected through personal breathing zone sampling to assure the method of removal does not result in airborne concentrations in excess of the restrictive limits of the respirator. Respiratory protection requirements may be relaxed to negative pressure respirators when sufficient data has been generated and at the approval of the Owner’s Representative on-site industrial hygienist.

12. Workers shall wear disposable full-body coveralls, head covers, and appropriate footwear in the removal area. Reusable footwear (i.e., boots) may be left in the dirty room of the removal area between workdays but must be either disposed of with other contaminated wastes or decontaminated thoroughly before removal from the dirty room. No street clothes will be allowed below disposable coveralls.

13. The Contractor shall provide gloves, hard hats, goggles or safety glasses, and other personal protective equipment (PPE) as may be appropriate for use by workers on the project site. The Contractor will meet all minimum PPE requirements set forth by the Construction Manager.

4.4 Worker Decontamination

1. The Contractor shall construct and isolate a decontamination area in accordance with 29 CFR 1926 Appendix F.

2. Contractor's employees shall remove street clothes in the clean/changing room, and dress in disposable coveralls, head covers, foot covers, and respiratory protection prior to entering negative pressure enclosure work areas. No street clothes will be allowed below disposable coveralls.

3. When workers leave the work area, they shall remove their head coverings, disposable coveralls, and foot coverings in the "dirty" or "equipment" room, and while wearing a respirator, proceed to the shower. Respirators shall be removed while showering with soap and water.

4. Because cold water showers discourage thorough worker decontamination, the Contractor must provide showers with water of at least 70 degrees Fahrenheit with independently adjustable hot and cold-water controls for worker decontamination.

The Contractor shall provide a portable water heater for each negative pressure enclosure.

5. Workers shall shower as a minimum:

a. before lunch

b. at the end of each workday

c. at any other time, the worker leaves the contaminated area.

4.5 Prohibited Activities

Smoking, vaping, drinking, eating, or chewing gum or tobacco inside the contaminated area and surrounding work areas are prohibited. The Contractor shall immediately release any individual of the privilege of working on the project if the individual is smoking, vaping, eating, drinking, or chewing tobacco or gum inside the work area.

4.6 On-Site Industrial Hygienist Responsibilities

1. The Owner will contract with Owner’s Representative, as the neutral third party to conduct air monitoring and assure Contractor compliance with applicable asbestos abatement standards, regulations, and procedures. Air monitoring procedures shall follow the NIOSH 7400 A method (third revision of June 14, 2019) and Appendix A of 29 CFR 1926.1101 (Construction standard) for asbestos. Air samples shall be collected, as stated below.

a. Background, baseline, or pre-abatement samples may be collected prior to the start of area preparation.

b. General (clean) area samples will be collected outside the restricted area to verify that the engineering controls established on this project are effective in preventing the spread of airborne asbestos fibers to uncontaminated areas. In the event that general area samples obtained outside the enclosure but in the regulated area are equal to or exceed 0.05 fiber/cc, work inside the removal area will cease. The cause will be identified and corrected before allowing the Contractor to resume the asbestos abatement activities.

c. Personal breathing zone samples shall be the responsibility of the Contractor. The Owner’s Representative may verify personal breathing zone samples. Sample results shall be displayed within 24 hours of collection. If the airborne fiber concentration is in excess of the PEL, the Contractor shall document the steps taken to control and minimize the levels of airborne asbestos fibers. This monitoring does not relieve the Contractor of their OSHA responsibilities.

d. Clearance samples shall be collected only after the on-site industrial hygienist, and a representative of the Contractor has performed a visual examination on the removal area. If asbestos is detected subsequent to clearance sampling, the ACM shall be removed. Additional clearance samples may be required.

Post-abatement air clearance samples shall be below the required MIOSHA limit of 0.05 f/cc.

e. The on-site hygienist will submit post abatement re-occupancy forms that will notify other building occupants that the area has had all abatement activities finalized and the space is safe to occupy.

4.7 Negative Pressure Enclosure (If required)

1. The Contractor shall isolate the project areas from the remainder of the building. Each area shall be pre-cleaned, and any suspect ACM and/or ACM debris found on ceilings, floors, or ledges shall be wetted and removed with the use of a HEPA vacuum prior to erecting the enclosure. The on-site owner’s representative shall inspect the integrity of the Contractor's barriers prior to the start of abatement in each area. The Contractor shall isolate work areas for the duration of the project by completely sealing off all openings to the area. Sealing of openings and fixtures of the work area shall include, but not be limited to, heating and ventilation ducts and openings, attic ventilation ducts extending downward into the floor, doors, windows, skylights, and lighting, electrical panels, and conduit openings. Sealing shall be accomplished with 6 mil polyethylene sheeting or equivalent, taped, or glued into place. Enclosure walls shall be constructed of a minimum of one layer of polyethylene sheeting taped into place. The floors of the enclosures shall be constructed of a minimum of one layer of 6-mil polyethylene sheeting, or equivalent, taped, or glued into place. The Contractor is responsible for cleaning any glue or tape residue or subsequent damage thereof, from any surface following the completion of the work.

2. If contaminated, movable objects are located within the removal area, the Contractor shall, while setting up the restricted area, vacuum, clean, and remove these from the removal area. Any permanent fixture or item that cannot be removed from the work area must be protected and covered during abatement activities.

3. Airlocks for entrance in and out of the work area shall be constructed of 6 mil polyethylene sheeting and wooden or metal framing. The airlocks from the work area, to the equipment (dirty) room, to the shower area, to the clean (change) room shall be contiguous.

4. The Contractor shall provide ventilation controls that facilitate the movement of airborne fibers away from the worker in all removal areas. The equipment used for such ventilation controls shall have HEPA filters for filtering exhaust air that shall be exhausted to the outdoors unless otherwise directed by the Owner. In each restricted area, ventilation controls shall operate continuously throughout the project until final clearance sampling levels are attained.

5. The Contractor shall post lawfully required notifications of asbestos removal, Contractor licensing, and training certificates of the Contractors personnel trained in the requirements of the NESHAP standard adjacent to the entrance of the removal area, and to any other points of access to the work area.

6. It is the Contractor's responsibility for site security unless otherwise stated.

4.8 Methods of Asbestos Removal Within the NPE

1. Removal of all asbestos shall be with wet methods. All asbestos surfaces shall be sprayed with water and an acceptable wetting agent. A fine spray of this solution shall be applied to prevent fiber liberation preceding removal; fine spraying of surfaces shall be continued to minimize employee exposure.

2. Asbestos-containing materials shall be removed and placed into 6 mil, labeled bags while still wet. Bags will be labeled with legally required hazard warnings, sealed, washed, and placed into a second 6 mil, labeled, polyethylene bag, and must be labeled and sealed in accordance with federal and state regulations. (See asbestos waste disposal requirements)

3. Asbestos-containing material shall not be removed with power tools unless attached to a HEPA filtration unit. Owner’s Representative must approve all use of power tools prior to beginning work.

4. All equipment used during removal shall be properly decontaminated prior to removal from the work area.

5. All plastic sheeting, cleaning materials, clothing, and other disposable materials used during removal shall be double-bagged in the same manner as asbestos-containing materials.

6. All transportation of asbestos-containing materials to the landfill shall be in enclosed vehicles.

4.9 Decontamination of the NPE

1. The Contractor shall clean all surfaces in the work area with water and/or a HEPA-filter equipped vacuum. After the work area has been cleaned, the Contractor and the industrial hygienist shall conduct a thorough visual examination to certify the removal of all ACM. Upon completion of the visual inspection and approval of the industrial hygienist, the Contractor shall apply a sealant (encapsulant) to all potentially contaminated surfaces inside the removal area.

2. If after final clearance air sampling, the industrial hygienist finds the work area is not sufficiently decontaminated, the Contractor shall repeat the cleaning and encapsulation process. This shall continue until no asbestos is found during the clearance visual.

3. After the work area is found to be in compliance, all barriers, plastic sheeting, tape, and other wastes and debris shall be removed and disposed of as asbestos-containing waste.

4. Remote decontamination may be proposed by the Abatement Trade Contractor as part of their abatement plan. Where a Mini Enclosure (ME) is specified, a pressure differential containment with a minimum two-stage decontamination facility contiguous with the containment will be constructed as outlined in these specifications prior to the removal of asbestos-containing materials or any other preparatory work which may involve disturbing the asbestos-containing material. A shower facility shall be located nearby pursuant to OSHA regulations (29 CFR 1926.1101) and must be equipped with hot and cold adjustable water, disposable towels, soap, and shower facilities must comply with 29 CFR 1910.141(d)(3).

5. Any other removal method or practice that the Contractor intends to use should be described in their written work plan and approved by Owner’s Representative and the Owner prior to proceeding with the work. These work practices include but are not limited to; glove bag removal operations, regulated area set-up, negative pressure enclosures, whole structure removal, etc.

4.10 Asbestos Waste Disposal Requirements

The Contractor shall dispose of the asbestos-containing materials in disposal bags labeled as follows:

First Label: Provide in accordance with 29 CFR 1910.1001(f) of OSHA's Asbestos standard:

DANGER CONTAINS ASBESTOS FIBERS

MAY CAUSE CANCER CAUSES DAMAGE TO LUNGS DO NOT BREATHE DUST AVOID

CREATING DUST

Second Label:

Provide in accordance with U. S. Department of Transportation regulation on hazardous waste marking. 49 CFR parts 106, 107, 171 to 180. Published December 21, 1990.

RQ, ASBESTOS, NA 2212 CLASS 9

Third Label:

East Grand Rapids High School 2211 Lake Drive, SE Grand Rapids, MI

Labels shall be applied to bags before bags are loaded onto vehicles or dumpsters to be transported to the landfill.

All waste shall be transported to the landfill in hard-roofed trucks, and all waste shipment records shall be submitted to the Owner with 35 days following their receipt from the landfill.

5.0 Scope of Work

The project involves the removal of all asbestos-containing materials affected by the planned renovations, as specified in the project documents and drawings. The base scope encompasses selective demolition for HVAC, electrical, and plumbing upgrades. The Contractor may be responsible for discovery of hidden materials inside walls and hard ceilings.

5.1 Contractor Responsibilities

1. These project specifications are the responsibilities of the Abatement Contractor. The Owner, Owners Representative, Construction Manager, or Consultant will approve in writing, prior to starting the project, any proposed deviations from these specifications. The information, which may be used to assist the Contractor in formulating his/her bid, is presented for informational purposes only and shall be verified by the Contractor or his/her representative at the time of the site inspection.

2. The Contractor will be responsible for removing all ACM within the work areas as identified in these specifications or found during abatement and selective demolition process. All mechanical equipment required for the removal of wall and ceiling materials should be equipped with an OSHA approved dust shroud.

3. The Contractor is responsible for additional demolition, including removal and disposal of walls, hard ceilings, and suspended ceiling tile around interior abatement work (directed by the CM or Consultant; not included in selective demo bid) that may be required to access known asbestos-containing materials.

4. Light fixtures associated with the suspended ceiling grid will be wired in place prior to the removal and disposal of ceiling materials. All other miscellaneous ceiling items the Owner is not to keep shall be removed and disposed of by the Contractor.

5. The Owner will provide electrical power for the Contractor to connect to his/her electrical panel to power equipment. It shall be the Contractor's responsibility to ensure all equipment and circuits are properly isolated prior to the commencement of work. All equipment must be plugged into a ground-fault circuit interrupter (GFCI).

The Contractor is required to coordinate any Lockout/Tagout activities with the Owner or Construction Manager, if applicable.

6. All equipment used on this project shall be in good repair with no exposed wires or insulation. All plugs shall be equipped with a ground. Extension cords shall be rated for appropriate amperage, "hard surfaces", and shall have watertight connectors.

7. The Contractor is responsible for temporary lighting. Lamps shall have sufficient power for adequate illumination. Guard cages or tempered glass shall be used to protect the lamps. Exterior fixtures shall be used if exposed to moisture.

8. The Owner will provide a source of water for the duration of the project. The Contractor is responsible for the proper disposal of all wastewater generated on-site during the project to the sanitary sewer. All wastewater shall be properly filtered prior to disposal.

9. The Contractor is responsible for the protection of door frames and other surfaces not impacted by the renovation. The Contractor shall repair spray adhesive residues and any paint damaged from the abatement work.

10. The Contractor is responsible for providing portable restroom facilities and hand washing stations of sufficient quantity for the labor force.

11. The Contractor and his/her employees are required to comply with all federal, state, and local laws regarding asbestos abatement.

12. The Contractor and his/her employees are required to adhere to all construction safety standards set forth by the Construction Manager.

13. The Contractor and his/her employees are required to comply with all COVID-19 safety protocols.

14. The construction drawings (Appendix D) show details of areas of the building that will be included in the renovation activities. The scope of work will include removal and disposal of the asbestos-containing materials, presented in the table below, inside of the schools’ renovation areas.

15. Tagged fire rated fire doors have also been identified in the renovation area.

16. The base bid must include three (3) mobilizations. A unit rate is also needed on the Unit Rates Bid Form.

17. The Contractor is responsible for determining the location of existing underground utilities prior to any excavation work. Contact MISS DIG a minimum of 3 days in advance of any excavation work, more than 3 days if required to allow adequate time for MISS DIG to mark underground utilities as required to meet excavation work schedules.

18. Submit verification of MISS DIG work order to the General Contractor and Owner.

Hand dig as necessary to avoid contact with underground utilities. Determine the location of existing underground utilities prior to any excavation work outside of the responsibility of MISS DIG for marking including fiber optic lines and other non-public utilities.

19. Contractor is required to protect existing structures, equipment, trees, landscaping, etc., to remain. The Contractor is also responsible for dust control for the duration of the work of this bid category.

20. The Contractor is responsible for providing, maintaining, and coordinating the placement and servicing of all dumpsters required for this scope of work. This includes protecting adjacent surfaces, removing debris from the site promptly, and ensuring legal off-site disposal of materials.

Confirmed Asbestos-Containing Materials:

The following table identifies the confirmed positive for asbestos homogeneous building materials at EGRHS in the 1963 and 1967 construction. The table provides the building materials’ corresponding identification number, location, and estimated quantity of each identified ACM at EGRHS:

Asbestos-Containing Materials at EGRHS 1963 and 1967 (Confirmed Positive) HA # Materials Description Location / Est. Qty.

HA-21 12”x12” vinyl floor tile – Tan with white streaks (TILE ONLY) 10H (1,000 Square Feet)

HA-28 9”x9” vinyl floor tile – Tan (TILE ONLY) 12E, 14E, 200A, 202, 205, 207, 209, 246 (4,750 Square Feet)

The following table identifies the suspect homogeneous building materials that tested negative (None Detected) at EGRHS in the 1963 and 1967 construction:

1963 & 1967 EGRHS Tested Building Materials Resulting in Non-Detect for Asbestos HA # Materials Description Est. Qty.

1 Drywall, tape, and mud (1963) >20,000 square feet 2 2’x2’ recessed ceiling tile (light texture) <5,000 square feet 3 Dark grey vinyl cove base and mastic <1,000 linear feet 4 2’x2’ recessed ceiling tile (small pine holes and grooves) >5,000 square feet 5 Window caulk <5,000 square feet 6 Grey sink undercoating 10 sinks 7 12”x12” beige vinyl floor tile and mastic >10,000 square feet 8 Dark blue vinyl cove base and mastic <3,000 square feet 9 Plaster (base and skim coat layers) <3,000 square feet 10 Grey rubberized caulk on exterior doors and windows <1,000 linear feet 11 2’x4’ recessed ceiling tile (grooves and pin holes) <80,000 square feet 12 Linoleum (grey with white swirls) and mastic <1,000 square feet 13 Bright gray exterior door caulk <500 square feet 14 Interior caulk on metal door frame & cinderblock <5,000 square feet

Asbestos-Containing Materials at EGRHS 1963 and 1967 (Confirmed Positive)

HA-18 Mudded pipe fittings on fiberglass lines

2B, 2C, 4, 5, 7, 8, 9, 11, 12G, 13, 13A, 13F, 16, 20, 20A, 21B, 21C, 24C, 24E, 110, 200 (East hall), 201 (West hall), 201A, 201B, 203 (including pipe chase), 207, 221, 227, 237, 238, 214C, 249 (including chase), Entry 4, Basement, and Tunnel

(310 Linear Feet)

HA-20 Straight pipe insulation (mag block pipe wrap) 101, 13F, 18, 21B, 110, 132A, 132B, 201A, 203, 249, Tunnel (1,050 Linear Feet)

HA-37 Mudded roof drain insulation

5, 12G, 13, 13A, 16, 20, 20A, 24C, 110, 200 (east hall), 201 (west hall), 207, 221, 227, 237, 238, 241C, 249, Entry 4 (600 Linear feet)

HA-39 Transite pipe and transite board 18, 110, 200 (East hallway), 226, Tunnel, Hidden under floors, Lockers (800 Linear Feet) + (500 Square)

HA-20 Sink undercoating (Black sinks) 10D, 110, 115, 202, 225 (20 Sinks)

HA-15 Light fixture insulation (heat shield) 2B, 2C, 201A, 201B (20 Square Feet)

HA-64 Fire doors (original fire doors with a fire rating) 10G, 10I, 11, 12D, 16A, 17, 22

(basement), 27B, 111B (18 Doors)

HA-68 Burgundy fire curtains (multiple curtains) Little auditorium (1,000 Square Feet)

1963 & 1967 EGRHS Tested Building Materials Resulting in Non-Detect for Asbestos HA # Materials Description Est. Qty.

16 12”x12” cream with gray vinyl floor tile and mastic >1,000 square feet 17 Tan vinyl cove base and mastic >3,000 square feet 19 2’x2’ recessed ceiling tile (pin holes) >4,000 linear feet 23 Concrete on the incinerator exhaust breach <500 square feet 24 Incinerator bricks <500 square feet 25 Fire door insulation (Green tagged doors) <30 doors 26 Fire door insulation (Red tagged doors) <10 doors 27 12”X12” vinyl floor tile (tan marbling) and mastic <500 square feet 29 2’x2’ ceiling tile (many grooves and pin holes) <400 square feet 30 Concrete ceiling >2,000 square feet 31 2’x2’ ceiling tile (gypsum with holes) >6,000 square feet 32 12”X12” vinyl floor tile (grey marbling) and mastic >400 square feet 33 Grey spray-on fireproofing >4,000 square feet 34 Dark grey door caulk on interior metal frame and cinderblock <1,000 square feet 35 2’x2’ recessed ceiling tile (thick acoustical texture) <5,000 square feet 36 2’x4’ ceiling tile (tectum) <1,000 square feet 38 1’x1’ stapled on ceiling tile (grooves and pin holes) <200 square feet 41 Black mastic <50,000 square feet 42 Black lab tables <1,000 square feet 43 Black lab counters <1,000 square feet 44 Tan rubberized stair treads and mastic <2,000 square feet 45 Concrete soffit <6,000 square feet 46 Concrete aggregate facade >10,000 square feet 47 Concrete foundation <2,000 square feet 48 Black sheet vinyl flooring, leveling compound, and mastic <100 square feet 49 Brown vinyl cove base and mastic <4,000 square feet 50 White spray-on fireproofing <300 square feet 51 1” ceramic tile on floors and grout <400 square feet 52 4” ceramic tile on walls, thin-set, and grout <300 square feet 53 2’x2’ recessed ceiling tile (heavy texture) <2,000 square feet 54 1-1/2” ceramic tile on floors with associated grout, and glue <4,000 square feet 55 White sink undercoating <5,000 square feet 56 Cement board ceiling and associated skim coat <5,000 square feet 57 1’x1’ fiberglass ceiling tile and associated glue pod <15,000 square feet 58 Drywall, tape, and mud (1967) <1,000 square feet 59 2’x4’ recessed ceiling tiles (small grooves and pin holes) <3,000 square feet 60 1’x1’ beige marble vinyl floor tile and mastic <2,000 square feet 61 Caulk on metal door frames in the pool area <500 square feet 62 1” ceramic floor tile with associated grout and mortar <100 square feet 63 4” ceramic wall tile with associated adhesive, grout, and mortar <600 square feet

1963 & 1967 EGRHS Tested Building Materials Resulting in Non-Detect for Asbestos HA # Materials Description Est. Qty.

65 Black cloth fire curtain in the large auditorium >500 square feet 66 Black vinyl flooring and mastic in the little auditorium >1,000 square feet 67 Tan fire curtain 2,500 square feet 69 Ductwork putty >1,000 linear feet 70 Ceiling panels in the auditorium >1,000 square feet 71 Textured wall panels in the auditorium >1,000 square feet

6.0 Project Notes

1. This project will require that the successful Contractor staff the project with a dedicated on-site supervisor/project manager for the duration of the project for continuity. On-site supervision should not be switched out unless Owner’s Representative or the Owner approves it and a transition plan is in place.

APPENDIX A

BID FORMS

BID FORM

1. TO: East Grand Rapids Public Schools 2211 Lake Drive, SE Grand Rapids, MI 49506

1.1 FOR: EGRHS Asbestos Abatement

1.2 DATE: _____________________ (Bidder to enter date)

1.3 SUBMITTED BY: (Bidder to enter name and address)

Bidder's Full Name ___________________________________________________

Address ___________________________________________________________

City, State, Zip ______________________________________________________

Telephone __________________________ Fax __________________________

E-mail Address ______________________________________________________

1.4 OFFER

EGRHS Asbestos Abatement

A. Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by EGRPS for the above-mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the Sum of:

B. Total Project Base Bid ________________________________________________________

____________________________________________________________________ dollars

($ ____________________________), in lawful money of the United States of America.

C. We have included the required security deposit as required by the Instruction to Bidders in the base bid. The cost of the security deposit included is $ ______________________________________________ .

D. The cost of the 100% Performance Bond included in the base bid is $ ______________________ .

E. The cost of the 100% Payment Bond included in the base bid is $ _________________________ .

F. All applicable federal taxes are included, and State of Michigan taxes are included in the Bid Sum.

G. Number of days estimated for work _________________________________________________ .

H. Typical work shift schedule (ex: M-F, 8 AM – 5 PM) _____________________________________.

I. Estimated size of the crew _________________________________________________________.

The bid bond shall be for 5% of the total dollar amount provided in the total project base bid for all project combined (including performance and payment bonds).

1.5 ACCEPTANCE

A. This offer shall be open to acceptance and is irrevocable for sixty days from the bid closing date.

B. If this bid is accepted by East Grand Rapids Public Schools within the time period stated above, we will:

1. Execute the Agreement within ten days of receipt of Notice of Award.

2. Furnish the required bonds within ten days of receipt of Notice of Award.

3. Commence work within ten days after written Notice to Proceed of this bid.

C. If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to East Grand Rapids Public Schools by reason of our failure, limited in amount to the lesser of the face value of the security deposit or the difference between this bid and the bid upon which a Contract is signed.

D. In the event our bid is not accepted within the time stated above, the required security deposit shall be returned to the undersigned, in accordance with the provisions of the Instructions to Bidders; unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time.

1.6 CONTRACT TIME

A If this Bid is accepted, we will:

1. Begin the scope of work on approximately April 4th, 2027 (1st mobilization). Complete 1st mobilization scope of work by June 16th, 2027. Include 3 separate mobilizations in this bid.

1.7 CHANGES TO THE WORK

A. When OWNERS CONSULTANT establishes that the method of valuation for Changes in the Work will be net cost plus a percentage fee in accordance with General Conditions, our percentage fee will be:

1. ______ percent overhead and profit on the net cost of our own Work;

2. ______ percent on the cost of work done by any Subcontractor.

B. On work deleted from the Contract, our credit to East Grand Rapids Public Schools shall be Architect-approved net cost plus _________ of the overhead and profit percentage noted above.

1.8 ADDENDA

A. The following Addenda have been received. The modifications to the Bid Documents noted below have been considered and all costs are included in the Bid Sum.

1. Addendum # ___ ___ Dated _ __.

2. Addendum # _______Dated ___________________.

1.9 BID FORM SIGNATURE(S)

A. The Corporate Seal of:

(Bidder - print the full name of your firm) was hereunto affixed in the presence of:

(Authorized signing officer, Title)

(Seal)

UNIT PRICE SCHEDULE

The undersigned agrees that upon the Owner’s approval, the Contract Base Bid Sum(s) may be altered by the Unit Prices indicated below. In preparing the unit price bids, include costs to provide the labor and material, permits, bonds, insurance, and all other items necessary to complete the indicated unit price work within the Contract start and completion dates (including quality control monitoring).

Standard hourly man hour rate for removal while on site $ ______________/HR

OT/Night/Weekend hourly man hour rate for removal while on site $ _____________/HR

Additional mobilization to and from the site $ ______________/Unit

Additional fire door/frame removal while on site $______________/Unit

Removal of pipe insulation (straight pipe of fittings) while on site

UNIT PRICE NO. 1:

UNIT PRICE NO. 2:

UNIT PRICE NO. 3:

UNIT PRICE NO. 4:

UNIT PRICE NO. 5:

UNIT PRICE NO. 6:

UNIT PRICE NO. 7:

UNIT PRICE NO. 8:

UNIT PRICE NO. 9:

UNIT PRICE NO. 10:

Removal of transite materials while on site

Removal of a sink while on site

Removal of vinyl flooring while on site

Removal of carpet and vinyl flooring while on site

Removal of l flooring mastic while on site

$ ______________/LF

$_______________/Square Foot

$_______________/Sink

$_______________/Square Foot

$_______________/Square Foot

$_______________/Square Foot

Contractor Acknowledges Reviewing Appendix C – Construction Drawings Yes

Contractor Acknowledges Reviewing Appendix D – NESHAP Inspection Report Yes

Contractor Acknowledges Submitting Familial Relationship, Non-Collusive Affidavit, Iran Business, Debarment Forms, Criminal Background Disclosure Form, and EGR Safety Form Yes

Contractor Acknowledges Submitting Unit Rates Form Yes

Contractor Has Submitted Acknowledgments Form Yes

Contractor Acknowledges Reviewing Appendix B – Contract Agreement Draft Yes

END OF BID FORM

FORM OF SWORN STATEMENT OF FAMILIAL RELATIONSHIP

As required by Section 1267 of the Revised School Code – MCL 380.1267

STATE OF MICHIGAN

COUNTY OF _______________________________, being duly sworn, deposes and says:

That _____________________________________ (The “Bidder”) has bid for an improvement to the following described real property located in Kent County, Michigan, which is owned by the East Grand Rapids Public Schools, and legally described as follows:

Project Name: EGRHS Asbestos Abatement

That the following is a statement of disclosure of any familial relationship that exists between the owner or any employee of the Bidder and any member of the East Grand Rapids Public Schools Board of Education or Superintendent, as required pursuant to Section 1267 of the Revised School Code, as amended.

1. That there are no such familial relationships existing at this time.

2. That a familial relationship exists between ______________________________, who is an (owner) (employee) of the Bidder and the _________________________ (nature of familial relationship – e.g., brother, sister, cousin, etc.) of __________________________who is (a member of the Board) (the Superintendent).

Deponent

Subscribed and sworn to before me this _________Date of_______________, 2026

Notary Public of MI, County of _______________

Acting in: ________________________________

My commission expires: ____________________

Iran Business Relationship Affidavit

Effective April 1, 2013 all bids, proposals, and/or qualification statements received in the State of Michigan must comply with the “Iran Economic Sanctions Act”. The following certification is to be signed and included at time of submittal.

Certification

Pursuant to the Michigan Iran Economic Sanctions Act, 2012 P.A. 517, by submitting a bid, proposal or response, Respondent certifies, under civil penalty for false certification, that it is fully eligible to do so under law and that it is not an “Iran linked business” as the term is defined in the Act.

Signature Title

Company Date

Subscribed and sworn to before me this Date of__________________________, 2026

Notary Public of MI, County of _______________

Acting in: ________________________________

My commission expires: ____________________

DEBARMENT AND SUSPENSION CERTIFICATION

The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:

• Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;

• Has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;

• Does not have a proposed debarment pending; and

• Is not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or Local) in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space:

Exceptions will not necessarily result in denial or award but will be…