Asbestos Lead Survey_Bldg-128_20150618.pdf

PDF 1 MB Posted

Attached to
Replace roof of Building 128, Fort Bliss, TX
Solicitation number
W911SG25BA039
Issued by

About this file

This document is a comprehensive Asbestos and Lead Paint Survey Report for Building 128 at Fort Bliss, Texas, conducted on May 26, 2015, by ALL Consulting Team. The survey identified several hazardous materials within the three-floor, 3,840-square-foot administrative building constructed in 1893. Key findings include the presence of asbestos-containing materials in three areas: exterior perimeter window caulking (250 linear feet), exterior perimeter door caulking (60 linear feet), and 12-inch floor tile in the locker room/restroom bottom layer (160 square feet). Additionally, the lead paint survey revealed 25 building components testing positive for lead, with measurements ranging from 1.1 to 20 mg/cm2, primarily located on interior wood surfaces such as door casings, window sills, and baseboards, as well as exterior wood components like windows, door casings, and roof elements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 18, 2015

Mr. Aaron Williams USACE, Tulsa District 1645 South 101st East Avenue Tulsa, OK 74128 Phone: (918) 669-4915

RE: Submittal of Hazardous Building Material Surveys Contract No. W912BV-10-D-2011, Task Order 0002 Ft. Bliss Bldg. # 128

Dear Mr. Williams, This document summarizes the Asbestos Survey and/or Lead Paint Survey Reports for the subject building. The below listed information was utilized to complete the Scope of Work Tasks:

Bldg. No. 128 POC: Jesse Moncada Phone No: 915-568-1838 Building Square Footage (SF) Reported: 3,840 Technical Summary:

1. LEAD PAINT. The ENCON team performed a total of ninety-two (92) XRF analyses, which included eighty-four (84) building component measurements and eight (8) calibration checks. Twenty-five (25) of the building readings tested positive for lead paint. Refer to the attachments for more details.

2. ASBESTOS. A total of fifty-one (51) bulk samples were collected for lab analysis. The attached analytical results indicated that asbestos containing materials were present in the subject building. Contact Ft. Bliss, DPW regarding the latest overall status of any asbestos or lead paint materials, and any future abatement reports that may become available.

SUMMARY TABLE (with Action Level) Previously Surveyed by others

Were Found

Were Not Found

Actions Required Yes / No

1. Lead Containing Paint Materials (≥0.3 mg/cm2) X Yes

2. Asbestos Containing Materials (>1 %) X Yes

Please contact me with any technical questions, or follow-up needs that you may have.

Sincerely, David Epperly, Ph.D., P.E.

Project Manager – ALL Consulting

CC: Jesse Moncada (Ft Bliss DPW) Barry Vercoe (CESFW-PEC-TM)

ATTACHMENTS

1. Lead Paint Survey Report

2. Asbestos Survey Report

ATTACHMENT 1

Lead Paint Survey Report

COMPREHENSIVE LEAD PAINT SURVEY

BUILDING 128

FORT BLISS, TEXAS 79916

Prepared for:

U.S. Army Corps of Engineers

Tulsa District

Prepared by:

ALL CONSULTING TEAM

ALL Consulting, LLC 1718 S. Cheyenne Ave.

Tulsa, OK 74119

Inspection Start Date:

May 26, 2015

ENCON International, Inc.

7307 Remcon Circle, #103

El Paso, TX 79912

L&P Scientific Consulting, LLC 6400 Airport Rd., Bldg. B, #J

El Paso, TX 79925

LEAD PAINT SURVEY REPORT

Ft. Bliss, Texas ─ Building 128

PURPOSE

The ALL Consulting Team was contracted by the U.S. Army Corps of Engineers (USACE), Tulsa

District, to perform comprehensive Hazardous Building Materials Surveys to identify the presence of any asbestos or lead paint at a number of buildings at Ft. Bliss, Texas. This project also included the development and population of a database to store the survey reports for access by the Ft. Bliss

Directorate of Public Works (DPW), and others. The buildings that are included within this contract scope of work includes buildings at McGregor Base Camp and Doña Ana Base Camp within the New Mexico portion of Ft. Bliss, in addition to the Ft. Bliss buildings within Texas.

BACKGROUND

Ft. Bliss has a large number of buildings constructed before 1990 when the use of asbestos and lead paint was prevalent in the construction of buildings. Because the presence of these materials still exists in these buildings, Ft. Bliss is required to identify the extent of the lead paint remaining at these buildings, as well as their condition. Lead in paint is a hazard that is regulated by the

Occupational Safety and Health Administration (OSHA) under 29 CFR 1926.62 for worker exposure. In addition to the dangers of occupational exposure to construction and maintenance workers, as well as building occupants, lead particles and lead dust may be inadvertently carried home on clothes and shoes to expose their families. Identifying components containing lead paint will not only protect the workers and their families, but will help to indemnify Ft. Bliss by preemptively identifying the location of these potential hazardous materials.

INTRODUCTION

In accordance with OSHA Lead Regulation 29 CFR 1926.62, and the OSHA Hazard

Communication standard (29 CFR 1910.1200), where lead exists workers must be notified and steps must be taken to protect them from the inherent hazards. By identifying the lead containing components in these buildings, and, when appropriate, removing the hazards or potential hazards, Ft. Bliss avoids the liability of workers becoming exposed. Lead paint was banned for use in residential dwellings starting in January of 1978, but lead paint is still available for non-residential applications.

FACILITY DESCRIPTION

Building 128 was constructed in 1893, and was occupied at the time of inspection. Its previous use was listed as “administration offices.” A description of this building is presented in Table 1 below.

TABLE 1 – BUILDING DESCRIPTION

Building Items Description Area of building 3,840 square feet Date of Construction 1893 Number of floors Three (3) floor Exterior wall materials Concrete Roof type Pitched Roof material Wood Interior walls Drywall, brick Interior floors Wood, concrete Interior floor coverings 12x12 vinyl tile, carpet Ceilings Wood, 2x4 ceiling tiles Notes:

UNIQUE PAINTING HISTORY

Lead can be found in paint, varnish, shellac, and stain, so any coated surface other than a factory coating is suspect for lead paint. A Lead Paint Survey is based upon coated components which are grouped into similar components with a similar (unique) painting history. This would include components with the same substrate, built or installed at the same time, with a common painting history. Items such as window components (sash and mullions), window frame (trim, header, sill, and apron), doors, and door frame materials, should be considered to have a possible separate painting history, and could have had different coatings applied throughout the years.

REGULATORY STANDARDS

Lead-based paint in residential structures, or Child Occupied Facilities (day care facilities, etc.), is regulated by the U.S. Department of Housing and Urban Development (HUD) under 24 CFR 35, and also by the U.S. Environmental Protection Agency (USEPA) under 40 CFR 745. Only a few of these types of facilities have been identified in the buildings included in this contract. For all buildings included in this category, both HUD and EPA regulations will apply. All other buildings identified in this project would be regulated under the OSHA standards pertaining to worker protection from hazards (29 CFR 1926.62).

Sampling protocols have already been thoroughly established by the HUD and the EPA for residential housing units. For non-residential structures, there is no specified lead paint sampling protocol, but HUD / EPA protocols were generally followed. These comprehensive lead paint surveys include thorough inspections to identify all lead painted components.

SAMPLING METHODOLOGY

The building materials survey tasks were performed in accordance with the Final Hazardous

Building Materials Surveys, Sampling Plan, Fort Bliss, Texas, December 2014, prepared by ALL

Consulting and ENCON International, Inc. A visual inspection of the building was conducted to develop a sampling strategy. This included identifying component groups with similar painting histories. Each component group was sampled throughout the building to establish whether or not the building contained lead at the prescribed action level for this project, at the time of the survey.

This Lead Paint Inspection was performed on May 26, 2015, using an x-ray fluorescence (XRF) analyzer, to identify if any lead amounts in the paint were at or above 0.3 mg/cm2. A total of ninety-two (92) XRF analyses were performed, which included eighty-four (84) building component measurements and eight (8) calibration checks. Drawings that illustrate the locations of all building measurements that tested positive for lead have been provided in Appendix A of this Report.

XRF RESULTS

The XRF analyzer indicated that lead-containing paint was identified in the building component types listed in the following Table 2. The table also provides additional details regarding building component types, and if the tested components were located at the exterior or interior of the subject building.

TABLE 2: LEAD CONTAINING COMPONENT TYPES

Interior Building

Component Substrate Condition Color

DOOR CASING WOOD FAIR WHITE

WINDOW SILL WOOD FAIR WHITE

WINDOW CASING WOOD FAIR WHITE

Component Substrate Condition Color

WINDOW WOOD FAIR WHITE

BASEBOARD WOOD FAIR WHITE

WALL BRICK FAIR WHITE

WALL BASE CONCRETE FAIR WHITE

Exterior Building

Component Substrate Condition Color

WINDOW WOOD POOR LIGHT GREEN

DOOR CASING WOOD POOR GREEN

DOOR FRAME WOOD POOR LIGHT GREEN

SOFFIT WOOD POOR GREEN

FASCIA WOOD POOR LIGHT GREEN

ATTIC VENT CASING WOOD POOR GREEN

ATTIC VENT METAL POOR LIGHT GREEN

The following Table 3 indicates that a total of twenty-five (25) of the building measurements tested positive, which confirmed the presence of lead at or above 0.3 mg/cm2. The complete XRF lead paint data, including negative measurements and calibration readings, have been provided in

Appendix B of this Report. Note that the XRF analyzer makes a final determination regarding if a building component is positive or negative for lead in paint. This analytical determination is

EDVHG�XSRQ�WKH�VWDQGDUG���0.3 mg/cm2), the measurement obtained, and the analytical range of the margin of error for the XRF analyzer. On occasion, a measurement obtained using this test method

(EPA method # 6200) that is slightly above or below the standard may effectively result in a positive or negative determination, due to the analyzer’s margin of error. Any measurements that are determined to be positive or negative for lead paint by the XRF analyzer, will be accepted as such, during this Survey. Any results that apply to this would have been noted with an asterisk (*) in the “Results” column of Appendix B of this Report.

TABLE 3: POSITIVE XRF LEAD PAINT MEASUREMENTS

No. Component Substrate Condition Color Measurement Locations Action Level

(mg/cm2)

Results PbC

(mg/cm2) Interior Building - First Floor

14 DOOR CASING WOOD FAIR WHITE MAIN ENTRANCE; S WALL 0.3 1.5

17 WINDOW SILL WOOD FAIR WHITE MAIN ENTRANCE; WINDOW

ABOVE DOOR 0.3 1.1

20 WINDOW SILL WOOD FAIR WHITE LOCKER RM.; S WALL 0.3 20

21 WINDOW CASING WOOD FAIR WHITE LOCKER RM.; S WALL 0.3 14.7

22 WINDOW WOOD FAIR WHITE LOCKER RM.; S WALL 0.3 17.6

23 BASEBOARD WOOD FAIR WHITE LOCKER RM.; S WALL 0.3 17.9

25 DOOR CASING WOOD FAIR WHITE LOCKER RM. ENTRY; N WALL 0.3 15.9

No. Component Substrate Condition Color Measurement Locations Action Level

(mg/cm2)

Results PbC

(mg/cm2)

30 WINDOW WOOD FAIR WHITE CONFERENCE RM.; N WALL;

E WINDOW 0.3 8.7

32 WINDOW WOOD FAIR WHITE CONFERENCE RM.; S WALL 0.3 8.5

Interior Building - Basement

37 WALL BRICK FAIR WHITE W WALL 0.3 1.7

38 WALL BASE CONCRETE FAIR WHITE S WALL 0.3 2.1

Interior Building - Second Floor

46 WINDOW CASING WOOD FAIR LIGHT BLUE E WALL 0.3 21.2

Exterior Building

52 WINDOW WOOD POOR LIGHT GREEN W WALL; OUTSIDE RM. 101-7 0.3 2

58 WINDOW WOOD POOR LIGHT GREEN W WALL; OUTSIDE RM. 108 0.3 0.8

64 WINDOW WOOD POOR LIGHT GREEN N SIDE; BASEMENT WINDOW 0.3 6.9

71 DOOR CASING WOOD POOR GREEN N WALL; BREAK RM.

ENTRANCE 0.3 5.6

72 DOOR FRAME WOOD POOR LIGHT GREEN N WALL; BREAK RM.

ENTRANCE 0.3 5.9

75 WINDOW WOOD POOR LIGHT GREEN S WALL; OUTSIDE

CONFERENCE RM. 0.3 6.1

82 WINDOW WOOD POOR LIGHT GREEN S WALL; MAIN ENTRANCE;

UPPER DOOR 0.3 8.3

84 SOFFIT WOOD POOR GREEN S SIDE 0.3 6.1

85 FASCIA WOOD POOR LIGHT GREEN S WALL 0.3 5.3

86 SOFFIT WOOD POOR GREEN N SIDE 0.3 5.1

87 FASCIA WOOD POOR LIGHT GREEN N WALL 0.3 5.4

88 ATTIC VENT

CASING WOOD POOR GREEN E WALL 0.3 5.4

89 ATTIC VENT METAL POOR LIGHT GREEN E WALL 0.3 6.7

QUALIFICATIONS

This Comprehensive Lead Paint Survey was performed by an Inspector that was qualified to perform work in Texas, per the Texas Department of State Health Services (DSHS), and in New

Mexico per USEPA certification credentials. This individual has received training under the HUD

/ EPA training criteria for the required Lead Paint Inspector and/or Risk Assessor courses and has received the refresher training within the prescribed period for each jurisdiction. Company and individual licenses and credentials have been provided and are available for review in the project sampling plan documents, which have been submitted to the USACE.

LIMITATIONS

The overall purpose of this Comprehensive Lead Paint Survey was to identify if lead-containing components were present, within the qualifications and limitations summarized below. Reliance on this Report is specifically limited to gathering initial information regarding the presence of lead in paint. Any time that lead-based paint may be identified during the performance of a lead inspection, the owner of the building is responsible to the occupants and to the public to properly manage these materials, per Local, State and Federal regulations. Prior to the abatement or removal of any lead containing materials, a Lead Project Design should be properly performed, by a qualified Lead Firm, to 1) ensure that materials will be properly managed, and 2) to prepare a more accurate estimate of actual materials to be addressed. This Survey Report was specifically prepared for ALL Consulting’s Client (USACE and Ft. Bliss), and the extent of liability incurred, is limited to the amount of the Report Fee paid by its Client. The USACE agrees that the ALL

Consulting Team cannot be held responsible for any liability based on reliance of this Report by any third party.

CONCLUSIONS

1. Specific Conclusions. Lead-containing paint was found on components either inside and / or outside of this building.

• Lead paint should not be disturbed without proper procedures in place. Should the lead paint need to be disturbed, personnel should be evacuated in advance, and only properly trained persons with adequate PPE should be allowed to disturb the lead paint material.

• Lead painted components in poor condition should be stabilized with interim controls or abatement procedures by properly trained personnel.

• Lead hazard air monitoring should be performed during abatement activities.

• Following abatement activities, clearance wipe samples should be collected and sent to an approved laboratory for lead paint analysis.

• The OSHA Hazard Communication Standard and the Lead Paint Standard both require anyone working in such areas to be informed of lead paint hazards and methods to avoid the hazards.

2. General Conclusions. Proper notification should be made to the appropriate authorities prior to disturbance of any lead-containing materials, including abatement activity, renovations, or operations and maintenance (O&M) activities, or demolition of any facilities or public buildings.

Other personnel working in the area must be alerted by signage and the appropriate regulated area designations. OSHA specifies worker protection and engineering controls, as well as work practices to ensure the safety of workers and anyone who will be in the area after the conclusion of the work.

Contact the personnel listed below with any clarifications that may be needed.

Inspected by: Reviewed by: Approved by:

Miguel Dominguez Alex Woelper, P.E., RPIH David Epperly, Ph.D., P.E.

Lead Inspector Environmental Consultant Project Manager L & P Scientific, LLC. ENCON International, Inc. ALL Consulting, LLC License #2070221

APPENDICES:

A. Lead Paint Measurement Location Drawing(s) B. XRF Lead Paint Data

APPENDIX A

Lead Paint Measurement Location Drawing(s)

Positive Lead Measurement Locations##

Project:

ALL CONSULTING TEAM

Hazardous Materials Surveys

Draw by:

FO

Location:

Building # 128 Fort Bliss, TX

L & P address and phone # (915)838-1188 Sheet

ENV-1

Date:

6/4/15

ENCON and L & P Team

NOT TO SCALE

6400 Airport Rd. Bldg B - Ste. J, El Paso, Tx

LEAD PAINT Measurement Locations- First Floor

Ft. Bliss Installation#139-14

Rm 108

Rm 101-7 Rm 101-6

Rm 101-8

Rm 101-9

Rm 101-1

Rm 101-3

Room Break Room

Information Management

Rm 104Locker 101-5

Main Corridor

C en te r

C or rid or

Small Corridor

Room

Conference

2021 22

75828584

Rm

N

Project:

ALL CONSULTING TEAM

Hazardous Materials Surveys

Draw by:

FO

Location:

Building # 128 Fort Bliss, TX

L & P address and phone # (915)838-1188 Sheet

ENV-1

Date:

6/4/15

ENCON and L & P Team

NOT TO SCALE

6400 Airport Rd. Bldg B - Ste. J, El Paso, Tx

LEAD PAINT Measurement Locations- 2nd Floor & Basement

Ft. Bliss Installation#139-14

Basement 2nd Floor

Positive Lead Measurement Locations##

N

APPENDIX B

XRF Lead Paint Data

Note that the XRF analyzer makes a final determination regarding if a building component is positive or negative for lead in paint. This analytical determination is based upon the standard (≥0.3 mg/cm2), the measurement obtained, and the analytical range of the margin of error for the XRF analyzer. On occasion, a measurement obtained using this test method (EPA method # 6200) that is above or below the standard may effectively result in a negative or positive determination, due to the analyzer’s margin of error. Any measurements that are determined to be negative or positive for lead paint by the XRF analyzer, will be accepted as such, for this Survey. Any results that apply to this situation will be noted with an asterisk (*) in the table to follow.

Fort Bliss, Texas XRF Lead Paint Data Bldg. 128

No. Component Substrate Condition Color Measurement Locations Results Action Level

(mg/cm2)

Results PbC

(mg/cm2)

1 SHUTTER_CAL 2.05

2 SHUTTER_CAL 2.15

3 CALIBRATION N/A 0.3 1.1

4 CALIBRATION N/A 0.3 1

5 CALIBRATION N/A 0.3 1

6 WALL DRYWALL FAIR BROWN RM. 108; S WALL Negative 0.3 0 7 BASEBOARD WOOD FAIR WHITE RM. 108; E WALL Negative 0.3 0.02 8 WINDOW SILL WOOD FAIR WHITE RM. 108; W WINDOW Negative 0.3 0 9 WINDOW WOOD FAIR WHITE RM. 108; W WINDOW Negative 0.3 0.08

10 WALL DRYWALL FAIR LIGHT GREEN RM. 101-7; S WALL Null 0.3 0 11 WALL DRYWALL FAIR LIGHT GREEN RM. 101-7; S WALL Negative 0.3 0 12 DOOR WOOD FAIR GRAY RM. 101-7; N WALL Negative 0.3 0 13 DOOR WOOD FAIR VARNISHED BROWN MAIN ENTRANCE; S WALL Negative 0.3 0 14 DOOR CASING WOOD FAIR WHITE MAIN ENTRANCE; S WALL Positive 0.3 1.5 15 WALL DRYWALL FAIR TAN CENTER CORRIDOR; N WALL Negative 0.3 0.01 16 BASEBOARD WOOD FAIR WHITE RM. 101-9; W WALL Negative 0.3 0 17 WINDOW SILL WOOD FAIR WHITE MAIN ENTRANCE; WINDOW ABOVE DOOR Positive 0.3 1.1 18 WALL PLASTER FAIR TAN LOCKER RM.; S WALL Null 0.3 0.01 19 WALL PLASTER FAIR TAN LOCKER RM.; S WALL Negative 0.3 0 20 WINDOW SILL WOOD FAIR WHITE LOCKER RM.; S WALL Positive 0.3 20 21 WINDOW CASING WOOD FAIR WHITE LOCKER RM.; S WALL Positive 0.3 14.7 22 WINDOW WOOD FAIR WHITE LOCKER RM.; S WALL Positive 0.3 17.6 23 BASEBOARD WOOD FAIR WHITE LOCKER RM.; S WALL Positive 0.3 17.9 24 WALL PLASTER FAIR BROWN LOCKER RM.; W WALL Negative 0.3 0 25 DOOR CASING WOOD FAIR WHITE LOCKER RM. ENTRY; N WALL Positive 0.3 15.9 26 BASEBOARD WOOD FAIR WHITE MAIN CORRIDOR; N WALL Negative 0.3 0 27 DOOR WOOD FAIR WHITE CONFERENCE RM.; W WALL Negative 0.3 0 28 DOOR CASING WOOD FAIR WHITE CONFERENCE RM.; W WALL Negative 0.3 0 29 WINDOW SILL WOOD FAIR WHITE CONFERENCE RM.; N WALL; E WINDOW Negative 0.3 0 30 WINDOW WOOD FAIR WHITE CONFERENCE RM.; N WALL; E WINDOW Positive 0.3 8.7

Interior Building - First Floor

05/26/2015 ALL CONSULTING TEAM 1

Action Level

(mg/cm2)

Results PbC

(mg/cm2)

31 WINDOW SILL WOOD FAIR WHITE CONFERENCE RM.; S WALL Negative 0.3 0.01 32 WINDOW WOOD FAIR WHITE CONFERENCE RM.; S WALL Positive 0.3 8.5 33 WALL DRYWALL FAIR LIGHT GREEN BREAK RM.; N WALL Negative 0.3 0.01 34 WALL BOARD WOOD FAIR WHITE BREAK RM.; W WALL Negative 0.3 0.01 35 DOOR CASING WOOD FAIR WHITE BREAK RM.; N WALL Negative 0.3 0 36 DOOR WOOD FAIR VARNISHED BROWN BREAK RM.; N DOOR Negative 0.3 0

37 WALL BRICK FAIR WHITE W WALL Positive 0.3 1.7 38 WALL BASE CONCRETE FAIR WHITE S WALL Positive 0.3 2.1 39 STAIR COLUMN WOOD FAIR WHITE CENTER STAIR COLUMN Negative 0.3 0 40 WINDOW WOOD FAIR WHITE E WINDOW Negative 0.3 0 41 WINDOW CASING WOOD FAIR WHITE E WINDOW Negative 0.3 0 42 STAIR HANDRAIL WOOD FAIR GRAY STAIRS Negative 0.3 0 43 WALL DRYWALL FAIR WHITE STAIRS TO 2ND FLOOR; N WALL Negative 0.3 0 44 CEILING WOOD FAIR WHITE CEILING Negative 0.3 0.06

45 WALL BRICK FAIR WHITE E WALL Negative 0.3 0.05 46 WINDOW CASING WOOD FAIR LIGHT BLUE E WALL Positive 0.3 21.2 47 WINDOW WOOD FAIR LIGHT BLUE E WALL Negative 0.3 0 48 WALL DRYWALL FAIR LIGHT BLUE S WALL Negative 0.3 0.02 49 BASEBOARD WOOD FAIR LIGHT BLUE S WALL Negative 0.3 0 50 CEILING WOOD FAIR WHITE CEILING Null 0.3 0.02 51 CEILING WOOD FAIR WHITE CEILING Negative 0.3 0.05

52 WINDOW WOOD POOR LIGHT GREEN W WALL; OUTSIDE RM. 101-7 Positive 0.3 2 53 WINDOW CASING WOOD POOR GREEN W WALL; OUTSIDE RM. 101-7 Negative 0.3 0.11 54 WINDOW SCREEN WOOD POOR GREEN W SIDE; OUTSIDE RM. 101-7 Negative 0.3 0 55 WINDOW TROUGH CONCRETE POOR PINK W WALL; OUTSIDE RM. 101-7 Null 0.3 0.02 56 WINDOW TROUGH CONCRETE POOR PINK W WALL; OUTSIDE RM. 101-7 Null 0.3 0 57 WINDOW TROUGH CONCRETE POOR PINK W WALL; OUTSIDE RM. 101-7 Negative 0.3 0.01 58 WINDOW WOOD POOR LIGHT GREEN W WALL; OUTSIDE RM. 108 Positive 0.3 0.8

Exterior Building

Interior Building - Basement

Interior Building - Second Floor

05/26/2015 ALL CONSULTING TEAM 2

Action Level

(mg/cm2)

Results PbC

(mg/cm2)

59 WINDOW CASING WOOD POOR GREEN W WALL; OUTSIDE RM. 108 Negative 0.3 0.07 60 WINDOW SCREEN WOOD POOR GREEN W SIDE; OUTSIDE RM. 108 Negative 0.3 0 61 WINDOW TROUGH CONCRETE POOR PINK W WALL; OUTSIDE RM. 108 Negative 0.3 0 62 CRAWL SPACE WINDOW VENT WOOD POOR GREEN W SIDE Negative 0.3 0 63 WALL BASE CONCRETE POOR BURGUNDY E WALL Negative 0.3 0.01 64 WINDOW WOOD POOR LIGHT GREEN N SIDE; BASEMENT WINDOW Positive 0.3 6.9 65 WINDOW CASING WOOD POOR GREEN N SIDE; BASEMENT WINDOW Null 0.3 0.18 66 WINDOW CASING WOOD POOR GREEN N SIDE; BASEMENT WINDOW Negative 0.3 0.04 67 WINDOW SCREEN WOOD POOR GREEN N SIDE; BASEMENT WINDOW Negative 0.3 0.02 68 WINDOW TROUGH CONCRETE POOR PINK N SIDE; BASEMENT WINDOW Negative 0.3 0.03 69 WINDOW TROUGH CONCRETE POOR PINK N SIDE; BASEMENT WINDOW Null 0.3 0.01 70 WINDOW TROUGH CONCRETE POOR PINK N SIDE; BASEMENT WINDOW Negative 0.3 0.03 71 DOOR CASING WOOD POOR GREEN N WALL; BREAK RM. ENTRANCE Positive 0.3 5.6 72 DOOR FRAME WOOD POOR LIGHT GREEN N WALL; BREAK RM. ENTRANCE Positive 0.3 5.9 73 HANDRAIL METAL POOR BLACK N SIDE ENTRANCE Negative 0.3 0 74 WALL BASE CONCRETE POOR BURGUNDY N WALL Negative 0.3 0 75 WINDOW WOOD POOR LIGHT GREEN S WALL; OUTSIDE CONFERENCE RM. Positive 0.3 6.1 76 WINDOW CASING WOOD POOR GREEN S WALL; OUTSIDE CONFERENCE RM. Negative 0.3 0.03 77 WINDOW SCREEN WOOD POOR GREEN S SIDE; OUTSIDE CONFERENCE RM. Negative 0.3 0 78 WINDOW TROUGH CONCRETE POOR PINK S WALL; OUTSIDE CONFERENCE RM. Negative 0.3 0 79 DOOR METAL POOR LIGHT GREEN S WALL; MAIN ENTRANCE Negative 0.3 0 80 DOOR CASING WOOD POOR GREEN S WALL; MAIN ENTRANCE Negative 0.3 0.12 81 WINDOW WOOD POOR LIGHT GREEN S WALL; MAIN ENTRANCE; UPPER DOOR Null 0.3 0.05 82 WINDOW WOOD POOR LIGHT GREEN S WALL; MAIN ENTRANCE; UPPER DOOR Positive 0.3 8.3 83 HANDRAIL METAL POOR BLACK S SIDE; MAIN ENTRANCE Negative 0.3 0 84 SOFFIT WOOD POOR GREEN S SIDE Positive 0.3 6.1 85 FASCIA WOOD POOR LIGHT GREEN S WALL Positive 0.3 5.3 86 SOFFIT WOOD POOR GREEN N SIDE Positive 0.3 5.1 87 FASCIA WOOD POOR LIGHT GREEN N WALL Positive 0.3 5.4 88 ATTIC VENT CASING WOOD POOR GREEN E WALL Positive 0.3 5.4 89 ATTIC VENT METAL POOR LIGHT GREEN E WALL Positive 0.3 6.7

05/26/2015 ALL CONSULTING TEAM 3

Action Level

(mg/cm2)

Results PbC

(mg/cm2)

90 CALIBRATION N/A 0.3 1.1

91 CALIBRATION N/A 0.3 1

92 CALIBRATION N/A 0.3 1

Null - Any result of "null" in the table above indicates that an inconclusive measurement was obtained with the XRF analyzer, and was therefore repeated in the same location until a measurement was obtained.

05/26/2015 ALL CONSULTING TEAM 4

ATTACHMENT 2

Asbestos Survey Report

COMPREHENSIVE ASBESTOS SURVEY

BUILDING 128

FORT BLISS, TEXAS 79916

Prepared for:

U.S. Army Corps of Engineers

Tulsa District

Prepared by:

ALL Consulting, LLC 1718 S. Cheyenne Ave.

Tulsa, OK 74119

Inspection Start Date:

May 26, 2015

ENCON International, Inc.

7307 Remcon Circle, #103

El Paso, TX 79912

L&P Scientific Consulting, LLC 6400 Airport Rd., Bldg. B, #J

El Paso, TX 79925

COMPREHENSIVE ASBESTOS SURVEY

Ft. Bliss, Bldg. 128

PURPOSE

The ALL Consulting Team was contracted by the U.S. Army Corps of Engineers (USACE), Tulsa

District, to perform comprehensive Hazardous Building Materials Surveys to identify the presence of any asbestos or lead paint at a number of buildings at Ft. Bliss, Texas. This project also included the development and population of a database to store the survey reports for access by the Ft. Bliss

Directorate of Public Works (DPW), and others. The buildings that are included within this contract scope of work include buildings at McGregor Base Camp and Doña Ana Base Camp within the New Mexico portion of Ft. Bliss, in addition to the Ft. Bliss buildings within Texas.

BACKGROUND

Ft. Bliss has a large number of buildings constructed before 1990 when the use of asbestos and lead paint was prevalent in construction of buildings. Because these materials may still exist within these buildings, Ft. Bliss is required to identify (asbestos or lead containing materials), assess the condition (stable or deteriorating), determine the nature of building materials (i.e., drywall or floor tile), and the extent of these hazardous substances. In accordance with the Clean Air Act (40 CFR

61 Subpart M, Asbestos), any renovation, remodeling or demolition of any structure, (i.e., buildings, facilities, etc.), shall be surveyed for ACMs and properly abated prior to any disturbance of the material.

INTRODUCTION

The facilities selected for this project were provided to the ALL Consulting Team by USACE, Tulsa District. The selected facilities were located in four (4) geographic areas: Ft. Bliss main post, Biggs Field (now known as East Bliss), McGregor Range, NM, and Doña Ana Range, NM.

Records were available for some of these buildings where previous partial or complete inspections had been performed. When available, prior asbestos reports were referenced to enhance the thoroughness of the asbestos inspection performed for this facility. The goal of this project was to provide a comprehensive inspection of the designated facilities, but destructive sampling was not authorized. Therefore, on rare occasion some ACMs may be hidden behind walls, under subfloors, or located in other areas that were inaccessible to the inspector. If or when any building is to undergo demolition, an additional investigation should be undertaken in which destructive sampling is authorized.

REGULATORY STANDARDS

Asbestos in building materials is regulated on the federal level by the Environmental Protection

Agency (EPA), and the Occupational Safety and Health Administration (OSHA). On the state level, Texas also has regulations pertaining to sampling and abatement of asbestos in buildings.

The inspection was conducted to ensure compliance with National Emission Standards for

Hazardous Air Pollutants (NESHAP) – 40 CFR Part 61, Subpart M, which states that “prior to the commencement of the demolition or renovation, thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation(s) will occur for the presence of asbestos, including Category I and Category II non-friable ACM.” Regulated asbestos containing materials have been designated as RACM. Asbestos Inspectors for both Texas and New Mexico facilities were trained under the EPA AHERA (40 CFR 763) standards. For facilities in the State of Texas, the Texas Asbestos Health Protection Rules (TAHPR) were complied with, which specify inspector licensure and a minimum of three (3) samples for each homogeneous area. In New

Mexico, facilities were sampled under the applicable regulations from the EPA, 40 CFR 61.

FACILITY DESCRIPTION

Building 128 was occupied and had been used as administration offices on Fort Bliss, Texas.

Description of this building is presented in Table 1 below:

TABLE 1 – BUILDING DESCRIPTION

Building Items Description Area of building 3,840 square feet Date of Construction 1893 Number of floors Three (3) floors Exterior wall materials Concrete Roof type Pitched Roof material Wood Interior walls Drywall, brick Interior floors Wood, concrete Interior floor coverings 12x12 vinyl tile, carpet Ceilings Wood, 2x4 ceiling tiles Notes:

FUNCTIONAL AREAS

Functional areas were areas (or groups of areas), within a structure or facility that were constructed to have the same use or purpose, constructed of the same materials, and were relatively the same age. A general administrative area, or several identical buildings within a facility, could typically be considered a single functional area.

The functional area(s), or purpose, of this facility was identified as follows:

“Administration Offices”

HOMOGENEOUS AREAS

Within functional areas, homogeneous areas were determined. Homogeneous areas are areas of surfacing material, thermal system insulation (TSI), or miscellaneous materials that were uniform in color, texture, substrate, and were relatively of the same age. Table 2 below lists the homogeneous areas and the general locations where they were identified.

TABLE 2 - Homogeneous Areas and Locations Identified

# Homogeneous Areas (Suspect Materials) Location

1 Tan texture drywall materials Conference room, small corridor, main corridor 2 Carpet mastic Conference room, room 108, main corridor 3 Light green texture drywall materials Break room, room 101-3, room 101-6 4 2x4 ceiling panel Conference room, room 101-7, break room 5 Brown texture drywall materials Room 108, locker room/restroom 6 Ceiling drywall Break room 7 12” light brown floor tile and mastic Information management, break room 8 Original ceiling tile Conference room 9 12” tan with specks floor tile and mastic Locker room top layer

10 12” floor tile and mastic Locker room/restroom bottom layer 11 Wall plaster Locker room 12 Carpet mastic Basement stairs, 2nd floor 13 Exterior perimeter window caulking Throughout exterior windows 14 Exterior window glazing Throughout exterior windows 15 Exterior perimeter door caulking Throughout exterior doors 16 Roofing materials Roof top 17 Roof penetration sealant Roof top

SAMPLING METHODOLOGY

The building materials survey tasks were performed in accordance with the Final Hazardous

Building Materials Surveys, Sampling Plan, Fort Bliss, Texas, December 2014, prepared by ALL

Consulting and ENCON International, Inc. A visual inspection of the building was conducted to develop a sampling strategy. This task included determining both functional areas and homogeneous areas / materials, as well as sample collection locations. Friability was assessed by manually manipulating the suspect asbestos materials utilizing hand pressure to determine if the materials, when dry, could be crumbled, pulverized, or reduced to powder. Seventeen (17) homogeneous areas were established and at least three (3) samples were collected from each area to adequately identify accessible asbestos in the facility. Portions of the subject building that had suspect asbestos-containing surfacing, thermal system insulation, or miscellaneous materials were divided into homogeneous areas for sampling. These samples were each uniquely and individually identified and logged into a chain of custody document and prepared for shipment to a third-party, independent laboratory for analysis. Building materials that were not considered suspect ACM included the following; concrete, metal, glass, asphalt, plastic, and wood. Destructive sampling was not authorized or performed to locate hidden or inaccessible materials.

Fifty-one (51) samples were collected and submitted for laboratory analysis. Bulk sample analyses were conducted utilizing polarized light microscopy (PLM), as per EPA Test Method 600/R-

93/116. This method separates the sample material into various layers based on their morphology, and then identifies the presence of the different asbestos fibers in each of these layers when detected. The analysis was performed Crisp Analytical Laboratories, LLC, located in Carrollton, TX. The term ACM is defined as a material that contains greater than 1% of any asbestos type including Chrysotile, Amosite, Crocidolite, Tremolite, Anthophyllite, and Actinolite, or combinations of these materials. Asbestos materials were determined as recommended in the July

1993 EPA/600/R-93/116 document titled, "Method for the Determination of Asbestos in Bulk

Building Materials." Copies of the asbestos laboratory test results and related laboratory documentation have been provided in Appendix B of this Report.

LABORATORY ANALYSIS

The sample collection and subsequent laboratory analysis indicated that asbestos was identified in the building material listed below. The NESHAPS definitions were used to define the condition of ACMs, per 40 CFR 61, Subpart M.

TABLE 3 – Identified Asbestos Containing Materials (> 1%) Sample

No.

Homogeneous Areas (Containing ACM)

Approx.

Qty.

Location Condition (friable, cat, damaged)

28-30 12” floor tile and mastic 160 SF Locker room / restroom bottom layer

Non-friable, Category I, Good

QUALIFICATIONS

This Comprehensive Asbestos Survey was performed by Inspector Miguel Dominguez on May

26, 2015, and was conducted in accordance with the EPA National Emission Standards for

Hazardous Air Pollutants (NESHAP): 40 CFR Part 61, Subpart M. Sampling protocols were performed in accordance with the AHERA. The Inspector has received training under the AHERA required Inspector Course and has received annual refresher training within the past year.

LIMITATIONS

The overall purpose of this Comprehensive Asbestos Survey was to identify if ACM was present, within the qualifications and limitations summarized below. Reliance on this report is specifically limited to gathering initial information regarding the presence of asbestos in building materials.

Any time that asbestos containing building materials may be identified during the performance of an asbestos survey, the owner of the building is responsible to the occupants and to the public to manage these materials properly, per Local, State and Federal regulations. Prior to the abatement or removal of any ACMs, an asbestos project design should be properly created, by a qualified asbestos consulting firm, 1) to ensure that materials will be properly managed, and 2) to prepare a more accurate estimate of materials to be abated. This Survey Report was specifically prepared for ALL Consulting’s Client (USACE and Ft. Bliss), and the extent of liability incurred is limited to the amount of the Report Fee paid by its Client. The USACE agrees that ALL Consulting cannot be held responsible for any liability based on reliance of this report by any third party for any business reasons.

CONCLUSIONS:

1. The ALL Consulting Team was retained by the USACE to perform a Comprehensive

Asbestos Survey at the subject building facility located within Ft. Bliss.

2. The survey for the subject building was successfully completed, as required, per State and

Federal environmental standards. Refer to Table 1 for building details.

Sample No.

Homogeneous Areas (Containing ACM)

Approx.

Qty.

Location Condition (friable, cat, damaged)

37-39 Exterior perimeter window caulking 250 LF Throughout exterior windows Non-friable, Category I, Good

44, 45 Exterior perimeter door caulking 60 LF Throughout exterior doors Non friable, Category I, Good

3. One (1) functional area was identified for this facility.

4. Suspect ACMs were potentially identified in seventeen (17) homogeneous areas at the subject building. Refer to Table 2 for a listing of homogeneous areas.

5. A total of fifty-one (51) suspect ACM samples were collected from either the building interior, building exterior, or the roof, and were properly analyzed by an independent, qualified third-party laboratory. Refer to the Appendices for details regarding positive sample locations and descriptions.

6. A review of the laboratory test results indicated that ACMs were identified at the subject building. Refer to Table 3 for a listing of any identified ACMs.

7. ACMs were identified in three (3) homogeneous areas at the subject building. Refer to the

Appendices for details regarding positive sample locations and descriptions.

8. Ft. Bliss is responsible for properly managing the ACMs at the subject building.

9. Prior to any renovation or demolition activities, asbestos related activities will need to be performed by properly licensed personnel. ACMs should not be disturbed by unlicensed and / or untrained personnel.

10. In the unlikely event that additional “hidden suspect ACMs” are encountered during any future renovation or demolition activities, then further sampling and lab analysis will be required. Ft. Bliss DPW personnel should be notified immediately for public safety and environmental compliance actions to properly manage any confirmed additional

ACMs.

11. Any Asbestos Project Designs must be prepared by a Texas licensed Asbestos Consulting

Firm.

12. Proper 10-day advance NESHAP notification should be made to the appropriate authorities prior to disturbance of any ACMs. Such disturbance includes abatement activities, building renovations, routine operation & maintenance activities, or any planned demolition in facilities or public buildings.

13. If disturbance of ACMs is anticipated, then these materials shall be properly removed in advance by licensed and trained personnel, as required by State and Federal regulations.

14. Abatement activities should be performed by a licensed Asbestos Abatement Contractor, with project management and air monitoring support by a licensed Asbestos Consulting

Firm.

Contact the personnel listed below with any clarifications that may be needed.

Inspected by: Reviewed by: Reviewed by:

Miguel Dominguez Alex Woelper, P.E., RPIH David Epperly, Ph.D., P.E.

Asbestos Inspector Environmental Consultant Project Manager L&P Scientific, LLC ENCON International, Inc. ALL Consulting, LLC License # 10-5321

APPENDICES:

A. Asbestos Drawing(s) B. Laboratory Documentation

APPENDIX A

Asbestos Drawing(s)

Project: #139-14

Hazardous Materials Surveys

Draw by:

FO

Location:

Building # 128 Fort Bliss, TX

L & P address and phone # (915)838-1188 Sheet

ENV-1

Date:

6/4/15

ENCON and L & P Team

NOT TO SCALE

N

6400 Airport Rd. Bldg B - Ste. J, El Paso, Tx

Asbestos Sample Locations - First Floor

Positive Asbestos Sample Locations## ## Asbestos Sample Locations

Ft. Bliss Installation

Rm 108

Rm 101-7 Rm 101-6

Rm 101-8

Rm 101-9

Rm 101-1

Rm 101-3

Room Break Room

Information Management

Rm 104LockerRm

Main Corridor

C en te r

C or rid or

Small Corridor

Room

Conference

06 07

27 28

Roof Top

101-5

Basement

2nd Floor

Project: #139-14

ALL CONSULTING TEAM

Hazardous Materials Surveys

Draw by:

FO

Location:

Building # 128 Fort Bliss, TX

L & P address and phone # (915)838-1188 Sheet

ENV-1

Date:

6/4/15

ENCON and L & P Team

NOT TO SCALE

N

6400 Airport Rd. Bldg B - Ste. J, El Paso, Tx

Asbestos Sample Locations - 2nd Floor & Basement

Positive Asbestos Sample Locations## ## Asbestos Sample Locations

Ft. Bliss Installation

101-7 101-6

101-8

101-9

101-1

101-3

Room Break Room

Information Management

104Locker 101-5

Main Corridor

N or th /S ou th

C or rid or

Small Corridor

Room

Conference

Project: #139-14

ALL CONSULTING TEAM

Hazardous Materials Surveys

Draw by:

FO

Location:

Building # 128 Fort Bliss, TX

L & P address and phone # (915)838-1188 Sheet

ENV-1

Date:

6/4/15

ENCON and L & P Team

NOT TO SCALE

6400 Airport Rd. Bldg B - Ste. J, El Paso, Tx

Asbestos Homogenous Area Locations - First Floor

Floor Tile Black Mastic/ Asbestos Homogenous Areas

Exterior Perimeter Door Caulking

Ft. Bliss Installation

N

Bottom Layer

Exterior Perimeter Window Caulking

Project: #139-14

Hazardous Materials Surveys

Draw by:

FO

Location:

Building # 128 Fort Bliss, TX

L & P address and phone # (915)838-1188 Sheet

ENV-1

Date:

6/4/15

ENCON and L & P Team

NOT TO SCALE

6400 Airport Rd. Bldg B - Ste. J, El Paso, Tx

Asbestos Homogenous Area Locations - 2nd Floor & Basement

Ft. Bliss Installation

N

Basement 2nd Floor

Floor Tile Black Mastic/ Asbestos Homogenous Areas

Exterior Perimeter Door Caulking

Bottom Layer

Exterior Perimeter Window Caulking

APPENDIX B

Laboratory Documentation

Attn:

Customer Project:

Reference #: Date: 05/28/15

Analysis and Method

Discussion

Qualifications

CA Labs Dedicated to Dedicated to Dedicated to Dedicated to QualityQualityQualityQuality

Crisp Analytical, L.L.C.

1929 Old Denton Road

Carrollton, TX 75006

Phone 972-242-2754

Fax 972-242-2798

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

Materials Characterization - Bulk Asbestos Analysis Laboratory Analysis Report - Polarized Light

L&P Scientific Consulting, LLC. Miguel Dominguez

6400 Airport Road, Bld B, STE J El Paso, TX 79925

15174, Fort Bliss Bldg 128

CAL15053807JE

Summary of polarizing light microscopy (PLM / Stereomicroscopy bulk asbestos analysis) using the methods described in 40CFR Part 763 Appendix E to Subpart E (Interim and EPA 600 / R-93 / 116 (Improved). The sample is first viewed with the aid of stereomicroscopy. Numerous liquid slide preparations are created for analysis under the polarized microscope where identifications and quantifications are preformed. Calibrated liquid refractive oils are used as liquid mouting medium. These oils are used for identification (dispersion staining). A calibrated visual estimation is reported, should any asbestiform mineral be present. Other techniques such as acid washing are used in conjugation with refractive oils for detection of smaller quantities of asbestos. All asbestos percentages are based on calibrated visual estimation traceable to NIST standards for regulated of asbestos. Traceability to measurement and calibration is achieved by using known amounts and types of asbestos from standards where analyst and laboratory accuracy are measured. As little as 0.001% asbestos can be detected in favorable samples, while detection in unfavorable samples may approach the detection limit of 0.50% (well above the laboratory definition of trace).

Vermiculite containing samples may have trace amounts of actinolite-tremolite, where not found be PLM should be analyzed using TEM methods and / or water separation techniques. Suspected actinolite/vermiculite presence will be indicated through the sample comment section of this report.

Fibrous talc containing samples may even contain a related asbestos fiber known as anthophyllite. Under certain conditions the same fiber may actually contain both talc and anthophyllite (a phenomenon called intergrowth). Again, TEM detection methods are recommended. CA Labs PLM report comments will denote suspected amounts of asbestiform anthophyllite with talc, where further analysis is recommended.

Some samples (floor tiles, surfacings, etc.) may contain fibers too small to be delectable by PLM analysis and should be analyzed by TEM bulk protocols.

A "trace asbestos" will be reported if the analyst observes far less than 1% asbestos. CA Labs defines "trace asbestos" as a few fibers detected by the analyst in several preparations and will indicate as such under these circumstances.

Quantification of <1% will actually be reported as <=1% (allowable variance close to 1% is high). Such results are ideal for point counting, and the technique is mandatory for friable samples (NESHAP, Nov. 1990 and clarification letter 8 May 1991) under 1% percent asbestos and the "trace asbestos". In order to make all initial PLM reports issued from CA Labs NESHAP compliant, all <1% asbestos results (except floor tiles) will be point counted at no additional charge.

CA Labs is accredited by the National Voluntary Accreditation Program (NVLAP) for selected test methods for airborne fiber analysis (TEM), and for bulk asbestos fiber analysis (PLM). CA Labs is also accredited by AIHA LAP, LLC. in the PLM asbestos field of testing for Industrial Hygiene. All analysts have a college degree in a natural science (geology, biology, or environmental science) or are recognized by a state professional board in one these disciplines .Extensive in-house training programs are used to augment education background of the analyst. The group leader of polarized light has received supplemental McCrone Research training for asbestos identification. Analysis performed at Crisp Analytical Labs, LLC 1929 Old Denton Road Carrollton, TX 75006

Dallas NVLAP Lab Code 200349-0 TEM/PLM TCEQ# T104704513-15-3 TDH 30-0235 AIHA LAP, LLC Laboratory #102929

Labs

A

C

Overview of Project Sample Material Containing Asbestos

Customer Project: 15174, Fort Bliss Bldg 128 CA Labs Project #: CAL15053807JE black mastic brown surfaced gray caulking

Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):

CA Labs Dedicated to Dedicated to Dedicated to Dedicated to QualityQualityQualityQuality

Crisp Analytical, L.L.C.

1929 Old Denton Road

Carrollton, TX 75006

Phone 972-242-2754

Fax 972-242-2798

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

Sample # Layer

Analysts Physical Description of Subsample black mastic

Asbestos type / calibrated visual estimate percent

List of Affected Building Material Types brown surfaced gray caulking

2% Chrysotile

S-37 37-1 brown surfaced gray caulking 2% Chrysotile

S-28 28-2

2% Chrysotile

Dallas NVLAP Lab Code 200349-0 TEM/PLM TCEQ# T104704513-15-3 TDH 30-0235

AIHA LAP, LLC Laboratory #102929 ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)

S-44 44-2

This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.

Polarized Light Asbestiform Materials Characterization

Customer Info: Attn: Customer Project:

05/28/15

5/27/15 10:00am

Phone # None Given

Fax #

Technical Manager

Chad Lytle

Jimmie Webster

Analyst

CA Labs Dedicated to Dedicated to Dedicated to Dedicated to QualityQualityQualityQuality

Crisp Analytical, L.L.C.

1929 Old Denton Road

Carrollton, TX 75006

Phone 972-242-2754

Fax 972-242-2798

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

Miguel Dominguez CA Labs Project #:

L&P Scientific Consulting, LLC.

15174, Fort Bliss Bldg 128

CAL15053807JE

6400 Airport Road, Bld B, STE J El Paso, TX 79925 Date:

Turnaround Time: Samples Received:

915-838-1188 24 Hours Date Of Sampling:

915-838-1166 Purchase Order #:

Sample # Com ment Layer

Analysts Physical Description of Subsample

Homo-geneo us (Y/N)

Asbestos type / calibrated visual estimate percent

Non-asbestos fiber type / percent

Non-fibrous type / percent

S-01 01-1 tan surfaced white compound n None Detected 100% mi,bi,ca

S-02 02-1 tan surfaced white compound n None Detected 100% mi,bi,ca

S-03 03-1 tan surfaced white compound n None Detected 100% mi,bi,ca

03-2 white drywall with brown paper n None Detected 14% ce 86% qu,gy

S-04 04-1 tan mastic y None Detected 100% gy,bi

S-05 05-1 tan mastic y None Detected 100% gy,bi

S-06 06-1 tan mastic y None Detected 100% gy,bi

Dallas NVLAP Lab Code 200349-0 TEM/PLM TCEQ# T104704513-15-3 TDH 30-0235

AIHA LAP, LLC Laboratory #102929 Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116). All samples received in good condition unless noted.

Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.

ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay) Approved Signatories:

Julio Robles QAC

Analyst Leslie Crisp, P.G.

1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers

2. Fire Damage no significant fiber damages effecting fibrous percentages

3. Actinolite in association with Vermiculite

4. Layer not analyzed - attached to previous positive layer and contamination is suspected

5. Not enough sample to analyze

6. Anthophyllite in association with Fibrous Talc

7. Contamination suspected from other building materials

8. Favorable scenario for water separation on vermiculite for possible analysis by another method

9. < 1% Result point counted positive

10. TEM analysis suggested

05/28/15

5/27/15 10:00am

Phone # None Given

Fax #

Technical Manager

Chad Lytle

Jimmie Webster

Analyst

CA Labs Dedicated to Dedicated to Dedicated to Dedicated to QualityQualityQualityQuality

L&P Scientific Consulting, LLC.

915-838-1188

Sample # Com ment

Layer

Crisp Analytical, L.L.C.

1929 Old Denton Road

Carrollton, TX 75006

Phone 972-242-2754

Fax 972-242-2798

CA Labs, L.L.C.

12232 Industriplex, Suite 32

Baton Rouge, LA 70809

Phone 225-751-5632

Fax 225-751-5634

Miguel Dominguez CA Labs Project #:

915-838-1166 Purchase Order #:

15174, Fort Bliss Bldg 128

CAL15053807JE

6400 Airport Road, Bld B, STE J El Paso, TX 79925 Date:

Turnaround Time: Samples Received:

Homo-geneo us (Y/N)

Asbestos type / calibrated visual estimate percent

Non-asbestos fiber type / percent

24 Hours Date Of Sampling:

Non-fibrous type / percent

S-07 07-1 green surfaced white compound n None Detected 100% mi,bi,ca

Analysts Physical Description of Subsample

07-2 white drywall with brown paper n None Detected 15% ce 85% qu,gy

S-08 08-1 green surfaced white compound y None Detected 100% qu,bi

08-2 white drywall with brown paper n None Detected 15% ce 85% qu,gy

S-09 09-1 green surfacing y None Detected 100% qu,bi

09-2 white…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .