AS OFFERED - Attachment 2 - QASP Solid Waste.pdf
PDF 269 KB Posted
- Attached to
- Berlin Lake Solid Waste Removal Services Federal contract opportunity
- Solicitation number
- W911WN23Q3006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911WN23Q3006-0001.pdf | ||
| W911WN23Q3006.pdf | ||
| AS OFFERED - Attachment 3 - Price Schedule.xlsx | XLSX spreadsheet | |
| AS OFFERED - Exhibit 2 - Dumpster Locations and Info.xlsx | XLSX spreadsheet | |
| AS OFFERED - Exhibit 1 - GIS Maps.pdf | ||
| AS OFFERED - Attachment 1 - Contract Deficiency Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 6
QUALITY ASSURANCE SURVEILLANCE PLAN
The Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this PWS. It is designed to provide an effective method of monitoring contractor performance.
The QASP provides a systematic method to evaluate the services the contractor is required to furnish.
The QASP is based on the premise the Government desires to maintain a quality standard in cleaning and maintaining of facilities. This service contract is the best means of achieving that objective.
The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.
In this contract the quality control plan is the driver for product quality. The contractor is required to develop a plan of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control plan approved at the beginning of the contract provides the measures needed to lead the contractor to success.
Once the quality control plan is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.
PERFORMANCE REQUIREMENT SUMMMARY
S m co
S co
P in co T tw ad in th th fi af C no If co TANDARD: The Contractor shall perform all work required by the task order in a satisfactory anner in accordance with the appropriate PWS paragraph. The COR shall not consider the task mplete until all deficiencies have been corrected.
URVEILLANCE: The Contracting Officer’s Representative (COR) will initiate or receive mplaints from Government personnel and pass them to the Contractor.
ROCEDURES: Any Government employee that observes unacceptable services, either complete or not performed, for any of the above performance objectives should immediately ntact the COR and the COR will complete appropriate documentation to record the complaint.
he COR shall verbally notify the Contractor about the complaint. The Contractor will be given enty four hours after verbal notification to correct the unacceptable performance at no ditional cost to the Government. If the Contractor disagrees with the complaint after vestigation of the site and challenges the validity of the complaint, the Contractor will notify e COR. The COR will conduct an investigation to determine the validity of the complaint. If e COR determines the complaint as invalid, he/she will document the written complaint of the ndings. The COR will retain the annotated copy of the written complaint for his/her files. If ter investigation the COR determines the complaint as valid, the COR will inform the ontractor and the Contractor will be given an additional hour to correct the defect. A defect will t be recorded if proper and timely correction of the unacceptable condition(s) is accomplished.
the complaint is still not corrected, the COR should contact the Contracting Officer and mplete DD Form 2772.